METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT”
Transcription
METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT”
METROUL S.A. Bucharest, ROMANIA METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER Ovidiu ARGHIROIU, PhD - Technical Director - BUCHAREST - MOBILITY EVOLUTION THE POPULATION - POSSIBLE EVOLUTION Population 1992 Annual growth rate Population 1998 Annual growth rate Population 2008 Annual growth rate Population 2015 2,067,545 - 0.42% 2,016,131 0.03% 2,042,100 0.51% 2,095,000 127,776 0.71% 133,305 0.70% 142,900 2.07% 165,000 Bucharest Metropolitan Area 2,195,321 - 0.35% 2,149,436 0.07% 2,165,000 0.62% 2,260,000 Active population 1,019,351 - 2.21% 891,685 0.83% 969,000 1.81% 1,098,800 Bucharest Inner Suburbs BUCHAREST - MOBILITY EVOLUTION IN METROPOLITAN AREA 2.15 million inhabitants account for 5.75 million transits/day 2.68 transits/day/inhabitant for all modes of transport 2.27 transits/day/inhabitant for mechanised modes DISTRIBUTION PER MODE Public transport Metro Tram 10.38% 22.79% Trolley Bus 6.81% 60.88% Private transport Bus Train Car 20.85% 0.06% 28.93% Maxi Taxi Taxi Others 0.31% 4.8% 39.12% 5.08% EXISTING METRO NETWORK Existing Metro Network represent about 2 - 3% from total public transport network length, but the weight of the metro travelers is about 20 - 25%. • TECHNICAL DATA: TUNNELS - 62.2 km double track STATIONS - 45 DEPOTS - 3 PARKING ZONE - 1 BUCHAREST METRO NETWORK In operation: Line 1: East - West Connection Line 2: North - South Connection Line 3: Northern Half-Ring Line 4: Nort-West Extension (Stg 1) In construction: North-West Extension (Stg 2) South-East Extension LINE 5 DRUMUL TABEREI - PANTELIMON IANCULUI PANTELIMON EROILOR UNIVERSITATE PARC DRUMUL TABEREI GHENCEA Existing Metro Network Line 5 Section 1: Drumul Taberei Universitate Line 5 Section 2: Universitate Pantelimon METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER 1st ROUTE OPTION 2nd ROUTE OPTION LINK AFTER “1 MAI” STATION (LINE 4). LINK IN “PIATA VICTORIEI” STATION (CONNECTION WITH LINES 2 & 3). METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER 1st ROUTE OPTION - LINK AFTER “1 MAI” STATION (LINE 4). METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER 1st ROUTE OPTION - LINK AFTER “1 MAI” STATION (LINE 4) – BANEASA AREA. METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER 1st ROUTE OPTION - LINK AFTER “1 MAI” STATION (LINE 4) – OTOPENI AREA. METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER No. Parameter 1. Total length – built [m] 13939 2. Total length – operation [m] 13794 3. Number of stations 4. Station total length – underground [m] 5. Total length (double railway equivalent) [m] 15049 6. Total length – tunnels (Shield Method) [m] 21783 7. Total length – galeries (Cut-and Cover Method), without Otopeni Parking Area [m] 8. Total length – acces to surface [m] 140 9. Length of Otopeni Parking Area [m] 302 10. Length of connection to National Railway [m] 600 14 2000 1st ROUTE OPTION - LINK AFTER “1 MAI” STATION (LINE 4). 1597 METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER 2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION (CONNECTION WITH LINES 2 & 3). METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER No. Parameter 1. Total length – built [m] 15793 2. Total length – operation [m] 15341 3. Number of stations 4. Station total length – underground [m] 5. Total length (double railway equivalent) [m] 16946 6. Total length – tunnels (Shield Method) [m] 23112 7. Total length – galeries (Cut-and Cover Method), without Otopeni Parking Area [m] 1997 8. Total length – acces to surface [m] 140 9. Length of Otopeni Parking Area [m] 302 10. 600 Length of connection to National Railway [m]2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION (CONNECTION WITH LINES 2 & 3). 19 2790 METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER Piata Victoriei 3 Piata 1 Mai Turda Domenii 2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER Expozitiei Parcul Copilului Piata Presei Libere Gara Baneasa 2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER Cartier Baneasa Gara Baneasa Aeroport “Aurel Vlaicu” - Baneasa Baneasa Institut 2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER Baneasa Meteo Padina Privighetorilor Otopeni Centura 2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER Otopeni Sud Otopeni Nord Otopeni Centru Aeroport “Henri Coanda” - Otopeni 2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION METRO LINK BETWEEN “OTOPENI INTERNATIONAL AIRPORT” AND BUCHAREST CITY CENTER 1st ROUTE OPTION - LINK AFTER “1 MAI” STATION (LINE 4). 2nd ROUTE OPTION - LINK IN “PIATA VICTORIEI” STATION (LINES 2 & 3). Total length – built [m] 13939 Total length – built [m] 15793 Total length – operation [m] 13794 Total length – operation [m] 15341 Number of stations Station total length – underground [m] 14 2000 Number of stations 19 Station total length – underground[m] 2790 Total length (double railway equivalent) [m] 15049 Total length (double railway equivalent) [m] 16946 Total length – tunnels (Shield Method) [m] 21783 Total length – tunnels (Shield Method) [m] 23112 Total length – galeries (Cut-and Cover Method), without Otopeni Parking Area [m] 1597 Total length – acces to surface [m] 140 Length of Otopeni Parking Area [m] 302 Length of connection to National Railway [m] 600 Total length – galeries (Cut-and Cover Method), without Otopeni Parking Area [m] Total length – acces to surface [m] 140 Length of Otopeni Parking Area [m] 302 Length of connection to National Railway [m] 600 1st ROUTE OPTION Total cost [EURO] - without VAT from where Construction works [EURO] without VAT Total length - built [km] Specific cost [EURO/km] - without VAT Internal rate of return - IRR [%] 1997 2nd ROUTE OPTION 764,630,008 943,364,573 569,912,511 723,607,447 13.939 15.793 54,855,442 59,733,083 9.88 11.02 METROUL S.A. Bucharest, ROMANIA THANK YOU !