LUCAS-HUNT VILLAGE TO SHELL GAS STATION ROUTE U
Transcription
LUCAS-HUNT VILLAGE TO SHELL GAS STATION ROUTE U
DATED. AND SEALED 50’ EXIST. R/W HAS SHEET IT 5 THIS NEW ADA RAMP ON ROUTE U (LUCAS & HUNT) PRESENT CONTINUES 40’ EXIST. R/W U BE THE SAME AS EXISTING. REMOVE & REPLACE EXIST. 4’ SIDEWALK WITH 6’ SIDEWALK SEAL A LUCAS HUNT VILLAGE IF 90’ EXIST. R/W IS U NEW BACK EDGE OF SIDEWALK SHALL RTE. RTE. ON CONTINUES 65’ EXIST. R/W BEEN 6 ON 4 ELECTRONICALLY REMOVE & REPLACE EXIST. 3.5’ SIDEWALK WITH 6’ SIDEWALK REMOVE & REPLACE EXIST. 4’ SIDEWALK WITH 6’ SIDEWALK RESTRIPE SB LANES ROUTE U (LUCAS & HUNT) ADA IMPROVEMENTS LUCAS-HUNT VILLAGE TO SHELL GAS STATION 7 MEMORIAL PARK CEMETERY NEW ADA RAMP CI TY LI MI T 64 JENNINGS POP. NEW ADA RAMP I4-1 SIGN 40’ EXIST. R/W MEDIAN CUT-THROUGH ROUTE U (LUCAS & HUNT) NEW ADA RAMP WALK ROSS 6’ C NEW CONTINUES ON NEW ADA RAMP MetroBus SIGN 6 NEW CONCRETE SIDEWALK EXIST. R/W U SIGN MetroBus NEW BACK EDGE OF SIDEWALK SHALL NEW ADA RAMP NEW ADA RAMP BE THE SAME AS EXISTING. LUCAS HUNT VILLAGE NEW ADA RAMP 64 BURRWOOD DR. NEW ADA RAMP RTE. RTE. U CONTINUES ON 5 REPLACE 7’ ASPHALT SHOULDER WITH NEW 7’ SIDEWALK TRUNCATED DOMES/ NEW LEVEL LANDING SHELL GAS STATION NEW CONCRETE ISLAND RESTRIPE ROADWAY FOR 2-10’ LANES REPLACE ASPHALT SHOULDER WITH NEW SIDEWALK NEW DRIVEWAY ENTRANCE CONSTRUCT NEW 6’ SIDEWALK SCALE EXIST. RIGHT OF WAY 0 40 80 120 NEW CONCRETE STAIRS