APPENDIX II - Environmental Clearances

Transcription

APPENDIX II - Environmental Clearances
Proposed residential development - ' ARAMNAGAR'
Form 1
FORM-1
(I)
Basic Information
Sr.
Item
No.
1 Name of the Project
2 S. No. in the Schedule
Proposed
capacity/area
/length/tonnage
to
be
handled/command
area/lease
area/ number of wells to be
drilled
4
5
6
7
8
9
New/Expansion/Modernization
Existing Capacity/Area etc.
Category of Project i.e. ‘A’ or ‘B’
Does it attract the general
condition? If Yes, Please specify
Does it attract the specific
condition? If yes, Please specify
Location
Plot/Survey/Khasra No.
Details
Proposed Residential project
8 (b)
Total plot area: 1,61,778.60 Sq.m
Net area of plot = 1,10,677.80 sq.m.
Proposed Built up Area(FSI): 1,44,512.47 sq m
Total Construction area: 2,65,129.07 Sq.m
New Project
‘B’
No
No.
Village
Tehsil
C.T.S No. 1103/A, 1 to 409 and 1103/B, Versova village,
Aram Nagar, J. P. Road, Andheri (W), Mumbai- 400058
Versova
Andheri
District
Mumbai
State
Maharashtra
10
Nearest railway station/airport
along with distance in kms.
Nearest Railway Station : Jogeshwari Railway Station (4.0
km)
Nearest Metro Station : Versova Metro Station (0.5 km)
Nearest Airport : Chattrapati Shivaji International Airport
(6.5 km)
11
Nearest Town, City, District
Headquarters along with distance
in kms.
Village Panchayats, Zilla
Parishad, Municipal Corporation,
Local body (complete postal
addresses with telephone nos. to
be given)
Name of the applicant
Registered Address
Mumbai
12
13
14
15
Municipal Corporation of Greater Mumbai.
Head Quarter, Mumbai C.S.T. 400001
M/s East & West Builders
RNA Corporate park, 6th floor
Near Chetana College, behind collectors office,
Kalanagar, Bandra (E), Mumbai-400 051.
Address for Correspondence:
As above
Name
Mr. Anubhav Aggarwal.
Designation(Owner/Partner/CEO) Proponent
Enviro Analysts & Engineers Pvt. Ltd.
1
Proposed residential development - ' ARAMNAGAR'
Form 1
Address
Pin Code
E-mail
[email protected]
Telephone No.
022-66805170, 66805100
Fax No.
16
Details of Alternative Sites
examined, If any.
Location of these sites should be
shown on a topo sheet
Interlinked Projects
No. Since the proposed project is a redevelopment project.
NA
19
Whether separate application of
interlinked project has been
submitted?
It yes, date of submission
20
If no, reason
NA
21
Whether the proposal involves
approval/clearance under: if yes,
details of the same and their
status to be given.
(a)
The Forest (Conservation)
Act, 1980?
(b) The Wildlife (Protection)
Act, 1972?
(c)
The C.R.Z. Notification,
1991?
Whether there is any Government
Order/Policy relevant/relating to
the site?
Forest land involved (hectares)
Yes. The proposal involves CRZ clearance.
The proposed project plot lies in CRZ - II zone as per the
CZMP plan and lies on the landward side of 18.30m. J.P
road which is existing prior to 19-2-1991.
Whether there is any litigation
pending against the project and/or
land in which the project is
propose to be set up?
(a) Name of the Court
(b) Case No.
(c) Orders/directions of the
Court, if any and its
Relevance with the
proposed project.
Yes. The following are the litigation pending.
Matters Pending Before Hon'ble High Court
17
18
22
23
24
Enviro Analysts & Engineers Pvt. Ltd.
No
NA
CRZ Clearance obtained vide letter dated 26-7-2013, Ref.
No. CRZ 2012/CR 89/TC 3.
No
Nil
1
K. S. Hariharn &
W. P . No.
Pending, no
Ors.
5490/2014
order
V/s. Aram Nagar
Tenants Welfare
Association & Ors.
2 S.M.Pasha & Ors.
W. P . No.
Pending, no
V/s.State of
6142/2014
order
Maharashtra & Ors.
Matters Pending Before Hon'ble City Civil Court at
Dindoshi
3 Leena Sagar & Ors. Suit No.2459
Pending, no
V/s. MHADA &
of 2014
order
Ors.
4 Suri Swarn V/s.
Suit
Pending, no
A.T.W.A. & Ors.
No.2241/2009
order
2
Proposed residential development - ' ARAMNAGAR'
Form 1
Matters Pending Before Hon'ble Charity Commissoner
5
S. M. Pasha & 5
Ors. V/S. Vivek
Vichare & 12 Ors.
Application
No.
