APPENDIX II - Environmental Clearances
Transcription
APPENDIX II - Environmental Clearances
Proposed residential development - ' ARAMNAGAR' Form 1 FORM-1 (I) Basic Information Sr. Item No. 1 Name of the Project 2 S. No. in the Schedule Proposed capacity/area /length/tonnage to be handled/command area/lease area/ number of wells to be drilled 4 5 6 7 8 9 New/Expansion/Modernization Existing Capacity/Area etc. Category of Project i.e. ‘A’ or ‘B’ Does it attract the general condition? If Yes, Please specify Does it attract the specific condition? If yes, Please specify Location Plot/Survey/Khasra No. Details Proposed Residential project 8 (b) Total plot area: 1,61,778.60 Sq.m Net area of plot = 1,10,677.80 sq.m. Proposed Built up Area(FSI): 1,44,512.47 sq m Total Construction area: 2,65,129.07 Sq.m New Project ‘B’ No No. Village Tehsil C.T.S No. 1103/A, 1 to 409 and 1103/B, Versova village, Aram Nagar, J. P. Road, Andheri (W), Mumbai- 400058 Versova Andheri District Mumbai State Maharashtra 10 Nearest railway station/airport along with distance in kms. Nearest Railway Station : Jogeshwari Railway Station (4.0 km) Nearest Metro Station : Versova Metro Station (0.5 km) Nearest Airport : Chattrapati Shivaji International Airport (6.5 km) 11 Nearest Town, City, District Headquarters along with distance in kms. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Name of the applicant Registered Address Mumbai 12 13 14 15 Municipal Corporation of Greater Mumbai. Head Quarter, Mumbai C.S.T. 400001 M/s East & West Builders RNA Corporate park, 6th floor Near Chetana College, behind collectors office, Kalanagar, Bandra (E), Mumbai-400 051. Address for Correspondence: As above Name Mr. Anubhav Aggarwal. Designation(Owner/Partner/CEO) Proponent Enviro Analysts & Engineers Pvt. Ltd. 1 Proposed residential development - ' ARAMNAGAR' Form 1 Address Pin Code E-mail [email protected] Telephone No. 022-66805170, 66805100 Fax No. 16 Details of Alternative Sites examined, If any. Location of these sites should be shown on a topo sheet Interlinked Projects No. Since the proposed project is a redevelopment project. NA 19 Whether separate application of interlinked project has been submitted? It yes, date of submission 20 If no, reason NA 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? Whether there is any Government Order/Policy relevant/relating to the site? Forest land involved (hectares) Yes. The proposal involves CRZ clearance. The proposed project plot lies in CRZ - II zone as per the CZMP plan and lies on the landward side of 18.30m. J.P road which is existing prior to 19-2-1991. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its Relevance with the proposed project. Yes. The following are the litigation pending. Matters Pending Before Hon'ble High Court 17 18 22 23 24 Enviro Analysts & Engineers Pvt. Ltd. No NA CRZ Clearance obtained vide letter dated 26-7-2013, Ref. No. CRZ 2012/CR 89/TC 3. No Nil 1 K. S. Hariharn & W. P . No. Pending, no Ors. 5490/2014 order V/s. Aram Nagar Tenants Welfare Association & Ors. 2 S.M.Pasha & Ors. W. P . No. Pending, no V/s.State of 6142/2014 order Maharashtra & Ors. Matters Pending Before Hon'ble City Civil Court at Dindoshi 3 Leena Sagar & Ors. Suit No.2459 Pending, no V/s. MHADA & of 2014 order Ors. 4 Suri Swarn V/s. Suit Pending, no A.T.W.A. & Ors. No.2241/2009 order 2 Proposed residential development - ' ARAMNAGAR' Form 1 Matters Pending Before Hon'ble Charity Commissoner 5 S. M. Pasha & 5 Ors. V/S. Vivek Vichare & 12 Ors. Application No. ACC/II/24 Of 2013 6 Satinder Mohan R. Application Batra & 4 Ors. V/s. No. Vivek Vichare & 12 ACC/II/29 Of Ors. 2013 7 Parvati Devi Miscellaneous Aggarwal Vs. Aram Application Nagar Welfare No. ACC/II/25 Association & 8 Of 20013 Ors. 8 Ramkrishna M. Application Bhandare V/s. No.27 of A.T.W.A.& 13 Ors. 2011 Under Section 41 A of the bombay Public trusts 9 Parvati Devi Application Aggarwal Vs. Aram No. Nagar Welfare ACC/II/5 Of Association & 8 2013 Ors. 10 K. S. Hariharan & 3 Revision Ors. V/s. Hirachand Application B. Momaya 12 Ors. No. 41 of 2013 11 Parvati Devi Revision Aggarwal Vs. Aram Application Nagar Welfare No. 31 Of 2014 Association & Ors. Pending, no order Pending, no order Pending, no order Pending, no order Pending, no order Pending, no order Pending, no order * Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) Enviro Analysts & Engineers Pvt. Ltd. 3 Proposed residential development - ' ARAMNAGAR' Form 1 (II) Activity 1. Sr. No. 1.1 1.2 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist Confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Permanent or temporary change No There shall be no changes in the land use. The in land use, land cover or Land use