Groundwater Remediation on a former Steel Works Site in Lübeck
Transcription
Groundwater Remediation on a former Steel Works Site in Lübeck
Groundwater Remediation on a former Steel Works Site in Lübeck-Herrenwyk, Germany Client: Grundstücksgesellschaft Metallhüttengelände mbH, Lübeck Engineering Design and Supervision: URS WCI Umwelttechnik GmbH, Lübeck Scope of Works: Groundwater remediation on an encapsulated site using sand filtration, activated carbon filtration and heavy metal adsorption Contract Period: October 2001 until end of 2003 The Project: As part of an earlier remediation program, the site of the former steel works had been encapsulated by a vertical cut-off wall and horizontal capping comprising PVC membranes and a layer of cohesive soil material. In addition, an internal groundwater control system had been installed. As the groundwater extracted from the encapsulated site was contaminated with heavy metals and polycyclic aromatic hydrocarbons (PAH‘s), it had to be remediated. C B A Index PIF PIF PIF gez. Überarbeitung Überarbeitung Überarbeitung Vermerk 21.01.2002 04.09.2001 31.08.2001 Datum BAUER + MOURIK UMWELTTECHNIK Projekt: In der Scherau 1 86529 Schrobenhausen Tel. 08252/884-0 erstellt geprüft freigegeben Datum 14.08.2001 14.08.2001 Name HÖRSCH GRUNDWASSERREINIGUNG eh. Metallhütte Lübeck Herrenwyk Blatt 1 FLIEßBILD Zeichn. Nr. Prüfstand: LÜBECK 0133HÖM-FB AUSFÜHRUNGSPLANUNG HERRENWYK Maßstab: 1:* Diese Zeichnung unterliegt dem Urheberrecht. Ohne Genehmigung ist keine Kopie oder Weitergabe erlaubt. A3 Flow diagram The Site: For the treatment of the contaminated water, BMU has set up and now operates a water treatment plant using sand filtration, activated carbon filtration and heavy metal adsorption. Sand filtration is used to separate particular matter. Organic pollutants are removed from the water by two activated carbon water filters connected in series. Subsequently, the water is directed through an heavy metal adsorption unit in which heavy metal contamination is removed. The Result: The entire plant is operated fully automatically (the sand filter for instance is backwashed automatically). Process visualisation by remote data link has been designed to enable fault messages to be transmitted via SMS and service personnel can monitor and/or correct these faults via remote data transmission. Sand filter, activated carbon filter and ion adsorption stage Depending on the water level in the drainage channel and in the encapsulated zone, between 0 and 15 m3 of water are pumped out by a pumping well and cleaned in the treatment plant. Sedimentation and treated water tank BAUER und MOURIK Umwelttechnik GmbH & Co, D-86529 Schrobenhausen, In der Scherau 1, Tel. (0 82 52) 884-0, Fax 884-111, www.bauer-mourik.de 902.235.2 4/2002 Water treatment plant with view of the river Trave