Site Master File - LAW Services GmbH
Transcription
Site Master File - LAW Services GmbH
Site Master File Version 04 Valid from Valid until 02-01-2016 01-31-2017 L-A-W Services GmbH, Leipziger Arzneimittelwerk Elisabeth-Schumacher-Str. 54/56 D-04328 Leipzig Site Master File Version: 04 Valid from: 02-01-2016 Page 1 of 2 Table of contents Page 1. General information about the manufacturer 1 1.1 Contact data of the manufacturer 1 1.2 Approved pharmaceutical manufacturing activities of the plant 1 1.3 Other manufacturing activities carried out in the plant 1 2 Quality management system of the manufacturer 2 2.1 The quality management system of the manufacturer 2 2.2 Approval procedure for finished products 3 2.3 Management of suppliers and service providers 5 2.4 Quality risk management (QRM) 7 2.5 Product quality reviews (PQR) 9 3. Personnel 9 4. Premises and equipment 10 4.1 Premises 10 4.1.1 Brief description of the heating and ventilation systems as well as the air conditioning system (HVAC) 11 4.1.2 Brief description of the water systems 16 4.1.3 Brief description of other systems such as steam, compressed air, N 2 etc. 16 4.2 Equipment 17 4.2.1 List of the important equipment for the production and control laboratory 17 4.2.2 Cleaning and hygiene 17 4.2.3 GMP-critical computer systems 17 5. Documentation 18 6. Production 19 6.1 Type of products 19 6.2 Process validation 20 6.3 Material management and storage 21 7. Quality control (QC) 25 8. Sales, complaints, product defects and recalls 26 8.1 Sales (for the part in the field of responsibility of the manufacturer) 26 8.2 Complaints, products defects and recalls 26 9. Self-inspection 27 Site Master File Version: 04 Valid from: 02-01-2016 Annexe no. Annexe 1 Copy of the valid manufacturing authorisation 2 Page 2 of 2 Open part/ closed part open part with preparation list closed part List of the manufactured dosage forms including INN descriptions or the conventional name (if available) of the active pharmaceutical ingredient (API) used -------------- Not applicable as a separate annexe: refer to annexes 1 and 4 3 Copy of the valid GMP certificate 4 List of the manufactured dosage forms including the active pharmaceutical ingredient (API) used with the specification of the supply chains of outsourced activities as well as List of the contract manufacturers and contract laboratories including the addresses and contact information open part closed part open part 5a Organisation chart open part 5b Number of employees in Quality Assurance, Production, Quality Control and Storage open part 6 Plans of the production areas including material and personnel flow, general flow diagrams of the manufacturing processes for every product type (dosage form) open part - Site map of the premises open part - Floor plans closed part - Zone concept with machine installation open part - Personnel and material flow open part - Description of the ventilation technology closed part - Description of the laboratories open part 7 Purified water (diagram of the water installation) open part 8a List of the important equipment for the production open part 8b List of the important equipment for the control laboratory open part 9 Activities for which L-A-W Services GmbH Leipziger Arzneimittelwerk is certified open part 10 List of the official GMP inspections of the last 5 years open part Site Master File Version: 04 Valid from: 02-01-2016 1. General information about the manufacturer 1.1 Contact data of the manufacturer Page 1 of 27 L-A-W Services GmbH, Leipziger Arzneimittelwerk, Elisabeth-Schumacher Str. 54/56, 04328 Leipzig, originates from “Homöopathischen Centralofficin Dr. Willmar Schwabe” established in 1866 and is domiciled in the manufacturing company set up in 1926 for purposes of industrial production of homoeopathic products in Leipzig Paunsdorf. After passing through different legal forms in the GDR, independent existence as Leipziger Arzneimittelwerk GmbH in the Federal Republic of Germany (1990) and takeover by the Wyeth Group (1992), Leipziger Arzneimittelwerk belonged to RIEMSER Pharma GmbH since March 2000 as a plant. Since, 01.06.2013 the location is operating as an independent company after change in ownership of the Leipzig plant and associated with that, the transition of the company and personnel in accordance with § 613a of BGB (German Civil Code) into L-A-W Services GmbH, Leipziger Arzneimittelwerk. L-A-W Services GmbH, Leipziger Arzneimittelwerk manufactures solid, semi-solid and liquid pharmaceuticals, medical device, dietary supplements, cosmetics and API (active pharmaceutical ingredient) on a contract basis. Human as well as veterinary medicinal products are manufactured. Contact data: L-A-W Services GmbH, Leipziger Arzneimittelwerk Elisabeth-Schumacher-Str. 54/56 04328 Leipzig Germany Telephone: +49 341 2582-0 (06:00 hours to 20:00 hours) Fax: +49 341 2582-444 GPS data of the plant: Length: 12° 26’ 22’’ E Width: 51° 21’ 04’’ N 1.2. Approved pharmaceutical manufacturing activities of the plant Only the pharmaceutical activities mentioned in the manufacturing authorisation are carried out. Copy of the valid manufacturing authorisation (refer to annexe 1) Type of the products currently manufactured in the plant (refer to annexe 1 or 4 (closed part) List of the official GMP inspections of the plant (refer to annexe 10) 1.3 Other manufacturing activities carried out in the plant Non-pharmaceutical manufacturing activities: manufacturing of cosmetics, dietary supplements, medical devices and chemicals. Site Master File Version: 04 Valid from: 02-01-2016 2. Quality management system of the manufacturer 2.1 The quality management system of the manufacturer Page 2 of 27 L-A-W Services GmbH, Leipziger Arzneimittelwerk, operates a quality assurance system on the basis of the EU GMP Guideline on Good Manufacturing Practices for pharmaceuticals. The quality assurance system helps to ensure the quality of the pharmaceutical products expected by the customers as well as to implement the quality objectives of the company comprehensively in all the company departments. The principle of the quality policy is that every work step is a contribution to the quality of the end product and must hence possess the required quality itself. This objective is ensured through corresponding framework conditions such as suitable technical and organisational equipment, qualified personnel, etc. The quality assurance system comprises all the company departments. It has been defined in SOPs, operating instructions and other documents and consists of the following elements among others: Current documentation system (refer to Chapter 5) Personnel training, job descriptions Hygiene Self-inspections Supplier qualification including subcontractor Qualification of systems, equipment and areas Calibration of measuring equipment Maintenance of areas, systems and equipment Monitoring of environmental conditions Validation of manufacturing, cleaning and test processes Change control, deviation, OOS and CAPA management PQR Inspection and manufacturing in accordance with approved instructions Release procedures Processing of complaints The Quality Assurance department is responsible. The Head of Quality Assurance leads the department (refer to organisation chart annexe 5a).The Quality Assurance department directly reports to the Management Board. The Management Board is involved in the quality management in different ways and is constantly informed of the integration into QA committees, a structured reporting system as well as through the inspections of the Quality Assurance department generally conducted once a year. Other options to obtain information are the protocols of the regular quality assurance meetings conducted every 14 days as well as the reports of audits and self-inspections as well as monthly reports to the Management Board. The other departments of the company are also responsible for maintaining the QM system. They are stated in the respective job descriptions as well as in the valid SOPs and instructions. An important committee for promoting and ensuring the collaboration of all the departments in this regard is the QA consultation that is conducted regularly every 14 days. Site Master File Version: 04 Valid from: 02-01-2016 Page 3 of 27 L-A-W Services GmbH, Leipziger Arzneimittelwerk is certified for the following activities: Manufacturing and testing of pharmaceuticals for human use, monitoring by the Landesdirektion Sachsen Manufacturing and testing of pharmaceuticals for animal use, monitoring by the Landesdirektion Sachsen Manufacturing and testing of investigational medicinal products, monitoring by the Landesdirektion Sachsen (For more information, refer to annexe 9) Furthermore: The appropriate specifications in accordance with DIN EN ISO 13485:2012 are considered for manufacturing and testing medical devices of class I and IIa. A certification is not available at present. The manufacturing and testing of dietary supplements, dietary/ balanced foodstuffs and cosmetics is monitored by the Saxony Regional Office. The cosmetics are manufactured and tested taking into account DIN EN ISO 22716 “Cosmetics – Good Manufacturing Practices (GMP) – Guidelines on Goods Manufacturing Practices”. 