our corporate profile - Seabulk Offshore | Home

Transcription

our corporate profile - Seabulk Offshore | Home
Seabulk Offshore
Operators Nigeria Ltd
11A Grace Anjous Drive, Off Adebayo Doherty Way, Lekki Phase 1, Lagos
Tel: +234-1-9503758, +234 802 2901 094
email: [email protected]
web:www.seabulkng.com
1
Content
Vision
1. The Creation of SOONL
2. Who we are – Our Mission
3. Our Story
4. What we believe in
5. Our Vessels
6. Managed Vessels
7. Organogram
8. QHSE
9. Safety Record
10. Satisfied Clients
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
2
The Creation of SOONL
Vision
1998
Seabulk Offshore International was incorporated
with a Subsidiary in Nigeria known as
Seabulk Offshore Operators Nig. Ltd
Seacor Marine Inc bought over Seabulk Offshore
International Inc. Including Seabulk Offshore
Nigeria Ltd
2008
Seacor Marine Inc sold off Seabulk Offshore
Operators Nigeria Ltd to a group of Nigerians.
Due to local content policies, seabulk Nigeria
has continued to Operate as a fully Indigenous
Nigerian Company
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
3
Who We Are – Our Mission
Independent owned
Indigenous Company
Vision
The trusted marine service provider
continually building long term relationships with
major IOC’s
Own, operate and manage quality offshore
marine vessels (such as DP2 PSVs , AHTS and
high Speed FSIVs, ) to International standards
Continue to carry out quality maintenance
services in our workshop based in ONNE
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
4
The SOONL Story
SOONL was
incorporated as a
subsidiary of Seabulk
Offshore Inc
1998
• Ownership of SOONL is
transferred to the current
Nigerian owners
• SOONL acquires a Platform
supply vessel M/V Seabulk
Pennington (Platform Supply
Vessel)
2005
2005
20082008
Seacor Marine Inc
acquires seabulk
offshore Inc. Including
Its Nigerian subsidiary
• Opened our Corporate Head
quarters in Lagos
• Employed Wholly Nigerian
Crew for our fleet
• Established an Operational
base at FLT Onne equipped to
meet the needs of the industry
2011
2010
2009 2009 2010
• We acquire 2 Fast supply
Intervention vessel (M/V
SEABULK NIGER and M/V
SEABULK RAMOS) - FSIV’s
Acquired a state of the
art DP2 PSV, AL-KAT
(TBN – SEABULK
VICTOR)
Acquired 1 DP1 PSV
vessel (GALAXIE)
14 Years of providing Professional service
to the Oil and Gas Industry and
counting…….
2012
Core Values
The SOONL Guarantee
Vision
SOONL continually
invests in its People, to
provide a prompt and
efficient service while
maintaining IIndustry best
practices in compliance
with IMO,ISPS and local
content rules guiding the
maritime industry.
• All vessels (owned or managed) will be
manned by crew certified to conform with
relevant International standards and
regulations
• All health and safety regulations and
policies will be adhered to at all times
• Ensure processes are followed and
reporting provided to clients and ship
owners
• Work closely with clients and ship
owners to continually gain better
understanding of their needs
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
6
Our Vessels -Owned
Vision
Vision
• Year Built: 1978
• Year Built: 1997
• Year Built:1987
• Length Overall: 54.8m
• Length Overall: 67.1m
• Length Overall: 46m
• Engine/Power: 2 x 1,500 BHP
• Engine/Power: 2 x 1,950 BHP
• Engine/Power: 5x 700 BHP
• Passenger Capacity: 23 PAX
• Passenger Capacity: 24PAX
• Passenger Capacity: 56 PAX
• Class: ABS Certified
• Class: ABS Certified
• Class: ABS Certified
MV SEABULK PENNINGTON
– PSV, 3000 BHP
MV GALAXIE – DP1 PSV;
3900 BHP
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
MV SEABULK NIGER – FSIV;
56 PAX; 3,500 BHP; 17 KNOTS
7
Our Vessels -Owned
Vision
Vision
• Year
•AgeBuilt: 1990
• Year Built: 2011
•Dimensions
• Length Overall: 49m
•Engine/Power
• •Passenger
Engine/Power: 6 x 680 BHP
Capacity
• •Class
Passenger Capacity: 56 PAX
•Length Overall: 67.06m
•Engine/Power: 2 x 2,000 BHP
•DP 2 CLASS
• Class: ABS Certified
•Deck Space: 579.7M2
•Class: ABS
MV SEABULK RAMOS – FSIV; 56 PAX
4,080 BHP; SPEED: 19 KNOTS
MV AL-KAT (TBN – SEABULK VICTOR) –
DP2 PSV; 15 PAX
4,000 BHP; SPEED: 13 KNOTS
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
8
Our Vessels - Managed
Vision
Vision
Vision
• Year Built: 2004
• Year Built: 2003
• Year Built: 2002
• Length Overall: 53.80m
• Length Overall: 54m
• Length Overall: 51.8m
• Engine/Power: 4x 1,800 BHP
• Engine/Power: 4 x 1,800 BHP
• Engine/Power: 4 x 1,800 BHP
• Passenger Capacity: 23 PAX
• Passenger Capacity: 82 PAX
• Passenger Capacity: 74 PAX
MV KEITH .G . MCCALL – FSIV - 7,200
MV GLORIA .A . MCCALL – FSIV 7,200 BHP
MV Joyce MCCALL – FSIV - 7,200
BHP
BHP
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
9
Our Vessels - Managed
Vision
Vision
Vision
• Year Built: 1999
• Year Built: 2007
• Length Overall: 67m
• Length Overall: 68.90m
• Engine/Power: 2x 2,700 BHP
• Engine/Power: 2x 1800 BHP
2 X 2,400 BHP
• Passenger Capacity: 12 PAX
• Class: RINA Certified
• Class: RINA Certified
MV ASSO VENTUNO – DP1 PSV –
5,400 BHP
• Passenger Capacity: 21 PAX
MV ASSO VENTOTTO – DP1 AHTS –
11,400 BHP; 137 T BP
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
10
Organogram
CHAIRMAN
BOARD OF
DIRECTORS
Vision
Vision
Vision
MANAGING DIRECTOR
EXECUTIVE DIRECTOR
FINANCE/ADMIN
EXECUTIVE DIRECTOR
OPERATIONS
GENERAL MANAGER
HEAD
IT
HEAD
QHSE
SAFETY
OFFICER
BASE
SUPERINTENDENT
BASE
ENGINEER
HEAD
COMMERCIAL
MASTER/
CH. ENG
HEAD
PERSONNEL
ADMIN OFFICER
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
ACCOUNTANTS
ACCOUNTS
11
QHSE
.
SAFETY
FIRST
.
• Full commitment to the safety and health of all employees
Vision
• Protection of the environment
we live in is key for SOONL
Vision
• Fully compliant to the requirements of the ISM code
• Established safety management system that’s constantly
reviewed and assessed for effectiveness
• Strong staff training program to ensure all employees aim
for Zero injuries and incidents with an open communication
channel that allows any member of staff to escalate important
safety issues to the highest level of management
•
Clearly defined procedures for reporting accidents and
responding to emergency situations
•
Weekly safety audits and management reviews with direct
reporting to the managing director
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
12
Safety Record
Vision
Vision
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
13
Safety Record
Vision
Vision
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
14
Satisfied Clients
Vision
Vision
14 Years of providing Professional
service to the Oil and Gas Industry and
counting…….
15