Planning of costs in FP7 - 7. EU-Rahmenprogramm
Transcription
Planning of costs in FP7 - 7. EU-Rahmenprogramm
Planning of costs in FP7 Martin Baumgartner FFG – Austrian Research Promotion Agency European and International Programmes RUSERA EXE Training course, Vienna 30. January 2008 Seite 1 © FFG Martin Baumgartner 2008 Type of costs Seite 3 © FFG Martin Baumgartner 2008 Direct costs Examples: Personnel costs Equipment Consumables Travel Seite 4 © FFG Martin Baumgartner 2008 Indirect costs Definition: Cannot be identified as directly attributed to the project – but can be identified by accounting system as being incurred in direct relationsship with direct costs. Seite 5 © FFG Martin Baumgartner 2008 Example of cost calculation in FP7 140 Collaborative Project Casestudy Partner Overhead rate Hourly rate (in Euros) Effort table (1 person-month = 140 hours) WP1: RTD (in person-month) WP2: Demonstration (in person-month) WP3: Training (in person-month) WP4: Management (in person-month) RTD personnel costs Total RTD personnel costs RTD equipment costs: 25.000 € used during 3 years for 100% - linear amortization on 5 years A - 3 persons (Industrial Organisation) B - 2 persons (University) 110% 60% 30 40 50 30 45 4200 5600 7000 4200 6300 20 30 20 15 15 20 10 10 5 10 2 0 5 13 10 0 0 1,5 7,5 7,5 84.000 168.000 392.000 140.000 63.000 94.500 157.500 15.000 Subtotal RTD 407.000 RTD overheads 431.200 94.500 TOTAL RTD 838.200 252.000 Demonstration personnel costs 84.000 56.000 157.500 70.000 21.000 63.000 Total Demonstration personnel costs 210.000 84.000 Subtotal Demonstration 210.000 84.000 Demonstration overheads 231.000 50.400 441.000 134.400 Demonstration subcontracting TOTAL Demonstration Training personnel costs 8.400 Total Training personnel costs 0 35.000 54.600 43.400 Training travel costs: 2 travel at 750 € each Partner 1.500 1.500 Subtotal Training 44.900 119.100 Training overheads 47.740 71.460 92.640 200.560 Training subcontracting 10.000 TOTAL Training Management personnel costs Total Management personnel costs Management meetings: 10 @ 750 € each Partner 0 0 10.500 7.500 10.500 31.500 47.250 78.750 7.500 Management travels: 10 @ 300 € each Partner 3.000 3.000 Subtotal management 21.000 89.250 Management overheads Management subcontracting : 1 x certificate on financial statement = 2.500 € 11.550 53.550 5.000 2.500 TOTAL Management 37.550 145.300 1.409.390 732.260 TOTAL COST Seite 6 63.000 117.600 © FFG Martin Baumgartner 2008 Description of costs in proposal Guide for applicants 2.4 Resources to be committed In addition to the costs indicated in part A3 of the proposal, and the staff effort shown in section 1.3 above, please indicate any other major costs (eg. equipment). Describe how the totality of the necessary resources will be mobilised, including any resources that will complement the EC contribution. Show how the resources will be integrated in a coherent way, and show how the overall financial plan for the project is adequate. (Maximum length for Section 2.4 – two pages) nicht rechtsverbindlich © FFG Martin Baumgartner 2008 Seite 7 Example of “cost breakdown” in FP7 proposal I nicht rechtsverbindlich © FFG Martin Baumgartner 2008 Seite 8 Example of “cost breakdown” in FP7 proposal II nicht rechtsverbindlich © FFG Martin Baumgartner 2008 Seite 9 Project Cost Plan I WP no. Cost Type Type of Units Unit Price WP 1 Personnel person months WP 1 Material WP 1 Travel project meetings WP 1 Others printing WP 1 Total WP 2 Personnel WP 2 Material WP 2 Travel WP 2 Others WP 2 Total 2.000,00 € 1.000,00 € 800,00 € Units Planned Costs 6 12.000,00 € 4 4.000,00 € 1 800,00 € 16.800,00 € 0 ... 16.800,00 € nicht rechtsverbindlich © FFG Martin Baumgartner 2008 Seite 10 Project Cost Plan II nicht rechtsverbindlich © FFG Martin Baumgartner 2008 Seite 11 Information EC Information about costs in FP7: http://cordis.europa.eu/fp7 ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf FFG/EIP Information about costs in FP7: http://rp7.ffg.at http://rp7.ffg.at/rp7_kostenberechnung nicht rechtsverbindlich © FFG Martin Baumgartner 2008 Seite 12 Mag. Martin Baumgartner FFG / European and International Programmes [email protected] Seite 13 © FFG Martin Baumgartner 2008