– FENCING SECTION 328250 – GENERAL PART 1

Transcription

– FENCING SECTION 328250 – GENERAL PART 1
SECTION 328250 – FENCING
PART 1 – GENERAL
1.1
RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary
Conditions and other Division 1 Specification sections, apply to this section.
B. See Section 033000 Cast-In-Place Concrete.
1.2
SUMMARY
A. Section includes:
1. Aluminum Fencing and Gates.
2. Gate hardware and gate operators.
3. Chain link fencing and gates.
1.3
SUBMITTALS
A. Product data of fencing, hardware and technical data.
B. Shop drawings showing elevations, details and foundation; field measure for layout on
shop drawings.
PART 2 – PRODUCTS
2.1
MANUFACTURERS
A. Manufacturer:
1. Master Halco (Design Basis)
2. Ameristar
3. iDEAL Aluminum Products, Deland, FL (Design Basis)
4. Approved equals
2.2
ALUMINUM FENCING
A. Materials:
1. Aluminum Extensions: Alloy 6005-T5; 35,000 PSI.
2. Fasteners: 18-8 stainless steel.
3. Framing:
a. Rails: 2 inch channel.
b. Pickets: 3/4 inch x 3/4 inch x 0.062 inches thick.
c. Gate Posts: 2 inches x 2 inches x 0.125 inches thick or 6 inches x 6 inches as
required by structural. Line Posts: 2 inches X 2 inches.
d. Picket spacing: 4 inches maximum.
4. Model: Commercial; style to match existing on site.
5. Gate Size: See plans.
6. Single Pedestrian Swing Gate Hardware:
a. Gate Exit Lever: LOCINOX 3006 Push “Exit” paddle.
b. Gate Lock: LOCINOX “LAKQ-U2”; cylinder to match building.
c. Gate Closer: Stainless steel; size per gate weight and width; LOCINOX “Samson”.
d. Hinges/Butts: Stainless steel; sized to carry gate load.
e. Expanded metal over entire gate and 2 ft. each side.
7. Height: 5 ft. minimum (match existing).
8. Finish: Powder coat; black.
9. Gate Frame: Frame of gate to be fully welded as one unit.
CYBES-BLDG
FENCING
328250–1
2.3
CHAIN LINK FENCING
A. Fence Fabric
1. Galvanized wire: Zinc coated, ASTM A 392, 1.2 oz./sq. ft.
2. Height: 8 ft. to match existing.
3. Knuckle top.
2.4
STEEL FENCE FRAMING
A. Steel pipe – Type I: ASTM F 1083, standard weight schedule 40; minimum yield
strength of 25,000 psi; sizes as indicated. Hot-dipped galvanized with minimum
average 1.8 oz./sq. ft. of coated surface area.
B. Formed steel (“C”) sections: Roll formed steel shapes complying with ASTM F 1043,
Group II, produced from 45,000 psi yield strength steel; sizes as indicated. External
coating per ASTM F 1043, Type A, minimum average 2.0 oz./sq. ft. of zinc per ASTM
A 123, or 4.0 oz./sq. ft. per ASTM A 525.
C. Steel square sections: [ASTM A 500, Grade B] Steel having minimum yield strength
of 40,000 psi; sizes as indicated. Hot-dipped galvanized with minimum 1.8 oz./sq. ft.
of coated surface area.
2.5
ACCESSORIES (CHAIN LINK)
A. Chain link fence accessories: [ASTM F 626] Provide items required to complete
fence system. Galvanize each ferrous metal item and finish to match framing.
B. Post caps: Formed steel, cast malleable iron, or aluminum alloy weathertight closure
cap for tubular posts. Provide one cap for each post. Cap to have provision for
barbed wire when necessary. “C” shaped line post without top rail or barbed wire
supporting arms do not require post caps. (Where top rail is used, provide tops to
permit passage of top rail.)
C. Top rail and brace rail ends: Pressed steel per ASTM F 626, for connection of rail
and brace to terminal posts.
D. Top rail sleeves: 7 inch expansion sleeve with spring, allowing for expansion and
contraction of top rail.
E. Wire ties: 9 gauge galvanized steel wire for attachment of fabric to line posts.
Double wrap 13 gauge for rails and braces. Hog ring ties of 12-1/2 gauge for
attachment of fabric to tension wire.
F. Brace and tension (stretcher bar) bands: Pressed steel. At square post provide
tension bar clips.
G. Tension (stretcher) bars: One piece lengths equal to 2 inches less than full height of
fabric with a minimum cross-section of 3/16 inch X 3/4 inch or equivalent fiber glass
rod. Provide tension (stretcher) bars where chain link fabric meets terminal posts.
