COMNAVAIRFORINST 3500.20C This Appendix provides sample messages and end of mission reports.
Transcription
COMNAVAIRFORINST 3500.20C This Appendix provides sample messages and end of mission reports.
COMNAVAIRFORINST 3500.20C APPENDIX V SAMPLE MESSAGES / END OF MISSION REPORTS This Appendix provides sample messages and end of mission reports. APPENDIX V-A SHIP TO TYCOM - CART I COMPLETION MESSAGE......V-A-1 APPENDIX V-B ISIC TO ATG - TRAINING SUPPORT REQUEST.........V-B-1 APPENDIX V-C ISIC TO TYCOM - CREW CERT PHASE I/II/III COMPLETION MESSAGE................................V-C-1 APPENDIX V-D ISIC TO TYCOM - CART II COMPLETION MESSAGE...........................................V-D-1 APPENDIX V-E TYCOM TO FFC - MID-PHASE PROGRESS REPORT– BASIC PHASE ULT...................................V-E-1 APPENDIX V-F ISIC TO TYCOM - END OF PHASE REPORT BASIC PHASE ULT...................................V-F-1 APPENDIX V-G TYCOM TO NUMBERED FLEET - END OF PHASE REPORT – BASIC PHASE ULT..........................V-G-1 APPENDIX V-H SHIP MESSAGE NATO SEA SPARROW MISSILE CERTIFICATION.....................................V-H-1 APPENDIX V-I ISIC MESSAGE NATO SEA SPARROW MISSILE CERTIFICATION.....................................V-I-1 APPENDIX V-J ATG TO ISIC CART II MEMO.......................V-J-1 APPENDIX V-K ATG TO ISIC CART II MEMO – CS TEAM.............V-K-1 APPENDIX V-L ATG TO ISIC CART II MEMO – DAMAGE CONTROL TEAM..............................................V-L-1 APPENDIX V-M ATG TO ISIC CART II MEMO - STT.................V-M-1 APPENDIX V-N ATG TO ISIC CART II MEMO – MEDICAL TEAM........V-N-1 APPENDIX V-O ATG TO ISIC CART II MEMO - NTT.................V-O-1 APPENDIX V-P ATG TO ISIC CART II MEMO - AVIATION TEAM.......V-P-1 APPENDIX V-Q ATG TO ISIC FEP MEMO...........................V-Q-1 APPENDIX V-R ATG TO ISIC FEP MEMO - CS TEAM.................V-R-1 V-1 COMNAVAIRFORINST 3500.20C APPENDIX V-S ATG TO ISIC FEP MEMO - DAMAGE CONTROL TEAM..............................................V-S-1 APPENDIX V-T ATG TO ISIC FEP MEMO - STT.....................V-T-1 APPENDIX V-U ATG TO ISIC FEP MEMO – MEDICAL TEAM............V-U-1 APPENDIX V-V ATG TO ISIC FEP MEMO - NTT.....................V-V-1 APPENDIX V-W ATG TO ISIC FEP MEMO - AVIATION TEAM...........V-W-1 V-2 COMNAVAIRFORINST 3500.20C APPENDIX V-A SHIP TO TYCOM - CART I COMPLETION MESSAGE RAAUZYUW 0007 2041621-UUUU--RHMCSUU. ZNR UUUUU R XXXXXXZ MAY 09 ZYB FM USS XXXXXX CVN XX// TO COMNAVAIRFOR SAN DIEGO CA//N7// APPROPRIATE CARRIER STRIKE GROUP COMMANDER APPROPRIATE NUMBERED FLEET COMMANDER APPROPRIATE AIR WING COMMANDER APPROPRIATE AFLOAT TRAINING GROUP BT UNCLAS MSGID/GENADMIN/CCSG XX// SUBJ/COMPLETION OF COMMAND ASSESSMENT OF READINESS AND TRAINING (CART I) REQUIREMENTS FOR CVN XX// REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// AMPN/REF A IS COMNAVAIRFOR CARRIER TRAINING AND READINESS MANUAL.// POC/XXXXXXXX/XXXXX/CCSG XX/LOC:XXXXXX, XX/ TEL:XXX XXX-XXXX// GENTEXT/REMARKS/1. IAW REF A, CVN XX HAS COMPLETED CART I REQUIRED ASSESSMENTS/ACTIONS: (A) PROVIDE ASSESSMENT OF INTEGRATED TRAINING TEAM (ITT) ORGANIZATION (B) PROVIDE ASSESSMENT OF AFLOAT SELF ASSESSMENT CHECKSHEETS (C) PROVIDE ASSESSMENT OF SHIP'S WATCH TEAM REPLACEMENT PLAN TO INCLUDE: - NEC PRODUCING/NON NEC FLTMPS REQUIRED SCHOOLS - ENLISTED DISTRIBUTION AND VERIFICATION REPORT - OFFICER DISTRIBUTION CONTROL REPORT (D) PROVIDE ASSESSMENT OF LONG RANGE TRAINING PLAN (LRTP) TO INCLUDE: - IDENTIFICATION OF TADTAR REQUIREMENTS - IDENTIFICATION OF REQUIRED SCHOOLS AND TEAM TRAINING (E) DEVELOPE, REFINE AND UPDATE SHIP'S REQUIRED MASTER SCHOOLS LIST. 2. DISCREPANCIES IDENTIFIED DURING THE CART I ASSESSMENT WILL BE DOCUMENTED ON THE CURRENT SHIP'S DISCREPANCY LOG (CSDL) UTILIZING THE RESTRICTIVE, MAJOR, MINOR FORMAT. 3. THE FOLLOWING IS A PRELIMINARY SCHEDULE OF MAJOR TRAINING EVENTS TO BE ACCOMPLISHED DURING CVN XX FRTP. EVENT DATE SBTT TBD FDC TBD CART II TBD V-A-1 COMNAVAIRFORINST 3500.20C TSTA INPT TSTA I/II/III/FEP NSSMS CERT TBD TBD TBD (PROVIDED SEPCOR) BT #0001 V-A-2 COMNAVAIRFORINST 3500.20C APPENDIX V-B ISIC TO ATG - TRAINING SUPPORT REQUEST FM CCSG XX//N37// TO APPROPRIATE AFLOAT TRAINING GROUP//N3/N80/N81/N82/N88// COMNAVAIRFOR SAN DIEGO CA//N7// APPROPRIATE TYPE COMMANDER USS XXXXX XXXXXXXXX BT UNCLAS MSGID/GENADMIN/CCSG-X SAN DIEGO CA// SUBJ/TRAINING SUPPORT REQUEST FOR CVN XX// REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// AMPN/REF A IS CARRIER TRAINING MANUAL.