2.2 Release procedure for finished products The Qualified Person, in accordance with § 14 AMG, having the expertise necessary in accordance with § 15 AMG is responsible for releasing the pharmaceuticals and investigational medicinal product, for placing them on the market. He reports directly to the Management Board and has all the necessary powers for carrying out this work. The tasks and responsibilities are specified in writing in a corresponding job description of the Qualified Person. Multiple Qualified Persons have been nominated in accordance with § 14 AMG for L-A-W Services GmbH, Leipziger Arzneimittelwerk. The Qualified Persons are completely recorded by name and listed in the organisation chart – annexe 5a. The Qualified Person mentioned first takes the responsibility for the tasks of the job holder on a full-time basis. If he is unable to attend, the persons following in the list are representatively responsible for it and will act correspondingly. The QM system is adapted to the needs of the batch release. All the finished products are in the quarantine status until the dispatch release, release for placing on the market or another decision. This status is secured by the identifications and configurations in the EDP (ERP system) as well as by a physical identification with the help of supply notes with the pallets. Manufacturing and testing must be carried out and logged in accordance with the manufacturing instructions or testing instructions. All deviations in the process and from the regulations in the specification must be documented and investigated thoroughly. After inspecting the manufacturing documents, the Head of Manufacturing, in accordance with § 12 of AMWHV (Regulation for the manufacturing of pharmaceuticals and APIs), must confirm proper manufacturing and labelling of the batch corresponding to the manufacturing instructions. The Head of Quality Control, in accordance with § 12 of AMWHV, must confirm that the testing was conducted corresponding to the testing instructions and the batch possesses the proper quality. The Qualified Person is responsible for ensuring that every batch of the pharmaceutical was manufactured and tested in accordance with the trade of pharmaceuticals. He has to confirm the compliance with the regulations for every pharmaceutical batch in a serial list before placing them on the market. For assuming his responsibility as a Qualified Person in accordance with AMG § 14, the job holder has to rest on the expertise of and information from the function holders - Head of Manufacturing as well as Head of Quality Control (§ 12 Para. 1 of AMWHV Manufacturing Management and Quality Control Management). He can moreover rest on certificates, which have been issued by other Qualified Persons if the batch has passed through different steps of manufacturing and testing or parts of these at different locations or with different manufacturers. The Qualified Person actively has to examine the batch documentation and the batch record review and take it into consideration. Furthermore he has to take into account essential information, especially that which is not Site Master File Version: 04 Valid from: 02-01-2016 Page 4 of 27 included in the manufacturing and testing documents, and he has to evaluate it. If necessary, he has to use the certificates issued by other Qualified Persons for deciding on the release of the finished product batches. The Qualified Person certifies that the pharmaceutical has been manufactured in accordance with GMP and the registration documents. This is followed by the release and entry in the release register or, in some cases, another decision. The release or another decision is indicated on the product and in the EDP. Rejected products will be stored separately and under lock and key, in an isolated manner and with the corresponding physical identification. The blocking will also be saved in the EDP system. The release procedure is defined in the SOP for batch release of finished products. The release for putting the pharmaceutical batches and investigational medicinal products on the market and also the variant of the dispatch release of aforementioned finished products as well as the releases for dispatch of non-pharmaceuticals are described there, too. Furthermore, SOPs are available, which describe how to deal with deviations and out-of-specification results. The system for activities that have been ordered is also stipulated in SOPs. Another SOP describes the procedure for dealing with rejected products. Quarantine and release of the finished products, conformity with the registration The release is regulated in the underlying contract for classifying the pharmaceutical responsibility between the customer and L-A-W Services GmbH Leipziger Arzneimittelwerk as the contractor. The finished products are released in accordance with the corresponding SOP. All the finished products remain in quarantine until they are released. The following processes are distinguished between: Release of finished medicinal products and investigational medicinal products for putting them on the market in accordance with §16 of AMWHV as well as in accordance with Annex 16, 2001/83/EC as well as 2001/82/EC for finished medicinal products and in accordance with Annex 13 2001/83/EC for investigational medicinal products. The release by the Qualified Person is issued after review of the entire, completed documentation about the manufacturing and quality control approved by the relevant employees. This includes properly signed manufacturing and packaging logs, inspection logs and the batch record review. If individual steps in the order are carried out at third party plants, the manufacturing and inspection logs and, if applicable, certificates of conformity of the contract manufacturer or laboratories serve as a basis for the release decision. Within this scope, the recourse to other QPs is also possible. On the basis of this and consideration and evaluation of other essential and relevant factors and information – consideration of essential information a statement is made by the Qualified Person regarding the release (or another decision as regards the status) with a date and signature. The inspection and confirmation of the conformity with the registration documents is also a part of the release decision made by the expert. The release decision will be documented by the Qualified Person in a serial list and on the corresponding form that is part of the batch documentation. Release for dispatch If the pharmaceutical responsibility for the batch release for putting on the market lies with the customer in case of contract manufacturing by L-A-W Services GmbH (contractor), a certificate of compliance (CoC) will be issued in accordance with Annex 16 EU-GMP by the Qualified Person and the release for dispatch will be confirmed. Batch recall Site Master File Version: 04 Valid from: 02-01-2016 Page 5 of 27 If pharmaceutical batches released by LAWS for putting on the market are subsequently recalled, this must be noted in the serial list in accordance with the requirement of § 17 Para. 5 of AMWHV. This means stocktaking of that what could have been on the market, and recording of the batch recall in the list by the Qualified Person. Statement on control strategies It is confirmed that process analytical technologies (PAT) and / or real-time releases or parametric releases do not play any role within the scope of the control strategies. 2.3 Management of suppliers and service providers A system for qualifying the GMP-relevant suppliers/service providers is installed and described in SOPs, which includes the identification of the supply chain and also an audit system. It contains the entire life cycle of the suppliers: Planning/selection Risk management system Risk assessment First qualification/release Supply/monitoring Periodic assessment/ requalification Blocking Based on a risk analysis, and taking into account the following safety objectives pharmaceutical or GMP objectives, occupational health, safety and environmental protection as well as business or economic objectives the suppliers will be allocated to a risk class as well as the scope and content of the qualification will be defined in detail. The qualification must have been completed with a release before the order is given to GMP-relevant contractors or suppliers. After a monitoring phase, a requalification/assessment takes place, which can also end in a blocking. Site Master File Version: 04 Valid from: 02-01-2016 Page 6 of 27 Lists of the released contractors, suppliers of raw materials as well as other suppliers and service providers will be maintained in the QA department and are available to the departments, especially the Purchasing / Procurement department for consideration and compliance. Owing to their significance for the quality of the products manufactured, the contract manufacturers / contract laboratories as well as the suppliers of raw materials (active pharmaceutical ingredients, additives and packaging containers) are thereby especially singled out. The release of contract manufacturers/ contract laboratories mainly requires the following prerequisites: Existence of the prerequisites for providing the required service Availability of a valid manufacturing authorisation/ GMP certificate Availability of an audit report Availability of a contract about the classification of the pharmaceutical responsibility. The Quality Agreement contains detailed regulations regarding the responsibility for procuring