PLACENTIA AVENUE UNDERCROSSING The Orange County Transportation Authority (OCTA) will construct a vehicle undercrossing at the intersection of Placentia Avenue and the Burlington Northern Santa Fe Railway. As part of the project, the roadway will be lowered to separate car traffic from train traffic. The undercrossing will be located between Crowther Avenue and State Route 57. During construction, Placentia Avenue will be open to travel in both directions, with cars traveling on a temporary roadway constructed just east of the current route while train traffic is realigned. AT A GLANCE When completed, the project will move cars safely and smoothly under the railroad tracks, enhancing safety and boosting mobility. PROJECT COST: $69 million CORRIDOR CITIES: Anaheim, Fullerton and Placentia COMMUNITY OUTREACH: Tresa Oliveri 714/560-5374 [email protected] WEBSITE: www.ocbridges.com FACEBOOK: facebook.com/ocbridges TWITTER: twitter.com/ocbridges CONSTRUCTION SCHEDULE Construction of the Placentia Avenue undercrossing began in early 2012 and is scheduled for completion in mid 2014. Work is scheduled so that adjacent crossings are not closed to drivers at the same time, and OCTA is working to reduce the effects of construction on the community. Some night work is anticipated throughout the project. SAFETY: OCTA’S TOP PRIORITY OCTA's highest priority is safety for its project workers and the public. During construction, please: • Slow down and watch for workers and equipment • Allow extra time to get to work, school and appointments Updated, 3/03/14 • Be extra careful when driving at night and in rainy weather • Avoid use of mobile phones orother distractions ER BLV Project Area D. Placentia KRAEM CHAP MAN AV E. Santa Fe Av e. BNSF RIGHT-OF-WAY Fender Ave. S UR NGE ORA • Be patient. Remember that this is a short-term inconvenience for a long-term traffic solution. PROJECT / MAJOR MILESTONE • Construct temporary bypass detour road for Placentia WTH CRO t. ose S Melr AVE. ENTIA PLAC MEA STATE COLLEGE BLVD. BNSF RIGHT-OF-WAY VE. ER A • Watch for closures and follow detours VE. PE A R THO Anaheim E The OC Bridges Program is partially funded by Measure M Orange County’s half-cent sales tax for transportation improvements. • Build railroad shoofly (detour) and shift rail traffic • Reconstruct Home Depot Way • Build new railroad bridge and shift rail traffic back • Construct new Placentia Avenue and remove bypass road PROJECT BENEFITS • Greater driver/pedestrian safety • Shorter emergency response times • Elimination of delays Orange County Transportation Authority • Easier business access 550 S. Main Street P.O. Box 14184 Orange, CA 92863-1584 (714) 560-OCTA www.octa.net • Enhanced economic vitality • Improved air/noise conditions • Better quality of life ANTICIPATED CONSTRUCTION SCHEDULE 2012 2011 2012 2013 2013 2014 2014 2015 2016 2017 2018 Placentia Avenue Kraemer Boulevard Orangethorpe Avenue Tustin Avenue / Rose Drive Lakeview Avenue Raymond Avenue State College Boulevard Schedule is estimated and subject to change. OC BRIDGES PROGRAM MAP YORBA LINDA BLVD. HW Y. BNSF R M 91 E. A AV ALM LA P 91 ST. LL S SSE GLA EAST Lead Agency: Orange County Transportation Authority Effective January 2011. Project area is approximate. Schedule is estimated and subject to change. 55 NO H A LR D. HR NC T. SUNKIST ST. STATE COLLEGE BLVD. Anaheim Lakeview Ave. A V E. Orangethorpe Ave. IN E. AV OMA IRAL IGHT-O TU ST ORA VD. R BL AVE. EME Placentia Ave. E. KRA LEMON ST. RPE E. LN AV LINCO AL HORPE AV WTH CRO THO NGE LA PALMA AVE. ERI ORANGET VE. ER A BNSF RIGHT-OF-WAY Raymond Ave. LAKEVIEW AVE. CHAP MAN AVE. Fullerton Tustin Ave./ Rose Dr. ROSE DR. RAYMOND AVE. E. IA AV Kraemer Blvd. Placentia Yorba Linda IMP 57 PLAC ENT Fullerton College STATE COLLEGE BLVD. State College Blvd. California State University Fullerton F-WAY