ACC/II/24 Of
2013
6 Satinder Mohan R.
Application
Batra & 4 Ors. V/s. No.
Vivek Vichare & 12 ACC/II/29 Of
Ors.
2013
7 Parvati Devi
Miscellaneous
Aggarwal Vs. Aram Application
Nagar Welfare
No. ACC/II/25
Association & 8
Of 20013
Ors.
8 Ramkrishna M.
Application
Bhandare V/s.
No.27 of
A.T.W.A.& 13 Ors. 2011 Under
Section 41 A of
the bombay
Public trusts
9 Parvati Devi
Application
Aggarwal Vs. Aram No.
Nagar Welfare
ACC/II/5 Of
Association & 8
2013
Ors.
10 K. S. Hariharan & 3 Revision
Ors. V/s. Hirachand Application
B. Momaya 12 Ors. No. 41 of 2013
11 Parvati Devi
Revision
Aggarwal Vs. Aram Application
Nagar Welfare
No. 31 Of 2014
Association & Ors.
Pending, no
order
Pending, no
order
Pending, no
order
Pending, no
order
Pending, no
order
Pending, no
order
Pending, no
order
* Capacity corresponding to sectoral activity (such as production capacity for manufacturing,
mining lease area and production capacity for mineral production, area of mineral
exploration, length for linear transport infrastructure, generation capacity for power
generation etc.)
Enviro Analysts & Engineers Pvt. Ltd.
3
Proposed residential development - ' ARAMNAGAR'
Form 1
(II) Activity
1.
Sr.
No.
1.1
1.2
Construction, operation or decommissioning of the Project involving actions,
which will cause physical changes in the locality (topography, land use, changes in
water bodies, etc.)
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
Permanent or temporary change
No
There shall be no changes in the land use. The
in land use, land cover or
Land use shall remain as per the Development
topography including increase in
plan
intensity of land use (with
respect to local land use plan)
Clearance of existing
vegetation and building?
land,
Yes
The existing no. 360 row houses shall be
demolished for new buildings.
Clearance of vegetation shall be required for the
proposed structures. The current and affected
vegetation cover is as follows:
1.3
1.4
Creation of new land uses
Pre-construction investigations
e.g. bore houses, soil testing?
No
Yes
Construction works?
Yes
1.5
Total trees present on the site
Trees to be cut/transplant due to
plinth.
Trees to be cut due to driveway
Trees to be cut due to D.P.Road
Retained Trees
1622
627
Proposed trees after development
2700
275
176
544
Final quantity of trees to be proposed for the
project shall be as per the permission (yet to be
received) from the Tree Authority, Mumbai.
There shall be no land use created.
Geotechnical investigations have been carried out
for the project by M/s Jai Geotechnics &
Foundation Engg. Pvt. Ltd.
The residential buildings proposed or the project
shall be of the following configurations:
SOCIETY BUILDING
• 1 Nos. Building (T1) with LG + UG + 1st & 2nd
Car Parking + 3rd to 25th floor & 26th Part floor
• 100 Row Houses( Gr + 1flr)
• 12 Nos of Shops
•
MHADA BUILDING
• Building (M1) with Basement + Stilt +
Enviro Analysts & Engineers Pvt. Ltd.
4
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr.
Information/Checklist
Yes/No Details thereof (with approximate quantities/
No.
Confirmation
rates, wherever possible) with source of
information data
9/10/11 floors
• Building (M2) with Basement + Stilt + 6 floor
• Building (M3) with Basement + Stilt + 1st to 7th
+ 8th part floor.
DEVELOPER BUILDING
• 1 Nos. Building (B1) - Basement + Stilt + 1st
to 15th floor & 16th part floor.
• 5. Nos. Building (B2 to B6) - Basement + Stilt
+ 1st to 15th floor + 16th to 18th part floor.
• 2 Nos. Building (B7 & B8) - Stilt +7th floor +
8th part floor.
Car Parking Details
Required
Max.
Building
parking permiss
Config
ible
Society
584
704
MHADA
201
251
Developer
480
601
Total
1265
1556
1.6
Démolition Works?
Yes
630
251
567
1448
Two wheeler parking provided only for building
T1 - 82 Nos.
The Exisitng 360 nos. row houses shall be
demolished in a phase wise manner. The total
demolition waste shall be as follows:
Sr.
Waste
Qty
Units
No
1
Excavation
26,196
Cum
Demolition
Debris for
2
43,034
Cum
existing
structures
Rein. Steel
3
for existing
454
MT
Structures
Structural
Steel for
4
479
MT
existing
Structures
Wooden
5
8,135
Cft
Door Frames
6
7
8
Enviro Analysts & Engineers Pvt. Ltd.
Parking
Proposed
Door shutters
Aluminium
Window
A.C Sheet
4,685
Sqm.
1,977
Sqm.