shall remain as per the Development topography including increase in plan intensity of land use (with respect to local land use plan) Clearance of existing vegetation and building? land, Yes The existing no. 360 row houses shall be demolished for new buildings. Clearance of vegetation shall be required for the proposed structures. The current and affected vegetation cover is as follows: 1.3 1.4 Creation of new land uses Pre-construction investigations e.g. bore houses, soil testing? No Yes Construction works? Yes 1.5 Total trees present on the site Trees to be cut/transplant due to plinth. Trees to be cut due to driveway Trees to be cut due to D.P.Road Retained Trees 1622 627 Proposed trees after development 2700 275 176 544 Final quantity of trees to be proposed for the project shall be as per the permission (yet to be received) from the Tree Authority, Mumbai. There shall be no land use created. Geotechnical investigations have been carried out for the project by M/s Jai Geotechnics & Foundation Engg. Pvt. Ltd. The residential buildings proposed or the project shall be of the following configurations: SOCIETY BUILDING • 1 Nos. Building (T1) with LG + UG + 1st & 2nd Car Parking + 3rd to 25th floor & 26th Part floor • 100 Row Houses( Gr + 1flr) • 12 Nos of Shops • MHADA BUILDING • Building (M1) with Basement + Stilt + Enviro Analysts & Engineers Pvt. Ltd. 4 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 9/10/11 floors • Building (M2) with Basement + Stilt + 6 floor • Building (M3) with Basement + Stilt + 1st to 7th + 8th part floor. DEVELOPER BUILDING • 1 Nos. Building (B1) - Basement + Stilt + 1st to 15th floor & 16th part floor. • 5. Nos. Building (B2 to B6) - Basement + Stilt + 1st to 15th floor + 16th to 18th part floor. • 2 Nos. Building (B7 & B8) - Stilt +7th floor + 8th part floor. Car Parking Details Required Max. Building parking permiss Config ible Society 584 704 MHADA 201 251 Developer 480 601 Total 1265 1556 1.6 Démolition Works? Yes 630 251 567 1448 Two wheeler parking provided only for building T1 - 82 Nos. The Exisitng 360 nos. row houses shall be demolished in a phase wise manner. The total demolition waste shall be as follows: Sr. Waste Qty Units No 1 Excavation 26,196 Cum Demolition Debris for 2 43,034 Cum existing structures Rein. Steel 3 for existing 454 MT Structures Structural Steel for 4 479 MT existing Structures Wooden 5 8,135 Cft Door Frames 6 7 8 Enviro Analysts & Engineers Pvt. Ltd. Parking Proposed Door shutters Aluminium Window A.C Sheet 4,685 Sqm. 1,977 Sqm. 7,290 Sqm. 5 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation rates, wherever possible) with information data 9 G.I Sheet 17,011 10 Tiles 65,408 11 Stones 2,883 12 Glass 1,977 1.7 1.8 1.9 Temporary sites used for construction works or housing of construction workers? Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations Underground works including mining or tunneling? Yes Yes No. quantities/ source of Sqm. Sqm. Sqm. Sqm. Part of the project site shall be used for temporary housing for upto 100 workers. The housing will be purely temporary. A logistic plan has been prepared highlighting the material storage and housing for workers. The existing row houses having the majority typology of Ground floor (G) and G+1 shall be demolished. The total excavated quantity of waste during construction shall be 2,36,151 cu.m There shall be no mining and tunnelling carried out. However, excavation work for creating basements for 10 buildings viz.M1, M2, M3, B1, B2, B3, B4, B5,B6 & T1 (lower ground) shall be carried out. 1.10 1.11 1.12 1.13 Reclamation works? Dredging? Offshore structures? Production and manufacturing Process? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No No No No Not required. Not required. Not Applicable Not Applicable Yes Temporary sheds will be constructed for the storage of construction materials during construction phase as per the material requirement. A tentavive site logistic plan has been prepared highlighting the location for storage of materials. During Construction Construction waste generated shall be properly disposed off as per the municipal laws. The necessary metal and recyclable waste shall be sold to vendors for recycling. Yes The solid waste generated by the onsite workers shall be handed over to municipal authority for safe disposal. Septic tank waste. Enviro Analysts & Engineers Pvt. Ltd. shall be used for treating liquid 6 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data Post construction The cumulative solid waste generation for the entire project shall be 5.5 tons/day . This shall be segregated into wet and dry waste. The wet waste generated i.e 3.30 tons/day shall be tretaed in an Organic Waste Converter of Cumulative Capacity (tentative) 3.5 Tons. The Dry waste i.e 2.20 tons/day shall be handed over to Municipal authority for disposal. 