MINING ENVIRONMENT AND SAFETY DIVISION: PERMIT TO INSTALL MECHANICAL EQUIPMENT

Transcription

MINING ENVIRONMENT AND SAFETY DIVISION: PERMIT TO INSTALL MECHANICAL EQUIPMENT
MINING ENVIRONMENT AND SAFETY DIVISION:
PERMIT TO INSTALL MECHANICAL EQUIPMENT
Schedule of Availability of Service : Monday – Friday; 8:00 AM – 5:00 PM without noon break
: Mining Companies
Who May Avail the service
What are the Requirements
1.Duly accomplished Application for Mechanical Equipment Installation (MGB ME-4 form)
2. Location Plan;
3. General Layout Plan;
4. Plan elevation (longitudinal & traverse);
5. Piping plan in isometric drawing & detailed plans of foundation and support;
6. Detailed construction and working plans of boilers and pressure vessels;
7. Complete machinery list in tabulated form;
8. Flow sheet if processing manufacturing or currently operating; and
9. Signature and Seal of Professional Mechanical Engineer.
Fees
: PhP500.00/plan
Duration
: 6 days and 4 hours
How to Avail the Service
Step
1
Applicant/Client
Submits written
application
2
3
4
5
6
Pays required fee
7
8
9
Receives permit
Service Provider
Duration of
Activity
Person In Charge
Receives and records application from client and forwards
documents to the ORD
Reviews and endorses application to the Chief MESD
Receives and checks the compliance of procedural requirements
30 minutes
R&R
30 minutes
1 hour
Prepares order of payment
Issues Official Receipt
Evaluates substantial compliance of application; processes permit
and prepares communication
Final evaluation and endorsement of initialled permit to the
Regional Director
Reviews/signs permit and endorsement letter
Records/releases the permit
30 minutes
30 minutes
5 days
RD
Chief, MESD/ SHS
personnel
SHS personnel
Cashier
SHS personnel
1 day
Chief, MESD
30 minutes
30 minutes
RD
R&R
PERMIT TO INSTALL ELECTRICAL EQUIPMENT
Schedule of Availability of Service : Monday – Friday; 8:00 AM – 5:00 PM without noon break
Who May Avail the service
What are the Requirements
Fees
Duration
: Mining Companies
1. Duly accomplished Application for Electrical Wiring Installation (MGB ME-4 form)
2. Location Plan;
3. Power Layout Plan;
4. Electrical Plans:
a. Layout and schematic diagram for lighting and convenient outlets;
b. Schematic diagram for feeder and sub-feeder;
c. Schematic for wiring diagram for load center;
5. Design computational, design analysis;
6. Schedule for load in tabulated form; and
7. Signature and Seal of Professional Electrical Engineer
: PhP500.00/plan
: 6 days and 4 hours
How to Avail the Service
Step
1
Applicant/Client
Submits written
application
2
3
4
5
6
Pays required fee
7
8
9
Receives permit
Service Provider
Duration of
Activity
Receives and records application from client and forwards
30 minutes
documents to the ORD
Reviews and endorses application to the Chief MESD
30 minutes
Receives and checks the compliance of procedural requirements 1 hour
Prepares order of payment
Issues Official Receipt
Evaluates substantial compliance of application; processes
permit and prepares communication
Final evaluation and endorsement of initialled permit to the
Regional Director
Reviews/signs permit and endorsement letter
Records/releases the permit
Person In Charge
R&R
30 minutes
30 minutes
5 days
RD
MESD CHIEF/ SHS
personnel
SHS
CASHIER
SHS personnel
1 day
MESD CHIEF
30 minutes
30 minutes
RD
R&R
PERMIT TO OPERATE ELECTRICAL AND MECHANICAL EQUIPMENT
Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break
Mining Companies
Who May Avail the service
What are the Requirements
1. Application letter
2. Duly accomplished Application for Mechanical and Electrical Equipment (MGB ME-4 form)
3. Copy of the permit to install issued by MGBRO;
4. As built plans.
PhP500.00/plan
Fees: Application
P 2,000.00/man/day or not less than P6,000.00. Transportation and incidental expenses shall be
Verification
shouldered by the applicant
Duration
: 11 days
How to Avail the Service
Step
1
Applicant/Client
Submits written
application
2
3
4
5
6
7
Pays required fee
8
9
10
Receives Permit
Service Provider
Duration of
Activity
Receives and records application from client and forwards
30 minutes
documents to the ORD
Reviews and endorses application to the Chief MESD
30 minutes
Receives and checks the compliance of procedural requirements 1 hour
Prepares order of payment
Issues Official Receipt
Evaluates /processes substantial compliance of the application
Conducts the verification of installations and prepares
recommendation(s) and permit
Evaluates, reviews and forwards initialled permit to the RD
Reviews and approves/issues the permit; signs the letter
endorsement
Releases permit
Person In Charge
R&R
30 minutes
30 minutes
2 days
8 days
RD
MESD CHIEF/ SHS
personnel
SHS personnel
CASHIER
SHS personnel
SHS personnel
4 hours
30 minutes
MESD CHIEF
RD
30 minutes
R&R
SAFETY ENGINEER’S/SAFETY INSPECTOR’S PERMIT
Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break
Who May Avail the service
What are the Requirements
Mining Companies and their service contractors
Fees: Application for/ Renewal
Temporary safety engineer’s permit P1,000.00
Permanent safety engineer’s permit P1,500.00
Temporary safety inspector’s permit P1,000.00
Permanent safety inspector’s permit P1,500.00
Duration
: 4 days
Three (3) copies of the following:
1. Duly filled accomplished form (MGB form 15-3A)
2. Certified photocopy of college diploma or high school diploma or pertinent credentials as
the case may be;