// POC/xxxxx/N37/CCSG XX/LOC:XXXXXXXX XX/ TEL:XXX XXX-XXXX// GENTEXT/REMARKS/1. PER REF A, REQUEST ATG TRAINING SUPPORT: A. USS XXXXXX, CVN XX, FOR THE FOLLOWING EVENTS: EVENT DATE SBTT 29 MAR-02 APR CREW CERT PH II TBD CREW CERT PH III TBD CART II 24-28 MAY TSTA INPT 14-18 JUN TSTA I/II/III/FEP TSTA/FEP 06-30 JUL NSSMS CERT TBD (PROVIDED SEPCOR) 2. REQUEST THE FOLLOWING RATES FOR EVENT SUPPORT: A. FOR SBTT: TRAINING LIAISON OFFICER (1), ABF (1), ABH (1), ABE (1), DC (2), QM(1), BM (1), OS (1), FC (1), HM(1). B. FOR CREW CERT PHASE II: TRAINING LIAISON OFFICER (1), DC (1), QM (1), BM (1), CTT (1), ET (1), IT (1), OS (1), FC (1), IS (1), STG (1), HM (1). C. FOR CREW CERT PHASE III: TRAINING LIAISON OFFICER (1), DC (4), QM (1), BM (1), CTT (1), ET (1), IT (1), OS (1), FC (1), IS (1), STG (1), HM (1). D. FOR CART II: TRAINING LIAISON OFFICER (1) ABF (2), ABH (2), ABE (1), DC (11), QM (1), BM (1), CTT (1), CTR OR CTO (1), ET (1), IT (1) OS (2), FC (2), IS (1), STG (1) HM (1). E. FOR TSTA I/P: TRAINING LIAISON OFFICER (1) ABF (2), ABH (2), ABE (1), DC (11), QM (1), BM (1), CTT (1), CTR OR CTO (1), ET (1), IT (1) OS (2), FC (2), IS (1), STG (1), HM (1). F. FOR TSTA/FEP: TRAINING LIAISON OFFICER (1) ABF (2), ABH (2), ABE (1), DC (11), QM (1), BM (1), CTT (1), CTR OR CTO (1), ET (1), IT (1) OS (2), FC (2), IS (1), STG (1), HM (1).// BT V-B-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-B-2 COMNAVAIRFORINST 3500.20C APPENDIX V-C ISIC TO TYCOM - CREW CERT PHASE I/II/III COMPLETION MESSAGE RAAUZYUW 0007 2041621-UUUU--RHMCSUU. ZNR UUUUU R XXXXXXZ MAY 09 ZYB FM COMCARSTRKGRU XX//N3// TO COMNAVAIRFOR SAN DIEGO CA//N7// COMNAVAIRLANT NORFOLK VA//N7A// INFO (APPROPRIATE) AFLOAT TRAINING GROUP BT UNCLAS MSGID/GENADMIN/CCSG XX// SUBJ/CREW CERTIFICATION PHASE X ICO CVN XX// REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// AMPN/REF A IS AIRCRAFT CARRIER TRAINING AND READINESS MANUAL.// POC/XXXXXXXX/XXXXX/CCSG XX/LOC:XXXXXX, XX/ TEL:XXX XXX-XXXX// GENTEXT/REMARKS/1. IAW REF A, CVN XX HAS SUCCESSFULLY COMPLETED CREW CERTIFICATION PHASE X . 2. CVN XX HAS COMPLETED PHASE I/II MILESTONES IN THE AREA OF TRAINING AND ADMINSTRATION AS OUTLINED IN REF A. 2A. CVN XX HAS COMPLETED PHASE III MILESTONES IN THE AREA OF TRAINING AND ADMINSTRATION, AND SUCCESSFULLY DEMONSTRATED SIMULATED UNDERWAY OPERATIONS AND EMERGENCY DRILLS AS OUTLINED IN REF A. 3. (XX) RESTRICTIVE, (XX) MAJOR AND (XXX) MINOR DISCREPANCIES WERE INDENTIFIED DURING THE CREW CERTIFICATION PHASE (X) PROCESS. RESTRICTIVE AND MAJOR DISCREPANCIES INCLUDE: RESTRICTIVE: DISCREPANCY/ MITIGATION STEPS/ESTIMATED COMPLETION DATE. MAJOR: DISCREPANCY/MITIGATON STEPS/ ESTIMATED COMPLETION DATE. 4. ALL DISCREPANCIES HAVE BEEN DOCUMENTED ON THE CURRENT SHIP'S DISCREPANCY LOG (CSDL). CCSG XX SHALL TRACK AND PROVIDE MIDMONTH UPDATES TO THE TYCOM CODE N7, UNTIL ALL NOTED DISCREPANCIES HAVE BEEN RESOLVED OR UNTIL THE SHIP HAS BEEN CERTIFIED MCO READY. BT V-C-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-C-2 COMNAVAIRFORINST 3500.20C APPENDIX V-D ISIC TO TYCOM - CART II COMPLETION MESSAGE RAAUZYUW 0007 2041621-UUUU--RHMCSUU. ZNR UUUUU R XXXXXXZ MAY 09 ZYB FM COMCARSTRKGRU XX//N3// TO COMNAVAIRFOR SAN DIEGO CA//N7// APPROPRIATE NUMBERED FLEET COMMANDER APPROPRIATE AIR WING COMMANDER APPROPRIATE AFLOAT TRAINING GROUP INFO USS SHIP (CVN XX)/ BT UNCLAS MSGID/GENADMIN/CCSG XX// SUBJ/COMPLETION OF COMMAND ASSESSMENT OF READINESS AND TRAINING (CART II) REQUIREMENTS FOR CVN XX// REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// AMPN/REF A IS COMNAVAIRFOR AIRCRAFT CARRIER TRAINING AND READINESS MANUAL. // POC/XXXXXXXX/XXXXX/CCSG XX/LOC:XXXXXX, XX/ TEL:XXX XXX-XXXX// GENTEXT/REMARKS/1. IAW REF A, CVN XX HAS SUCCESSFULLY COMPLETED CART II AND IS READY TO PROCEED TO THE NEXT PHASE OF UNIT LEVEL TRAINING. 2. ALL CART II EVENTS HAVE BEEN SATISFACTORILY COMPLETED WITH THE FOLLOWING EXCEPTIONS/RESULTS: (A) IDENTIFICATION OF CART II EVENTS NOT COMPLETED/TRAINING CONCERNS. (TYPE/NAME/ REASON NOT COMPLETE /MITIGATION STEPS AS REQUIRED /ESTIMATED COMPLETION DATE) (B) NUMBER/TYPE DISCREPANCIES IDENTIFIED DURING CART II. (NUMBER RESTRICTIVE, MAJOR, MINOR) (C) ASSESSMENT OF SHIP'S ONGOING TRAINING PROGRAMS. (D) ASSESSMENT OF INTEGRATED TRAINING TEAM (ITT) ORGANIZATION ABILITY TO BRIEF, EXECUTE AND DEBRIEF COMPLEX DRILL SETS. (E) ASSESSMENT OF TRAINING TEAM/WATCH STANDERS TRAINING LEVEL OF PROFICIENCY BY WARFARE AREA. (F) RECOMMENDATIONS REGARDING EMPHASIS/TAILORING FOR UPCOMING UNIT LEVEL TRAINING AS APPROPRIATE. (G) IDENTIFICATION OF RESOURCES REQUIRED TO COMPLETE BASIC PHASE TRAINING EVENTS (COMMERCIAL AIR SERVICES, RANGE SERVICES, NCEA) 3. THE FOLLOWING IS A SCHEDULE FOR COMPLETING REMAINING BASIC PHASE TRAINING EVENTS, INSPECTIONS, CERTIFICATIONS, ASSESSMENTS AND OPTIONAL ASSIST VISITS (ICAVS), REQUIRED DURING THE BASIC UNIT LEVEL PHASE OF TRAINING. (BELOW ARE EXAMPLES AND NOT ALL INCLUSIVE) V-D-1 COMNAVAIRFORINST 3500.20C EVENT DATE TYCOM/ISIC/SHIP ULT PLANNING CONF TBD ATFP TBD SAR CERT TBD