the raw materials, the manufacturing, testing and/or release of the relevant product. Moreover, the contract contains regulations for processing complaints, qualifying suppliers, generating the PQR, conducting the stability tests as well as forwarding information in case of changes and deviations. The manufacturing and testing regulations of the contractor will be checked and approved by the relevant persons of L-A-W Services GmbH against the registration documents or against the master regulations allocated by the customer and taken as a basis in the approval. The approval will be additionally obtained by the customer of L-A-W Services GmbH. The contractor is under an obligation to follow and adhere to the GMP regulations and gets them certified from the relevant Qualified Person (CoC). The contractor is under an obligation to allocate sub-contracts only after an approval by L-A-W Services GmbH so that updated information about the supply chain is available at all times. The contract manufacturers and contract laboratories are specified in annexe 4 (closed part). The qualification of suppliers of raw materials proceeds across multiple stages and involves all the parties in the supply chain (manufacturer and trader). The supplier must have been approved by the Quality Assurance department before an initial order. The basis of the release decision is the availability of sample test results, supplier certificates, other product information (specifications, certificates, statements about TSE / BSE, solvent residues, REACH among others if necessary) as well as information, certificates and documents of traders and manufacturers such as questionnaires, proofs and information regarding the QM system and audit reports, if notified to be necessary. In addition to the Quality Assurance department of the customer and the internal departments, Purchasing/Procurement, the Manufacturing and Quality Control departments are also involved functionally and as regards content. After three goods receipts at the earliest, the supplier shall be assessed and will result in the supplier (the source of supply) being allocated to a supplier class. Depending on the allocation, the incoming tests can then be reduced according to defined specifications, whereby a full test must be conducted regularly in accordance with the specifications. Audits at contractors and suppliers of raw materials are planned once a year. The execution and documentation of audits as well as their frequency is defined in a SOP. Audits of contract manufacturers and contract laboratories are necessary before the release and then generally every three years. Site Master File Version: 04 Valid from: 02-01-2016 Page 7 of 27 Audits of raw material suppliers will be conducted in a risk-based manner, whereby, among other things, the availability of GMP certificates or other certifications of the QM system, the material type (API) as well as the variety and quantities of the materials procured by this supplier will be considered. It is possible to resort to audits conducted by third parties. When delivering raw materials, the manufacturer and trader will be audited for compliance with the specifications and the released supply sources within the scope of the incoming inspection. In case of suspicion of imitated/ falsified products, the delivery will be immediately rejected, the supply chain will be inspected and informed and the relevant authorities will be informed as well. Imitated/ falsified products can be identified with the help of the measures established in the company. The collaboration with our suppliers even lasts many years in some cases and is characterised by a good bond of trust. The Purchasing department stays in close contact with our suppliers so that discrepancies in a delivery could also be identified in this manner, which would have cropped up due to infiltration of falsified products in the supply chain. All the goods receipts of raw materials (packaging material, active pharmaceutical ingredients, excipients, bulk products) will be checked by the Quality Control department at least for identity, depending on the specifications regarding the type and scope of the incoming inspection. In this connection, the sound condition of the packaging, if available, the proper and intact lead-sealing as well as the compliance of the specifications on labels and delivery notes with the approved supplier will also be checked. If the raw materials are procured by L-A-W Services GmbH, the quality is and will also be checked and ensured in accordance with the specifications of the incoming test. If the raw materials are provided by the customer, the quality is considered to be warranted. During goods receipt, the identity will be checked and ensured by the Quality Control department as described above. Deviating regulations are possible in accordance with the specifications and in agreement with the customer. Use of external scientific, analytical or other technical support for manufacturing and analysis (refer to annexe 4 closed part). List of the manufactured dosage forms including the active pharmaceutical ingredient (API) used with the specification of the supply chains of outsourced activities as well as list of the contract manufacturers and contract laboratories including the addresses and contact information (refer to annexe 4 closed part). The responsibility for compliance with the registration documents is defined in the Quality Agreement and is in the role of the customer. This is ensured with the approval of the testing and manufacturing instructions by the customer as well as continuous information to our Qualified Person about the current status of the registration and about corresponding changes or in accordance with the contractual regulations and pharmaceutical responsibility classification in the agreed type and scope. 2.4 Quality risk management (QRM) The risk management system, which is installed within the scope of the quality management system, includes all the areas of manufacturing and testing pharmaceuticals and other product classes and helps to ensure the quality of the pharmaceuticals manufactured and other product classes as well as the ability to deliver on schedule. Risk analyses are predominantly conducted in the form of informal risk inspections, fish-bone diagrams and based on FMEA. The execution of FMEA-based risk analyses is defined in a SOP. GMP-risks in particular and risks for the quality of the pharmaceutical or for the patient associated with it are considered in this respect, but also technological, financial, time-related and financial risks with an effect on the company or the ability to deliver as well as health risks for the employees of the company. Site Master File Version: 04 Valid from: 02-01-2016 Page 8 of 27 In addition to QA, QP, Head of Manufacturing and Head of Quality Control, the heads or employees of the relevant departments are included. The Management Board will either be directly included or informed during discussions or by means of minutes of the consultation depending on the requirement. When defining the processes in SOPs, the elements of the risk management system to be used including responsibility and employee group to be included/ informed will also be defined and described: Risks at the time of manufacturing and testing will be considered and minimised with the following activities: qualification of the equipment during manufacturing and quality control including supply systems, qualification of the manufacturing and storage areas taking into account the required climatic conditions, validation of the processes for manufacturing, testing and cleaning, qualification of suppliers and service providers, employment of qualified and trained personnel. The type and scope of the tests to be conducted will be defined based on the risks. Risk analyses will be conducted in accordance with the specifications. The temperature and, if necessary, humidity monitoring in the storage and manufacturing areas is based on temperature mapping for ascertaining the critical measuring points. Monitoring will be implemented by a central climate monitoring system with integrated recording and alarm system. Environmental monitoring will also be carried out in a risk-based manner; the measuring points will be defined within the scope of the qualification. In order to identify the risks at an early stage, intervention limits were defined in the form of warning and alarm limits as well as specification limits and trend and other data analyses will be generated. The allocation of the line on which solid preparations are to be packaged, is carried out on the basis of a risk analysis. The audit programme for suppliers and subcontractors will be prepared in a risk-based manner. The changes, deviations, OOS and complaints will be processed taking into account the risk inspections. The goods receipts will be tested based on the risks. The testing scope will be defined depending on the qualification status of the supplier. The stability tests will be defined taking into account the valid regulations and in a risk-based manner (matrixing, bracketing). The training programme will be defined risk-based. The decisions of the QP are based on the information about the manufacturing and testing as well as the information associated with it and are also risk-based. The measures defined in the