Email Cover Sheet
Transcription
Email Cover Sheet
Email Cover Sheet Date: February 17, 2010 From: Joey Ganser To: All Plan Holders Subject: Addendum #1 for Nevada State Library and Archives Photovoltaic System SPWB Project #10‐A016 Comment(s): Following is Addendum #1 for the Nevada State Library and Archives Photovoltaic System. Company: Email: • Nevada SPWB Attn: Jeff Resler • Reno Builders Exchange Attn: Jana Higgins (Plan Rm.) [email protected] • Sierra Contractors Source Attn: Plan Room [email protected] • Western Pacific Electric Attn: Cliff Springmeyer [email protected] • Reliant Electric Attn: Joe Ganser [email protected] • Reed Construction Data Attn: Heidi Shaffer [email protected] [email protected] • Nelson Electric Attn: Scott Emerich [email protected] • Construction Notebook Attn: Jennifer Holcombe [email protected] • McGraw Hill Const. Dodge Attn: Judy Morgen judy_morgen@mcgraw‐hill.com • EFACEC Attn: Sergio Cancelo [email protected] • System 3, Inc. Attn: Bob Brady [email protected] • Aspen Electric Attn: Shawn O’Meara [email protected] • Hamilton Solar Attn: Chad Dickason [email protected] ADDENDUM NO.1 PROJECT: Nevada State Library and Archives Photovoltaic System SPWB Project #10-A016 SUBJECT: Addendum No. 1 to Project Specifications and Drawings OWNER: State Public Works Board 515 E. Musser Street, Suite 102 Carson City, Nevada 89701-4263 p: (775) 684-4141 FROM: Joey Ganser – Engineering Operations Manager; PK Electrical, Inc. 681 Sierra Rose Drive, Suite B Reno, NV 89511 p: 775-826-9010 f: 775-826-9030 DATE: February 17, 2010 BIDDERS NOTES: 1. The Contractor shall acknowledge receipt of this Addendum on the Bid Proposal Form. All terms and provisions of the Bid Documents shall apply to this Addendum. The Contractor is responsible for ensuring that all changes identified in this Addendum are fully understood by him and by his subcontractors, that all changes are accounted for in the bid amount, and that each of the subcontractors utilized in preparation of his bid received the addendum and have accounted for the addendum in their bid amount. 2. Addenda are being issued by PK Electrical, Inc. to all Prime Contractor plan holders with complete sets of Drawings (Specification and Plans). It shall be the Contractor’s responsibility to verify that all their bidders are aware of the items in the Addendum. ADDENDUM ITEMS: ITEM #1 Mandatory Pre-Bid Meeting has been revised as follows: Meeting will be NON-MANDATORY Date: February 22, 2011 Time: 10:00am (local time) Place: Nevada State Library and Archives Building Atrium 100 North Stewart Street Carson City, Nevada 89701-4263 ITEM #2 Bid Opening has been revised as follows: Date: March 3, 2011 Time: 10:00am (local time) Place: State Public Works Board 515 E. Musser Street, Suite 102 Carson City, Nevada 89701-4263 ITEM #3 Agenda (revised date) is included as part of this Addendum and identified as Attachment No. 1. ITEM #4 Current Plan Holders List is included as part of this Addendum and identified as Attachment No. 2. ATTACHMENT NO. 1 PRE-BID WALK-THRU AGENDA 02/22/2011 Nevada State Library and Archives Photovoltaic System 100 North Stewart Carson City, Nevada 89701 SPWB Project No. 10-A016 State Labor Commission PWP #CC2011-155 INTRODUCTIONS: Joey Ganser - PK Electrical – Electrical (775) 826-9010 Cece Zimmerman- SPWB, Qualification of Bidders (775) 684-4106 Jeff Resler- SPWB- Project Manager (775) 684-4125 Ray Crook - RPC Roof Consulting – (775) 853-7202 Project Bid: 2:00 P.M. 03/3/2011 at the SPWB Conference Room State Public Works Board 515 East Musser St. Suite 102 Carson City, Nevada 89701 1. Qualification of Prime Contractors: All bidders submitting bids to the State Public Works Board must be qualified as bidders by the State Public Works Board prior to the bid opening. Information regarding applications to become a qualified bidder can be obtained by calling Cece Zimmerman at (775) 684-4106 http://spwb.state.nv.us/ Pull down menu under Bids: Qualification of Bidders Prior to submitting a bid verify that your Nevada State Contractor License allows you to bid this project. 