7,290
Sqm.
5
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr.
Information/Checklist
Yes/No Details thereof (with approximate
No.
Confirmation
rates, wherever possible) with
information data
9
G.I Sheet
17,011
10
Tiles
65,408
11
Stones
2,883
12
Glass
1,977
1.7
1.8
1.9
Temporary sites used for
construction works or housing of
construction workers?
Above
ground
buildings,
structures
or
earthworks
including linear structures, cut
and fill or excavations
Underground works including
mining or tunneling?
Yes
Yes
No.
quantities/
source of
Sqm.
Sqm.
Sqm.
Sqm.
Part of the project site shall be used for
temporary housing for upto 100 workers. The
housing will be purely temporary.
A logistic plan has been prepared highlighting
the material storage and housing for workers.
The existing row houses having the majority
typology of Ground floor (G) and G+1 shall be
demolished.
The total excavated quantity of waste during
construction shall be 2,36,151 cu.m
There shall be no mining and tunnelling carried
out.
However, excavation work for creating
basements for 10 buildings viz.M1, M2, M3, B1,
B2, B3, B4, B5,B6 & T1 (lower ground) shall be
carried out.
1.10
1.11
1.12
1.13
Reclamation works?
Dredging?
Offshore structures?
Production and manufacturing
Process?
1.14 Facilities for storage of goods or
materials?
1.15 Facilities for treatment or
disposal of solid waste or liquid
effluents?
No
No
No
No
Not required.
Not required.
Not Applicable
Not Applicable
Yes
Temporary sheds will be constructed for the
storage of construction materials during
construction phase as per the material
requirement. A tentavive site logistic plan has
been prepared highlighting the location for
storage of materials.
During Construction
Construction waste generated shall be properly
disposed off as per the municipal laws. The
necessary metal and recyclable waste shall be
sold to vendors for recycling.
Yes
The solid waste generated by the onsite workers
shall be handed over to municipal authority for
safe disposal.
Septic tank
waste.
Enviro Analysts & Engineers Pvt. Ltd.
shall be used for treating liquid
6
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr.
Information/Checklist
Yes/No Details thereof (with approximate quantities/
No.
Confirmation
rates, wherever possible) with source of
information data
Post construction
 The cumulative solid waste generation for the
entire project shall be 5.5 tons/day . This shall
be segregated into wet and dry waste.
 The wet waste generated i.e 3.30 tons/day shall
be tretaed in an Organic Waste Converter of
Cumulative Capacity (tentative) 3.5 Tons.
 The Dry waste i.e 2.20 tons/day shall be
handed over to Municipal authority for
disposal.
1.16 Facilities for long term housing
of operational workers?
Yes
1.17 New road, rail or sea traffic
during construction of operation?
No
1.18 New road, rail, air waterborne or
other transport infrastructure
including new or altered routes
and stations, ports, airports etc.?
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
1.20 New or diverted transmission
lines or pipelines?
1.21 Impoundment,
damming,
culverting, realignment or other
changes to the hydrology of
watercourses or aquifers?
1.22 Stream crossings?
1.23 Abstraction or transfers of water
from ground or surface waters?
No
1.24 Changes in water bodies or the
land surface affecting drainage or
run-off
1.25 Transport of personnel or
materials
for
construction,
operation or decommissioning?
No
Enviro Analysts & Engineers Pvt. Ltd.
No
No
No
No
No
Yes
Since the project shall proceed in phases, housing
for approx. 100 nos. onsite construction workers
would be required. However they shall also be
shifted as per phase wise progress of work.
The 18.30 mt wide existing J.P. Road, 18.30 mt
wide proposed DP Road, and the 36.60m wide
proposed D.P road shall cater to the site
requirements.
No new Rail/road is required. The entire essential
infrastructure is already available. The existing
approach from DP Road near to the site will be
utilized.
There will be no diversion or closure of the
existing transport routes and infrastructure.
No diversion of Transmission lines or Pipelines
involved.
No changes to the hydrology of watercourses.
There is a no stream passing through the site.
 Water requirement in the construction
phase will be fulfilled by private tanker
water.
 During operation phase, water shall be
served by MCGM water supply & onsite
STP treated water
There will not be any change in the natural
drainage pattern.
 Approximately 15 Nos. of trucks shall be
used for carrying debris daily until the
demolition work is completed.
7
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr.
Information/Checklist
Yes/No Details thereof (with approximate quantities/
No.
Confirmation
rates, wherever possible) with source of
information data
 Transportation of construction materials shall
be as per the requirement.
2.
1.26 Long-term
dismantling
or
decommissioning or restoration
works?
No
1.27 Ongoing
activity
during
decommissioning which could
have an impact on the
environment?
1.28 Influx of people to an area in
either
temporarily
or
permanently?