risk analysis will either be processed in the process to which the risk analysis belongs or transferred to the CAPA system of L-A-W Services GmbH. Risks will also be considered when defining processes, which must not contain any risk inspections. Site Master File Version: 04 2.5 Valid from: 02-01-2016 Page 9 of 27 Product quality reviews (PQR) Regular product quality reviews (PQR) will be carried out for all the pharmaceuticals manufactured/ tested/ released in the company after order by the respective customer and in a manner and scope agreed by both parties. These reviews will be prepared by the Quality Assurance department in accordance with the specifications of the valid SOP. Furthermore, the requirements of the customer will be taken into account. The PQR will be carried out product-related for a defined period – generally a year –, but should include a minimum of five bulk product batches. If less than five bulk product batches are manufactured within a year, the period under review can be extended correspondingly in order to have the required minimum number of batches at disposal. If a period of 3 years has passed since the last period under review, a PQR should be prepared irrespective of whether 5 bulk product batches have been reached. In case of less number of batches (< 3 batches in the period under review of 3 years), the scope and contents of the PQR must be adapted in a risk-oriented and purposeful manner. Inappropriate sections or parts can be omitted fully or in part with justification. The report also includes all the manufactured batches, i.e. even those which were rejected and destroyed. The information, changes and dependencies, which cropped up during the period under review when manufacturing and testing the product, will be recorded, evaluated and documented within the scope of the PQR. The aim of the PQR is to check the consistency of the process and the suitability of the specifications for the raw materials and packaging materials as well as for the finished product. With the PQR, the Qualified Person is provided with another tool to ensure the pharmaceutical quality of the product within the scope of the release. 3. Personnel Organisation chart (refer to annexe 5a) Number of employees in the departments (refer to annexe 5b) Site Master File Version: 04 Valid from: 02-01-2016 4. Premises and equipment 4.1 Premises Page 10 of 27 The plant premises are in Leipzig-Paunsdorf in the “Hohentichelnstraße/ Permoserstraße” industrial area. The plant premises is bordered in the south and west by Permoserstraße or Elisabeth-Schumacher-Straße, other companies in the north and east of the plant premises (snack bar or warehouse). Size of the company: approx. 3.85 ha Main building: Year of construction - 1926 Extension - 1938 Addition of stories in the south wing - 1990 Modernisation 1990 – 1996 Laboratory extension - 2007 Partial modernisation for the GMP-compliant remodelling including ventilation technology - 2009 to 2014 Built-up area: 5110 m², 1- to 4-storey Manufacturing and/or packaging of solid, semi-solid and liquid products; Storage, laboratory, management, workshop, utilities management, canteen, sanitary areas Annexe: Year of construction - 1985 Built-up area: 561 m², 2-storey unused at present Warehouse: Year of construction 1983, new flooring 2008 Built-up area: 1779 m² Installations: High-bay racking, office containers Storage of hazardous materials: Year of construction - 1996 Built-up area: 58 m² Storage/forklift garage: Year of construction - 1984 Built-up area: 266 m² Storage for rejected for packaging material and finished products Storage shed: Year of construction - 1981/83 Built-up area: 298 m² Transformer station: Year of construction - 1990 Built-up area: 38 m² Detached house: Year of construction - 1915 Built-up area: 44 m² Covered storage area: Year of construction - 1981 Built-up area: 553 m2 Site Master File Version: 04 Fuel oil tank depot: Valid from: 02-01-2016 Page 11 of 27 Year of construction - 1992 Capacity: 4x24 m³ The manufacturing for different markets is not carried out in different buildings. The position of the building in the premises is shown in annexe 6. Position, size and utilisation of the rooms in the manufacturing area including storage rooms, material and personnel flow as well as the classification of the rooms are shown in annexe 6. L-A-W Services GmbH Leipziger Arzneimittelwerk manufactures products, which contain substances, which are allocated to the toxic and hazardous categories (refer to section 6.1). Areas for storing and handling highly toxic, hazardous and allergenic substances: Microbiological laboratory: Reference strains of risk class 2 as per IfSG Storage of hazardous materials: Storage of the hazardous materials as per VbF Storage for active pharmaceutical ingredients with risk potential: Storage of active pharmaceutical ingredients with risk potential Safety weighing workstation: Weighted sample and suspension of substances, which are classified as toxic and/ or hazardous Bulk manufacturing: Processing of active pharmaceutical ingredients and other substances with the above mentioned risk potential (pre-suspended; see above) Blister room 1: Blistering of solid forms with less therapeutic (exposed formulations, whose lowest therapeutic dosage is ≤ 10 mg) index (Also refer to section 6.1) The cold storage cell has special storage conditions with two areas at 2 °C to 8 °C as well as 8 °C to 15 °C. 4.1.1 Brief description of the heating and ventilation systems as well as the air conditioning system (HVAC) Separate ventilation systems are operated for the different product areas as well as for the sanitary areas. The ventilation systems are adapted to the special requirements as regards their features. Only the special features of the individual ventilation systems for the manufacturing and quality control areas are described below. Site Master File Version: 04 Valid from: 02-01-2016 Page 12 of 27 Main building – semi-basement: Ventilation system 1 refer to annexe 6 Bulk manufacturing 1 (R1033), bulk manufacturing 3 (R1034), weighing cabinets (R1030 – 1032): refer to annexe 6 heated, cooled Implementation of clean room class E Proportion of ambient air: minimum 30% Ventilation number 5 - 10 Supply air via H13 Extraction system for gel manufacturing (connectable if necessary) Pressure gradient LTA 1: - R1027, R1028, R118B as clean corridor in excess pressure to the black zone - R1027, R1028 as clean corridor in low-pressure of 5 Pa to adjacent corridor R188 - Corridor R188 in excess flow of 3 Pa to corridor R118B (LTA 1) - Clean corridor equal pressure to adjacent corridor R188 (LTA 37) - Pressure drop from clean corridor to bulk manufacturing 1 and 3 of 5 Pa - Pressure drop from clean corridor to personnel air lock 118A of 5 Pa - Pressure drop from clean corridor to weighing cabinets 1-3 and safety weighing workstation of 10 Pa Safety weighing workstation Two workstations Implementation of clean room class E Air velocity at the weighing workstation (right) Air velocity in the weighing cabinet (left) 0.15 m/s 100% supply air H14 0.45 m/s recirculating air via H14 Ventilation system 26 refer to annexe 6 Bulk manufacturing 2 heated, cooled Implementation of clean room class E Proportion of ambient air: 100% (via building envelope) Ventilation number in the subareas: 5 - 10 Excess pressure to black zone Pressure gradient to upstream clean corridor (LTA 37) Supply air via H13 Ventilation system 21 refer to annexe 6 Bulk manufacturing 4 heated, cooled Implementation of clean room class E Proportion of ambient air: 100% (via building envelope) Ventilation number in the subareas: 10-20 Excess pressure to black zone Pressure gradient to upstream clean corridor (LTA 37) Supply air via H13 Site Master File Version: 04 Valid from: 02-01-2016 Page 13 of 27 Ventilation system 22: refer to annexe 6 Container cleaning/container drying area heated Recirculating air-dehumidification system in the room Implementation of clean room class E Ventilation number in the subareas: 10 Proportion of ambient air: 100% (via building envelope) Pressure gradient as a directed overflow from the container drying area in the direction of the container cleaning Supply air via F9 Cold storage cell in the raw materials warehouse two-tier: 2 °C to 8 °C and 8 °C to 15 °C Implementation of no clean room class Heating cell in the warehouse for opened containers up to 60 °C Ventilation system 36: refer to annexe 6 Sampling cabinet - quality control Implementation of clean room class E Proportion of ambient air: 100% (from building envelope) Ventilation number in the subareas: 5 – 10 Excess pressure barriers in the locks as against the black zone of +10 Pa and as against the sampling room of +5 Pa Supply air via third filter step H14 Vacuum cleaner in the sampling cabinet for spot extraction via H13 Ventilation system 37: refer to annexe 6 warehouse for opened containers, bulk products warehouse, central materials lock, cleansing agent area and adjacent areas (R1010 to 1025): heated, cooled, partly dehumidified Implementation of clean room class E Proportion of ambient air: 100% Supply air via third filter step H13, additional filter-fan-units for filtration of recirculating air with H14 in R1010, R1020, R1024, R1025 Additional vacuum-cleaning units in the central materials lock and dedusting of the warehouse for opened containers