TITLE OF THE PROJECT (DEFINITION)
Transcription
TITLE OF THE PROJECT (DEFINITION)
SAMPLE SHEET (OUTER COVER PAGE) TITLE OF THE PROJECT (DEFINITION) (24pt., 1.5 line spacing, Centre Aligned, Bold) BCA Semester VI : A GRAND PROJECT REPORT (12pt, Bold) SUBMITTED IN FULFILLMENT OF THE REQUIREMENTS FOR THE AWARD OF THE DEGREE OF (12pt, Centre Aligned) BACHELOR OF COMPUTER APPLICATIONS (14pt, Bold) (Name of Institution) (14pt) SUBMITTED TO (12pt, Bold) <KSV logo> KADI SARVA VISHWAVIDYALAYA (14pt, Bold) SUBMITTED BY (12pt, Bold) Name of Student(s) (14pt) Karan Kumar Rajesh Sharma Tarvinder Singh Roll No(s). (14pt) 98149231 98149232 98149233 Name of the Company (Bold14pt) (if project is allocated by company) City (12pts) November 2012 (12pt) (Month & Year of Submission) SAMPLE SHEET (INNER COVER PAGE) TITLE OF THE PROJECT (DEFINITION) (24pt., 1.5 line spacing, Centre Aligned, Bold) BCA Semester VI : A GRAND PROJECT REPORT (12pt, Bold) SUBMITTED IN FULFILLMENT OF THE REQUIREMENTS FOR THE AWARD OF THE DEGREE OF (12pt, Centre Aligned) BACHELOR OF COMPUTER APPLICATIONS (14pt, Bold) (Name of Institution) (14pt) SUBMITTED TO (12pt, Bold) <KSV logo> KADI SARVA VISHWAVIDYALAYA (14pt, Bold) SUBMITTED BY (12pt, Bold) Name of Student(s) (14pt) Karan Kumar Rajesh Sharma Tarvinder Singh Roll No(s). (14pt) 98149231 98149232 98149233 SUPERVISED BY (12pt,Bold) NAME OF SUPERVISOR(S)-Internal (12pt) Name of Institute (12pt) SUPERVISED BY (12pt,Bold) NAME OF SUPERVISOR(S) (12pt) Name of the Company (12pt) November 2012 (12pt) (Month & Year of Submission) SAMPLE SHEET ACKNOWLEDGEMENT Signature(s) of Students Karan Kumar (98149231), Rajesh Sharma (98149232), Tarvinder Singh (98149233) SAMPLE SHEET B.P. COLLEGE OF COMPUTER STUDIES A constituent of KADI SARVA VISHWAVIDYALAYA Sector-23, GH-6, Gandhinagar. Certificate from DIRECTOR This is to certify that the project documentation entitled '<title of the project>' is bonafide project work done by Mr./Ms. <name of student><,exam no>, in fulfillment of the requirement for the award of degree of Bachelor Of Computer Application at <institute> - a constituent college of KADI SARVA VISHWAVIDYALAYA. I further certify that in project work done by him/her is original work carried out at the company <name of the company> under their supervisor and guidance. Date:_________ Director SAMPLE SHEET B.P. COLLEGE OF COMPUTER STUDIES A constituent of KADI SARVA VISHWAVIDYALAYA Sector-23, GH-6, Gandhinagar. Certificate from INTERNAL SUPERVISOR This is to certify that the project report compiled by Mr. /Ms. ______________________________, student of semester-____ from BCA department, B.P. College Of Computer Studies, a constituent college of Kadi Sarva Vishwavidyalaya, Gandhinagar, is done under my guidance. To the best of my knowledge, this work is satisfactorily completed. During the tenure, he/she was found to be very hard working and sincere. He/She completed all the tasks assigned and suggested to him/her. Comments: 1 2 3 Date:_________ Internal Supervisor SAMPLE SHEET B.P. COLLEGE OF COMPUTER STUDIES A constituent of KADI SARVA VISHWAVIDYALAYA Sector-23, GH-6, Gandhinagar. DECLARATION I hereby declare that the project entitled “___________________ ________________________” submitted for the BCA Degree is my original work and the project has not formed the basis for the award of any degree or any other similar titles in any other Univeristy. Signature of the Student: 1 2 3 Place: Date SAMPLE SHEET Project Report Sequence 1. Certificate of Successful Completion From company From director From internal supervisor Candidate’s self declaration 2. Acknowledgement 3. Problem Abstract 