1.16 Facilities for long term housing of operational workers? Yes 1.17 New road, rail or sea traffic during construction of operation? No 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? 1.23 Abstraction or transfers of water from ground or surface waters? No 1.24 Changes in water bodies or the land surface affecting drainage or run-off 1.25 Transport of personnel or materials for construction, operation or decommissioning? No Enviro Analysts & Engineers Pvt. Ltd. No No No No No Yes Since the project shall proceed in phases, housing for approx. 100 nos. onsite construction workers would be required. However they shall also be shifted as per phase wise progress of work. The 18.30 mt wide existing J.P. Road, 18.30 mt wide proposed DP Road, and the 36.60m wide proposed D.P road shall cater to the site requirements. No new Rail/road is required. The entire essential infrastructure is already available. The existing approach from DP Road near to the site will be utilized. There will be no diversion or closure of the existing transport routes and infrastructure. No diversion of Transmission lines or Pipelines involved. No changes to the hydrology of watercourses. There is a no stream passing through the site. Water requirement in the construction phase will be fulfilled by private tanker water. During operation phase, water shall be served by MCGM water supply & onsite STP treated water There will not be any change in the natural drainage pattern. Approximately 15 Nos. of trucks shall be used for carrying debris daily until the demolition work is completed. 7 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data Transportation of construction materials shall be as per the requirement. 2. 1.26 Long-term dismantling or decommissioning or restoration works? No 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Yes 1.29 Introduction of alien species? No 1.30 Loss of native species or genetic diversity? No 1.31 Any other actions? No Yes The existing 18.30 mt. J P road and 18.30 mt. D P road will be utilized for the transportation of material and personnel. The onsite facilities for workers shall be shifted as per phase rrequirement and hence no long term dismantling or decommissioning or restoration required. Noise pollution due to machineries and air pollution because of dust. Construction Phase: During the construction phase about 100 persons will be deployed on the site from nearby places. Influx of these people will be temporary in nature. Operation Phase: On completion of the project, residents will occupy their property. Total occupancy of the project will be 2,189 tenants. The new trees proposed shall be selected as per the current existing trees at site. No alien species shall be inroduced. Maximum attempt shall be done to make use of existing genetic diversity. ------- Use of Natural resources for construction or operation of Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply). Sr. No. 2.1 Information/Checklist Confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The land is in highly developed infrastructure Land specially undeveloped or No area under the jurisdiction of MCGM agricultural land (ha) Enviro Analysts & Engineers Pvt. Ltd. 8 Proposed residential development - ' ARAMNAGAR' Form 1 Water requirement in the construction phase 2.2 Water (expected source & Yes will be fulfilled by private water tanker .In the competing users) unit KLD operation phase MCGM water supply & onsite treated water shall be used. The total water demand post construction shall be as follows: Domestic water: 985 KLD Flushing water: 493 KLD Landscaping : 100 KLD 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – stone, aggregates, and/soil (expected source-MT) Forests and timber (source-MT) Yes 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Yes 2.7 Any other natural resources (use appropriate standard units) No 2.5 Yes The construction materials, which will be used in the project site, will be obtained from authorized local dealer. During construction phase, wood shall be avoided as a construction material. Metal formwork and supporting members shall be used. The energy requirement shall be as follows: Construction Phase : 100 KW Operation Phase Cumulative Connected Load : 30340 KW Cumulative Demand Load : 11374 KW D.G SET capacity(cummulative) : 3290 KVA ----------------------- 3.0 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Sr. No. 3.1 3.2 Information/Checklist Confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Use of substances or materials, No Approximately 7,290 sq.m of Asbestos & which are hazardous (as per Cement sheet shall be properly disposed to MSIHC rules) to human health or CHWTSDF. the environment (flora, fauna, and water supplies) Post Construction, the diesel which shall be used as a fuel for operating D.G. set during emergency shall be stored as per MSIHC rules Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) Enviro Analysts & Engineers Pvt. Ltd. No During the entire construction phase adequate precaution will be taken to avoid stagnation of water giving rise to mosquito breeding. Proper housekeeping practices will be adopted. 