MINING ENVIRONMENT AND SAFETY DIVISION: PERMIT TO INSTALL MECHANICAL EQUIPMENT
Transcription
MINING ENVIRONMENT AND SAFETY DIVISION: PERMIT TO INSTALL MECHANICAL EQUIPMENT
MINING ENVIRONMENT AND SAFETY DIVISION: PERMIT TO INSTALL MECHANICAL EQUIPMENT Schedule of Availability of Service : Monday – Friday; 8:00 AM – 5:00 PM without noon break : Mining Companies Who May Avail the service What are the Requirements 1.Duly accomplished Application for Mechanical Equipment Installation (MGB ME-4 form) 2. Location Plan; 3. General Layout Plan; 4. Plan elevation (longitudinal & traverse); 5. Piping plan in isometric drawing & detailed plans of foundation and support; 6. Detailed construction and working plans of boilers and pressure vessels; 7. Complete machinery list in tabulated form; 8. Flow sheet if processing manufacturing or currently operating; and 9. Signature and Seal of Professional Mechanical Engineer. Fees : PhP500.00/plan Duration : 6 days and 4 hours How to Avail the Service Step 1 Applicant/Client Submits written application 2 3 4 5 6 Pays required fee 7 8 9 Receives permit Service Provider Duration of Activity Person In Charge Receives and records application from client and forwards documents to the ORD Reviews and endorses application to the Chief MESD Receives and checks the compliance of procedural requirements 30 minutes R&R 30 minutes 1 hour Prepares order of payment Issues Official Receipt Evaluates substantial compliance of application; processes permit and prepares communication Final evaluation and endorsement of initialled permit to the Regional Director Reviews/signs permit and endorsement letter Records/releases the permit 30 minutes 30 minutes 5 days RD Chief, MESD/ SHS personnel SHS personnel Cashier SHS personnel 1 day Chief, MESD 30 minutes 30 minutes RD R&R PERMIT TO INSTALL ELECTRICAL EQUIPMENT Schedule of Availability of Service : Monday – Friday; 8:00 AM – 5:00 PM without noon break Who May Avail the service What are the Requirements Fees Duration : Mining Companies 1. Duly accomplished Application for Electrical Wiring Installation (MGB ME-4 form) 2. Location Plan; 3. Power Layout Plan; 4. Electrical Plans: a. Layout and schematic diagram for lighting and convenient outlets; b. Schematic diagram for feeder and sub-feeder; c. Schematic for wiring diagram for load center; 5. Design computational, design analysis; 6. Schedule for load in tabulated form; and 7. Signature and Seal of Professional Electrical Engineer : PhP500.00/plan : 6 days and 4 hours How to Avail the Service Step 1 Applicant/Client Submits written application 2 3 4 5 6 Pays required fee 7 8 9 Receives permit Service Provider Duration of Activity Receives and records application from client and forwards 30 minutes documents to the ORD Reviews and endorses application to the Chief MESD 30 minutes Receives and checks the compliance of procedural requirements 1 hour Prepares order of payment Issues Official Receipt Evaluates substantial compliance of application; processes permit and prepares communication Final evaluation and endorsement of initialled permit to the Regional Director Reviews/signs permit and endorsement letter Records/releases the permit Person In Charge R&R 30 minutes 30 minutes 5 days RD MESD CHIEF/ SHS personnel SHS CASHIER SHS personnel 1 day MESD CHIEF 30 minutes 30 minutes RD R&R PERMIT TO OPERATE ELECTRICAL AND MECHANICAL EQUIPMENT Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break Mining Companies Who May Avail the service What are the Requirements 1. Application letter 2. Duly accomplished Application for Mechanical and Electrical Equipment (MGB ME-4 form) 3. Copy of the permit to install issued by MGBRO; 4. As built plans. PhP500.00/plan Fees: Application P 2,000.00/man/day or not less than P6,000.00. Transportation and incidental expenses shall be Verification shouldered by the applicant Duration : 11 days How to Avail the Service Step 1 Applicant/Client Submits written application 2 3 4 5 6 7 Pays required fee 8 9 10 Receives Permit Service Provider Duration of Activity Receives and records application from client and forwards 30 minutes documents to the ORD Reviews and endorses application to the Chief MESD 30 minutes Receives and checks the compliance of procedural requirements 1 hour Prepares order of payment Issues Official Receipt Evaluates /processes substantial compliance of the application Conducts the verification of installations and prepares recommendation(s) and permit Evaluates, reviews and forwards initialled permit to the RD Reviews and approves/issues the permit; signs the letter endorsement Releases permit Person In Charge R&R 30 minutes 30 minutes 2 days 8 days RD MESD CHIEF/ SHS personnel SHS personnel CASHIER SHS personnel SHS personnel 4 hours 30 minutes MESD CHIEF RD 30 minutes R&R SAFETY ENGINEER’S/SAFETY INSPECTOR’S PERMIT Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break Who May Avail the service What are the Requirements Mining Companies and their service contractors Fees: Application for/ Renewal Temporary safety engineer’s permit P1,000.00 Permanent safety engineer’s permit P1,500.00 Temporary safety inspector’s permit P1,000.00 Permanent safety inspector’s permit P1,500.00 Duration : 4 days Three (3) copies of the following: 1. Duly filled accomplished form (MGB form 15-3A) 2. Certified photocopy of college diploma or high school diploma or pertinent credentials as the case may be; 3. Certificate of employment (present and previous) signed under oath; 4. Latest photograph 2”x2”. How to Avail the Service Step 1 2 3 4 5 6 