2. The estimate of construction: $415,000 3. Project Time: Anticipated Notice to Proceed: 03/21/2011 CONSTRUCTION TIME 70 CALENDAR DAY 4. ARRA Qualification Requirements: (Supplementary General Conditions) • • • Project is funded by ARRA money. (American Recovery and Reinvestment Act) Must comply with Buy American requirements Must comply with Davis Bacon and Nevada Prevailing Wage law whichever is more stringent. Nevada State Library and Archives Photovoltaic System 10-A016 Non-Mandatory Prebid Meeting Page 1 of 4 • Confirm that all worker classifications are covered under Davis Bacon prior to bid. • Comply with reporting requirements • These statements are for information purposes only and all bidders are expected to be completely familiar with the supplemental general conditions as well as any Federal Department of Energy update. Recent update to the ARRA requirements that the SPWB are aware of at this time are posted on http://www1.eere.energy.gov/recovery/buy_american_provision.html 5. Qualifications 1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years documented experience. These shall also be approved by the California Energy Commission (CEC) and meet or exceed the requirements set forth by NV Energy’s Public Building Solar Generations Rebate Program. B. Contractor: Company and/or Qualified Employee shall be licensed by the State of Nevada for PV installations and specialize in performing work of this section with a minimum two years documented experience installing like product in Nevada and has completed at least 2 documented successful in-service, minimally sized 10kW, solar PV systems that were in compliance with all NV Energy Solar Generations standards. Contactor and/or Qualified Employee training/certifications shall meet or exceed all requirements set forth by NV Energy’s Solar Generations Rebate Program. C. Installer: Contractor shall employ technicians that are trained in the installation of PV system components and materials to the level of training required by the equipment manufacturers to satisfy the individual manufacturer’s continuing warranties. D. Contractor and/or Qualified Employee shall make available evidence of the above listed performance, experience and training upon request. Nevada State Library and Archives Photovoltaic System 10-A016 Non-Mandatory Prebid Meeting Page 2 of 4 6. 1.2 Photovoltaic Products: PRODUCTS PHOTOVOLTAIC COLLECTORS A. Manufacturers: 1. 2. 3. 1.3 INVERTER A. Manufacturers: 1. 2. 3. 4. 7. Sharp Solar – Model No. ND-U235F1 Solar World – Model No. SW-235/240 Substitutions: General Conditions - Product Requirements. a. The photovoltaic system has been designed to the specified manufacturer's electrical and physical characteristics. The equipment sizing, spacing, amounts, electrical wiring, ventilation, mounting, framing and all other associated equipment have all been sized and designed around SHARP, PV POWERED and DPW equipment. Should any substitutions be made, the CONTRACTOR shall bear responsibility for the installation, coordination and operation of the system as well as any engineering and redesign costs, which may result from such substitutions. Products shall fully comply with all American Recovery and Reinvestment Act (ARRA) Buy America requirements. PV Powered – PVP75KW SMA America Solectria Renewables Substitutions: General Conditions - Product Requirements. a. The photovoltaic system has been designed to the specified manufacturer's electrical and physical characteristics. The equipment sizing, spacing, amounts, electrical wiring, ventilation, mounting, framing and all other associated equipment have