DEDEMAN PARK
Transcription
DEDEMAN PARK
DEDEMAN PARK CONCEPT DEVELOPMENT PACK CONTENT Introduction ................................................................................................................. 02 Brand Promise ............................................................................................................. 03 Our Expertise ............................................................................................................... 05 Pre-Opening Support and Hotel Management ................................................ 06 Technical and Information Systems Support .................................................. 07 Building Design ............................................................................................................ 08 Design Principles ........................................................................................................ 10 Concept, Image and Location .................................................................................. 12 Exterior Rendering .................................................................................................... 13 Site Plan ........................................................................................................................... 14 01 Ground Floor Plan ....................................................................................................... 15 Basement Floor Plan .................................................................................................. 16 First Floor Plan ............................................................................................................ 17 Typical Guest Floor Plan ........................................................................................... 18 Front Elevation ............................................................................................................. 19 A-A Section .................................................................................................................... 20 B-B Section ..................................................................................................................... 21 Superior Room .............................................................................................................. 22 Deluxe Room ................................................................................................................. 26 Food & Beverage Concept ........................................................................................ 28 Staffing Levels ............................................................................................................... 31 INTRODUCTION The Dedeman Park Hotel concept has been developed as a “select” Service Hotel, with a brand new design approach that offers comfortable and affordable hospitality for both Corporate and Leisure travellers. This document will guide the developers/investors and architects/designers in assessing the feasibility of a new Dedeman Park Hotel. The information contained in this document relates to a model design for a New Build Property. Different sites will face different challenges and the model design may not be appropriate for all locations. 02 BRAND PROMISE One of Turkey’s Most Prestigious Companies. Founded in 1918, today, Dedeman Holdings is a group which is continuously growing and expanding. With tourism, mining and real estate investment as its main branches of business, it currently engages around 3000 employees. Dedeman Holdings, one of Turkey’s most prestigious companies, has a high national and international profile and a reputation for new enterprise. During its long establishment, it has made major investments and developments in all sector areas; technology, human resources, management and information systems. With hotels nationally and abroad, Dedeman Hotels & Resorts International is Turkey’s most widespread and preferred hotel chain. With the progress it has made in the last 10 years, Dedeman Hotels & Resorts International has successfully implemented its strategy of realizing new projects in locations that fit the dynamic profile of the company’s vision. Dedeman has followed a targeted course of expansion, opening hotels in major city centres and desirable resort destinations throughout Turkey and further abroad. With 19 hotels currently in Turkey, upscale hotels in Middle East cities, Asia and new European projects under development, Dedeman Hotels & Resorts International continues to play a leading role in the hospitality industry with the introduction of a new Brand; the DEDEMAN PARK HOTEL. The Dedeman Hotels & Resorts International hotel chain has a capacity of 5000 rooms offering hotel accommodation primarily in the corporate sector, underpinning the 5* conference facilities on offer with a capacity of 22,000 guests in 136 conference and meeting rooms. 