H. Nuts and bolts: Galvanized.
PART 3 – EXECUTION
3.1
INSTALLATION
A. Install per manufacturer.
B. Provide concrete foundation for each post per wind load requirements.
END OF SECTION 328250
CYBES-BLDG
FENCING
328250–2
SECTION 328400 – PLANTING IRRIGATION
PART 1 - GENERAL
1.1
SUMMARY OF WORK
A.
Work of this section includes renovation and/or installation of a complete and
operating irrigation system, and shall include the following:
1.
2.
3.
4.
1.2
RELATED WORK
A.
Related work specified elsewhere:
1.
1.3
Approval and Rejection of Materials and Work: The selection of all materials and
execution of all operations required under the drawing and specifications shall be
subject to the approval of the Landscape Architect. The Landscape Architect or
his representative shall have the right to reject any and all work which in his
opinion does not meet with the requirements of the specifications at any stage of
the operations. All rejected materials shall be removed from the site.
DEFINITION AND INTENT OF DOCUMENTS
A.
The contract documents consist of the contract agreement, the drawings and the
specifications, including all modifications thereof incorporated in the documents
before their execution. It is specifically agreed upon that this contract shall be in
all aspects constructed and interpreted in accordance with the laws of the state in
which it is executed.
B.
The contract documents are complimentary and what is called for by one shall be
as binding as if called for by all. The intent of the documents is to include, unless
otherwise stated, all labor, materials, equipment and transportation for the proper
execution of the work.
1.
1.5
329300 - Planting
GENERAL REQUIREMENTS
A.
1.4
Connection to water supply
Irrigation piping, valves, and auxiliary equipment
Sprinkler heads
Controller and power connections
Where there is a conflict between requirements called for in both these
written specifications and the drawings, the stricter of the two shall be the
contractual obligation, unless specifically noted by the other.
OWNER'S AUTHORIZED REPRESENTATIVE
A.
CYBES-BLDG
The Owner shall designate or appoint one (1) person as his representative to
work with the Contractor. The Contractor shall be notified in writing of the name
and address of this duly appointed representative. This representative shall have
full authority to approve work performed by the Contractor, make field changes
that are deemed necessary and approve estimated submitted by the Contractor
for payment.
PLANTING IRRIGATION
328400–1
1.6
1.7
LIABILITY OF CONTRACTOR
A.
The Contractor shall be liable for any and all damages to property which result
from his performance. He shall, with extra cost, restore to original condition any
areas and/or construction damaged, defaced, disturbed or destroyed by him or
his workmen.
B.
The Contractor shall maintain adequate protection of all his work from damages
and shall protect the Owners and adjacent property from injury or loss arising
from this contract
C.
The Contractor shall not be obligated to replace, repair or restore any portion of
this work which is damaged, defaced, disturbed or destroyed by others or by the
owner and/or which results from Owner's negligence.
TAXES
A.
1.8
EXAMINATION AND VERIFICATION OF DRAWINGS AND SITE
A.
1.9
It shall be the contracting installer’s responsibility to report to the Owner's
Representative any deviations between drawings, specifications, and the site.
Failure to do so prior to installing of the plant material and resulting in replacing
and/or relocating same shall be done at the Contractors own expense.
ORDINANCES AND REGULATIONS
A.
1.10
The Contractor shall pay all Federal, State and local sales and use tax applicable
to materials, processes or devices purchased or used in connection with the work
under this contract
All local, municipal and state laws and rules and regulations governing or relating
to any portion of this work are hereby incorporated into and made a part of these
specifications and their provisions shall be carried out by the Contractor.
Anything contained in these specifications shall not be construed to conflict with
any of the above mentioned Rules and Regulations or requirements, and where
the Rules, Regulations or Specifications and/or drawings call for or describe
materials, workmanship or construction, or a better quality or higher standard,
these specifications and/or drawings shall take precedent over the requirements
of said rules, regulations or codes.
MATERIALS AND WORKMANSHIP
A.
CYBES-BLDG
Whenever any material is specified by name or number thereof, such
specification shall be deemed to be used for the purpose of facilitating a
description of the materials and establishing quality, and shall be deemed and
construed to be followed by the word "OR APPROVED EQUAL." No substitution
will be permitted which has not been submitted for prior approval by the owners
Representative. All materials shall be new and without flaws or defects and shall
be the best of their class and kind. Sufficient literature and/or samples must be
furnished for any materials submitted as "equal" substitutes. All materials shall be
guaranteed for a period of one (1) year against material defects and
workmanship.
PLANTING IRRIGATION
328400–2
B.
1.11
PROJECT INSPECTION
A.
1.12
1.13
A.
The Owner will furnish the Contractor with two sets of blueline prints, showing all
work required under this contract for the purpose of having the Contractor record
on one set of prints all changes that may be made during actual installation of the
landscape.
B.
After final acceptance of the completed installation, the Contractor shall be
responsible for having complete drawings prepared showing all such changes
and these shall be turned over to the Owner for recording purposes. These
drawings shall be made available in a digital format and media as directed by the
Owner.
