potency of power supply development on domestic capability
Transcription
potency of power supply development on domestic capability
POTENCY OF POWER SUPPLY DEVELOPMENT ON DOMESTIC CAPABILITY ORIONTATION INDONESIAN POWERS & ELECTRICITY EXPO 2011 Jakarta, 15 November 2011 DIRECTOR OF PLANNING AND RISK MANAGEMENT REALIZATION AND PROJECTION OF POWER (2011-2020) 350,000 Realization Projection 328 TWh 300,000 250,000 200,000 150,000 sia e on Ind 241 TWh i Bal a Jaw 100,000 50,000 - Barat Indonesia Indonesia Timur 55 TWh 31 TWh Indonesia Electricity needs predicted to grow averagely 8,46% per annum (JawaBali 7.8%, West Indonesia 10,2% and East Indonesia 10,8%) Sumber : RUPTL 1 DEVELOPMENT OF PLANT CAPACITY (2011 – 2020) • Increasing plant until year 2020 by 53.509 MW (PLN 31.676 MW and IPP 21.834MW) • Average plants increase around 5.400 MW/year 60,000 MW Kumulatif IPP Kumulatif PLN 50,000 21,834 40,000 20,859 19,449 17,219 30,000 13,205 8,807 20,000 4,992 3,158 2,375 10,000 - 1,083 4,676 10,788 2011 2012 15,246 17,307 19,411 21,505 2013 2014 2015 2016 23,211 25,290 2017 2018 28,231 2019 31,676 2020 Sumber : RUPTL 2 DEVELOPMENT OF TRANSMISSION AND SUB STATION (2011-2020) DEVELOPMENT OF ELECTRICITY PRIMARY SYSTEM OF PLN YEAR 2012 Domestic Industry Opportunity To Support National Economy Growth 7 % required electricity growth around 8-10 % In line with RUPTL (General Plan of Power Supply) 2011 - 2020, then in 2012 PLN will build among others: 1. Power Plants Additional Plan : 6.113 MW 2. Line 3. GI with Transformer by System 150 kV 6.889 kms 500/150 kV 1.830 MVA System 70 kV 74 kms 275/150 kV 2.500 MVA System 500 kV 172 kms 150/70 kV 60 MVA 8.035 kms 150/20 kV 11.470 MVA Total 70/20 kV 570 MVA 4. Distribution TM Line 18.573 kms TR Line 21.080 kms Distribusi Transformer 3 .721 MVA 4 INVESTMENT PLAN ON ELECTRICITY DEVELOPMENT (2011 – 2015) 5 QUALIFICATION OF THE ELECTRICTY PROJECT IMPLEMENTER PLN needs Capable Implementer in Finance, Technique and Experience Qualification of Finance Qualification of Technique Qualification of Experience Criteria o Total Asset : equal to project value o Net profit : sufficient for working capital ±20% of project value o Healthy and bankable balance sheet o Offer price < HPS CRITERIA o Supplied machine base on international standard o The equipment has been proven o Offered machine has been operated successfully for 2 years. o Has standard QA/QC and technically accepted by PLN CRITERIA o Has ever designing similar project/ a project with compatible complexity Eengineering Design o Has done similar project/a project with compatible complexity (Construction Experience) POLICY So the National contractor could build his basic capacity,thus: o Foreign constructor imposed to collaborate with National Contractor o Contractor could make consortium with strong financial company o Could make consortium with proven manufacturer o Has experience as partner/sub contractor of foreign company Accredited and or Combined Experience o Can have Partnership with Design Institute in engineering field o For APLN and APBN Fund Source provided to Domestic Preference 6 STAKEHOLDER OF ELECTRICITY PRIMARY SYSTEM DEVELOPMENT The role of Industry in National electricity Development Engineering Services Industry Transportation Services Industry Construction Services Industry Certification Services Industry EPC Contractor Finance and Banking Services Industry Primary Energy Supplier Industry Manufacturing Services Industry Repair shop Industry 7 PLN SUPPORTS TKDN POLICY TKDN PLN has conducted TKDN policy on the project 10.000 MW Phase I in line with National Policy on Domestic Product Utilization (Up-to-date Policy; Regulation of Ministry of Industry no. 48/M-IND/PER/4/2010): Sumber: Lampiran Permen Perindustrian No. 48/M-IND/PER/4/2010 DOMESTIC PRODUCT HAS BEEN PROVEN Domestic Industry Product and Primary System Equipment Appririate