TSTA I/II/III/FEP TBD NSSMS CERT TBD 4. ALL DISCREPANCIES NOTED DURING CART II HAVE BEEN ADDED TO THE CURRENT SHIP'S DISCREPANCY LOG (CSDL) AND ISICS SHALL TRACK AND PROVIDE MID-MONTH UPDATES TO THE TYCOM UNTIL FINAL RESOLUTION OF ALL NOTED DISCREPANCIES OR UNTIL THE SHIP HAS BEEN CERTIFIED MCO READY. BT #0001 V-D-2 COMNAVAIRFORINST 3500.20C APPENDIX V-E TYCOM TO FFC - MID-PHASE PROGRESS REPORT– BASIC PHASE ULT FM COMNAVAIRFOR SAN DIEGO CA//N7// TO COMUSFLTFORCOM NORFOLK VA//N01/N4/N7/N70/N71/N72/N73/N74// COMPACFLT PEARL HARBOR HI//01/N3/N7/N70/N71// INFO COMSECONDFLT/COMTHIRDFLT/COMSEVENTHFLT (AS APPROPRIATE) TYCOMS (AS APPROPRIATE) COMCARSTRIKEGRU XXXX USS SHIP 1 BT CLASSIFICATION //N03210// MSGID /GENADMIN/COMNAVAIRFOR// SUBJ/(U) MID-PHASE PROGRESS REPORT, BASIC PHASE ULT// REF/A/DOC/CUSFF-CPF INSTRUCTION 3501.3B/20JUL2009// REF/B/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// NARR/REF A IS THE FLEET TRAINING CONTINUUM. REF B IS THE AIRCRAFT CARRIER TRAINING AND READINESS MANUAL.// POC/NAME/CODE/TEL: /EMAIL: // RMKS/1. IAW REF A AND REF B, UNIT/GROUP IS MIDWAY THROUGH THE BASIC PHASE OF THE FRTP AND IS (AT RISK / NOT AT RISK) OF COMPLETING THE BASIC PHASE AS SCHEDULED AND/OR (ATTAINING / MAINTAINING) IURFT CERTIFICATION. 2. AREAS OF CONCERN WITH MITIGATION STEPS: A. SCHEDULE CHANGE/TYPE OF SCHEDULE CHANGE (E.G., EXTENDED MAINT PERIOD/FRTP EVENT CHANGE/OPERATIONAL TASKING)/TYPE OF RISK/REASONS FOR CHANGE/MITIGATION STEPS AS REQUIRED/COMMENTS. (BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE): SCHEDULE CHANGE/EXTENDED MAINTENANCE PERIOD BY THREE WEEKS/RISK TO COMPLETING THE BASIC PHASE CERTIFICATION ON SCHEDULE /MAINTENANCE PERIOD EXTENDED TO MAKE EMERGENT REPAIRS TO HULL/ BASIC PHASE WILL BE COMPRESSED BY THREE WEEKS/ UNIT LEVEL TRAINING MAY NOT BE COMPLETED BEFORE THE UNIT IS REQUIRED TO PARTICIPATE IN THE C2X). THE UNIT MAY NOT HAVE THE BASIC SKILLS NECESSARY TO ACTIVELY PARTICIPATE IN C2X).// B. PERSONNEL ISSUES (NOTE PERSONNEL ISSUES/ REASONS/ MITIGATION STEPS). (BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE): PERSONNEL ISSUES/TWO OF TWO SEARCH AND RESCUE SWIMMERS TAD/ONE SAR SWIMMER TAD TO HARPOON SCHOOL UNTIL MIDWAY THROUGH C2X, ONE SAR SWIMMER DEPLOYED ON IA UNTIL AFTER COMPLETION OF DEPLOYMENT/ REQUESTING SAR SWIMMERS FROM OTHER UNITS IOT COMPLETE THE VBSS CERTIFICATION.// C. EQUIPMENT ISSUES/SYSTEM/ISSUES (DISCUSS ANY EQUIPMENT DEFICIENCIES THAT AFFECT THE UNIT/GROUP’S ABILITY TO EXECUTE THE FRTP) (BELOW ARE EXAMPLES AND NOT ALL INCLUSIVE): V-E-1 COMNAVAIRFORINST 3500.20C MDS VERSION XX/SOFTWARE NOT INSTALLED/TOMAHAWK EXECUTION DEGRADED UNTIL AFTER C2X/ GTM1A/ONE OF FOUR MAIN ENGINES OOC, CASREP XXXX REFERS/UNABLE TO COMPLETE ULTRA-E AS SCHEDULED. BASIC PHASE TRAINING MAY NOT BE COMPLETED BY (SCHEDULED DATE). THE UNIT MAY NOT BE ELIGIBLE FOR INDEPENDENT TASKING AS SCHEDULED. UNIT LEVEL TRAINING MAY CARRY INTO THE INTEGRATED PHASE.// D. TRAINING ISSUES/ CERTIFICATION OR EVENT AFFECTED/ DATE/(SUMMARIZE THE UNIT’S FRTP, IDENTIFY SPECIFIC WARFARE AREAS OF CONCERN AND ANY DEFICIENCIES WHICH AFFECT THE ABILITY TO TRAIN). (BELOW ARE EXAMPLES AND NOT ALL INCLUSIVE) CMTQ/20NOV09/SECOND FAILURE/REMEDIAL TRAINING REQUIRED. CERTIFICATION RESCHD 15DEC09// ULTRA C/30NOV09/FAILED/THREE TSTAS SCHEDULED. THERE ARE LIMITED PERSONNEL TO SUPPORT ASSIST VISITS PRIOR TO UNIT COMPLETING THE FRTP BASIC PHASE. UNIT LEVEL TRAINING WILL CONTINUE DURING THE INTEGRATED PHASE. RESCHD 15JAN10.// E. SUPPLY ISSUES/(IDENTIFY SPECIFIC SUPPLY/MATERIEL SHORTFALLS WHICH AFFECT THE UNIT’S FRTP). (BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE) HELO PACKUP KIT UNAVAIL UNTIL 15DEC09/MAY DELAY HELO SUPPORT FOR C2X.// F. ORDNANCE ISSUES/(IDENTIFY SPECIFIC AMMUNITION/WEAPON SHORT-FALLS). (BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE) UNIT ALLOCATION FOR 5IN NCEA INSUFFICENT TO SUPPORT NGFS CERTIFICATION/NCEA AUGMENTATION REQUEST SUBMITTED.// 3. CLOSING REMARKS.// V-E-2 COMNAVAIRFORINST 3500.20C APPENDIX V-F ISIC TO TYCOM - END OF PHASE REPORT - BASIC PHASE ULT FM COMCARSTRKGRU XXXXXXX TO APPROPRIATE TYCOM (COMNAVAIRPAC SAN DIEGO CA/COMNAVAIRLANT NORFOLK VA//N00/N01/N7//) INFO COMTHIRDFLT (Receiving Numbered Fleet Commander C2F/C3F) COMSTRKFORTRAPAC/(LANT or PAC as appropriate) COMAFLOATTRAGRUPAC/LANT(Appropriate Afloat Training Group) USS XXXXXXXXX BT UNCLASS //N03210// MSGID/GENADMIN/COMCARSTRKGRU XXXXXXXX// SUBJ/BASIC PHASE UNIT LEVEL TRAINING COMPLETION REPORT (U)// REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// AMPN/REF A IS AIRCRAFT CARRIER TRAINING AND READINESS MANUAL// POC/XXX XXXXXX/CDR/CCSGXX/EMAIL:[email protected]// RMKS/1. IAW REF A AND B, USS XXXXXX(CVN XX)HAS SUCCESSFULLY COMPLETED THE BASIC PHASE AND IS READY FOR FOLLOW ON TRAINING. 