9 Proposed residential development - ' ARAMNAGAR' Form 1 3.3 Affect the welfare of people e.g. by Yes Positive impact due to enhanced and hygienic changing living conditions? living conditions generation. Aesthetic value of area will be improved. It will provide employment opportunities to the local people in terms of skilled and unskilled labour during construction and service personnel during operational phase. 3.4 Vulnerable groups of people who No No vulnerable group of people identified. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No No other causes identified. 4.0 Production of solid wastes during construction or operation or decommissioning (MT/month) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ No. Confirmation No rates, wherever possible) with source of information data Not Applicable. 4.1 Spoil, overburden or mine wastes No 4.2 Municipal waste (domestic and or Yes commercial wastes) 4.3 Hazardous hazardous wastes waste (as per Yes management The cumulative solid waste generation for the entire project shall be 5.5 tons/day .This shall be segregated into wet and dry waste. The wet waste generated i.e 3.30 tons/day shall be treated in an Organic Waste Converter of Cumulative Capacity (tentative) 3.5 Tons The Dry waste i.e 2.20 tons/day shall be handed over to Municipal authority for disposal. Waste oil shall be stored at separate location duly marked as per MSIHC rules and will be sold to the CPCB authorized recyclers. rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge from effluent treatment Yes Dewatered / dried sludge of approximately 45 Kg shall be generated from STP. It will be used as manure for gardening/landscaping. Enviro Analysts & Engineers Pvt. Ltd. 10 Proposed residential development - ' ARAMNAGAR' Form 1 4.7 Construction or demolition wastes Yes Demolition waste Sr. Waste No 1 Excavation Demolition Debris for 2 existing structures Rein. Steel 3 for existing Structures Structural Steel for 4 existing Structures Wooden 5 Door Frames 6 Door shutters Aluminium 7 Window 8 A.C Sheet 9 G.I Sheet 10 Tiles 11 Stones 12 Glass Qty Units 26,196 Cum 43,034 Cum 454 MT 479 MT 8,135 Cft 4,685 Sqm. 1,977 Sqm. 7,290 17,011 65,408 2,883 1,977 Sqm. Sqm. Sqm. Sqm. Sqm. Construction Waste Sr. Waste No 1 Excavated earth 2 Rein. Steel Scrap 3 Cement 4 Concrete waste 5 Bricks / Blocks 6 Sand 7 Tile Stone 8 (Marble,Granite, Quartz,Kota) 10 Gypsum plaster 4.8 Redundant machinery or equipment 4.9 Contaminated soils materials 4.10 Agricultural wastes or other 4.11 Other solid wastes Enviro Analysts & Engineers Pvt. Ltd. No Qty Units 2,36,151 411 2,912 2,184 192,223 33,493 1,77,661 Cum MT Bags Cum Nos Cft Sft 65,531 Sft 354,673 Kgs No All Equipments used for construction will be of standard quality and maintained on regular basis. No contaminated soil found. No Not Applicable No Not Applicable 11 Proposed residential development - ' ARAMNAGAR' Form 1 5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. No. Information/Checklist Confirmation Yes/No 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes 5.2 Emission from production processes Emissions from materials handling including storage or transport No 5.3 Yes 5.4 Emissions from construction activities including plant and equipment Yes 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Emissions from DG set when it is operated in case of emergency. Emissions from Automated construction Machinery and Heavy vehicles during Construction Phase. Emissions from light vehicles during Operations Phase. There is no production as the proposed project is Residential. Emissions will be generated while handling and transportation of materials to site, this will be temporary in nature. The project may cause rise in dust levels during construction phase. Precautions would be taken to reduce dust generation during construction phase: Tarpaulins will be used to cover trucks carrying debris. Transport distance between storage materials and site shall be minimum. Water sprinkling will be done at regular intervals to reduce control of dust generation on unpaved roads. Construction Phase: Dust emissions will be generated