MATERIAL STORAGE AND CLEANUP
The Contractor shall keep the premises free from rubbish and debris at all times
and shall arrange for this storage so as not to interfere with Owners operation of
the job. All unused materials, rubbish and debris shall be removed from the site.
EQUIPMENT, TOOLS AND LABOR
A.
1.15
It is the intention of these specifications, together with the accompanying
drawings to accomplish the work in an efficient and satisfactory manner
according to the workmanlike standards established for the nursery industry.
Notwithstanding is the fact that these specifications and drawings may be
deficient in setting forth a complete detailed description of the work to be done.
RECORD DRAWINGS
A.
1.14
All materials and equipment shall be installed in a neat and workmanlike manner.
The owners Representative reserves the right to direct the removal and
replacement of any items, which in his opinion shall not represent an orderly and
reasonably neat workmanlike appearance, provided such work can be properly
installed in such and orderly way, by the usual methods in such work. Such
removal and replacement shall be done, when directed in writing, at the
Contractor's expense without additional cost to the Owner.
The Contractor shall furnish all such equipment tools and labor necessary to
push work in an acceptable manner, to a speedy completion. This contract is
based on the Contractor furnishing and using his equipment tools and labor
which are suitable to carry out this contract in a first class manner, unless
otherwise hereinafter specified.
CHANGES OR ADDITIONAL WORK
A.
CYBES-BLDG
The Owner may, without invalidating the original contract, order such changes or
additions as may from time to time be deemed desirable or necessary. In doing
so, the contract price shall be adjusted to the mutual agreement of the Contractor
and the Owner, with all work being done under the conditions of the original
contract except for such adjustments in price and in extension of time as may be
PLANTING IRRIGATION
328400–3
necessary.
B.
1.16
1.17
TIME OF COMPLETION
A.
Where a specified time of completion is so designed in the Contract all delays
caused by any act of neglect by the Owner of Owner's Representative or by other
contractors in the construction of the project of which this work is a part, changes
ordered or necessitated by deviations in general constructions or schedule of
other Contractors on the project inclement weather conditions, Acts of God and
acts beyond the control of the Contractor such as strikes, fire, lockouts, unusual
delays in shipments, shall not be cause for delay in payment of estimates as
presented and shall be considered as bona fide causes for extensions of time.
The Owner and Contractor shall agree on a reasonable extension of time.
B.
If construction Contractor is delayed in completion of part or parts of the project
so that the Contractor must leave the job and return at a later date to complete
his installation, payments for work completed and materials delivered shall not be
held back and extensions of time for completion of work shall be granted if
needed. Owner shall reimburse the Contractor for any expenses incurred due to
these delays unless otherwise herein specified.
FEES AND PERMITS
A.
1.18
The Contractor shall obtain and pay for fees and permits required by law.
QUALITY CONTROL
A.
1.19
The Contractor shall bring to the attention of the Owner's Representative
changes which may necessitate deviation(s) in construction form the original
plans by other contractors on the job. Changes in price caused by such
deviation(s) shall be agreed upon by both Contractor and Owner/Representative
before work proceeds.
The work shall be done by an organization that is established and installs lawn
irrigation systems as a full time occupation. Contractor shall provide references
from (3) projects, similar in scope, installed within the past three years. Owner
reserves the right to verify and inspect referenced projects.
OPERATIONS AND MANUALS
A.
CYBES-BLDG
The Contractor shall provide three (3) bound manuals to include instructions for
operation and maintenance of the system, and a complete list of parts and
equipment installed in the system.
PLANTING IRRIGATION
328400–4
PART 2 - PRODUCTS
2.1
2.2
APPROVED MANUFACTURERS
A.
The Toro Company, Irrigation Division
B.
Hunter Industries
C.
L.R. Nelson Corp.
D.
Rain Bird Corporation
VALVES
A.
2.3
PIPE
A.
2.4
Provide for underground valves. Boxes shall be high impact thermoplastic, with
covers, sizes as required by installation, color-green, Ametek or approved equal.
CONTROLLER
A.
2.9
Sprinkler heads shall be made of a high impact plastic (cycolac) and shall have
adjustable arcs, and be capable of producing 100% coverage over the entire site
except as indicated on the landscape plans.
VALVE BOXES
A.
2.8
The following backflow prevention device shall be provided unless the governing
code specifies otherwise. A 1-1/2" Double Check Assembly, Watts 007-QT-1 or
approved equal, mounted 12" above grade, with galvanized pipefittings. Backflow
Preventers should be installed in an inconspicuous area such as shrubbery.
SPRINKLER EQUIPMENT
A.
2.7
PVC Schedule 40 or approved equal.
BACKFLOW PREVENTERS
A.
2.6
Normal impact Type 1, PR-160 Polyvinyl Chloride Pipe.
FITTINGS
A.
