Document 6525157

Transcription

Document 6525157
Virginia State Corporation Commission
eFiling CASE Document Cover Sheet
Case Number (if already
assigned)
PUE-2013-00052
Case Name (if known)
Application of Rappahannock Electric Cooperative For
approval of a plan to migrate transitioning customers to
the Cooperative's legacy rates and to revise rate
schedules for electric service
Document Type
CORR
Document Description Summary
Revised pages 5-6 of Schedule 5A (Rate Schedules
and Riders - Clean) included in Rappahannock Electric
Cooperative's application filed July 29, 2013
Total Number of Pages
4
Submission ID
7316
eFiling Date Stamp
W
a
co
8/14/2013 9 :57 :30AM
W
McGuireWoods LLP
One James Center
901 East Cary Street
Richmond, VA 23219-4030
Phone: 804.775 .1 GOO
Fax: 804.775 .1061
www.mcguirewoods .com
Kristian M. Dahl
Direct: 804.775 .4730
~A ~!
W
0;
McGUIRREWOODS
BY ELECTRONIC DELIVERY
kdahl*mcguirewoods .com
Direct Fax: 804.698.2004
August 14, 2013
Joel H. Peck, Clerk
Document Control Center
State Corporation Commission
1300 E. Main St., Tyler Bldg ., I" Floor
Richmond, Virginia 23219
Application ofRappahannock Electric Cooperative
For approval ofa plan to migrate transitioning customers to the
Cooperative's legacy rates and to revise rate schedulesfor electric service
Case No. PUE-2013-00052
Dear Mr. Peck:
On behalf of Rappahannock Electric Cooperative ("REC" or the "Cooperative"),
enclosed for electronic filing in the above-referenced proceeding please find revised pages 5-6 of
Schedule 5A (Rappahannock Electric Cooperative Rate Schedules and Riders - Clean), which
was included in Volume I of REC's application for approval of a plan to migrate transitioning
customers to the Cooperative's legacy rates and to revise rate schedules for electric service
("Application") filed with the State Corporation Commission on July 29, 2013 .
Since filing the-above-referenced Application, it has come to the Cooperative's attention
that an incorrect version of REC's proposed Power Cost Adjustment Rider, Schedule PCA-l
(Interim) was provided on pages 5-6 of Schedule 5A. Accordingly, pages 5-6 of Schedule 5A
(Rappahannock Electric Cooperative Rate Schedules and Riders - Clean) should be replaced
with the enclosed revised pages .
Please do not hesitate to contact me if you have any questions regarding this filing .
Very truly yours,
,// d2t~~
stian M. Dahl
Enclosures
cc:
Bryan D. Stogdale, Esq.
K. Beth Clowers, Esq .
Mr. Cody Walker
Mr. Matthew Faulconer
Atlanta I Austin I Baltimore I Brussels I Charlotte I Charlottesville I Chicago I Houston I Jacksonville I London
Los Angeles] New York I Norfolk I Pittsburgh I Raleigh I Richmond I Tysons Comer I Washington, D.C . I Wilmington
W
I.& ::
RAPPAHANNOCK ELECTRIC COOPERATIVE
Fredericksburg, VA
Exhibit No .
Witness : DFK & JDG
Schedule SA
Revised Page 5 of 41
AVAILAOILITY
Available in all territory served by the Cooperative, subject to the Terms and Conditions of
the Cooperative on file with the Virginia State Corporation Commission.
APPLICABILITY
This schedule is applicable to and becomes a part of each electric rate schedule in
which reference is m*ade to Power Cost Adjustment Rider, Schedule PCA-1 .-
The Cooperative shall apply a uniform per kWh charge or credit'to applicable sales
in accordance with the following terms . All definitions and calculations shall be in
reference to the total Cooperative system but shall exclude any kWh sales, kWh
purchases, Energy Supply Service revenues, and power costs related to service to
any customer under an electric service tariff that separately provides for a direct
pass through of purchased power expense .
DEFINITIONS
PCA
Power cost adjustment factor.
ESS Revenue
Revenue produced by the base Energy Supply Service part
of each tadff.
ESS Base
Not applicable
kWhs
Not applicable
PCP
Not applicable .
01
Any Over Recovery balance recorded on the Cooperative's
balance sheet as of the most recent accounting month
available .-
U
Any Under Recovery balance recorded on the Cooperative's
balance sheet as of the most recent accounting month
available .
Power Cost Adjustment Rider
Filed State Corporation Commission
Effective for service rendered on and after January 1, 2014.
cl
Wi
POWER COST ADJUSTMENT RIDER
SCHEDULE PCA-1 (INTERIM)
Schedule PCA-1
W
Page 1
Exhibit No.
Witness: DFK & JDG
Schedule 5A
Revised Page 6 of 41
IV.
W
01,
FORMULA
W
PCA =
0
V.
Rider RS 1 2-1 + Rider RS1 3-1 + Subsequent Riders, if any* + WPCA
Fuel Factor
Subsequent Riders, iff any, to be determined pursuant to Part A of the WPCA
OVER AND UNDER RECOVERY AMOUNT
The over or under recovery of power cost will be calculated and booked monthly
based on the difference between actual purchased power costs in the month
(including any charge or credit for an ODEC margin stabilization adjustment and
excluding any Transition Payments) and revenues booked in the month equal to
the base ESS Revenues; plus, the PCA revenues ; less, the product of booked
kWh sales for the month times $0.00030 .1 Booked revenues and kWh sales will
be net of any applicable unbilled adjustments .
(Over) and Under Recovery Amounts, if any, will be credited or debited to accounts
2532 .0 Deferred Credit - PCA or 1860 .59 Deferred Debit - PCA, with
corresponding credits or debits to 555.14 Purchased' Power - PCA..
V1 .
RIDER RS11-1-NT
Applicable to customers of the Cooperative who receive service within the territory
acquired by Rappahannock Electric Cooperative as approved in PUE-2009000100 .
a. A charge of $0.01128 per kWh, and ;
b. A charge of $ 0.00172 per kWh be applied through June 30, 2014, in
accordance with the conditions prescribed in requirement 2) of the Final Order
in Case No . PUE-20009-00101 .
$0.00030 represents cost per kWh of the allocated non-purchased power costs'included in the base
G&T rates.
Interim Schedule PCA-1
Power Cost Adjustment Rider
Filed State Corporation Commission
Effective for service rendered on and after January 1, 2014.
Page 2
W:
CERTIFICATE OF SERVICE
I hereby certify that .a true c9g of the foregoing was hand delivered or mailed
first class, postage prepaid, on this 14t day of August 2013, to the following:
C . Meade Browder, Jr., Esq.
Sr. Assistant Attorney General
Office of the Attorney General
Division of Consumer Counsel
900 East Main Street, 2"d Floor
Richmond, VA 23219
-7
,,
-
'.'4
-
W!