Applicant/Client Submits application Pays required fee 7 8 9 Receives permit Service Provider Receives and records application from client and forwards documents to the RD Reviews and endorses application to the Chief MESD Receives and checks the compliance of procedural requirements Prepares order of payment Issues Official Receipt Evaluates /processes substantial compliance of the application; processes permit and prepares communication Evaluates, reviews and endorses initialled permit to the Regional Director Reviews/signs permit and endorsement letter Records/releases the permit Duration of Activity Person In Charge 30 minutes R&R 30 minutes 1 hour 30 minutes 30 minutes 3 days RD SHS personnel SHS personnel CASHIER SHS personnel 4 hours MESD CHIEF 30 minutes 30 minutes RD R&R BLASTER FOREMAN’S LICENSE Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break Who May Avail the service What are the Requirements Mining Companies and their blasting contractor Fees Duration P500.00 per application Four (4) copies of the following: 1. Application letter; 2. PNP Form No. 6; 3. PNP Provincial Commander Endorsement; 4. Copy of the employer’s Purchaser’s License. 5. Certification of employment ; 7. Certification of a licensed mining engineer; 8. Dully filled-up application sheet. 4 days 4 hours and 30 minutes How to Avail the Service Step 1 Applicant/Client Submits application 2 3 4 5 6 7 8 9 10 Pays required fee Undergoes written and practical examinations Receives letter Service Provider Duration of Activity Person In Charge Receives and records application from client and forwards documents to the RD Reviews and endorses application to the Chief MESD Receives and checks the compliance of procedural requirements 30 minutes R&R 30 minutes 1 hour Prepares order of payment Issues Official Receipt Evaluates /processes substantial compliance of the application; conducts written and practical examinations; and prepares communication Prepares letter endorsement to the PNP Reviews and affixes initials to the endorsement letter to the ORD Reviews/signs letter endorsement Records/releases the endorsement 30 minutes 30 minutes 3 days RD MESD CHIEF/SHS personnel SHS CASHIER MESD CHIEF/SHS personnel 1 day 30 minutes 30 minutes 30 minutes SHS personnel MESD CHIEF RD R&R LICENSE TO POSSESS EXPLOSIVES Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break Mining Companies Who May Avail the service What are the Requirements 1. PNP Form No. 6; 2. PNP Provincial Commander Endorsement; 3. Clearance from the Municipal Mayor, Chief of Police, Municipal Judge and NBI; 4. Mining contract/ Exploration Permit of the area; 5. Operating Agreement if the applicant is other than the Tenement Holder/Permittee; 6. Drilling and blasting scheme prepared by a licensed Mining Engineer justifying the legitimate use of the Explosives; 7. Plan of the explosive magazines; 8. Location map of the explosive magazines; Fees: Application Verification P 1,000.00 per application P2,000.00 per man/day with a minimum amount of P6,000.00. Transportation and incidental expenses shall be borne by the applicant. Duration 8 days 4 hours and 30 minutes How to Avail the Service Step 1 Applicant/Client Submits application 2 3 4 5 6 7 8 9 10 Pays required fee Receives letter Service Provider Duration of Activity Receives and records application from client and forwards 30 minutes documents to the RD Reviews and endorses application to the Chief MESD 30 minutes Receives and checks the compliance of procedural requirements 1 hour Prepares order of payment Issues Official Receipt Evaluates /processes substantial compliance of the application; Conducts verification of explosives magazines Prepares report and letter endorsement to the PNP Reviews and endorses initialled letter to the ORD Reviews/signs letter endorsement to the PNP Records/releases the endorsement Person In Charge R&R 30 minutes 30 minutes 5 days RD MESD CHIEF/SHS personnel SHS personnel CASHIER SHS personnel 3 days 30 minutes 30 minutes 30 minutes SHS personnel MESD CHIEF RD R&R PERMIT TO PURCHASE AND MOVE EXPLOSIVES Schedule of Availability of Service Monday – Friday; 8:00 AM – 5:00 PM without noon break Mining Companies Who May Avail the service What are the Requirements 1. Application letter; 2. PNP Form No. 6; 3. PNP Provincial Commander Endorsement; 4 Latest monthly explosive consumption report; 5. Copy of Purchaser’s license; 6. Drilling and blasting scheme prepared by a licensed Mining Engineer justifying the legitimate use of the Explosives; 7. Plan of the explosive magazines; 8. Location map of the explosive magazines; 9. Operating Agreement if the applicant is other than the Tenement Holder/Permittee P1,000.00 per application Fees Duration 3 days and 4 hours How to Avail the Service Step 1 Applicant/Client Submits application 2 3 4 5 6 8 9 10 Pays required fee Receives letter Service Provider Duration of Activity Person In Charge Receives and records application from client and forwards documents to the RD Reviews and endorses application to the Chief MESD Receives and checks the compliance of procedural requirements 30 minutes R&R 30 minutes 30 minutes Prepares order of payment Issues Official Receipt Evaluates /processes substantial compliance of the application; prepares letter endorsement to the PNP Reviews and endorses initialled letter to the ORD Reviews/signs letter endorsement to the PNP Records/releases the endorsement 30 minutes 30 minutes 3 days RD MESD CHIEF/SHS personnel SHS personnel CASHIER SHS personnel 30 minutes 30 minutes 30 minutes MESD CHIEF RD R&R