2.5
Automatic, 24 volts, electric. Valves shall be installed in valve wells of
appropriate size and of a type as described under “Valve Boxes".
For electric valves: 115 V.A.C. input and 24 V.A.C. output electric type.
CONDUIT
A.
CYBES-BLDG
Schedule 80 PVC sized as required.
PLANTING IRRIGATION
328400–5
PART 3 – EXECUTION
3.1
LAYOUT
A.
3.2
UNDERGROUND UTILITIES
A.
3.3
3.6
3.7
Excavation, backfill and compaction shall comply with the requirements of
earthwork specifications.
INSTALLATION OF PIPE
A.
Minimum depth: Main pipelines shall be buried to provide 18" minimum cover; all
piping downstream of solenoid valves shall have a 12" minimum cover.
B.
Connections: PVC pipe to metal threaded connection: polyvinyl chloride pipe
solvent welding, according to the pipe manufacturers' printed directions.
INSTALLATION OF HEADS
A.
Lawn Heads: Set at finish grade with tolerance for installation of sod. Mount on
flexible PVC.
B.
Adjustment: Adjust heads for coverage required to completely irrigate the lawn
and landscaped areas.
IDENTIFICATION
A.
3.8
Complete the installation of the irrigation system before grassing, seeding and
landscape work begins.
EXCAVATION
A.
3.5
Locate and protect underground utilities in the work area.
SEQUENCES OF WORK
A.
3.4
Landscape plans and existing conditions shall dictate layout of irrigation system.
The Contractor shall layout the renovations/additions as required by project
conditions to insure 100% coverage of the all areas shown within the project
limits of work.
Identify the zone valves with an aluminum or brass tag embossed with a zone
number corresponding to the final layout and connection to the automatic
controller. These zone numbers shall be recorded in the as-built drawings and
manuals provided to the Owner at project acceptance.
TESTING
A.
CYBES-BLDG
When the installation is complete, the system shall be tested through a full cycle,
final adjustments made, and defects corrected to meet the approval of the
owners representative.
PLANTING IRRIGATION
328400–6
3.9
OPERATION AND SETTING
A.
3.10
3.11
CLEAN-UP AND PROTECTION
A.
Upon completion of the work, the grounds shall be cleared of all debris,
superfluous materials and equipment due to irrigation operations.
B.
The Contractor shall protect all work included under his contract against
trespassing and damage of any kind until final inspection and acceptance. If any
material is damaged, it shall be repaired or replaced as required.
FINAL INSPECTION
A.
3.12
The Contractor shall not be held responsible for replacement or repairs of system
components damaged by hurricanes or Acts of God provided he shall have taken
all reasonable precautions to minimize their damage.
GUARANTEE
A.
3.14
At the conclusion of the installation, a final inspection of the work will be make to
determine the proper coverage and alignment All landscaped areas not receiving
100% in relationship to that called for in the plans, or areas of overspray, will be
corrected by the Contractor at no additional cost to the Owner.
HURRICANE DAMAGE OR ACTS OF GOD
A.
3.13
Set the system for automatic operation at a frequency and time period required
for good irrigation of the landscaping and grasses and in compliance with current
St. Johns River Water Management District watering restrictions.
The Contractor shall guarantee the system to be free of defects in labor and
materials for a period of one year. Repairs and maintenance required because of
such defects shall be at no cost to the owner.
DAMAGE TO IRRIGATION SYSTEM
A.
The General Contractor is responsible for damage to the system which is
damaged by foot traffic, paint brush cleaning, spillage of chemicals in landscaped
areas, heavy equipment traffic, construction debris left laying, roofing materials or
any other circumstances which is obviously the result of construction work
aftermath.
END OF SECTION 328400
CYBES-BLDG
PLANTING IRRIGATION
328400–7
SECTION 329300 - PLANTING
PART 1 - GENERAL
1.1
1.2
DESCRIPTION OF WORK:
A.
The extent of the landscape work is described in the Contract Documents.
B.
Subgrade Elevations: Excavation, filling and grading required establishing
elevations shown on the drawings are not specified in this section.
C.
Fine Grading: Provide fine grading necessary to establish finish grade in all
landscape areas. Fine grading shall include only minor grading to correct
random or infrequent grade irregularities of 3" or less.
QUALITY ASSURANCE:
A.
Source Quality Control:
1.
2.
B.
1.3
Ship landscape materials with certificates of inspection as required by
governmental authorities. All plant material shall be FLORIDA NO. 1 OR
BETTER as outlined in the latest edition of "Florida Grades and
Standards for Nursery Plants, " Part I and Part II, State of Florida, Dept. of
Agriculture.
Do not make substitutions without approval. If specified landscape
material is not obtainable, submit proof of non-availability and proposal for
use of equivalent material for approval.
Landscape Contractor Qualifications: The Landscape Contractor must have
been in business for at least three (3) years and must have completed three (3)
installations of similar scope.