due to movement of vehicles and material handling. Operation Phase: During Operation Phase, emissions will be generated from operation of DG sets in emergency cases. To reduce emissions from movement of vehicles, the vehicles shall be spyaed with water. to reduce rise of dust. 5.6 Emissions from incineration of waste Enviro Analysts & Engineers Pvt. Ltd. No MBBR technology shall be used which an efficient STP methodology and results in lower odour generation. The STP shall be naturally and mechanically ventilated for dispersion of odour and harmful gases. Not Applicable 12 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data 5.7 Emissions from burning of waste No The construction debris shall be in open air (e.g. slash materials, responsibly disposed as per CPCB construction debris) norms. No burning of waste shall take place. 5.8 Emissions from any other sources No ------------------- 6.0 Generation of Noise and vibration, and emissions of Light and heat Sr. No. 1 Information/Checklist Confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data From operation of equipment e.g. Yes Noise generation from construction engines, ventilation plant, equipments used for transporting, drilling, crushers cutting operations. During Operation Phase, Noise will be generated due to operation of DG sets. This will be about 75 dB (A) at source. All DG sets will be enclosed as per CPCB rules and will confirm to noise standards. It is likely that noise will affect the residents in operation phase being located at the major road junction. 6.2 From industrial processes or similar Enviro Analysts & Engineers Pvt. Ltd. No For control of noise following measures shall be adopted: The construction site shall be baricaded to avoid the noise spread in the surrounding areas. Properly maintained equipments with mufflers will be used. High noise generating construction activities would be carried out only during day time. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. Not Applicable 13 Proposed residential development - ' ARAMNAGAR' Form 1 6.3 From construction or demolition Yes Machineries will be regularly maintained to avoid excess vibration and noise arising from them. Following precautions shall be taken to control noise pollution : High noise generating construction activities would be carried out only during day time. Installation, use and maintenance of mufflers on equipment. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. 6.4 From blasting or piling No Not Applicable. 6.5 6.6 6.7 From construction or operational traffic From lighting or cooling systems From any other sources Yes No. No During Construction phase: There will be transport of materials for Construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. During Operation Phase : The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. Adequate tree plantation along the boundary will also help to reduce the noise level and enhance air quality. All the workmen in noise area will be provided with proper PPEs. ---------------------------------- 7.0 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Sr. No. Information/Checklist Confirmation 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Enviro Analysts & Engineers Pvt. Ltd. Yes Details thereof (with approximate quantities/ /No rates, wherever possible) with source of information data No The diesel oil to be used for D.G.Set of cumulative capacity 3290KVA during emergency shall be stored as per MSIHC rules. No The sewage shall be treated in a designated STP of cumulative capacity 1410 KLD. After utilizing 493 KLD for flushing and 100 KLD for landscaping, the excess treated water 559KLD shall be drained into the municipal sewers. 14 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Information/Checklist Yes Details thereof (with approximate quantities/ No. Confirmation /No rates, wherever possible) with source of information data 7.3 By deposition of pollutants No Dust will be generated during construction emitted to air into the land or into phase from earthworks and movement of water vehicles. Appropriate dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG exhaust will be provided as per CPCB norms. 7.4 From any other sources No --------------------7.5 Is there a risk of long term build No There is no risk of long term build up of up of pollutants in the pollutants environment from these sources? 