2. ALL BASIC PHASE REQUIRED EXERCISES, SCHOOLS AND INSPECTIONS, CERTIFICATIONS AND ASSESSMENTS HAVE BEEN SATISFACTORILY COMPLETED WITH THE FOLLOWING EXCEPTIONS. 2A. TYPE/NAME/REASONS NOT COMPLETE/MITIGATION STEPS AS REQUIRED/ESTIMATED COMPLETION DATE: (BELOW ARE EXAMPLES, BUT NOT ALL INCLUSIVE) A. TSTA REQUIRED FLEET EXERCISES: AAW-11A-SF ANTI-SHIP MISSILE DEFENSE (STREAM RAID/LIVE FIRING)/NOT COMPLETED DUE TO TARGET CONSTRAINTS RESULTING FROM REQUIREMENT CONFLICTS/MITIGATION STEPS NOT REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X. AW-21-SF PHALANX FIRING(ALL MOUNTS)/NOT APPLICABLE, NO CIWS ONBOARD. DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X. B. FEP REQUIRED FLEET EXERCISES: AW-20-SF PHALANX READINESS EVALUATION EXERCISE/NOT APPLICABLE, NO CIWS ONBOARD. SUW-12-SF VISUAL ID COUNTERING/OBSERVATION SHIP NOT AVAILABLE DUE TO TIME, DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X. C. BASIC PHASE REQUIRED INSPECTIONS, CERTIFICATIONS, ASSESSMENTS AND OPTIONAL ASSIST VISITS (ICAV’S). (REPORT STATUS OF ALL BASIC PHASE INDEPENDENT UNIT READY FOR TASKING (IURFT) REQUIRED (ICAV’S) OUTLINED IN CHAPTER 5. D. MANNING. (IDENTIFY MANNING SHORTFALLS THAT REQUIRE TYCOM ATTENTION). V-F-1 COMNAVAIRFORINST 3500.20C 3. AFLOAT TRAINING GROUP PAC/LANT (as appropriate) IDENTIFIED ZERO RESTRICTIVE DISCREPANCIES DURING XXXXXX TSTA/FEP. ALL MAJOR DISCREPANCIES IDENTIFIED HAVE BEEN SATISFACTORILY CORRECTED WITH THE FOLLOWING EXCEPTIONS. A. BATTLE FORCE TACTICAL TRAINER (BFTT)/SYSTEM DEGRADED/CATEGORY II CASREP SUBMITTED XXXXXX/ESTIMATED COMPLETION DATE XXXXXXX. B. DAMAGE CONTROL DISCREPANCIES/TOTAL NUMBER OF DAMAGE CONTROL DISCREPANCIES CHALLENGES CREW’S ABILITY TO EFFECTIVELY SET MATERIAL CONDITIONS OF READINESS/SHIP’S DC TEAMS AND CSGXX ARE EXERCISING A FOCUSED EFFORT TO MITIGATE ALL OUTSTANDING DISCREPANCIES. FULL TYCOM RESOURCE SUPPORT AND OVERSIGHT PROVIDED/ESTIMATED COMPLETION DATE ONGOING. 4. ALL DISCREPANCIES NOTED DURING UNIT LEVEL TRAINING HAVE BEEN ADDED TO THE CURRENT SHIP'S DISCREPANCY LOG (CSDL) AND ISICS SHALL TRACK AND PROVIDE MID-MONTH UPDATES TO THE TYCOM UNTIL FINAL RESOLUTION OF ALL NOTED DISCREPANCIES OR UNTIL THE SHIP HAS BEEN CERTIFIED MCO READY. 5. ORIG RECOMMENDS THAT USS XXXXX BE CERTIFIED INDEPENDENT UNIT READY FOR TASKING. BT// V-F-2 COMNAVAIRFORINST 3500.20C APPENDIX V-G TYCOM TO NUMBERED FLEET - END OF PHASE REPORT – BASIC PHASE ULT FM COMNAVAIRFOR SAN DIEGO//N7// TO COMTHIRDFLT (RECEIVING NUMBERED FLEET COMMANDER) INFO COMPACFLT PEARL HARBOR HI//01/N4/N7/N70/N71// COMUSFLTFORCOM NORFOLK VA//01/N4/7/N70/N71/N72/N73/N74// COMSTRKFORTRAPAC/(LANT OR PAC AS APPROPRIATE) COMCARSTRKGRU XXXXXXX (APPROPRIATE STRIKE GROUP COMMANDER) USS XXXXXXXXX BT UNCLASS//N03210// MSGID /GENADMIN/COMNAVAIRFOR// UNCLASS//N03210// MSGID/GENADMIN/CNAF// SUBJ/BASIC PHASE UNIT LEVEL TRAINING COMPLETION REPORT// REF/A/DOC/ CUSFF-CPF INSTRUCTION 3501.3B/20JUL2009// REF/B/MSG/CCSG BASIC PHASE ULT CERTIFICATION MESSAGE/DATE// NARR/REF A IS DRAFT COMUSFLTFORCOM/COMPACFLTINST3501.3B FLEET TRAINING CONTINUUM INST. REF B IS CCSGXX UNIT-LEVEL TRAINING PHASE CERTIFICATION MESSAGE FOR USS XXXXXX// POC/XXX XXXXXX/CIV/CNAF/EMAIL:[email protected]// RMKS/1. IAW REF A AND B, USS XXXXXX(CVN XX)HAS SUCCESSFULLY COMPLETED THE BASIC PHASE AND IS READY FOR FOLLOW-ON TRAINING. 2. ALL BASIC PHASE REQUIRED EXERCISES, INSPECTIONS, QUALIFICATIONS, CERTIFICATIONS, SCHOOLS, AND ASSESSMENTS HAVE BEEN SATISFACTORILY COMPLETED WITH THE FOLLOWING EXCEPTIONS. 2A. TYPE/NAME/REASONS NOT COMPLETE/MITIGATION STEPS AS REQUIRED/ESTIMATED COMPLETION DATE: (BELOW ARE EXAMPLES, BUT NOT ALL INCLUSIVE) A. TSTA REQUIRED FLEET EXERCISES: AAW-11A-SF ANTI-SHIP MISSILE DEFENSE (STREAM RAID/LIVE FIRING)/NOT COMPLETED DUE TO TARGET CONSTRAINTS RESULTING FROM REQUIREMENT CONFLICTS/MITIGATION STEPS NOT REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X. AW-21-SF PHALANX FIRING(ALL MOUNTS)/NOT APPLICABLE, NO CIWS ONBOARD. DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X. B. FEP REQUIRED FLEET EXERCISES: AW-20-SF PHALANX READINESS EVALUATION EXERCISE/NOT APPLICABLE, NO CIWS ONBOARD. SUW-12-SF VISUAL ID COUNTERING/OBSERVATION SHIP NOT AVAILABLE DUE TO TIME, DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X. 3. AFLOAT TRAINING GROUP PAC/LANT (AS APPROPRIATE) IDENTIFIED ZERO RESTRICTIVE DISCREPANCIES DURING XXXXXX TSTA/FEP. ALL V-G-1 COMNAVAIRFORINST 3500.20C MAJOR DISCREPANCIES IDENTIFIED HAVE BEEN SATISFACTORILY CORRECTED WITH THE FOLLOWING EXCEPTIONS. A. BATTLE FORCE TACTICAL TRAINER (BFTT)/SYSTEM DEGRADED/CATEGORY II CASREP SUBMITTED XXXXXX/ESTIMATED COMPLETION DATE XXXXXXX. B. DAMAGE CONTROL DISCREPANCIES/TOTAL NUMBER OF DAMAGE CONTROL DISCREPANCIES CHALLENGES CREW’S ABILITY TO EFFECTIVELY SET MATERIAL CONDITIONS OF READINESS/SHIP’S DC TEAMS AND CSGXX ARE EXERCISING A FOCUSED EFFORT TO MITIGATE ALL OUTSTANDING DISCREPANCIES. FULL TYCOM RESOURCE SUPPORT AND OVERSIGHT PROVIDED/ESTIMATED COMPLETION DATE ONGOING. 