Brochure - Narstco

Transcription

Brochure - Narstco
•
Reduces the ballast required by as much as 40% vs.
wood ties
•
Less Expensive to handle and transport
•
Simple and efficient to assemble and install
•
Holds gauge and prevents derailment
•
Made from recycled steel. Considerable scrap value at
the end of service life (50+ years)
•
Cost effective option for maintenance projects
NARSTCO - Matt Violin
2
VS.
•No Spikes!
•No Plates!
•No Anchors!
• Less Ballast!
•No Gauge Problems!
•No Rot and Decay!
•No Toxic Creosote!
NARSTCO - Matt Violin
3
•
Tie Sections:
M8 = 8mm M section steel
 M10 = 10mm M section steel
 H10 = 10mm H section steel
 H12 = 12mm H section steel

NARSTCO - Matt Violin
4
NARSTCO - Matt Violin
5
ASTM designation
A242/G101-01
defines our product
grade as High
Strength Low-Alloy
Weathering Steel
“atmospheric corrosion
resistance approx two
times that of carbon steel
with copper ….and four
times without copper”
ATMOSPHERIC CORROSION - PROJECTED
THICKNESS LOSS
PENETRATION, um

400
350
300
250
200
150
100
50
0
NARSTCO - Matt Violin
RURAL - Potter
County, PA
INDUSTRIAL Kearny, NJ
MARINE - Kure
Beach, NC
1
10
50
EXPOSURE TIME, YEARS
6
NARSTCO - Matt Violin
7
NARSTCO - Matt Violin
8
NARSTCO - Matt Violin
9
Reduction in the depletion
of natural resources!
NARSTCO - Matt Violin
10
NARSTCO - Matt Violin
12
NARSTCO - Matt Violin
13
NARSTCO - Matt Violin
14
NARSTCO - Matt Violin
15
Headblock and Switch Rod Ties
NARSTCO - Matt Violin
16
Headblock and Switch Rod Ties
NARSTCO - Matt Violin
17
WCH Switch Point Guard
NARSTCO - Matt Violin
18
Steel Turnout Package
NARSTCO - Matt Violin
19
Steel Turnout Material Package
NARSTCO - Matt Violin
20
NARSTCO - Matt Violin
22
NARSTCO - Matt Violin
23
NARSTCO - Matt Violin
24
Complete Crossover
NARSTCO - Matt Violin
27
Double Crossover
NARSTCO - Matt Violin
28
NICTD
Double Crossover Diamond Crossing
Michigan City, IN
NARSTCO - Matt Violin
29
NARSTCO - Matt Violin
30
NARSTCO - Matt Violin
31
NARSTCO - Matt Violin
Quebec Gatineau Railway (G&W)
Yard with Steel Tie Turnout Sets
Trois Rivieres, Quebec, Canada
Bloom Lake (G&W)
Yards and Loop with Steel Tie Turnout Sets
Northern Quebec
NARSTCO - Matt Violin
34
Jacksonville Port Authority (JaxPort)
Port Rehab Project 2011
Steel Ties and Turnouts
NARSTCO - Matt Violin
35
FEC – Hialeah Yard
19ea #8 Steel Turnouts and 6ea #10 Steel Turnouts
Installed in the late 90’s
NARSTCO - Matt Violin
36
Alabama State Docks/Port Auth.
2011 Installation
Coal Terminal Lead/Loop Tracks
NARSTCO - Matt Violin
37
CSX Intermodal Yard (National Gateway)
North Baltimore, OH
2010/2011
NARSTCO - Matt Violin
38
CSX Intermodal Yard
Winter Haven, FL
2013/2014
NARSTCO - Matt Violin
39
*Ref: www.railcomm.com
NARSTCO - Matt Violin
40
NS – Pottstown, PA
2010/2011
NARSTCO - Matt Violin
41
NS – Charlotte, NC
Intermodall
2013
NARSTCO - Matt Violin
42
CONRAIL
Oak Island Yard, Newark, NJ - Steel Turnout Set
1994 Installation!
NARSTCO - Matt Violin
43
Westville, NJ – H10 Steel Ties
2013 Installation
River Rouge Yard – Detroit, MI
Custom Layout
2012 Install
NARSTCO - Matt Violin
44
Union Pacific
Intermodal Yard – 2009/2010 Construction
Joliet, IL
NARSTCO - Matt Violin
45
CP REGINA, SK – EVRAZ/IPSCO Yard
7ea NARSTCO Steel Tie Turnout Sets
In service for over 6+ years, zero maintenance!
NARSTCO - Matt Violin
47
GO TRANSIT
Union Station – Toronto, ON (2013)
Insulated M10 Steel ties & 23’ H12 Crossover Ties
NARSTCO - Matt Violin
48
GO TRANSIT
Layover Yards
NARSTCO - Matt Violin
49
SIRE Plant in Council Bluffs, IA
H10 Steel Ties installed in double loop track
2008 Installation
NARSTCO - Matt Violin
50
Philadelphia Energy Solutions (PES)
ENBRIDGE – Eddystone Rail Terminal
NARSTCO - Matt Violin
51
WATCO – Birmingham Terminal Railway
Interspersed Steel Ties (1 to 3)
Birmingham, AL
PBR Railroad
Interspersed Steel Ties (1 to 3)
Sparrows Point, MD
NARSTCO - Matt Violin
52

