our corporate profile - Seabulk Offshore | Home
Transcription
our corporate profile - Seabulk Offshore | Home
Seabulk Offshore Operators Nigeria Ltd 11A Grace Anjous Drive, Off Adebayo Doherty Way, Lekki Phase 1, Lagos Tel: +234-1-9503758, +234 802 2901 094 email: [email protected] web:www.seabulkng.com 1 Content Vision 1. The Creation of SOONL 2. Who we are – Our Mission 3. Our Story 4. What we believe in 5. Our Vessels 6. Managed Vessels 7. Organogram 8. QHSE 9. Safety Record 10. Satisfied Clients 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 2 The Creation of SOONL Vision 1998 Seabulk Offshore International was incorporated with a Subsidiary in Nigeria known as Seabulk Offshore Operators Nig. Ltd Seacor Marine Inc bought over Seabulk Offshore International Inc. Including Seabulk Offshore Nigeria Ltd 2008 Seacor Marine Inc sold off Seabulk Offshore Operators Nigeria Ltd to a group of Nigerians. Due to local content policies, seabulk Nigeria has continued to Operate as a fully Indigenous Nigerian Company 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 3 Who We Are – Our Mission Independent owned Indigenous Company Vision The trusted marine service provider continually building long term relationships with major IOC’s Own, operate and manage quality offshore marine vessels (such as DP2 PSVs , AHTS and high Speed FSIVs, ) to International standards Continue to carry out quality maintenance services in our workshop based in ONNE 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 4 The SOONL Story SOONL was incorporated as a subsidiary of Seabulk Offshore Inc 1998 • Ownership of SOONL is transferred to the current Nigerian owners • SOONL acquires a Platform supply vessel M/V Seabulk Pennington (Platform Supply Vessel) 2005 2005 20082008 Seacor Marine Inc acquires seabulk offshore Inc. Including Its Nigerian subsidiary • Opened our Corporate Head quarters in Lagos • Employed Wholly Nigerian Crew for our fleet • Established an Operational base at FLT Onne equipped to meet the needs of the industry 2011 2010 2009 2009 2010 • We acquire 2 Fast supply Intervention vessel (M/V SEABULK NIGER and M/V SEABULK RAMOS) - FSIV’s Acquired a state of the art DP2 PSV, AL-KAT (TBN – SEABULK VICTOR) Acquired 1 DP1 PSV vessel (GALAXIE) 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 2012 Core Values The SOONL Guarantee Vision SOONL continually invests in its People, to provide a prompt and efficient service while maintaining IIndustry best practices in compliance with IMO,ISPS and local content rules guiding the maritime industry. • All vessels (owned or managed) will be manned by crew certified to conform with relevant International standards and regulations • All health and safety regulations and policies will be adhered to at all times • Ensure processes are followed and reporting provided to clients and ship owners • Work closely with clients and ship owners to continually gain better understanding of their needs 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 6 Our Vessels -Owned Vision Vision • Year Built: 1978 • Year Built: 1997 • Year Built:1987 • Length Overall: 54.8m • Length Overall: 67.1m • Length Overall: 46m • Engine/Power: 2 x 1,500 BHP • Engine/Power: 2 x 1,950 BHP • Engine/Power: 5x 700 BHP • Passenger Capacity: 23 PAX • Passenger Capacity: 24PAX • Passenger Capacity: 56 PAX • Class: ABS Certified • Class: ABS Certified • Class: ABS Certified MV SEABULK PENNINGTON – PSV, 3000 BHP MV GALAXIE – DP1 PSV; 3900 BHP 14 Years of providing Professional service to the Oil and Gas Industry and counting……. MV SEABULK NIGER – FSIV; 56 PAX; 3,500 BHP; 17 KNOTS 7 Our Vessels -Owned Vision Vision • Year •AgeBuilt: 1990 • Year Built: 2011 •Dimensions • Length Overall: 49m •Engine/Power • •Passenger Engine/Power: 6 x 680 BHP Capacity • •Class Passenger Capacity: 56 PAX •Length Overall: 67.06m •Engine/Power: 2 x 2,000 BHP •DP 2 CLASS • Class: ABS Certified •Deck Space: 579.7M2 •Class: ABS MV SEABULK RAMOS – FSIV; 56 PAX 4,080 BHP; SPEED: 19 KNOTS MV AL-KAT (TBN – SEABULK VICTOR) – DP2 PSV; 15 PAX 4,000 BHP; SPEED: 13 KNOTS 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 8 Our Vessels - Managed Vision Vision Vision • Year Built: 2004 • Year Built: 2003 • Year Built: 2002 • Length Overall: 53.80m • Length Overall: 54m • Length Overall: 51.8m • Engine/Power: 4x 1,800 BHP • Engine/Power: 4 x 1,800 BHP • Engine/Power: 4 x 1,800 BHP • Passenger Capacity: 23 PAX • Passenger Capacity: 82 PAX • Passenger Capacity: 74 PAX MV KEITH .G . MCCALL – FSIV - 7,200 MV GLORIA .A . MCCALL – FSIV 7,200 BHP MV Joyce MCCALL – FSIV - 7,200 BHP BHP 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 9 Our Vessels - Managed Vision Vision Vision • Year Built: 1999 • Year Built: 2007 • Length Overall: 67m • Length Overall: 68.90m • Engine/Power: 2x 2,700 BHP • Engine/Power: 2x 1800 BHP 2 X 2,400 BHP • Passenger Capacity: 12 PAX • Class: RINA Certified • Class: RINA Certified MV ASSO VENTUNO – DP1 PSV – 5,400 BHP • Passenger Capacity: 21 PAX MV ASSO VENTOTTO – DP1 AHTS – 11,400 BHP; 137 T BP 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 10 Organogram CHAIRMAN BOARD OF DIRECTORS Vision Vision Vision MANAGING DIRECTOR EXECUTIVE DIRECTOR FINANCE/ADMIN EXECUTIVE DIRECTOR OPERATIONS GENERAL MANAGER HEAD IT HEAD QHSE SAFETY OFFICER BASE SUPERINTENDENT BASE ENGINEER HEAD COMMERCIAL MASTER/ CH. ENG HEAD PERSONNEL ADMIN OFFICER 14 Years of providing Professional service to the Oil and Gas Industry and counting……. ACCOUNTANTS ACCOUNTS 11 QHSE . SAFETY FIRST . • Full commitment to the safety and health of all employees Vision • Protection of the environment we live in is key for SOONL Vision • Fully compliant to the requirements of the ISM code • Established safety management system that’s constantly reviewed and assessed for effectiveness • Strong staff training program to ensure all employees aim for Zero injuries and incidents with an open communication channel that allows any member of staff to escalate important safety issues to the highest level of management • Clearly defined procedures for reporting accidents and responding to emergency situations • Weekly safety audits and management reviews with direct reporting to the managing director 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 12 Safety Record Vision Vision 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 13 Safety Record Vision Vision 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 14 Satisfied Clients Vision Vision 14 Years of providing Professional service to the Oil and Gas Industry and counting……. 15