4. ALL DISCREPANCIES NOTED DURING BASIC PHASE ULT HAVE BEEN ADDED TO THE CURRENT SHIP'S DISCREPANCY LOG (CSDL) AND ISICS SHALL TRACK AND PROVIDE MID-MONTH UPDATES TO THE TYCOM UNTIL FINAL RESOLUTION OF ALL NOTED DISCREPANCIES OR UNTIL THE SHIP HAS BEEN CERTIFIED MCO READY. 5. NO INSTALLS OR TCD WAVIER SCHEDULED THAT AFFECT TRAINING OR CERTIFICATION. 6. ORIG HAS CERTIFIED USS XXXXXX BASIC UNIT LEVEL PHASE OF TRAINING IS COMPLETE AND IURFT. BT// V-G-2 COMNAVAIRFORINST 3500.20C APPENDIX V-H SHIP MESSAGE NATO SEA SPARROW MISSILE CERTIFICATION ZNR UUUUU ZUI P (DTG) PSN XXXXXXX FM USS (SHIP) TO COMCARSTRKGRU XXX INFO APPROPRIATE TYPE COMMANDER//N7// COMSTRKFORTRALANT COMSTRKFORTRAPAC COMAFLOATRAGRULANT NORFOLK VA//00/N3/N88// COMAFLOATRAGRUPAC SAN DIEGO CA//00/N3/N88//) COMAFLOATRAGRU (MAYPORT, WESTPAC ETC.)//00/N3/N88//) USS (SHIP) (SAME AS FROM LINE) BT UNCLAS //N03500// MSGID/GENADMIN/USS (SHIP)/-/(MOS)// SUBJ/NATO SEA SPARROW MISSILE CERTIFICATION// REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// REF/B/DOC/COMNAVAIRFORINST 3600.1A/24AUG2006// NARR/REF A IS CVTRAMAN, REF B IS NSSMS CERTIFICATION INSTRUCTION// POC/POINT OF CONTACT INFORMATION// RMKS/1. IAW REF A, REQUEST NSSMS CERTIFICATION FOR USS (SHIP). ALL REQUIREMENTS CONTAINED IN REF B WERE ACHIEVED. PHASE I AND PHASE II COMPLETED (DATE). PHASE III COMPLETED (DATE). 2. EMBARKED ATG EVALUATORS CONCUR CERTIFICATION CRITERIA WAS ATTAINED.// BT V-H-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-H-2 COMNAVAIRFORINST 3500.20C APPENDIX V-I ISIC MESSAGE NATO SEA SPARROW MISSILE CERTIFICATION P (DTG) PSN XXXXXXXX FM COMCARSTRKGRU XXX TO APPROPRIATE TYPE COMMANDER//N6/N7// INFO COMSECONDFLT /(COMTHIRDFLT) COMSTRKFORTRALANT COMSTRKFORTRAPAC COMAFLOATRAGRULANT NORFOLK VA//00/N3/N88// COMAFLOATRAGRUPAC SAN DIEGO CA//00/N3/N88//) USS (SHIP) (CVN XX) USS (Other pertinent USS vessels which are part of CSG) BT UNCLAS //N03000// MSGID/GENADMIN/CCSG-X// SUBJ/USS (SHIP) NATO SEA SPARROW CERTIFICATION// REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)// REF/B/DOC/COMNAVAIRFORINST 3600.1A/24AUG2006// REF/C/MSG/USS (SHIP)/(DTG)/NOTAL// NARR/REF A IS CVTRAMAN. REF B IS NSSMS CERTIFICATION INST. REF C IS USS (SHIP) REQUEST FOR NSSM CERTIFICATION.// RMKS/IAW REFS A-C, RECOMMEND NSSM CERTIFICATION FOR USS (SHIP). ALL REQUIREMENTS CONTAINED IN REF B WERE MET. PHASE I COMPLETED (DATE), PHASE II COMPLETED (DATE), AND PHASE III COMPLETED (DATE). 2. ATG EVALUATORS CONCUR CERTIFICATION CRITERIA WAS ATTAINED.// BT V-I-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-I-2 COMNAVAIRFORINST 3500.20C From: To: APPENDIX V-J ATG TO ISIC CART II MEMO Carrier Training Officer, AFLOAT TRAINING GROUP LANT/PAC/PACNORWEST/WESTPAC Commander, CARRIER STRIKE GROUP XXXXXX Subj: USS XXXXX (CVN XX) COMMAND ASSESSMENT OF READINESS AND TRAINING (CART II) Ref: (a) COMNAVAIRFORINST 3500.20 series (b) FXP 4, Rev. A Encl: (1) (2) (3) (4) (5) (6) Combat Systems End of Mission Report Damage Control End of Mission Report Seamanship End of Mission Report Medical End of Mission Report Navigation End of Mission Report Aviation End of Mission Report 1. CART II was conducted on board USS XXXXX (CVN XX) XX-XX January in port, and XX-XX January XX underway. The AFLOAT TRAINING GROUP (LANT/PAC/Appropriate ATG) Carrier Training Team assessed the administration, material, readiness and the Ship Board Training Teams ability to brief, execute, and debrief complex drill sets to establish a proficiency baseline for TSTA. 2. Detailed End of Mission Reports for each functional/warfare area are provided in enclosures (1) through (6). Each enclosure covers specifics on events/drills conducted, Administrative, Personnel and Procedural Discrepancies, Material Discrepancies and an overall summary that includes recommendations for further training. 