SUBMITTALS:
A.
Landscape Contractor Qualification: Submit the date the business was
established and a list of 3 completed installations of similar scope. Include
location; name and address of owner; and date of completion.
B.
Soil test report with recommendations for pH adjustment of existing soil.
C.
Photographs of each tree type as specified, taken at the nursery or holding area.
D.
List of Nursery sources with name and quantity of plants from each source.
E.
Inspection Certificates, Manufacturer's Data: Submit copies of certificates of
inspection required by governmental authorities. Submit manufacturers’ or
vendors’ certified analysis, application, and installation instructions for materials
noted below. Submit other data substantiating that materials comply with
specified requirements.
1.
2.
3.
4.
F.
CYBES-BLDG
Fertilizer
pH Adjuster used
Compost
Certification from each nursery providing B & B Trees, stating that the B &
B Trees, except for Crape Myrtles & Ligustrums where specified, have
been "hardened off" for at least 30 days before shipment.
Sod grower's certification indicating grass species and conformance to ASPA
"nursery grown" grade, location of field where sod was cut, and date cut.
PLANTING
329300–1
1.4
1.5
PLANT INSPECTION BEFORE INSTALLATION:
A.
At least 1 week before trees are shipped from grower, submit 1 photograph of
each tree type as specified and obtain initial approval.
B.
Before installing any plants, obtain approval of the plants either at the
Contractor's nursery or at the work site. Remove and replace rejected plants.
PRODUCT DELIVERY, STORAGE AND HANDLING:
A.
Packaged materials: Deliver packaged materials in original containers and
protect from deterioration.
B.
Plants:
1.
2.
3.
C.
1.6
Do not bend or bind-tie plants in such a manner as to damage bark, break
branches or destroy natural shape. Provide protective covering during
delivery.
Deliver plants after preparations for planting have been completed and
plant immediately. If planting is delayed more than 6 hours after delivery,
set plants in shade, protect from weather and mechanical damage, and
keep roots moist.
Keep container grown stock in containers until planting time. Pick up
plants by ball or container, not by stems or trunks.
Sod: Time delivery so that sod will be placed within 36 hours after stripping.
Protect sod against drying and breaking.
JOB CONDITIONS
A.
Coordination: Coordinate all landscape work with the Landscape Architect and
other Contractors. Plant after final grades are established.
B.
Protection:
1.
2.
3.
4.
Protect vehicular and pedestrian traffic, new landscaping, existing
vegetation, above ground and underground utilities and structures from
damage by landscape work. Determine location of underground utilities
before excavating; hand excavate as required.
Protect landscape work from damage by landscape operations,
operations by other contractors and trespassers.
Post signs, barricades or barriers as required. Maintain protection until
final acceptance. Repair or replace damage as directed.
Maintain grade stakes set by others until removal is mutually agreed upon
by all parties concerned.
C.
Planting Schedule: Schedule and perform landscape work only when weather
and soil conditions are suitable in accordance with local practice.
D.
Excavation: When conditions detrimental to plant growth are encountered, such
as rubble fill, limerock, poor drainage, or obstructions, cease planting in the
affected area and immediately notify Landscape Architect. Test drainage of
representative plant beds and pits by filling with water twice in succession. If
water remains for more than 24 hours, immediately notify Landscape Architect
before planting. The Landscape Architect shall determine the corrective action
required before planting is continued.
CYBES-BLDG
PLANTING
329300–2
1.7
PLANTING PERIOD:
A.
Proceed with and complete the landscape work as rapidly as portions of the site
become available during planting period.
B.
Plants may be installed at any time if a permanent or temporary irrigation system
is installed. If a temporary irrigation system is used, submit plan for approval.
C.
If no potable water supply is readily available and a water truck is used, plant
only between October 1 and March 15 unless written approval is obtained to
extend the planting period.
PART 2 – PRODUCTS
2.1
EXISTING SOIL:
A.
2.2
2.3
Use existing soil in plant pits, unless the soil is contaminated with limerock, clay,
brush, weeds, roots, stumps, stones larger than 1 1/2 inches in any dimension,
litter and other extraneous or toxic matter harmful to plant growth. Remove
contaminated soil and replace with clean topsoil.
TOPSOIL:
A.
Provide new topsoil which is fertile, friable, natural sandy loam surface soil, free
of subsoil, limerock, clay lumps, brush, weeds, roots, stumps, stones larger than
1 inch in any dimension, and other extraneous or toxic matter harmful to plant
growth.
B.
Provide topsoil from local sources or from areas having similar soil
characteristics. Obtain topsoil only from naturally, well-drained sites where
topsoil occurs in depth of not less than 4 inches; soil obtained from bogs or
marshes is not acceptable.
PLANTS:
A.