Pressure gradient LTA 37: - Bulk products warehouse, weighing corridor, vestibules for bulk manufacturing 2 and 4, container cleaning corridor as clean corridor in excess pressure to black zone; gradual reduction in pressure via the materials lock, personnel air lock R189 and cleansing agent warehouse twice 5 Pa - Clean corridor with an excess pressure, respectively excess flow of 5 Pa to adjacent LTA 1 - Pressure drop from clean corridor to: bulk manufacturing 2 of 5 Pa Bulk manufacturing 4 of 5 Pa Sink and ZBV room of 10 Pa each - Directed overflow from clean corridor via container cleaning and container warehouse provision in the direction of container cleaning (LTA 22) Site Master File Version: 04 - Valid from: 02-01-2016 Page 14 of 27 Exhaust air implementation for vertical conveyor; directed overflow from bulk products warehouse and container cleaning provision as well as from packaging 1 in the direction of the vertical conveyor with clean room class F Ventilation system 2: refer to annexe 6 Central personnel air lock heated, cooled Lock area for clean room class E Proportion of ambient air: 100% Pressure gradient from the clean room via the lock rooms to black zone of twice 5 Pa Supply air via F9 Main building – ground floor: Ventilation system 6: refer to annexe 6 Packaging 1 and locks heated, cooled, moistened Implementation of clean room class F Proportion of ambient air: 70% Ventilation number: 6 Excess pressure red. 5 Pa, overflow to the black zone Supply air via F9 independent laminar flow boxes via the filling and closing machines for semi-solid products (min. H13) Ventilation system 25 refer to annexe 6 Blister room 1 (enclosed blister line) heated, cooled, moistened, dehumidified Implementation of clean room class F Proportion of ambient air: 100% Air exchange rate min. 15x in blister room 1, min. 10x in the material locks and personnel air locks, low pressure as against packaging, two-tier via locks of ≥ 15 Pa Supply air via F9 additional local extraction system at the blister machine via H14 multi-stage locking procedures (physical barriers and air shower) Ventilation system 33 refer to annexe 6 Blister room 2 (enclosed blister line) heated, cooled, moistened, dehumidified Implementation of clean room class F Proportion of ambient air: 100% Air exchange rate min. 15x in blister room 2, min. 10x in the material locks and personnel air locks, low pressure as against packaging, two-tier via locks of ≥ 15 Pa Supply air via F9 additional local extraction system at the blister machine via H13 single-stage locking procedure Ventilation system 34 Filling rooms liquid/ semi-solid 1 and 2 heated, cooled Implementation of clean room class E refer to annexe 6 Site Master File Version: 04 Valid from: 02-01-2016 Page 15 of 27 Supply air 100% from packaging 1 (room 236) via H14 Air exchange rate min. 10x in bottling rooms 1 and 2 Excess pressure in the bottling rooms 1 and 2 min. 10 Pa Reduction in pressure via materials lock and personnel air lock, excess pressure in the locks min. 5 Pa Ventilation system 35: refer to annexe 6 Cleaning area heated, cooled Implementation of clean room class F Supply air 100% from packaging 1 (room 236) via F9 Air exchange rate min. 10 in the cleaning room (room 265) Flow direction from storage (room 276) to the cleaning and packaging 1 rooms as well as from packaging 1 via provision (room 289) to cleaning Ventilation system 7 refer to annexe 6 Packaging 2 and 3 heated, cooled Implementation of clean room class F Proportion of ambient air 100% Ventilation number: 15 (locks 5) Excess pressure in the locks as against manufacturing room as well as black zone of 5 - 15 Pa Supply air via F9 Local extraction (H13) Galenic laboratory heated, cooled Proportion of ambient air 100% Supply air via F9 Lab hood independent of the ventilation system Ventilation system 5 refer to annexe 6 Quality control laboratory heated, cooled Temperature regulation separate for every room Proportion of ambient air: 100% Supply air via F9 2 lab hoods, independent of the ventilation system Microbiology laboratory Supply via ventilation system, quality control laboratory depending on clean room class E Proportion of ambient air: 100% Supply air via H14 Microbiological safety cabinet class 2 in accordance with DIN 12950; independent of the ventilation system Main building – attic storey Ventilation system 24 Attic storey laboratory heated, cooled Proportion of ambient air: 100% refer to annexe 6 Site Master File Version: 04 Valid from: 02-01-2016 Page 16 of 27 Supply air via F9 Lab hood, independent of the ventilation system Compliance with the parameters defined in advance with respect to air supply, air refeeding, temperature, humidity, pressure differences and air exchange rates will be checked and ensured within the scope of the qualification of the ventilation system and the room. The parameters will be further monitored within the scope of monitoring, maintenance procedures and requalifications. 4.1.2 Brief description of the water systems Purified water, which is produced by means of reverse osmosis, is used for the manufacturing (refer to annexe 7). Drinking water as well as purified water are used for cleaning. The drinking water is extracted from the public drinking water network of Kommunale Wasserwerke Leipzig GmbH. In addition, other water treatment plants are available for galenics (only for development purposes) and in the quality control laboratories. The laboratory water production from drinking water is carried out using an ion exchanger with special treatment systems. The HPLC water production is carried out by means of reverse osmosis with a downstream high-purification column und sterile filter. The system for producing purified water (reverse osmosis system) is shown in annexe 7 as a schematic representation. It has an output of 1000 l/h. The drinking water is pre-treated using a pre-filter having the pore size 0.5 µm and 0.45 µm and ultraviolet lamp. The quality of purified water is subsequently achieved in the two-tier reverse-osmosis system. The conductivity is monitored online. If the limit value is exceeded, the water is not carried to the extraction cycle. The ring line is equipped with a container, pump, cooler and heater and provides the purified water to 6 extraction points for manufacturing and cleaning. The water is stored without any loss in quality by means of cooling and constant recirculation. The ring line with all the fittings is regularly sanitised by means of heating in accordance with the SOP. The quality of the water produced is, on the one hand, ensured with the qualification of the system that has already taken place and, on the other hand, by means of continuous monitoring. The sampling points for the monitoring and the inspection frequency are defined in SOPs. The purified water to be used during manufacturing is monitored by inspection of the chemical and microbiological criteria by the Quality Control department. 4.1.3 Brief description of other systems such as steam, compressed air, N 2 etc. A compressed air system is operated, which provides compressed air to the laboratory department as well as to the manufacturing department - compressed air not in contact with the product (system control) as well as compressed air in contact with the product. Other systems are not operated at the plant. Required gases are directly taken from cylinders. The required compressed air is centrally generated for the entire manufacturing department and laboratory department and supplied via an internal network. Site Master File Version: 04 Valid from: 02-01-2016 Page 17 of 27 The compressed air is mainly generated using a screw compressor from Boge, type VLKEX 22R-8. Two piston compressors from Boge of the RM 3700-313 type serve as supporting compressors in times of high loads. The generated compressed air (10 bar) is buffered in two compressed-air chambers having a capacity of 1000 litres each. An oil/ water separation takes place before the drying stage. A filter stage consisting of two compressed air filters of the ECOCLEAN type is allocated to the compressed air dryer of the BOGE DS 75 230/1/50 BEKO 32 type. After the compressed air drying, 2 filter batteries, consisting of 3 filters each of the Domnick Hunter make (reversible in case of charging), are again integrated into to outgoing central compressed air line. The operating pressure is reduced from 10 bar to the required pressure stage directly on the machine or in case of the consumer. The process systems of the bulk manufacturing 1 – 4 are connected to a central nitrogen supply. The nitrogen is provided in compressed gas cylinders, which are connected to a central station. The required line pressure is set at this station and the nitrogen is distributed to the process systems. Compressed air and nitrogen is switched between at the process systems at the time of acceptance. 4.2 Equipment 4.2.1 List of the important equipment for the production and control laboratory List of the important equipment for the production and the quality control (annexes 8a and 8b). 