4. Index* /(Table of Content) 5. List of Abbreviations 6. List of Tables (with page nos.) 7. List of Figures/Graphs/Charts (with page nos.) 8. Chapters (as mentioned in the Index) 9. References 10. Bibliography 11. Appendix A. Project Log Sheets (as per the scheduled meetings) B. Data & Sheets (Questionnaires/ Interviews, if any) C. Formulation Details (if any) D. Referred Papers/ Existing Systems (if any)) Note: The Header and Footer must start from First Chapter and end at Bibliography/ References Page. The maximum Page limit for the report is 80 (or 4000 words, whichever is minimum) excluding Acknowledgement, Certificate, Index, List of Abbreviations, Figures, Tables and Appendix. One softy copy/Hard copy with Spiral-Binding for Pre-Submission and Two copies with Spiral-Binding /Hard-Binding (including attached CDs) for the Final Submission. Report Format: Font Type: Times New Roman Font Size: Normal Text (12), Headings (14, Bold), Sub-Headings (12, Bold Italic) Line Format: Spacing (1.5), Alignment (Justified) Margins: Left-1.5, Right-1.0, Top-1.25, Bottom-1.0 Header: <<Project Title>>, Left-Aligned, Size-10 Footer: Left- Institute Name, Right- Page No., Size-10 For References, Bibliography & Appendix: Font Type: Times New Roman Font Size: 10 Line Format: Spacing (1.0), Alignment (Justified) Margins: Left-1.5, Right-1.0, Top-1.25, Bottom-1.0 SAMPLE SHEET INDEX CONTENTS PAGE NO. Certificate of Successful Completion I From company From director From internal supervisor Candidate’s self declaration Acknowledgement II Problem Abstract III List of Abbreviations 1. List of Tables (with page nos.) 2. List of Figures/Graphs/Charts (with page nos.) 4. Chapter 1: INTRODUCTION & PROBLEM BACKGROUND - Chapter 2: EXISTING SYSTEM STUDY /LITERATURE REVIEW - Chapter 3: REQUIREMENT ANALYSIS /SRS & DESIGN - (Functional, Non- Functional, Technical Requirement/UML/ DFD/ FLOW CHARTS/CIRCUIT DIAGRAMS etc.) Chapter 4: IMPLEMENTATION - (With Screen Shots [Input/Output/Reports]) Chapter 5: SYSTEM TESTING [(Unit/ Functional) -Test Cases] & RESULTS - Chapter 6: ANALYSIS OF RESULT AND CONCLUSIONS - Chapter 7: FUTURE SCOPE & LIMITATIONS - References Bibliography Appendix A. Project Log Sheets (as per the scheduled meetings) B. Data & Sheets (Questionnaires/ Interviews, if any) C. Formulation Details (if any) D. Referred Papers Review and Existing Systems Study Findings (if any) – E. Coding if needed. SAMPLE SHEET Grand Project Log Sheet (for Internal Supervisor) Date: Time: Semester & Class: Title of Project: Points to be discussed with Supervisor: Record of Discussion: Points to cover by the next meeting/ in Final report (Suggested Modifications): Sr. No. 1. 2. 3. 4. Roll No. Student Name Sign SAMPLE SHEET Project Draft Proposal Form Roll No: Names: Semester: A. Proposed Project Title B. Problem Background and Description? [Limited to 500 words, Use extra Sheet (if needed)] Follow following Project Proposal Template Sr. Number Content 1 Introduction 2 Objectives 3 Study Analysis 4 Analysis Finding 5 Proposed System 6 Technical Specification 7 Effort Estimation 8 Feasibility Study Schedule Feasibility Technical Feasibility Economical Feasibility Operational Feasibility 9 Scope Of Project 10 Fact – Finding Technique 11 Anticipated Expectation Page Number Approved by Project Monitoring Committee Approval/Not Approve (Tick) PMC Signature 1 2 Comments (write points) SAMPLE SHEET B.P. College Of Computer Studies Grand Project Log Sheet (for student) Roll No: Names: Semester: Srno Task Allocation Date Student Signature: Certified by Internal/External Supervisor Signatures Completion Follow-Up Date Date Status