placentia avenue undercrossing - Orange County Transportation

Transcription

placentia avenue undercrossing - Orange County Transportation
PLACENTIA
AVENUE
UNDERCROSSING
The Orange County Transportation Authority (OCTA) will construct a vehicle
undercrossing at the intersection of Placentia Avenue and the Burlington Northern
Santa Fe Railway. As part of the project, the roadway will be lowered to separate car
traffic from train traffic. The undercrossing will be located between Crowther Avenue
and State Route 57.
During construction, Placentia Avenue will be open to travel in both directions, with cars
traveling on a temporary roadway constructed just east of the current route while train
traffic is realigned.
AT A GLANCE
When completed, the project will move cars safely and smoothly under the railroad
tracks, enhancing safety and boosting mobility.
PROJECT COST:
$69 million
CORRIDOR
CITIES:
Anaheim, Fullerton
and Placentia
COMMUNITY
OUTREACH:
Tresa Oliveri
714/560-5374
[email protected]
WEBSITE:
www.ocbridges.com
FACEBOOK:
facebook.com/ocbridges
TWITTER:
twitter.com/ocbridges
CONSTRUCTION SCHEDULE
Construction of the Placentia Avenue undercrossing began in early 2012 and is
scheduled for completion in mid 2014. Work is scheduled so that adjacent crossings
are not closed to drivers at the same time, and OCTA is working to reduce the effects of
construction on the community. Some night work is anticipated throughout the project.
SAFETY: OCTA’S TOP PRIORITY
OCTA's highest priority is safety for its project workers and the public. During
construction, please:
• Slow down and watch for workers and equipment
• Allow extra time to get to work, school and appointments
Updated, 3/03/14
• Be extra careful when driving at night and in rainy weather
• Avoid use of mobile phones orother distractions
ER BLV
Project
Area
D.
Placentia
KRAEM
CHAP
MAN
AV
E.
Santa
Fe Av
e.
BNSF RIGHT-OF-WAY
Fender Ave.
S
UR
NGE
ORA
• Be patient. Remember that this is a short-term inconvenience for a long-term
traffic solution.
PROJECT / MAJOR MILESTONE
• Construct temporary bypass detour road for Placentia
WTH
CRO
t.
ose S
Melr
AVE.
ENTIA
PLAC
MEA
STATE COLLEGE BLVD.
BNSF RIGHT-OF-WAY
VE.
ER A
• Watch for closures and follow detours
VE.
PE A
R
THO
Anaheim
E
The OC Bridges Program is partially funded by Measure M Orange
County’s half-cent sales tax for transportation improvements.
• Build railroad shoofly (detour) and shift rail traffic
• Reconstruct Home Depot Way
• Build new railroad bridge and shift rail traffic back
• Construct new Placentia Avenue and remove bypass road
PROJECT BENEFITS
• Greater driver/pedestrian safety
• Shorter emergency response times
• Elimination of delays
Orange County Transportation Authority
• Easier business access
550 S. Main Street
P.O. Box 14184
Orange, CA 92863-1584
(714) 560-OCTA
www.octa.net
• Enhanced economic vitality
• Improved air/noise conditions
• Better quality of life
ANTICIPATED CONSTRUCTION SCHEDULE
2012
2011
2012
2013
2013
2014
2014
2015
2016
2017
2018
Placentia Avenue
Kraemer Boulevard
Orangethorpe Avenue
Tustin Avenue / Rose Drive
Lakeview Avenue
Raymond Avenue
State College Boulevard
Schedule is estimated and subject to change.
OC BRIDGES PROGRAM MAP
YORBA LINDA BLVD.
HW
Y.
BNSF R
M
91
E.
A AV
ALM
LA P
91
ST.
LL S
SSE
GLA
EAST
Lead Agency: Orange County Transportation Authority
Effective January 2011. Project area is approximate. Schedule is estimated and subject to change.
55
NO
H
A
LR
D.
HR
NC
T.
SUNKIST ST.
STATE COLLEGE BLVD.
Anaheim
Lakeview Ave.
A V E.
Orangethorpe
Ave.
IN
E.
AV
OMA
IRAL
IGHT-O
TU
ST
ORA
VD.
R BL
AVE.
EME
Placentia Ave.
E.
KRA
LEMON ST.
RPE
E.
LN AV
LINCO
AL
HORPE AV
WTH
CRO
THO
NGE
LA PALMA AVE.
ERI
ORANGET
VE.
ER A
BNSF RIGHT-OF-WAY
Raymond Ave.
LAKEVIEW AVE.
CHAP
MAN
AVE.
Fullerton
Tustin Ave./
Rose Dr.
ROSE DR.
RAYMOND AVE.
E.
IA AV
Kraemer Blvd. Placentia
Yorba
Linda
IMP
57
PLAC
ENT
Fullerton
College
STATE COLLEGE BLVD.
State College Blvd.
California
State
University
Fullerton
F-WAY