03 ECO Friendly Aims Dedeman hotels have been increasingly run with an awareness of the environment, targeting waste reduction, recycling, water and energy conservation but with the new Dedeman Park Hotels, our targets will be in line with all top European and Middle Eastern hotels. Loyalty Program The Dedeman Park Hotels Loyal Club program is designed to reward frequent guests for their loyalty and each Hotel provides ‘Loyal Club’ points and benefits to all its members. Guest Satisfaction Tracking Systems Each Hotel participates in the Guest Satisfaction Tracking System (GSTS). GSTS is a solid tool to understand the key drivers of guest satisfaction during their hotel stay and as a result, determine which areas or services can be improved. The system is statistically reliable and offers Web-based customized hotel reporting with cross data to understand best practices and challenges. “İyi Geceler” (Good night sleep guaranteed) To further enhance our guests’ sleep experience, rooms will feature state of the art bedding. Our bedding comprises comfortable anti allergenic pillows, dust skirt, decorative pillows, mattress protectors, top quality sheets and comfortable duvets. BRAND PROMISE Conference Booking Efficiency – Our 3 hour booking guarantee Each hotel in the Group must honor the “3- Hour Response Guarantee” and send a written quotation within 24 hours. Each hotel must respond to all meeting enquiries within three hours of the hotel receiving the enquiry, or the Meeting Planner is entitled to 5% off the group’s master account once the meeting is booked. The response from the hotel must be directed to the person(s) who made the original enquiry unless otherwise indicated. An acceptable response from the hotel must: 1) Indicate that the hotel has received the enquiry. 2)Indicate available dates, space and rates. The 3-Hour Response Guarantee applies to all verbal and written meeting enquiries delivered to the hotel by the following means: telephone, fax, hand delivery, and any publicly-posted e-mail address. Each hotel is responsible for implementing procedures for handling after-hour enquiries. 04 OUR EXPERTISE • Pre-opening Support • General Hotel Management • Technical Assistance during Planning and Development of Hotel Real Estate Investment • Food and Beverage Concept Planning, Development and Operation • National, International and Regional Sales & Marketing Support • Central Reservation, Internet Systems and Revenue Management • Financial Services • Central Purchasing • Human Resources Management and Training • Guest and Employee Satisfaction Analysis • Information Systems Support 05 PRE-OPENING SUPPORT AND HOTEL MANAGEMENT As Dedeman Hotels & Resorts International, we provide the following support services during the pre-opening, opening and post-opening of the hotels whose management we adopt: • Development of critical path for pre-opening and opening of the hotel • Providing technical support to the standards of Dedeman Hotels & Resorts International • Providing Food and Beverage concept planning, development and operation • Preparation of a pre-opening budget and operational budget • Preparation and implementation of hotel management and auditing procedures and accounting systems • Preparation of the manning plan, selection of employment and implementation of training programs 06 • Preparation of risk management and insurance analysis • Defining the marketing strategy and the implementation of its application methods • Planning and implementation of the public relations activities • Implementation of sales, promotions and reservation procedures • Planning the grand opening ceremony • Determining the needs of hotel operating equipment, materials and uniforms • Management of the hotel in accordance with Turkish hospitality and international hotel management standards, and therefore accelerating the return on investment TECHNICAL AND INFORMATION SYSTEMS SUPPORT Technical Support In accordance with the standards of Dedeman Design and Construction; • Providing support in order to optimize the space planning • Providing guidance and support for the interior