Ehren Haus Industries> Charlotte, NC

Transcription

Ehren Haus Industries> Charlotte, NC
Ehren Haus Industries > Charlotte, NC
Ehren Haus Industries
Build-to-Suits/Own • 54,000 square-foot manufacturing facility • Charlotte, NC
Case Study
Specs
Ehren Haus Industries needed to expand their existing
manufacturing facility substantially. The company had initially
worked with various real estate agents to explore the options
available, but found they needed more detailed analysis before
moving forward.
• Build-to-Suit/Own
•5
4,000 square-foot
manufacturing facility
Red Rock Developments:
• assisted with site selection analysis
• assisted in negotiation of incentives
• provided acquisitions services and performed all due
diligence
• provided value engineering services
• evaluated financing options including industrial revenue
bonds
The project was developed or constructed by principals of Red
Rock Developments prior to founding the company.
1201 Main Street • Suite 2360
Columbia, SC 29201
803.779.3025
redrockdevelopments.com

Similar documents