4.2.2 Cleaning and hygiene The cleaning of surfaces of machines and equipment that are in contact with the product is described in detail in the corresponding operating instructions. The contents of the operating instructions and the development of cleaning procedures are defined in a SOP. Cleaning-in-place procedures will be preferably used. If this is not possible, the cleaning will be done manually with visual dual inspection of the cleaning result. The cleaning procedures are validated. The validation procedure is described in a SOP. The room cleaning and personnel hygiene are described in the hygiene plan. Microbiological environmental monitoring is carried out regularly for assessing the cleaning and hygiene measures. 4.2.3 GMP-critical computer systems The complete materials management and the order processing are generally implemented with the help of an ERP system (GUS-OS ERP) (refer to 1.9.1). The access is regulated by means of passwords and user profiles. Computers and microprocessors are used during manufacturing as well as packaging for process control and monitoring. When weighing, the weighed components are recorded by a log printer according to the quantities. A paperless recorder is used during manufacturing for recording the process data. The measured data is saved and evaluated using special software. During the packaging, scales are used with printers and statistics programmes, which allow the fill quantity to be checked in accordance with the pre-packaging ordinance and its proper documentation. In the Quality Control laboratory, the computers are used as stand-alone solutions, mostly for controlling measuring devices and for evaluating the analysis results. The archiving of raw data is defined in a SOP. The management of reference substances, chemicals, reagents and standard solutions is implemented using the ERP system (OS laboratory). Site Master File Version: 04 5. Valid from: 02-01-2016 Page 18 of 27 Documentation The content of the GMP-compliant pharmaceutical documentation and the handling are described in different SOPs, operating instructions and other documents depending on the department. The persons in-charge are also mentioned in them and the log formats and archiving are defined as well. The documents will be prepared and updated in the relevant department in each case. In case of updates, they will be replaced with the new version, stamped as invalid and preserved. The copies will be destroyed. The documents are hierarchically structured and range from the general, rather descriptive document to general and more specific specifications right up the documents with the logging function (refer to figure). The documentation system predominantly exists in hardcopy form and is thus also mainly manual. SMF SOPs, VMP Description and specification Specifications for general and comprehensive processes Testing instructions Manufacturing and operating instructions, maintenance instructions, IPK instructions Specifications for specific processes other operating instructions, specifications, plans, lists Forms, logs, reports Documents for documenting activities as well as results The documents are archived in the rooms in accordance with a valid manufacturing authorisation. No documents are archived outside the plant. Site Master File Version: 04 6. Production 6.1 Type of products Valid from: 02-01-2016 Page 19 of 27 At L-A-W Services GmbH, Leipziger Arzneimittelwerk, the manufacturing of liquid and semi-solid as well as the packaging of liquid, semi-solid and solid pharmaceutical dosage forms is carried out on a contract basis. These products mainly concern pharmaceuticals for human use. The preparations are non-sterile semi-solid and liquid preparations for oral and external use as well as solid dosage forms for oral use. A detailed list of the preparations can be taken from the annexes 1 or 4 (closed part). The dosage forms of the manufactured investigational medicinal products are identical (also refer to annexe 1 closed part). Investigational medicinal products will be manufactured in the manufacturing rooms. During the manufacturing, the employees will be assisted by the specially trained employees from galenics. The plant manufactures products, which contain the following substances, which are allocated to the toxic and hazardous categories: Substances with hormonal effect Teratogenic substances Ectoparasites Other potentially hazardous substances. The following categories of toxic and hazardous substances are not used during manufacturing: beta-lactam antibiotics Cephalosporins Sex hormones Prostaglandins / cytokines Cytostatic agents Immunosuppresive agents Prions Genotoxic agents Radioactive substances. For reasons of personal as well as product protection, active pharmaceutical ingredients and other substances with hazard potential are weighed at a different safety weighing workstation and suspended/dissolved in an excipient. Likewise, the blistering of solid forms with less therapeutic index and hazard potential will be carried out on separately enclosed blister lines with special safety precautions (ventilation system, pressure zone concept, lock concept, extractions). In the containments, the blistering of solids can be carried out in the form of unprotected formulations with APIs having a sufficient therapeutic index as well as in the form of protected formulations with APIs having a less therapeutic index. One of the containments, owing to its design, also allows the blistering of solids, which are available as unprotected formulations with APIs having a less therapeutic index (lowest therapeutic dosage ≤ 10 mg). The most varied work equipment and system parts are used only in a product-specific or product group-specific manner for preventing cross-contaminations, such as weighing equipment, tubes, etc. If the manufacturing systems/ rooms used are not used dedicatedly, this will be approveded risk- based. The following measures are implemented among others for preventing cross-contamination or intermixing or incorrect labelling: Site Master File Version: 04 Valid from: 02-01-2016 Page 20 of 27 Marking, cleaning validation, line clearance, corresponding clothing regulations, hygiene regulations and codes of conduct for personnel, limiting and checking access regulations as well as suitable clean room classes, hygiene concepts and air and pressure zone concepts in the manufacturing departments bulk manufacturing and packaging Process-analytical technologies are not used. 6.2 Process validation The execution of process validations is defined in the validation master plan. Pharmaceuticals to be manufactured for the first time will be prospectively or concurrently validated on the basis of three validation batches. The validation plan contains all the measures, such as additional in-process checks or the like, which have turned out to be necessary owing to the risk analysis, with their specifications. The documentation of the process validation consists of the validation plan and the validation report. If faults still need to be rectified, it is recorded in a nonconformity report. The plan as well as the report will be generated by the persons carrying out the validation, checked in the specialist departments and approved by the Head of Manufacturing. With the approval of the report, the validated process will also be approved simultaneously. The following procedure is followed during the process validation: Description of the validation object Definition of the responsibilities and schedule Description of the manufacturing procedure with reference to approved instructions; justification of the procedure during matrixing Description of the quality features of the end product Execution of the risk analysis taking into account the values influencing the process and the quality of the product (raw materials, process equipment and its calibration and qualification status) Definition of the acceptance criteria for the process flow, the setting parameters of the equipment and for tests Definition of the validation scope (in case of prospective or concurrent validation in general of three batches) Creation of the sampling plan and inspection plan with the inspection methods Definition of the documentation and the test evaluation Data collection Generation of the report with evaluation of the data, if necessary assessment of deviations and faults and definition of subsequent measures. A revision is permissible in an exceptional case if the quality of the end product is not affected and the specifications are adhered to. Decisions about any possible revisions (reworking, reprocessing) of a batch, for which the prerequisites for a batch release do not exist, will be taken in a common agreement between the Head of Manufacturing, Head of Quality Control, Qualified Person and the customer. The batch has to remain in the “Quarantine” status up to this or any other decision. A reworking / reprocessing of the manufactured products is permissible for L-A-W Services GmbH only after a written approval from the customer and will be carried out in accordance with the instructions approved by the contractor and customer. Site Master File Version: 04 Valid from: 02-01-2016 Page 21 of 27 In case of a necessary reworking / reprocessing, both the parties agree upon measures with each other that may be additionally necessary, such as Scope of the analytical tests (additional IPK or release tests) Specifications and scope of the documentation (SOPs, specifications, batch documentation, etc.) Qualification & validation measures Training of the employees Stability tests. The reworking/reprocessing process is described in detail in a manufacturing record and enclosed with the batch documentation. 