Atlantic Entrance Deepening & Widening Volume: 15.6 M m3 RFP Issued: February 27, 2009 Site Visit: April 29, 2009 Pre Bid Conference: April 30, 2009 Proposals received: September 10, 2009 Awarded to: Jan de Nul NV Date of award: September 25, 2009 Awarded amount: $89,617,317 Option: Additional 60 cm in depth $16,411,600 End of project: May 2013 Width: 225m (740´) ▶ Programmed 1.3% Current 1.3% Reforestation Projects in Execution PAC-1 / Camino de Cruces National Park (Panama) 65% PAC-2 / Campana National Park (Panama/ West) 65% 45% PAC-3 / ANAM Forest Research Center (Chiriqui) PAC-3 / Gral. Omar Torrijos National Park (Piedras Gordas – Cocle) 42% PAC-2 / Gral. Omar Torrijos National Park (Bajo Grande/Ojo de Agua–Cocle) 42% Gatun Lake Dredging / Baru Volcano National Park (Chiriqui) 34% PAC-3 / Chagres National Park (Panama-Quebrada Oscura) 32% 30% PAC-2 / Gral. Omar Torrijos National Park (La Rica/Caño Sucio–Cocle) 0 Baru Volcano National Park 30 Ha Campana National Park 30 Ha 10 20 30 40 Gral. Omar Torrijos National Park 180 Ha 60 Chagres National Park 40 Ha Camino de Cruces National Park 115 Ha Forest Research Center 50 Ha Rev. Oct-30 50 70 80 90 100 Major contracts under Procurement Pacific Access Channel - Phase 4 26 M m3 of Dry Excavation Tender Tender Documents Documents published published on on July July 31, 31, 2009 2009 •• Site Site Visit: Visit: August August 25, 25, 2009 2009 Programmed 2% Current 2% •• Pre Pre tender tender Meeting: Meeting: August August 26, 26, 2009 2009 •• Bid Bid receiving: receiving: December December 3, 3, 2009 2009 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% PAC PAC 3 3 PAC PAC 4 4 PAC PAC 2 2 PAC PAC 1 1 ELEVATION Borinquen Dam 140 140 110 110 PAC-1 PAC-1 80 50 PAC-2 PAC-2 20 80 50 PAC-3 PAC-3 PAC-4 PAC-4 20 - 10 - 10 - 40 - 40 0+175 0+675 1+175 1+675 2+175 2+675 3+175 3+675 4+175 4+675 5+175 5+675 6+175 6+675 7+175 Borinquen Dam Pacific Locks Access Channel Rock Clay Core Miraflores Lake Summary Schedule of Main Projects with Baseline and Contingency as of October 2009* % Dredging Access Channel Locks Activity Progress Specifications and Locks Models 100% Design & Build Post-Panamax Locks <1% Excavation Contract 1 98% Excavation Contract 2 91% Excavation Contract 3 39% Excavation Contract 4 and Dams 2% Dredging of the Pacific Entrance 48% Deepening and Widening of Gatun Lake and Deepening of Gaillard Cut 23% Dredging of the Atlantic Entrance 1% Increase Operating Level of Gatún Lake <1% 2007 06 4T 1T 2T 3T 4T 1T 2008 2T 3T 2009 4T 1T 2T 3T 4T 2010 1T 2T 3T 2011 4T 1T 2T 3T 2012 4T 1T 2T 3T 2013 4T 1T 2T 3T 4T 2014 1T 2T Expanded Canal Begins Operations Specifications and Design Bidding and Contracting Execution Baseline* Baseline Baseline * Baseline from December 31, 2006 including contingency. Contingency against baseline Beginning of operations 3T 4T Dry Excavation and Dredging Volumes 1909 1909 1886 Original Original Canal Canal Construction Construction Expansion Expansion Program Program 0 50 100 Cubic Meters in Millions 2008 2008 147 147 200 200 74 74 % % 150 200 250 2007 2007 Volume of Concrete to Build the Locks ◄ ◄ Existing Existing Locks Locks Original Original Canal Canal Construction Construction 3.4 3.4 Canal Canal Expansion Expansion Program Program 0 1 2 4.7 4.7 3 Concrete Concrete -- Cubic Cubic Meters Meters in in Millions Millions New New Locks Locks ► ► 4 138 % 5 6 Panama canal Expansion Program Pacific Locks Jorge Jorge L. L. Quijano Quijano Panama Panama Canal Canal Authority Authority November November 2009 2009