8.0 Risk of accidents during construction or operation of the project, which could affect human health or the environment Sr. No. Information/Checklist Confirmation Yes/No 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances. Yes 8.2 8.3 From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, could burst etc)? Enviro Analysts & Engineers Pvt. Ltd. No No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Fire accidents possible due to electrical failures. Fuel leakages from vehicles used for construction operations. The risk can be reduced by: Use of PPE during construction work. Regular inspection of vehicles before entering the site. Signages shall be displayed in local language to warn construction workers. Educating workers regarding risk for fire hazard for increasing awareness. -----------------The project falls under seismic zone-III as per IS1893 (Part-1):2002, The structural design shall be accordingly performed. 15 Proposed residential development - ' ARAMNAGAR' Form 1 9.0 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Sr. No. Information/Checklist Confirmation 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc) Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Yes Supporting and ancillary development will take place. The project provides a well designed residential housing area for the occupants. Yes Roads 18.30m wide Internal D.P. Road 18.30m wide existing J.P Road (abutting the plot). 35.60m wide proposed D.P Road Power Supply Cumulative Connected Load : 30340 KW Cumulative Demand Load : 11374 KW Source : Reliance Energy/ TATA power Water Supply Domestic water supply for 985 KLD shall be met through Municipal water supply. Flushing water: requirement for 493 KLD shall be met through treated water. A Cumulative STP of 1410 KLD Shall be provided for treating onsite waste water. Housing development Yes The project provides a well designed residential housing area for the occupants. Extractive industries No Not Applicable 9.2 9.3 Supply industries No Other Lead to after use of the site, which could have an impact on the environment Set a precedent for later developments No No Enviro Analysts & Engineers Pvt. Ltd. Yes Not Applicable. Similar projects are being carried out in the entire region. 16 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data 9.4 Have cumulative effects due to No Currently no construction projects are in proximity to other existing or place in the immediate vicinity. However planned projects with similar future development around the surrounding effects are can have a cumulative effect on the environment. (iii) Environmental Sensitivity Sr. No. 1 2 3 4 5 6 7 8 9 Areas Name/ Aerial distance (with 15-km) Proposed Identity project location boundary Areas protected under Yes Mangrove present to the north of the project international conventions, at an aerial distance of 1.5 km national or local legislation for their ecological, landscape, cultural or other related value Areas which are important or No No Notified eco sensitive receptors in the sensitive of ecological reasons – surounding areas. However, Mangrove wetlands, water courses or other cover present at Versova village to the water bodies, coastal zone, North of the proposed site at an aerial biospheres, mountains, forests distance of 1.5 km Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Inland, coastal, marine or underground waters State, national boundaries No - No - No Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Defense installations Densely populated or built-up area No The project is located within Municipal limits of Greater Mumbai. Not Applicable. Areas occupied by sensitive man made land uses (hospitals, schools, places of worship, community facilities) No Yes No defense installation in the neighborhood. The surrounding area is Residential & Commercial in terms of Land use. Proposed project site is located in densely populated area. Yes 1. Nearest Hospital. Kokilaben Hospital 1 Km 2. Nearest School Kamlaben Mehta high school 0.1 Km 7 Bunglow 0.5 Km Andheri Sports 1.5 km 3. 4 Enviro Analysts & Engineers Pvt. Ltd. Nearest Market Nearest Sports 17 Proposed residential development - ' ARAMNAGAR' Form 1 Sr. Areas Name/ Aerial distance (with 15-km) Proposed No. Identity project location boundary Complex 5 10 11 12 Areas containing important, high quality or scarce resources (ground water resource, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Nearest Place of Worship Complex Hare Rama Hare Krishna Temple, Iskcon 2 km No No resources exist near the proposed project site. No -- No The area falls in Seismic Zone III which is low seismic activity zone. The proposed construction is designed for earthquake as per IS 456: 2000. (b) The following shall be inserted at the end, namely:“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.” Date: 13-2-2015 Place: Mumbai Mr. Anubhav Aggarwal, (Project Proponent) th RNA Corporate Park, 6 floor, Near Collector office, Kalanagar, Bandra (E), ,Mumbai -400051. Enviro Analysts & Engineers Pvt. Ltd. 18