General: Provide State inspected, nursery grown plants, unless otherwise
specified. Conform to the plant schedule, "Florida Department of Agriculture
Grades and Standards for Nursery Plants", local landscape ordinance, and,
where applicable, to ANSI Z60.1. Plants may be either container grown, balled
and burlapped or tree spaded unless otherwise specified. Plants shall be well
branched, shaped true to type, free from disease, insects and injury, with a solid
healthy root ball of vigorous, fiberous roots, but not excessively rootbound.
B.
Balled and burlapped plants: Dig balled and burlapped plants with firm, natural
balls of earth sufficient in diameter and depth to encompass the fibrous and
feeding root system necessary for full recovery of the plant. Provide ball sizes
complying with the latest edition of ANSI Z60.1, American Standard for Nursery
Stock, at a minimum unless otherwise specified. Firmly wrap balls with burlap or
other biodegradable cloth. Cracked or loose balls are not acceptable. "Harden
off" trees for at least 30 days before shipment.
C.
Container Plants: Provide container grown plants with sufficient roots to hold the
container soil together after removal from the container. Rootbound plants are
not acceptable.
D.
Spaded Trees: Trees shall be spaded from a commercial nursery field. Utilize
tree spade equipment capable of appropriately moving trees up to caliper shown.
Ball size shall be at least equal to sizes recommended by ANSI Z60.1, American
Standard for Nursery Stock unless otherwise specified.
CYBES-BLDG
PLANTING
329300–3
2.4
2.5
2.6
E.
Single Trunk Trees: Unless otherwise specified, all trees to have a single trunk
and a single predominate central leader. Multiple leaders and "V" crotches will
not be accepted. The specified trunk caliper is the minimum caliper size
acceptable.
F.
Multi-trunked Trees: All specified trunks of multi-trunked trees shall originate
from the root ball. The specified trunk caliper is the minimum caliper size
acceptable.
FERTILIZER:
A.
Granulated: Commercial grade fertilizer with a 16-4-8 ratio of nitrogen,
phosphorous, and potassium, with minor elements and at least 25% of the
nitrogen in a water insoluble form.
B.
Tablets: Commercial grade "Agriform" fertilizer tablets, tightly compressed, long
lasting and slow release, weighing 21 grams each with an analysis of 20-10-5 by
Grace-Sierra Horticultural Company available from VJ Growers, 1-800-327-5422.
PH ADJUSTERS:
A.
Lime: Commercial grade, ground or hydrated dolomite containing not less than
85% of total carbonates.
B.
Aluminum sulfate: Commercial grade.
SURFACE MULCH:
A.
2.7
Clean, shredded cypress mulch, natural color, free of disease, weeds, moss,
sticks and other debris.
GUYING AND STAKING MATERIAL:
A.
Tree stakes: Sound softwood, 2" x 2" lumber pointed at one end. Height as
shown.
B.
Guy Stakes: Sound softwood, 2" x 4" x 24" lumber pointed at one end.
C.
Guy Wire: No. 12 gauge malleable galvanized iron wire, twisted into double
strand; turnbuckles optional.
D.
Hose: New or used two-ply, 1/2" minimum diameter, rubber or plastic hose of
consistent black or dark green color and of sufficient length to protect the tree
trunk from guy wire.
2.8
WATER: Suitable quality for plant irrigation.
2.9
LAWNS:
A.
Sod: Provide healthy, strongly rooted sod, not less than 2 years old, free of
weeds and undesirable native grasses in 16" x 24" pads, 1 1/2" thick. Sod shall
conform to "Nursery Grown" grade as established by American Sod Producers
Association (ASPA). Sod shall be considered free of weeds, if less than 5 weeds
are found per 100 square feet of area. Provide grass type specified on drawings.
B.
Sod stakes: Soft wood, 1" x 2" x 12"
CYBES-BLDG
PLANTING
329300–4
PART 3 - EXECUTION:
3.1
TEST:
A.
3.2
3.3
PREPARATION FOR PLANTING:
A.
Commencement of work shall indicate acceptance of site conditions and that no
conditions detrimental to plant growth has been encountered. Remove bottles,
boards, construction materials and other debris prior to commencement.
B
In planting areas outside preserved natural areas where living vegetation still
remains, apply Roundup or similar non-selective herbicide according to
manufacturer's instructions. Apply herbicide only when the vegetation is actively
growing.
C.
After vegetation has been killed and removed, loosen subgrade of all plant beds
and lawn areas to a minimum depth of 4 inches within the work limits, excluding
preserved natural areas and the surface root zones of existing trees. Remove
limerock, stones over 1-1/2 inches in any dimension, sticks, roots, rubbish, soil
contaminated with material detrimental to plant growth, and other extraneous
matter. Limit preparation to areas which will be planted promptly after
preparation.
D.
Spread pH adjustment materials throughout prepared areas of plant beds and
lawns in quantities recommended by the soil test for the plants specified. Also
spread a minimum of 2" of compost (6.3 cub. yds./1000 sq. ft.) over all lawn
areas and plant beds. Large open mulch areas do not require compost.