design of the rooms and public areas • Providing support for indoor materials selection • Providing support for mechanical and electrical systems • Providing support for fire, life & safety and emergency implementations 07 Information Systems Support • Installation, set-up and support of hotel management systems (PMS, accounting, stock control, POS) • Central reservation systems • Virus protection systems • SPA management systems • Infrastructure (Cabling, active and passive device selection-management) • Computer hardware selection • Printer hardware selection • Telephone exchange selection • Firewall selection and management • Door access card systems • Interactive TV systems (Application-support) • Licensing (Microsoft) • All kinds of hotel guidance systems • Secure wireless internet access • Uninterruptible power supply systems (UPS) BUILDING DESIGN Sizes and Facilities Dedeman Park Hotels will range between 100 rooms and 150 rooms and the information in this document gives details on building areas required up to 100 rooms. The ‘Working’ Zone is located in the Lobby near the Reception Desk and offers printing, faxing and scanning facilities as well as 1 PC and Printer for the Guest/s Usage. A Remote Printer is available to the Hotels Guest/s for easy access to printing. Lobby Bar : 20 pax Restaurant : 60 pax - Direct access from outside and the Hotel Lobby. Meeting Room (small): 30 sqm Meeting Room (big) : 100 sqm Multi Purpose Room is subject to Market Demands Gymnasium : 50 sqm Total Building Space : 5300 sqm Public Areas Lobby & Vestibule & Bakk-al Restaurant Bar/Lounge Break Out Meeting Room A Meeting Room B Circulation to Meeting rooms 08 sqm 100 150 60 40 30 100 74 Working Zone 6 Public Telephones 2 Public Restrooms 50 Luggage Storage 5 Gym50 Total Public Area (including circulation) 734 sqm Back of House sqm Kitchen 150 (Including buffet, Food & Beverage store, prep dish wash, service station and pantry) Food & Beverage Storage 25 Laundry Linen Room 50 Laundry/Dry Cleaners (subject to location) General Storage 45 Employee Dining Room and Lockers 40 Employee Break Room 40 Meeting Room Storage 20 Garbage Area 7 Plant Room 250 Engineering Store 10 Service Corridor 48 Total Back of House (including circulation) 685 sqm BUILDING DESIGN Administration sqm Front desk 10 Office 8 Office 8 Office 10 Corridor 12 Work Area 15 IT & PBX Equipment 13 Total Administration (including circulation) 76 sqm Guest Room & Support Total Guest Room Area Total Guest Room Circulation Internal Stairs Elevator Shafts Housekeeping Floor Stores Mechanical Electrical Closets & Miscellaneous Guest Room & Support Total Program sqm 2478 500 210 15 84 15 3302 4797 sqm GROSS INTERNAL AREA ESTIMATE GROSS EXTERNAL BUILDING AREA ESTIMATE Gross External Area per Key Gross Internal Area per Key 09 5036 5276 52.76 sqm 50.36 sqm DESIGN PRINCIPLES Dedeman Park Hotels will be characterised by modern and welcoming exteriors, warm interior decor and facilities effectively designed with style. The Restaurant and Bar will provide a comfortable casual space for breakfast, snacks and dinner. The seating capacity is of no more than 60 persons. Design aims will focus on simplicity both of design and layout, looking towards a more contemporary comfort level for guests. There will be two small meeting rooms ranging between 30 sqm and 100 sqm. Dedeman Park Hotels will be catering directly to current guest expectation with a full Turkish breakfast and menu plus signature items, providing a Hotel experience that is unique yet economical, and offering optimum service and facilities at a highly attractive cost. All Dedeman Park Hotels will be environmentally conscious and will have a fully comprehensive ‘Green Plan’ for each hotel certified by the Local Authorities. Each entrance will have a pedestrian canopy, a revolving door with a secondary exit door. The Reception desk – two piece Welcoming Desk with a timber canopy-like ceiling above and is to referred to as a ‘Reception Capsule’ and to incorporate sales point for the “Bakk-al”. The “Bakk-al” is a retail area with a selection of snacks, alcoholic and nonalcoholic beverages and emergencies supplies can be purchased by the guests as there is no Room Service in the Hotel. This outlet will be open 24/7 for guest convenience. Lobby Lounge Area is an area to relax separated from the Reception area with a sandblasted glass separator/partition (where possible). 