6.3 Material management and storage Measures for working with raw materials, packaging material, bulk products and finished products, including sampling, quarantine, release, blocks and storage Manufacturing batch Every batch of any delivered material receives an internal batch number, which will be allocated serially. The internal batch number helps to ensure the retraceability of all the materials, i.e. every further inspection or use of these materials will be controlled with these internal batch numbers. The batch number of the manufacturer / supplier will be noted in the EDP system (ERP system) on the supply notes with the pallets as well as on the inspection log so that it can be retraced to the manufacturer. Sampling plans The Quality Control is responsible for preparing and approving all the sampling plans. The sampling of the delivered primary materials (raw materials, packaging materials, bulk products) is the responsibility of the Head of Quality Control and will be carried out by trained personnel of the Manufacturing / Storage and Quality Control departments according to the sampling plans, which are available for all the materials subject to mandatory testing. The bulk products for testing will be sampled by employees of bulk manufacturing in accordance with the corresponding sample plans. The employees were trained for this activity. During the packaging, the shift in-charge will take samples for the microbiological testing, the testing of the packaging and reference samples. Sampling plans are available for this too. The sampling for the microbiological and particulate monitoring as well as for the monitoring of purified water will be carried out by trained employees of the Quality Control department (employees of the microbiological laboratory) or trained employees of the Manufacturing department. The sampling is specified / described in the respective underlying instructions. For the compressed air monitoring, the sample is done in accordance with the instructions by employees of the Manufacturing and Technology departments. Status tracking The status marking of the materials is carried out in the ERP system, whereby access options too are controlled, as well as by means of physical marking using coloured supply notes with the pallets or labels. Site Master File Version: 04 Valid from: 02-01-2016 Page 22 of 27 Stock issue for manufacturing and packaging Generally, only raw materials (active pharmaceutical ingredients, excipients), bulk products, intermediate products, semi-finished products and packaging materials, which have been approved by the Quality Control department, may be used for manufacturing and packaging. The raw materials for a manufacturing order will be provided via a collective release order from the raw materials warehouse in accordance with the material number and internal batch number, checked and compiled on pallets after weighing with respect to the orders. The packaging materials will be transferred in an order-related manner via a collective release order from the warehouse in the assembly area of the packaging to pallets. The bulk products will be provided in an order-related manner via a collective release order from the corresponding warehouse in accordance with the material number and internal batch number and transferred to the packaging area. One pallet must not contain materials for multiple orders. Checking the weighing The raw materials will be weighed at the central weighing location of the Manufacturing department. Two weighing labels will be printed out in each case. One weighing label remains on the weighed raw material and the second will be on the manufacturing order. The accuracy according to type and quantity will be checked by two employees and confirmed with initials on the manufacturing order. The weighted sample of active pharmaceutical ingredients will be checked by the department head. The active pharmaceutical ingredient container will generally be sealed. Inspection methods The identity and status will be checked by checking the name, material number, internal batch number and release status before every relocation or consumption of a material. These checks will be conducted in accordance with the four-eye-principle. Labelling and release of the materials required for manufacturing All the pallets with raw materials (active pharmaceutical ingredients, additives), bulk products, semi-finished products and packaging materials receive a supply note with the pallets (PBS) containing at least the following information: status, material number, name, quantity, internal batch number. All the incoming or manufactured products are automatically put into the quarantine status. After Quality Control has tested and released the products, they will be physically marked and their status will be changed in the ERP system. The authorised persons for the release of the different materials are specified in SOPs. Checking the bulk products manufacturing Checking and recording the most important parameters Detailed manufacturing instructions are available for every product, which simultaneously serve as a manufacturing record. The integral parts of the manufacturing instructions are specifications for structuring the product and a detailed description of the manufacturing procedure including process data and in-process checks. The parameters of a manufacturing process are checked accurately and the actual process data is transferred to the manufacturing record in writing. Product temperature, internal pressure as well as speeds of the mixer and the homogeniser will be recorded during the manufacturing using a LOGOSCREEN paperless recorder, then saved on a disk, evaluated using the PC and printed out as diagrams. Manufacturing instructions/record, weight printouts for the raw materials and bulk products as well as the results calculations are integral parts of the manufacturing documentation. The process data logs are archived with the Manufacturing group head. Site Master File Version: 04 Valid from: 02-01-2016 Page 23 of 27 IPC and its recording The in-process controls to be conducted are also an integral part of the manufacturing instructions. The data will be transferred to the manufacturing record in writing and signed. The bulk product will be weighed and the results will be calculated. Compliance with the registration documents The respective customer is responsible for checking and ensuring the conformity with the registration documents in case of pharmaceuticals or the compliance with the product dossier and other registration documents for other product classes with the manufacturing instructions. Checking the packaging Packaging instructions and records are available for the packaging. Release of the bulk products, semi-finished products and packaging materials Generally, only bulk products, intermediate products, semi-finished products and packaging materials, which have been approved by the Quality Control department, may be used for packaging. The responsibility for the release of different materials is defined in SOPs. The status of the materials is changed in the ERP system as well as physically on the materials. Line clearance, confirmation of the identity of packaging materials and bulk as well as line release Before the packaging is started, a check is conducted to ensure that the packaging line and the surroundings are completely tidy and devoid of contaminants. All the materials and the line will be checked by the packaging employees and these processes will be documented in the packaging record. The packaging line will be provided with a label, which contains the product name, the batch description and the expiry date of the product to be packed. After checking and setting up the scales and the monitoring equipment (code reader, Lumat) and checking the labelling on the packaging container sample, the line is released for packaging. When delivering the materials to the line, the shift in-charge checks the identity of the bulk products and the packaging containers with the help of the material numbers, the internal batch numbers and for printed packaging containers, additionally with the help of version numbers and documents the correctness in the packaging log. IPC and its recording As in-process-controls during the packaging, fill quantity checks are continuously conducted in accordance with the Fertigpackungsverordnung (regulation for final packages), at least hourly checks of the labels as well as checks for the completeness of the packaging. The stated in-process controls are an integral part of the packaging documentation. The packaging lines have modern code readers for tubes, labels, package inserts and folded boxes. The correct functioning of the code readers is checked and documented before the order is started and tested repeatedly during the order processing. A luminescence reader checks the presence of the package inserts in the folded boxes. The function of this device too is tested repeatedly during the order processing. Site Master File Version: 04 Valid from: 02-01-2016 Page 24 of 27 Compliance with the registration documents The respective customer is responsible for checking and ensuring the conformity with the registration documents in case of pharmaceuticals or the compliance with the product dossier and other registration documents for