3. Training Team Action Items: a. b. c. d. e. f. g. ITT CSTT. DCTT SEA MTT NAV ADTT 4. ATGXXXXX Summary of Discrepancies requiring attention prior to commencing the next phase of training. (This list is not all-inclusive, but does represent top concerns. Details and additional discrepancies are addressed in enclosures (1)-(6): V-J-1 COMNAVAIRFORINST 3500.20C a. Combat Systems: (Restrictive) (Major) b. Damage Control: (Restrictive) (Major) c. Seamanship: (Restrictive) (Major) d. Medical: (Restrictive) (Major) e. NAV: (Restrictive) (Major) f. ADTT: (Restrictive) (Major) 5. End of Mission Report total discrepancy count: (Restrictive) (Major) (Minor) 6. ATGXX Training Liaison Officer (TLO) EOM summary and recommendations to the Commanding Officer for further training: 7. ATGXX TLO Recommendations to CSG XX: 8. ATGXX TLO Recommendations to TYCOM 9. The ATGXX Carrier Team greatly appreciates the hospitality and cooperation shown by the entire crew throughout CART II. V-J-2 COMNAVAIRFORINST 3500.20C Very Respectfully, LT XXXXXXXXX ATGXXX Carrier Liaison Officer Copies to: CNAL / CNAP , N7 (Appropriate TYCOM) COMMANDING OFFICER, XXXXXX (CVN XX) COMAFLOATRAGRU (Appropriate N00) V-J-3 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-J-4 COMNAVAIRFORINST 3500.20C APPENDIX V-K ATG TO ISIC CART II MEMO – CS TEAM From: To: OSC(SW/AW) XXXXXX,XXXX CS Team Lead, ATG XXXX Carrier Training Officer, AFLOAT TRAINING GROUP XXXX Subj: CSTT USS XXXXXX (CVN XX) CART II END OF MISSION REPORT FOR Ref: (a) COMNAVAIRFORINST 3500.20 Series, (b) FXP 2,3,4 1. CART II was conducted on board USS XXXXX (CVN XX) (Date of Event) (In port / Underway). 2. The following FXP exercises were conducted: (List all exercises conducted during CART II). AW-24-SF DTE (NON-FIRING) MOB-D-25-SF MASS CONFLAGRATION 3. The following FXP exercises were not conducted: (List all required exercises not complete during CART II). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6. Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully OSC XXXXX,XXXX (SW/AW) USN V-K-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-K-2 COMNAVAIRFORINST 3500.20C APPENDIX V-L ATG TO ISIC CART II MEMO – DAMAGE CONTROL TEAM From: To: DCC(SW) XXXXX,XXXXX Damage Control Team Lead, ATG XXXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: DCTT USS XXXXXX (CVN XX) CART II END OF MISSION REPORT FOR Ref: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) (s) COMNAVAIRFORINST 3500.20 Series, NSTM 555 Volume 1 Surface Ship Firefighting NTTP 3-20.31 Surface Ship Survivability NSTM 074 V3 Gas Free Engineering NSTM 079 V2 Practical Damage Control NSTM 077 Personal Protection Equipment NSTM 470 Shipboard BW/CW Defense and Countermeasures NSTM 600 Watertight Closures OPNAVINST 3120 OPNAVINST 3541 Series Surface Ship Survivability Requirements OPNAVINST 4790 Series Maintenance and Material Management (3-M) NAVEDTRA 43119 PQS Standards for Damage Control COMNAVAIRFORINST 5400.27 Series Standard Repair Party Manual PMS MIP 5519 Series PMS MIP 6641 Series XXXXXINST 5400.2J EDORM XXXXXINST 3541.4B DCTT Instruction XXXXXINST 4790.9D DCPO Preventive and Corrective Maintenance Program XXXXXSORM 30010 XXXXXX Zone Inspection Program 1. CART II was conducted on board USS XXXXX (CVN XX) (Date of Event) In port / Underway). 2. The following FXP exercises were conducted: (List all exercises conducted during CART II). 3. The following FXP exercises were not conducted: (List all required exercises not complete during CART II). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: V-L-1 COMNAVAIRFORINST 3500.20C a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor: 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, DCC(SW) XXXX X, XXXX V-L-2 COMNAVAIRFORINST 3500.20C APPENDIX V-M ATG TO ISIC CART II MEMO - STT From: To: BMC (SW/AW) XXXXXXX; STT, ATGXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: USS XXXXX (CVN XX) CART II END OF MISSION REPORT FOR STT Training Team Ref: (a) COMNAVAIRFORINST 3500.20 Series 1. CART II was conducted on board USS XXXXX (CVN XX) (Date of Event) (In port / Underway). 2. The following FXP exercises were conducted: (List all exercises conducted during CART II). 3. The following FXP exercises were not conducted: (List all required exercises not complete during CART II). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, BMC (SW/AW) XXXXX,XXXX V-M-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-M-2 COMNAVAIRFORINST 3500.20C APPENDIX V-N ATG TO ISIC CART II MEMO – MEDICAL TEAM From: To: HMC (SW/FMF/AW) XXXXXXX Medical Team Lead, ATG XXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: USS XXXXXX (CVN XX) CART II END OF MISSION REPORT FOR MTT Ref: (a) COMNAVAIRFORINST 3500.20 Series (b) COMNAVAIRFORINST 6000.11 Series (c) FXP 4 (Rev A) (d) OPNAVINST 4790.4D 1. CART II was conducted on board USSXXXXXX (CVN XX) (Date of Event) (In port / Underway). 2. The following FXP exercises were conducted: (List all exercises conducted during CART II). 3. The following FXP exercises were not conducted: (List all required exercises not complete during CART II). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, HMC XXXXXX,XXX (SW/FMF/AW) USN V-N-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-N-2 COMNAVAIRFORINST 3500.20C APPENDIX V-O ATG TO ISIC CART II MEMO - NTT From: To: XXXXXXXXX, NTT, ATGSD Carrier Training Officer, AFLOAT TRAINING GROUP XXXX Subj: USS XXXXX (CVN XX) CART II END OF MISSION REPORT FOR NTT Training Team Ref: (a) COMNAVAIRFORINST 3500.20 Series 1. CART II was conducted on board USS XXXXX (CVN XX) (Date of Event) (In port / Underway). 