ERTMS Specific Objectives Judit Bertrand DG MOVE
Transcription
ERTMS Specific Objectives Judit Bertrand DG MOVE
ERTMS Specific Objectives Judit Bertrand DG MOVE 2014 CEF Transport Calls Info Days, ERTMS Workshop Brussels, 10 October 2014 Indicative budget & specific objectives €200 million (general envelope) and €100 million (Cohesion envelope) support actions in the following Specific Objectives: 1) 2) 3) 4) 5) 6) ERTMS track-side deployment - HIGH Priority ERTMS on-board deployment - HIGH Priority Simplification and facilitation of placing in operation ERTMS training ERTMS specifications maintenance Operational rules EU grant: • • ERTMS: maximum 50%/85% (CF) of the eligible costs Infrastructure works (Sp. Priority 1): 20-40%/85% (CF) of the eligible costs 1. ERTMS track-side deployment 1. ETCS deployment: - Eligible Baseline: B2 (230d) and B3 Focus on Core Network Corridors sections Upgrade: B3 is the priority Infrastructure works (for L2): eligible Pilot actions for complex situations, incl. radio communication system 2. Preparatory actions (e.g. studies, ToR): followed by deployment! 1. ERTMS track-side deployment • Eligible costs of: • ETCS deployment: ceiling of €260k/km of doubletrack line. Adaptation possible for complex situations • ETCS upgrade: actual (no ceiling) • Infrastructure works (for L2): actual (no ceiling) • Preparatory actions: actual (no ceiling) • Preparatory actions/ ERTMS deployment: separate applications 2. ERTMS on-board deployment ETCS deployment: - Eligible Baseline: B3 - Existing vehicles only - GSM-R interference issues: eligible for vehicles to be equipped with ETCS 2. ERTMS on-board deployment • Eligible costs of: • ETCS retrofit: ceiling of €250k/ERTMS OBU (HW, SW and GSM-R, if applicable) • ETCS upgrade: actual (no ceiling) • Equipped vehicles to remain/operate in EU/EEA for minimum 5 years following the completion of an Action 3. Simplification and facilitation of placing in operation • Studies on authorisation procedure aiming at: - Simplifying/facilitating the procedure - Harmonising the procedure among Member States - Reducing time and costs • More than 1 Member States involved • NoBO(s) and NSA(s) involved • On-board and track-side APIS eligible! 3. Simplification and facilitation of placing in operation • Eligible costs: actual (no ceiling) • Results: made public • Results: compliant with TSI CCS 4. ERTMS training • Eligible trainings for: - ERTMS experts - ERTMS project managers (ToR, contract/project follow-up) - Train dispatchers - Train drivers (operating OBU/lines), etc. • Priority for Railway Undertakings and Infrastructure Managers • Drivers simulators: eligible • Results available by the end of a project • Eligible costs: actual (no ceiling) 5. ERTMS specifications maintenance • Focus on stability of specifications • Test cases, sequences, scenarios • Feedback from completed/on-going deployment • Backward compatibility analysis • Stakeholders from more than 1 Member State • Eligible costs: actual (no ceiling) • Results available to ERA 6. Operational rules • Focus: cross-border issues • Goal: finding coordinated solutions • Involvement of IMs and RFC essential • Eligible costs: actual (no ceiling) • Results available to ERA Questions… 12