all been sized and designed around SHARP, PV POWERED and DPW equipment. Should any substitutions be made, the CONTRACTOR shall bear responsibility for the installation, coordination and operation of the system as well as any engineering and redesign costs, which may result from such substitutions. Products shall fully comply with all American Recovery and Reinvestment Act (ARRA) Buy America requirements. Prime Contractors including Electrical Contractors bidding as prime Contractors are responsible for providing all aspects of the projects including all labor and materials for a complete job as well as the requirements contained in the Instructions to Bidders and the General Conditions. Nevada State Library and Archives Photovoltaic System 10-A016 Non-Mandatory Prebid Meeting Page 3 of 4 Discussion Points: 1. 2. 3. 5. 6. 7. 8. Staging Area and crane access if necessary Coordination with Library and Archives personnel Site utilities available to Contractor (Sanitary Facilities) Schedule Liquidated Damages Working hours Fixture Delivery to Jobsite Nevada State Library and Archives Photovoltaic System 10-A016 Non-Mandatory Prebid Meeting Page 4 of 4 ATTACHMENT NO. 2 Project Name: Nevada State Library & Archives PV System Bid Date: 3-Mar-11 Project No.: 10-A016 Bid Time: 10:00AM SET # / DATE PLANHOLDER NAME/ ADDRESS PHONE NO. FAX NO. Nevada State Public Works Board 515 E. Musser Street Suite 102 Carson City, 89701 775-684-4141 775-684-4142 [email protected] #1 2/3/2011 CHECK NO./ AMOUNT N/A Project Manager: Joey Ganser DEPOSIT/PLANS RETURNED REMARKS PICKED UP BY : Delivered by NV Blue PICKED UP BY : #2 2/3/2011 #3 2/3/2011 #4 2/4/2011 #5 2/7/2011 #6 2/8/2011 #7 2/10/2011 #8 2/10/2011 Same as Set #1 Reno Builders Exchange 634 Ryland Street Reno, NV 89502 775-786-4468 775-789-7595 [email protected] N/A PICKED UP BY : Delivered by NV Blue Sierra Contractors Source 500 Ryland Street #100 Reno, NV 89502 Western Pacific Electric 2395 Tampa Street Suite C Reno, NV 89512 Reliant Electric 685 Edison Way Reno, NV 89510 775-329-7222 775-329-7255 [email protected] #2442 $50.00 PICKED UP BY : Nikki Daly 775-324-2700 775-324-2560 [email protected] #5934 $50.00 PICKED UP BY : Cliff Springmeyer 775-342-2900 775-342-2905 [email protected] #1429 $50.00 PICKED UP BY : Joe Ganser Reed Construction Data, Inc. 30 Technology Pkwy South Suite 500 Norcross, GA 30092 Nelson Electric 1410 Freeport Blvd. Sparks, NV 89431 303-265-6494 800-303-8629 [email protected] #53419 $50.00 PICKED UP BY : Sent Via Fed Ex per Heidi Shaffer 775-358-0643 775-358-0674 [email protected] #67825 $50.00 PICKED UP BY : per Scott Project Name: Nevada State Library & Archives PV System Bid Date: 3-Mar-11 Project No.: 10-A016 Bid Time: 10:00AM PLANHOLDER NAME/ ADDRESS PHONE NO. FAX NO. DATE #9 2/11/2011 Construction Notebook 3131 Meade Ave. Suite B Las Vegas, NV 89102 702-876-8660 702-876-5683 [email protected] #10 2/11/2011 McGraw Hill Construction Dodge 150 N. Durango Drive, #101 Las Vegas, NV 89145 702-735-2141 702-735-0697 [email protected] #9000445020 $50 PICKED UP BY : Fed-ex Overnight per Judy Morgen #11 2/11/2011 EFACEC 2755 Northwoods Parkway Norcross, GA 30071 770-446-8854 770-446-8920 [email protected] #002691 $50 PICKED UP BY : Fed-ex Overnight per Sergio Cancelo #12 2/15/2011 System 3, Inc. 5921 Landis Ave. Carmichael, CA 95608 916-979-0550 916-979-0551 [email protected] #28219 $50 PICKED UP BY : Bob Brady #13 2/15/2011 Aspen Electric 855 S. Center, #200 Reno, NV 89501 775-830-2983 775-677-0993 [email protected] #2204 $50 PICKED UP BY : Mark #14 2/15/2011 Hamilton Solar 748 S. Meadows Pkwy, #A9 Reno, NV 89521 775-747-6000 775-853-7309 [email protected] #4650 $50 PICKED UP BY : Bobbie Jo CHECK NO./ AMOUNT #47559 $50 Project Manager: Joey Ganser DEPOSIT/PLANS RETURNED REMARKS PICKED UP BY : Sent Via UPS per Jennifer PICKED UP BY : #15 PICKED UP BY : #16