10 A fitness centre for hotel guest use will be fitted with the latest Gymnasium Equipment. Room Amenities: • Spacious working desk with space for laptops • Adjustable lighting • Reading lamps over the bed/s • Electrical outlet and internet access at desk height • • • • • • • Two telephones (one line) Sitting area with armchair 26” flat screen television Iron and ironing board in each room In room safe, large enough for laptop with a plug Electronic locks on the bedroom doors Life safety systems throughout the Hotel (CCTV Coverage – Fire Alarm System – Sprinklers – Smoke Detectors) 30% of the Guest rooms will have King Size bed and the balance will be twin beds or to suit the Market. DESIGN PRINCIPLES All rooms will be identical in materials and finish, with the accent on good space planning and relaxing colour schemes. Rooms for disabled guests will be provided with an interconnecting bedroom. Internal floor area of the guest room area is 24 sqm. The rooms have suspended ceiling over the room foyer and bathroom with fan coil and wet area systems. Suspended ceiling heights will be 2,4 m and there will be no suspended ceiling of the bed area. Room foyer floor will be marble tiles and the bed area will be carpeted. The bathroom is separated from the bedroom area with semi transparent glazing partition, there will be a built-in shower area with a clear glass partition. The flooring will be marble tiles. Public areas of the Hotel are open, flexible and spacious. The kitchen and the “Bakk-al” facilities are placed to serve all public places without intercepting guest traffic. Lobby and Restaurant area has an extra height to provide a comfortable and air space with full height glazing. Meeting rooms have a separate foyer area to enhance their facilities where guests can relax. 11 CONCEPT, IMAGE AND LOCATION Concept and Image The Hotel will be distinguished with its simple but outstanding facade, in addition to its warm and comfortable interiors. Lobby, reception area and restaurant are designed to create a warm ‘invitation’. Meeting rooms will be comfortable, functional and fitted with the latest technology. 12 Location The Dedeman Park Hotels will be built in big cities around business parks and / or suburban areas, in secondary cities near city center to attract the corporate, transient and leisure business. EXTERIOR RENDERING 13 SITE PLAN SITE PLAN 14 GROUND FLOOR PLAN GROUND FLOOR PLAN 15 BASEMENT FLOOR PLAN BASEMENT FLOOR PLAN 16 FIRST FLOOR PLAN 1. FLOOR PLAN 17 TYPICAL GUEST FLOOR PLAN TYPICAL FLOOR PLAN 18 FRONT ELEVATION FRONT ELEVATION 19 A-A SECTION A-A SECTION 20 B-B SECTION B-B SECTION 21 SUPERIOR ROOM “KING BED PLAN” 24 m2 ROOM PLAN DEDEMAN PARK HOTEL - SUPERIOR ROOM - KING BED PLAN 22 SUPERIOR ROOM “KING BED MOOD BOARD” SHOWER WALL MARBLE MOSAIC BATHROOM FROSTED GLASS BATHROOM DEDEMAN PARK HOTEL SUPERIOR ROOM “KING” 23 SUPERIOR ROOM “TWIN BED PLAN” 24 m2 ROOM PLAN DEDEMAN PARK HOTEL - SUPERIOR ROOM - TWIN BED PLAN 24 SUPERIOR ROOM “TWIN BED MOOD BOARD” SHOWER WALL MARBLE MOSAIC BATHROOM FROSTED GLASS BATHROOM DEDEMAN PARK HOTEL SUPERIOR ROOM “TWIN” 25 DELUXE ROOM “KING BED PLAN” 30 m2 ROOM PLAN DEDEMAN PARK HOTEL - DELUXE ROOM - KING BED PLAN 26 DELUXE ROOM 27 FOOD & BEVERAGE CONCEPT The Restaurant will be an open area near the lobby where a full Turkish Breakfast, light lunch and dinner will be served. In a new departure, there will not be a room service provision at Dedeman Park Hotels; however a mini-fridge will be provided for guest use in rooms for storage of any items purchase at the ‘Bakk-al’ outlet. Lunch will be a limited snack type menu. Dinner concept will be developed to suit the region/area. The “Bakk-al”is a retail area which has a selection of fresh snacks, made daily in our kitchen, non-alcoholic and alcoholic drinks, fruit juices, soft drinks, water, chocolates, biscuits, chewing gum and emergency supplies for the convenience of the Hotel Guests. 28 MEETING ROOMS DEDEMAN PARK HOTEL MEETING ROOMS 29 BREAKFAST ROOM LOBBY-FOYER DEDEMAN PARK HOTEL GROUND FLOOR BREAKFAST ROOM - LOBBY - FOYER 30 STAFFING LEVELS The Dedeman Park Hotels are operated on multi-tasking staffing which is the key to the success of these Hotels. It gives the opportunity for the individual employees to increase their knowledge of all aspects of the Hotel by multi tasking which is great opportunity for their developments. The Hotels operate on a ratio of 0.33 employee per key (Room). 31 Yıldız Posta Caddesi, 48 Esentepe 34340 Istanbul-Turkey Phone: +90 212 337 39 00 Fax: +90 212 356 19 50 [email protected] www.dedeman.com