Shipping savings:




Steel Ties per truckload = 280ea with fasteners
Steel Tie Turnouts per truckload = 2ea with fasteners
Steel Ties per railcar = approx. 1,000ea with fasteners
Steel Tie Turnouts per railcar = approx. 6ea with fasteners
Less trucks or railcars = SAVINGS!!!
NARSTCO - Matt Violin
56
COSTS COMPARISON FOR YARD TRACK WITH M10 TIES
NARSTCO Steel Ties vs. Wood ties
DAT A ENT RY REQUIRED
Type:
Length
TIE AND RELATED ITEMS
NARSTCO
Steel Ties
M10
8.33
Wood ties
(new)
Length of tie
ft (8'4")
8.5
$ Savings /
Mile
UNIT
NON-INSULATED
TIE (excluding transportation costs)
$ each
$101.60
$60.00
"e CLIP"
PER TIE
included
Not required
SHOULDERS
PER TIE
included
Not required
TIE PLATES
PER TIE
Not required
$30.00
ANCHORS
PER TIE
Not required
$3.00
SPIKES
PER TIE
Not required
$6.00
TRANSPORTATION COST
PER TIE
$101.60
$99.00
SUB TOTAL COST PER EACH TIE
Tie Spacing - inches
Ties / mile
SUB-TOTAL COST PER MILE
LABOR AND EQUIPMENT
per Track Foot
per MILE
24
ft
inches
20
2640
3168
$268,224
$313,632
$12.00
$24.00
$63,360
$126,720
inches
$45,408
$63,360
No impact on costs
RAIL
$40.00
Ballast per cubic yard:
Ballast - YD 3 per mile
BALLAST COST PER MILE
T OT AL COST PER MILE
SAVINGS / MILE
Project FT
20,000
2,444
3,719
$97,778
$148,769
$50,991
$429,362
$589,121
$159,759
$159,759
TOTAL SAVINGS
$605,148
COSTS COMPARISON FOR TURNOUTS
NARSTCO Steel Ties vs. Wood ties
DATA ENTRY REQUIRED
#10 Turnout (SMSG)
Tie Set
NARSTCO
Steel Turnout
$23,995
Wood ties
(new)
$21,000
Plates (tie, gage, etc)
not required
included
Anchors
not required
included
Spikes
not required
included
M aterial Subtotal
Labor & Equipment
Rails & Special Trackwork
QTY of ballast required (cubic yards)
Ballast cost per switch
Total Cost
$23,995
$21,000
$3,000
$9,000
No Difference
No Difference
60
89
$2,400
$3,560
$29,395
$33,560
$4,165
Savings per turnout
6
Quantity of turnouts required
Total Savings on project turnouts
NARSTCO - Matt Violin
$24,990
59
$148,769
NARSTCO - Matt Violin
62
Less ballast per
installation
100% GREEN Product!
Lower
Transportation
Costs – more ties
and turnouts per
load
Quicker to install
Reduced maintenance
requirements
…Think Different Think Steel!
NARSTCO - Matt Violin
63
Think Different! Think Steel!
Thank you!
NARSTCO - Matt Violin
64

Similar documents