other product classes with the packaging instructions. Working with rejected materials and products Working with rejected materials is defined in a SOP. Rejected materials and products are provided with a red label “GESPERRT” or a red supply note with the pallets and preserved in spatially separated stores for rejected material until they are destroyed or returned. In the ERP system, rejected materials are provided with the “04” status (rejected). Materials, which need to be disposed, are supplied to the assembly area for disposal. From there, these materials are handed over to a waste management company. This process is properly documented using dock receipts or supply notes and the proof of disposal or collective disposal. Site Master File Version: 04 7. Valid from: 02-01-2016 Page 25 of 27 Quality control (QC) The processes for quality control are regulated in the form of SOPs, operating instructions, testing instructions (consisting of components such as specifications, test methods, sampling plans, inspection plans). Documents containing instructions are subject to an approval cycle and distribution. Specifications are generally prepared based on the registration documents or other specifications of the customer. Specifications are approved by the Head of QC. The specifications for bulk, semi-finished and finished products are approved by the Qualified Person and the customer. The responsibilities and authorities for the release or rejection of the individual intermediate levels and finished products are defined in SOPs. All the relevant raw materials, packaging materials, intermediate products, bulk products and finished products are tested analytically. The findings of release tests are included in the respective batch documentation e.g. in the form of analysis reports or analysis certificates. In particular, physicochemical and organoleptic parameters chemical parameters (identity, impurities, content of effective ingredients) as well as microbiological purity (in each (partial) filling of manufacturing batches and microbiologically sensitive bulk products) are tested on the basis of approved specifications and the requirements of the European Pharmacopoeia. The analyses are carried out by using qualified equipment, for which the operation, cleaning, maintenance, function check and calibration is defined in device-specific SOPs or operating instructions. The following analysis procedures are used among others: HPLC, GC, TLC, titration, IR and UV spectroscopy, testing of disintegration time and dissolution, density measurement, viscosity determination, pH-value measurement. In addition, the quality of the purified water as well as the microbiological and particulate environmental conditions in the manufacturing area is regularly monitored (surface tests, air determinations). In addition to the routine analysis, stability studies (primary in accordance with ICH guidelines and on-going in accordance with EU-GMP guidelines) are conducted for external customers. The following climatic conditions are available for storing test samples: 25 °C / 60% relative humidity 30 °C / 65% relative humidity 30 °C / 75% relative humidity 40 °C / 75% relative humidity The documentation system is regulated via SOP. Raw data is archived in hardcopy form and, if applicable, electronically. The procedures for working with reagents, standard solutions and reference substances are defined in SOPs. Results out-of-specification (OOS) will be analysed and evaluated in accordance with a procedure defined in a SOP. Site Master File Version: 04 Valid from: 02-01-2016 Page 26 of 27 8. Distribution, complaints, product defects and recalls 8.1 Distribution (for the part in the field of responsibility of the manufacturer) The finished product manufactured by L-A-W Services GmbH, Leipziger Arzneimittelwerk on a contract basis will be directly delivered to the respective customer or to a recipient specified by it. The dispatch is carried out on the basis of the concluded Quality Agreements within Germany and, in isolated cases, within the EU to companies having their own manufacturing authorisation. The party responsible for the transport in accordance with the Quality Agreement must ensure suitable environmental conditions during the transport and the compliance with the GDP requirements. L-A-W Services GmbH generally delivers ex works (Incoterms 2010) and does not assume any responsibility for transporting the finished products / contractual products to be delivered. Deviating regulations are possible in agreement with the customer. Generally, the respective customer is responsible for the transport; the transport is carried out in accordance with its requirements. If, in isolated cases, the responsibility for the transport lies with L-A-W Services GmbH, Leipziger Arzneimittelwerk, a transport validation is taken out with regular monitoring of the transports by adhering to the GDP requirements. The transport company is selected carefully in accordance with the requirements. The transport requirements are derived from the storage instructions. The traceability of the pharmaceutical deliveries or contractual products is ensured using the ERP system. All the deliveries will be documented with the batch description of the dispatched product. That products get into an illegal supply chain is prevented by the supply practice: The product manufactured on a contract basis will be exclusively and directly delivered to the customer or to a recipient specified by it. 8.2 Complaints, product defects and recalls The process of dealing with complaints is regulated in a SOP. The Sales department is responsible for processing the commercial complaints. Complaints about the pharmaceutical quality fall within the scope of responsibility of that manufacturer, where the products are produced based on contract manufacturing. In case of subcontracting of manufacturing steps to third parties, contract manufacturers and contract laboratories are involved in the processing. The Head of Quality Assurance is responsible for the processing flow. The processing is done by including all the relevant departments. The resulting decisions and initiated measures will be documented. After the inspection is complete, a report is sent to the customer, who has complained about the product. The documentation of the complaints will be regularly checked for references with respect to special or recurring problems, which require special attention and additional measures in order to derive subsequent measures if necessary. The records about quality-relevant complaints will be maintained in the Quality Assurance department for at least 10 years. The customer is responsible for processing medically relevant complaints as well as notifications of unknown, undesired or serious side effects and this is mandatorily the responsibility of the respective customer (pharmacovigilance). In case of product recalls, the Qualified Person who released the product will be informed by the relevant customer; the recall of finished medicinal products will be noted in the batch register by the Qualified Person. Site Master File Version: 04 9. Valid from: 02-01-2016 Page 27 of 27 Self-inspection Self-inspections will be conducted in all the departments of L-A-W Services GmbH, Leipziger Arzneimittelwerk for checking the functionality of the quality assurance system as well as for checking that the pharmaceutical products are being manufactured, tested, stored and dispatched properly. The execution of the self-inspections is defined in a SOP. The self-inspection program can be adapted in accordance with the updated requirements during the year. At the start of every year, a self-inspection plan will be prepared, which will be approved by the Head of Quality Assurance and the Managing Director. The frequency of the self-inspections in the departments is ascertained in a risk-based manner. A self-inspection is conducted at least once a year in the GMP areas of Manufacturing, Quality Control and Quality Assurance. When planning the deadlines and contents of the self-inspections, the results of previous external and internal audits, deviations, results of the data analyses, PQRs and complaints will also be considered among other things. The preparation and post-processing of the self-inspection will be done in agreement with the Qualified Person. Generally, self-inspections are conducted by an inspection team, which consists of at least an internally approved inspector and another person. Both must not have any responsibility for the department being inspected (the inspected issue). It is possible to also include outsiders in the inspection team. A cover sheet for the audit report will be prepared as proof of the self-inspection; this cover sheet will contain the date of the execution, the audited department as well as the participants. An internal audit report will be generated as a result of the self-inspection, which will be evaluated by the auditors together with the person in-charge of the audited department. The audit report contains an action plan, in which the measures required for rectifying the ascertained faults will be specified along with the responsibilities and deadlines. The measures receive a CAPA number and will be included in the CAPA list. The implementation of the defined measures will be monitored by QA within the scope of the CAPA system.