2. The following FXP exercises were conducted: (List all exercises conducted during CART II). 3. The following FXP exercises were not conducted: (List all required exercises not complete during CART II). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully QMC XXXXXXXX (SW/AW) USN V-O-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-O-2 COMNAVAIRFORINST 3500.20C APPENDIX V-P ATG TO ISIC CART II MEMO - AVIATION TEAM From: To: ABHCS (AW/SW) XXXXXXXX Aviation Team Lead, ATG XXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: ADTT USS XXXXXXX (CVN XX) CART II END OF MISSION REPORT FOR Ref: (a) COMNAVAIRFORINST 3500.20 Series (b) FXP 4 (Rev A) 1. CART II was conducted on board USS XXXXXX (CVN XX) (Date of Event) (In port / Underway) 2. The following FXP exercises were conducted: (List all exercises conducted during CART II). 3. The following FXP exercises were not conducted: (List all required exercises not complete during (CART II). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, ABHCS XXXXX,XXXX (AW/SW) USN V-P-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-P-2 COMNAVAIRFORINST 3500.20C APPENDIX V-Q ATG TO ISIC FEP MEMO From: To: Carrier Training Officer, AFLOAT TRAINING GROUP LANT/PAC/PACNORWEST/WESTPAC Commander, CARRIER STRIKE GROUP XXXXXX Subj: USS XXXXX (CVN XX) FINAL EVALUATION PERIOD (FEP) REPORT Ref: (a) (b) Encl: (1) (2) (3) (4) (5) (6) COMNAVAIRFORINST 3500.20 series FXP 4, Rev. A Combat Systems End of Mission Report Damage Control End of Mission Report Seamanship End of Mission Report Medical End of Mission Report Navigation End of Mission Report Aviation End of Mission Report 1. FEP was conducted on board USS XXXXX (CVN XX) (Date of Event). The AFLOAT TRAINING GROUP (Appropriate ATG) Carrier Training Team guided CVN XX crew through several complex Unit Level Training Exercises, placing emphases on the ship’s Integrated Training Teams (ITT) while improving the ship’s watch standing, war fighting and ship’s survival capabilities across all required warfare areas. 2. Detailed End of Mission Reports for each functional/warfare area are provided in enclosures (1) through (6). Each enclosure covers specifics on events/drills conducted, Administrative, Personnel and Procedural Discrepancies, Material Discrepancies and an overall summary that includes recommendations for further training. 3. Training Team Action Items: a. ITT b. CSTT c. DCTT d. SEA e. MTT f. NAV g. ADTT 4. ATGXXXXX Summary of Discrepancies requiring attention prior to the commencing to the next phase of training.. (This list is V-Q-1 COMNAVAIRFORINST 3500.20C not all inclusive, but does represent top concerns. Details and additional discrepancies are addressed in enclosures (1)-(6): 5. a. Combat Systems: (Restrictive) (Major) b. Damage Control: (Restrictive) (Major) c. Seamanship: (Restrictive) (Major) d. Medical: (Restrictive) (Major) e. NAV: (Restrictive) (Major) f. ADTT: (Restrictive) (Major) End of Mission Report total discrepancy count: (Restrictive) (Major) (Minor) 6. ATGXX Training Liaison Officer (TLO) EOM summary and recommendations to the Commanding Officer for further training: 7. ATGXX TLO Recommendations to CSG XX: 8. ATGXX TLO Recommendations to TYCOM 9. The ATGXX Carrier Team greatly appreciates the hospitality and cooperation by the entire crew throughout CART II. Very Respectfully, V-Q-2 COMNAVAIRFORINST 3500.20C LT XXXXXXXXX ATGXXX Carrier Liaison Officer Copies to: COMNAVAIRFORCE , N7 COMMANDING OFFICER, XXXXXX (CVN XX) COMAFLOATRAGRU (Appropriate N00) V-Q-3 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-Q-4 COMNAVAIRFORINST 3500.20C APPENDIX V-R ATG TO ISIC FEP MEMO - CS TEAM From: To: OSC(SW/AW) XXXXXX,XXXX CS Team Lead, ATG XXXX Carrier Training Officer, AFLOAT TRAINING GROUP XXXX Subj: USS XXXXXX (CVN XX) FEP END OF MISSION REPORT FOR CSTT Ref: (a) COMNAVAIRFORINST 3500.20 Series, (b) FXP 2,3,4 1. FEP was conducted on board USS XXXXX (CVN XX) (Date of Event). 2. The following FXP exercises were conducted: (List all exercises conducted during FEP). AW-24-SF DTE (NON-FIRING) MOB-D-25-SF MASS CONFLAGURATION 3. The following FXP exercises were not conducted: (List all required exercises not complete during FEP). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully OSC XXXXX,XXXXl (SW/AW) USN V-R-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-R-2 COMNAVAIRFORINST 3500.20C APPENDIX V-S ATG TO ISIC FEP MEMO - DAMAGE CONTROL TEAM From: To: DCC(SW) XXXXX,XXXXX Damage Control Team Lead, ATG XXXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: USS XXXXXX (CVN XX) FEP END OF MISSION REPORT FOR DCTT Ref: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) (s) 1. COMNAVAIRFORINST 3500.20 Series, NSTM 555 Volume 1 Surface Ship Firefighting NTTP 3-20.31 Surface Ship Survivability NSTM 074 V3 Gas Free Engineering NSTM 079 V2 Practical Damage Control NSTM 077 Personal Protection Equipment NSTM 470 Shipboard BW/CW Defense and Countermeasures NSTM 600 Watertight Closures OPNAVINST 3120 OPNAVINST 3541 Series Surface Ship Survivability Requirements OPNAVINST 4790 Series Maintenance and Material Management (3-M) NAVEDTRA 43119 PQS Standards for Damage Control COMNAVAIRFORINST 5400.27 Series Standard Repair Party Manual PMS MIP 5519 Series PMS MIP 6641 Series XXXXX INST 5400.2J EDORM XXXXX INST 3541.4B DCTT Instruction XXXXX INST 4790.9D DCPO Preventive and Corrective Maintenance Program XXXXX SORM 30010 USS SHIP XX Zone Inspection Program FEP was conducted on board USS XXXXX (CVN XX) (Date of Event). 2. The following FXP exercises were conducted: (List all exercises conducted during FEP). 3. The following FXP exercises were not conducted: (List all required exercises not complete during FEP). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) Restrictive: V-S-1 COMNAVAIRFORINST 3500.20C b) c) 5. Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, DCC(SW) XXXX X, XXXX V-S-2 COMNAVAIRFORINST 3500.20C APPENDIX V-T ATG TO ISIC FEP MEMO - STT From: To: BMC (SW/AW) XXXXXXX; STT, ATGXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: USS XXXXX (CVN XX) FEP END OF MISSION REPORT FOR STT Training Team Ref: (a) COMNAVAIRFORINST 3500.20 Series 1. FEP was conducted on board USS XXXXX (CVN XX) (Date of Event). 2. The following FXP exercises were conducted: (List all exercises conducted during FEP). 3. The following FXP exercises were not conducted: (List all required exercises not complete during FEP). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, BMC (SW/AW) XXXXX,XXXX V-T-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-T-2 COMNAVAIRFORINST 3500.20C APPENDIX V-U ATG TO ISIC FEP MEMO – MEDICAL TEAM From: To: HMC (SW/FMF/AW) XXXXXXX Medical Team Lead, ATG XXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: USS XXXXXX (CVN XX) FEP END OF MISSION REPORT FOR MTT Ref: (a) (b) (c) (d) COMNAVAIRFORINST 3500.20 Series COMNAVAIRFORINST 6000.11 Series FXP 4 (Rev A) OPNAVINST 4790.4D 1. FEP was conducted on board USS XXXXXX (CVN XX) (Date of Event). 2. The following FXP exercises were conducted: (List all exercises conducted during FEP). 3. The following FXP exercises were not conducted: (List all required exercises not complete during FEP). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion. 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, HMC XXXXXX, XXX (SW/FMF/AW) USN V-U-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-U-2 COMNAVAIRFORINST 3500.20C APPENDIX V-V ATG TO ISIC FEP MEMO - NTT From: To: XXXXXXXXX, NTT, ATGSD Carrier Training Officer, AFLOAT TRAINING GROUP XXXX Subj: USS XXXXX (CVN XX) FEP END OF MISSION REPORT FOR NTT Training Team Ref: (a) COMNAVAIRFORINST 3500.20 Series 1. FEP was conducted on board USS XXXXX (CVN XX) (Date of Event). 2. The following FXP exercises were conducted: (List all exercises conducted during FEP). 3. The following FXP exercises were not conducted: (List all required exercises not complete during FEP). Include: Name / Reason not complete / Mitigation plan / Estimated Date of Completion 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully QMC XXXXXXXX (SW/AW) USN V-V-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-V-2 COMNAVAIRFORINST 3500.20C APPENDIX V-W ATG TO ISIC FEP MEMO - AVIATION TEAM From: To: ABHCS (AW/SW) XXXXXXXX Aviation Team Lead, ATG XXX Carrier Training Officer, AFLOAT TRAINING GROUP (Appropriate ATG) Subj: USS XXXXXXX (CVN XX) FEP END OF MISSION REPORT FOR ADTT Ref: (a) COMNAVAIRFORINST 3500.20 Series (b) FXP 4 (Rev A) 1. FEP was conducted on board USS XXXXXX (CVN XX) (Date of Event). 2. The following FXP exercises were conducted: (List all exercises conducted during FEP). 3. The following FXP exercises were not conducted: (List all required exercises not complete during FEP). Include: Name / Reason not complete / Mitigation plan / Estimated Time of Completion 4. Administrative, Personnel and Procedural Discrepancies: a) b) c) 5. Restrictive: Major: Minor: Material Discrepancies: a) b) c) Restrictive: Major: Minor 6) Overall Assessment Summary / Recommendations: (ATG provide comments / recommendations concerning Training Team / Watch Standers). Very Respectfully, ABHCS XXXXX,XXXX (AW/SW) USN V-W-1 COMNAVAIRFORINST 3500.20C (THIS PAGE INTENTIONALLY BLANK) V-W-2