E.
Rototill pH adjustment materials into the top 4" of soil.
F.
Fine grade rototilled areas to smooth, even surface with loose, uniformly fine
texture. Roll, rake and drag areas, remove ridges and fill depressions with soil
as required to meet finish grades. In areas to be sodded, allow for sod thickness,
providing a sod finish grade 1" below adjacent pavement or curbs.
G.
Moisten prepared areas before planting if soil is dry. Water thoroughly and allow
surface moisture to dry before planting lawns. Do not create a muddy soil
condition.
H.
Restore lawn areas to specified condition if eroded or otherwise disturbed after
fine grading and prior to planting.
LAYOUT:
A.
3.4
Two (2) weeks prior to planting operations, test existing soil for pH and submit
report from the University of Florida Extension (IFAS) Soil Testing Laboratory.
Collect soil samples in accordance with recommendations of the Laboratory. A
soil test kit may be obtained from the County Extension Service.
Lay out individual tree and shrub locations and areas for multiple plantings.
Stake locations and outline areas and secure approval before start of planting
work. Make minor adjustments as may be requested.
PLANTING TREES, SHRUBS AND GROUNDCOVERS:
A.
Perform all work in strict accordance with sound horticultural practice.
B.
Remove existing sod, roots, limerock, concrete, and other construction debris
from plant pits. Replace with topsoil.
CYBES-BLDG
PLANTING
329300–5
C.
Place plants where shown and as detailed. After pits are excavated to
dimensions shown, remove containers and set plants plumb in center of pits. Set
the top of the root ball level with or slightly above the top of soil and orient plant
to present its best appearance. If the plant is balled and burlapped, remove
twine, loosen burlap at the top of the ball and roll back to expose the entire side
of the ball. Cut off and remove loose burlap. If the plant ball is wrapped with
plastic or other non-bio-degradable fabric, remove wrap totally from the ball.
Back fill with soil in 12 inch layers. Water in and compact each layer to eliminate
voids.
D.
Place temporary plant saucers around all trees and where directed. Immediately
apply at least 2" of water. After planting, remove excess soil and rake plant beds
to a smooth even surface conforming to required finish grades.
E.
Fertilization:
1.
2.
3.5
After shrubs and groundcovers are installed, apply 1/2 lb. of 16-4-8
fertilizer per 100 sq. ft. of shrub and ground cover bed areas.
After trees are installed, place fertilizer tablets on the soil surface evenly
around the outside edge of the rootballs. Place tablets at a rate of 1
tablet for each foot of tree height.
G.
Inspection of Fertilizer Application: Schedule with the Landscape Architect an
inspection after completion of the fertilizer application and obtain approval before
mulching. After approval, incorporate fertilizer into top 2 inches of soil.
H.
Pruning: Prune plants in accordance with standard horticulture practice. Prune
to remove suckers, dead, injured or diseased wood, and to achieve a uniform
shape natural to each species. Remove Lower branches of all trees to achieve a
minimum 5' clear trunk unless otherwise specified. Required plant sizes are after
pruning. Replace excessively pruned or misformed plants. Do not cut tree
leaders.
I.
Staking: Stake and guy trees as shown only when required to maintain them in a
vertical alignment. Set tree stakes vertical. Support trees with 2 strands of wire
encased in hose sections at contact points with tree trunk and twist securely. For
multi-trunked trees, use 2-3 guys securely attached to 2" x 4" x 24" stakes driven
to grade.
J.
Mulching: Apply 3 inches of mulch to all plant beds. Around each tree in lawn
areas, apply mulch 3" deep in a circle the diameter of the tree pit. Pull mulch at
least 4 inches from tree and shrub trunks. Rake to neat finished appearance.
Top of mulch to be 1" below adjacent lawn or pavement.
SODDING:
A.
Lay sod within 36 hours of stripping at farm.
B.
Lay sod in straight (not curved) parallel rows to form a solid mass with tightly
fitted joints, without overlap. Stagger strips to offset joints. Work topsoil into
minor cracks.
C.
On 4:1 slopes or greater, lay sod with long dimension of pads parallel to contours
and stake sod as necessary to stabilize sod. Avoid continuous seal along water
flow in swales. Drive stakes flush with top of sod.
D.
Roll entire sodded area with a 200 lb. roller.
CYBES-BLDG
PLANTING
329300–6
3.6
3.7
3.8
3.9
E.
Water sod immediately after rolling; thereafter water sufficiently to keep soil moist
to a depth of 4" until established.
F.
Where seeded areas meet sod, transition level of soil to cover sod root zone.
RECONDITIONING LAWN:
A.
Recondition existing lawn areas damaged by Contractor's operations, and where
minor grading is required within construction limits.
B.