3. Certificate of employment (present and previous) signed under oath;
4. Latest photograph 2”x2”.
How to Avail the Service
Step
1
2
3
4
5
6
Applicant/Client
Submits application
Pays required fee
7
8
9
Receives permit
Service Provider
Receives and records application from client and forwards
documents to the RD
Reviews and endorses application to the Chief MESD
Receives and checks the compliance of procedural requirements
Prepares order of payment
Issues Official Receipt
Evaluates /processes substantial compliance of the application;
processes permit and prepares communication
Evaluates, reviews and endorses initialled permit to the Regional
Director
Reviews/signs permit and endorsement letter
Records/releases the permit
Duration of
Activity
Person In Charge
30 minutes
R&R
30 minutes
1 hour
30 minutes
30 minutes
3 days
RD
SHS personnel
SHS personnel
CASHIER
SHS personnel
4 hours
MESD CHIEF
30 minutes
30 minutes
RD
R&R
BLASTER FOREMAN’S LICENSE
Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break
Who May Avail the service
What are the Requirements
Mining Companies and their blasting contractor
Fees
Duration
P500.00 per application
Four (4) copies of the following:
1. Application letter;
2. PNP Form No. 6;
3. PNP Provincial Commander Endorsement;
4. Copy of the employer’s Purchaser’s License.
5. Certification of employment ;
7. Certification of a licensed mining engineer;
8. Dully filled-up application sheet.
4 days 4 hours and 30 minutes
How to Avail the Service
Step
1
Applicant/Client
Submits application
2
3
4
5
6
7
8
9
10
Pays required fee
Undergoes written
and practical
examinations
Receives letter
Service Provider
Duration of
Activity
Person In Charge
Receives and records application from client and forwards
documents to the RD
Reviews and endorses application to the Chief MESD
Receives and checks the compliance of procedural requirements
30 minutes
R&R
30 minutes
1 hour
Prepares order of payment
Issues Official Receipt
Evaluates /processes substantial compliance of the application;
conducts written and practical examinations; and prepares
communication
Prepares letter endorsement to the PNP
Reviews and affixes initials to the endorsement letter to the ORD
Reviews/signs letter endorsement
Records/releases the endorsement
30 minutes
30 minutes
3 days
RD
MESD CHIEF/SHS
personnel
SHS
CASHIER
MESD CHIEF/SHS
personnel
1 day
30 minutes
30 minutes
30 minutes
SHS personnel
MESD CHIEF
RD
R&R
LICENSE TO POSSESS EXPLOSIVES
Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break
Mining Companies
Who May Avail the service
What are the Requirements
1. PNP Form No. 6;
2. PNP Provincial Commander Endorsement;
3. Clearance from the Municipal Mayor, Chief of Police, Municipal Judge and NBI;
4. Mining contract/ Exploration Permit of the area;
5. Operating Agreement if the applicant is other than the Tenement Holder/Permittee;
6. Drilling and blasting scheme prepared by a licensed Mining Engineer justifying the
legitimate use of the Explosives;
7. Plan of the explosive magazines;
8. Location map of the explosive magazines;
Fees: Application
Verification
P 1,000.00 per application
P2,000.00 per man/day with a minimum amount of P6,000.00. Transportation and incidental
expenses shall be borne by the applicant.
Duration
8 days 4 hours and 30 minutes
How to Avail the Service
Step
1
Applicant/Client
Submits application
2
3
4
5
6
7
8
9
10
Pays required fee
Receives letter
Service Provider
Duration of
Activity
Receives and records application from client and forwards
30 minutes
documents to the RD
Reviews and endorses application to the Chief MESD
30 minutes
Receives and checks the compliance of procedural requirements 1 hour
Prepares order of payment
Issues Official Receipt
Evaluates /processes substantial compliance of the application;
Conducts verification of explosives magazines
Prepares report and letter endorsement to the PNP
Reviews and endorses initialled letter to the ORD
Reviews/signs letter endorsement to the PNP
Records/releases the endorsement
Person In Charge
R&R
30 minutes
30 minutes
5 days
RD
MESD CHIEF/SHS
personnel
SHS personnel
CASHIER
SHS personnel
3 days
30 minutes
30 minutes
30 minutes
SHS personnel
MESD CHIEF
RD
R&R
PERMIT TO PURCHASE AND MOVE EXPLOSIVES
Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break
Mining Companies
Who May Avail the service
What are the Requirements
1. Application letter;
2. PNP Form No. 6;
3. PNP Provincial Commander Endorsement;
4 Latest monthly explosive consumption report;
5. Copy of Purchaser’s license;
6. Drilling and blasting scheme prepared by a licensed Mining Engineer justifying the
legitimate use of the Explosives;
7. Plan of the explosive magazines;
8. Location map of the explosive magazines;
9. Operating Agreement if the applicant is other than the Tenement Holder/Permittee
P1,000.00 per application
Fees
Duration
3 days and 4 hours
How to Avail the Service
Step
1
Applicant/Client
Submits application
2
3
4
5
6
8
9
10
Pays required fee
Receives letter
Service Provider
Duration of
Activity
Person In Charge
Receives and records application from client and forwards
documents to the RD
Reviews and endorses application to the Chief MESD
Receives and checks the compliance of procedural requirements
30 minutes
R&R
30 minutes
30 minutes
Prepares order of payment
Issues Official Receipt
Evaluates /processes substantial compliance of the application;
prepares letter endorsement to the PNP
Reviews and endorses initialled letter to the ORD
Reviews/signs letter endorsement to the PNP
Records/releases the endorsement
30 minutes
30 minutes
3 days
RD
MESD CHIEF/SHS
personnel
SHS personnel
CASHIER
SHS personnel
30 minutes
30 minutes
30 minutes
MESD CHIEF
RD
R&R