Used For PLN Electricity System: a. Material for Main Distribution (MDU) All (100%) local product, which are : Transformer of Distribution 20/0,4 kV TM cable TR cable Kwh meter + MCB (electronic, elektromechanic, prepaid) Isolator b. Material for Main Transmission (MTU) Local product used among others consist of : Pole for Tower Base Steel Structure / Tower TT Cable Conductor 300 mm PRODUCTS ALREADY DOMESTICALLY PRODUCE HAVE TO USE During CDA: PLN appoints third party to verified the products domestically produced and recorded in the vendor list prohibeted to import PLN TRUST ON THE NATIONAL EPC CONTRACTORS PLN manages National Contractor gradually CONSTRUCTION SERVICES National EPC Contractor That Implements Small scale PLTU projects (has been trusted to carry out Total EPC Turnkey Project of Small PLTU) , among others: NO CONTRACTOR PLTU PROJECT PLTU Ampana 2X3 MW 1 PT Hutama Karya 2 PT Twink Indonesia dan Perfect Circle Eng PLTU Sumbawa Barat 2X7 MW 3 PT Amarta-Tehate PLTU Alor 2X3 MW 4 PT Zug PLTU Rote 2X3 MW 5 PT Adhi Karya PLTU Sintang 3X7 MW 6 PT Citicon-Weltes PLTU Kota Baru 2X7 MW 7 PT Indokomas-PT Buana Perkasa- Jiangxi PLTU Berau 2X7 MW 8 PT PAL + Waskita Karya PLTU Malinau 2X3 MW 9 Truba Jaya Engineering PLTU Buntok 2X7 MW 10 PT Adhi Karya dan PT KMN PLTU Tanjung selor 2X7 MW 11 PT Wijaya Karya PLTU Ketapang 2X7 MW 12 PT Mega Eltra-PT Sakti Mas Mulia PLTU Bau-Bau 2X10 MW PLTU Kendari 1X10 MW Several National EPC Contractor have been trusted by Bank as IPP Developer 10 CAPABILITY IMPROVEMENT OF NATIONAL EPC CONTRUCTOR National EPC Contractor Kontraktor EPC Nasional dalam proses Capability Improvement untuk mampu membangun PLTU s.d 660 MW NO Contractor Strategic Partnership Land Improvement 1 PT. Rekayasa Industri CNTIC Project management & Engineering 2 PT. Truba Jurong Engineering Chengda Engineering Project Management & Erection 3 PT. Dalle Energie Dongfang Project Management 4 PT. Penta Adi Samudera Sinomach Project Management 5 PT. Maxima Infrastruktur Shanghai Electric Project Management & Erection 6 PT. Priamanaya Djan International Zeland SDN BHD Project Management & Engineering 7 PT. Cahaya Mulia Energi Konstruksi dan PT. Bajragraha Sentranusa CNTIC dan Shanghai Electric Project Management 8 PT. Mitra Selaras Hutama Energi Harbin Power Engineering Project Management National EPC Contractor That Capable of Construct PLTU 100 MW NO CONTRUCTOR Remark 1 PT. Rekadaya Industri Total EPC, Design Institute (foreign) 2 PT. Adhi Karya Total EPC, Design Institute (foreign) 3 PT. Wijaya Karya Total EPC, Design Institute (asing) 4 PT. Poeser Indonesia Total EPC, Design Institute (asing) 5 PT. Truba Jaya Engineering Total EPC, Design Institute (asing) 11 Implementer of Transmission and Distribution Project All national contractor National EPC Contractor That Carries Out PLN Line: 1 PT Modaco 2 PT BBS 3 PT Areva/Multifab 4 PT Bukaka Teknik Utama 5 PT Perfect Circle Eng 6 KSO (Joint Operation) PT MetaepsiDalima Raya 7 PT Mega Eltra 8 KSO (Joint Operation) Ratu PolaPerfect Elektro 9 PT Modern Surya Jaya 10 KSO (Joint Operation) CitramasjayaWahanayasa ..... dll. 12 CONSULTING SERVICES OPPORTUNITY Consultation Services For project funded by APLN all consultant, start from Basic Design, Design Review and Construction Supervision handled by National Consultant, among others : i. PT PLN PUSENLIS ii. PT PLN-E iii. PT Rekadaya Elektrika iv. PT PLN JMK and National Consultant supported by Overseas Consultant, among others : i. PT Connusa Energindo ii. PT Kwarsa Hexagon iii. PT Arkonin Engineering Manggala Pratama iv. PT Tata Guna Patria v. PT Jaya CM 13 Terima Kasih … 14
Similar documents
Engineering Data Submittal Manual
temperature range from 20° to 120°F (-6.7° to 48.9°C) (extended data tables; Heating 25F – 90F, cooling 50F – 110F) as standard. All equipment listed in this section must be rated and certified in ...
More information