Remove dead, and extensively damaged areas larger than 1 sq. foot. Remove
construction debris and topsoil containing foreign materials from construction
operations. Provide new soil to fill low spots and to meet new finished grades.
C.
Sod the prepared areas with the same grass species as the adjacent lawn.
D.
Where substantial lawn remains, but is thin (bare area greater than 2 inches
square), mow, rake, aerate compacted soil, remove extensive weeds, seed and
fertilize.
E.
Soil preparation, installation, maintenance and guarantee same as for new
seeding and sodding.
CLEAN-UP AND PROTECTION:
A.
During landscape work, store materials and equipment where directed. Keep
pavements clean and work area in an orderly condition.
B.
Protect landscape work and materials from damage. Maintain protection during
installation and maintenance periods. Treat, repair or replace damaged
landscape work as directed.
REPLACEMENTS AND CONDITIONS:
A.
The specified plant warranty, including the maintenance, inspection and
acceptance provisions, shall apply to replacement plants. The extended
warranty period shall begin from the date the Landscape Architect has accepted
the installation of replacement plants and shall continue for the minimum
specified maintenance period and until Final Acceptance, with each additional
replacement in turn being maintained and warranted for the minimum specified
maintenance period.
B.
Replacements shall comply with specified requirements for new plants.
C.
After initial acceptance, the Contractor will not be responsible for damage to work
resulting from: neglect by Owner; damage by others; abnormal weather
conditions such as floods, excessive wind damage, severe freezing or abnormal
rains; or other activities beyond the Contractor's control.
INITIAL INSPECTION AND ACCEPTANCE:
A.
The warranty shall begin after Initial Landscape Inspection and Acceptance.
B.
Inspection shall be made by the Landscape Architect within ten days of written
notification from the Contractor that installation is complete.
C.
Replace rejected work within 15 days of notification and continue specified
maintenance until re-inspected and found to be acceptable. Remove rejected
plants and materials promptly from project site.
CYBES-BLDG
PLANTING
329300–7
3.9
MAINTENANCE AND WARRANTY:
A.
Warranty that plants remain in healthy condition and meet specifications until
final acceptance. If the date of final acceptance is in the dormant season, then
deciduous material shall be guaranteed to be in healthy condition until the plants
break dormancy.
B.
Begin maintenance of landscape work immediately after each area is planted
and continue through the maintenance period specified.
C.
Plant Maintenance and Warranty:
1.
2.
3.
4.
5.
D.
Lawn Maintenance and Warranty:
1.
2.
3.
4.
5.
6.
7.
3.10
Maintain plants for a minimum period of 120 days after Initial Acceptance
and until Final Acceptance. Guarantee trees for a period of 365 days
after Final Acceptance. Guarantee shrubs and groundcovers for a period
a 90 days after Final Acceptance.
After initial watering, water plants as needed to prevent wilting, but at
least three times weekly, if no rain, for the first 30 days. Water thereafter
as required for healthy growth.
Reset settled plants to proper grade and position, remove and replace
unhealthy or dead material, tighten or repair guys and stakes, spray to
keep plants free of insects and disease, and prune as necessary.
Keep mulch areas neat and attractive during the maintenance period.
Weed every 30 days with a minimum of four weedings.
At the end of the maintenance period, re-mulch any areas with less than 3
inches of mulch and remove stakes and guys from trees.
Maintain and guarantee lawns for a minimum period of 45 days after
Initial Acceptance and until Final Acceptance.
Immediately reseed bare spots in seeded areas.
Reset settled or eroded sod areas to proper grade. Fill open joints with
top soil. Keep sod free of, insects and disease.
Water lawn sufficiently to maintain moist soil to a depth of 4 inches until
Final Acceptance.
Apply appropriate herbicide to keep sodded and seeded lawns free of
weeds.
Mow lawns and trim edges when sod is firmly rooted and tip growth
exceeds 3". Repeat mowing when grass is 4" high, mowing to a height of
3".
Fertilize sodded lawns 4 weeks after planting with 16-4-8 at a rate of 6
lbs. per 1,000 sq. ft.
FINAL INSPECTION AND ACCEPTANCE:
A.
Final Inspection: At the end of the maintenance period a final inspection shall be
conducted by the Landscape Architect within 10 days of written notification from
the Contractor that the maintenance period has been completed.
B.
Plant Materials: Replace plants not in healthy condition or which fails to meet
specifications.
CYBES-BLDG
PLANTING
329300–8
C.
Lawns:
1.
At the time of Final Inspection, sodded lawns will be acceptable provided
a healthy, well-rooted, even colored, lawn is established, free of weeds,
insects and disease, with no open joints or bare areas.
D.
Replace rejected work with 15 days of notification and continue specified
maintenance until work is re-inspected and found to be acceptable.
E.
If the planting period has expired, then plant replacement shall be delayed until
the next planting period, unless written approval is obtained to extend the
planting period
END OF SECTION 329300