Yes
1.29 Introduction of alien species?
No
1.30 Loss of native species or genetic
diversity?
No
1.31 Any other actions?
No
Yes
 The existing 18.30 mt. J P road and 18.30 mt.
D P road
will be utilized for the
transportation of material and personnel.
The onsite facilities for workers shall be shifted
as per phase rrequirement and hence no long term
dismantling or decommissioning or restoration
required.
Noise pollution due to machineries and air
pollution because of dust.
Construction Phase:
During the construction phase about 100 persons
will be deployed on the site from nearby places.
Influx of these people will be temporary in
nature.
Operation Phase:
On completion of the project, residents will
occupy their property. Total occupancy of the
project will be 2,189 tenants.
The new trees proposed shall be selected as per
the current existing trees at site.
No alien species shall be inroduced. Maximum
attempt shall be done to make use of existing
genetic diversity.
-------
Use of Natural resources for construction or operation of Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short supply).
Sr.
No.
2.1
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
The land is in highly developed infrastructure
Land specially undeveloped or
No
area under the jurisdiction of MCGM
agricultural land (ha)
Enviro Analysts & Engineers Pvt. Ltd.
8
Proposed residential development - ' ARAMNAGAR'
Form 1
Water requirement in the construction phase
2.2 Water
(expected
source
& Yes
will be fulfilled by private water tanker .In the
competing users) unit KLD
operation phase MCGM water supply & onsite
treated water shall be used.
The total water demand post construction shall
be as follows:
Domestic water: 985 KLD
Flushing water: 493 KLD
Landscaping : 100 KLD
2.3 Minerals (MT)
No
Not Applicable
2.4
Construction material – stone,
aggregates, and/soil (expected
source-MT)
Forests and timber (source-MT)
Yes
2.6
Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)
Yes
2.7
Any other natural resources
(use appropriate standard units)
No
2.5
Yes
The construction materials, which will be used
in the project site, will be obtained from
authorized local dealer.
During construction phase, wood shall be
avoided as a construction material. Metal
formwork and supporting members shall be
used.
The energy requirement shall be as follows:
Construction Phase : 100 KW
Operation Phase
Cumulative Connected Load : 30340 KW
Cumulative Demand Load : 11374 KW
D.G SET capacity(cummulative) : 3290 KVA
-----------------------
3.0 Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about actual
or perceived risks to human health
Sr.
No.
3.1
3.2
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
Use of substances or materials,
No
 Approximately 7,290 sq.m of Asbestos &
which are hazardous (as per
Cement sheet shall be properly disposed to
MSIHC rules) to human health or
CHWTSDF.
the environment (flora, fauna, and
water supplies)
 Post Construction, the diesel which shall be
used as a fuel for operating D.G. set during
emergency shall be stored as per MSIHC rules
Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
Enviro Analysts & Engineers Pvt. Ltd.
No
During the entire construction phase adequate
precaution will be taken to avoid stagnation of
water giving rise to mosquito breeding. Proper
housekeeping practices will be adopted.
9
Proposed residential development - ' ARAMNAGAR'
Form 1
3.3 Affect the welfare of people e.g. by
Yes
Positive impact due to enhanced and hygienic
changing living conditions?
living conditions generation. Aesthetic value of
area will be improved. It will provide
employment opportunities to the local people in
terms of skilled and unskilled labour during
construction and service personnel during
operational phase.
3.4 Vulnerable groups of people who
No
No vulnerable group of people identified.
could be affected by the project e.g.
hospital patients, children, the
elderly etc.,
3.5 Any other causes
No
No other causes identified.
4.0 Production of solid wastes during construction or operation or decommissioning
(MT/month)
Sr.
Information/Checklist
Yes/ Details thereof (with approximate quantities/
No.
Confirmation
No
rates, wherever possible) with source of
information data
Not Applicable.
4.1 Spoil, overburden or mine wastes
No
4.2
Municipal waste (domestic and or
Yes
commercial wastes)
4.3
Hazardous
hazardous
wastes
waste
(as
per
Yes
management
The cumulative solid waste generation for the
entire project shall be 5.5 tons/day .This shall be
segregated into wet and dry waste.
The wet waste generated i.e 3.30 tons/day shall
be treated in an Organic Waste Converter of
Cumulative Capacity (tentative) 3.5 Tons
The Dry waste i.e 2.20 tons/day shall be handed
over to Municipal authority for disposal.
Waste oil shall be stored at separate location duly
marked as per MSIHC rules and will be sold to
the CPCB authorized recyclers.
rules)
4.4
Other industrial process wastes
No
Not Applicable
4.5
Surplus product
No
Not Applicable
4.6
Sewage sludge or other sludge
from effluent treatment
Yes
Dewatered / dried sludge of approximately 45 Kg
shall be generated from STP. It will be used as
manure for gardening/landscaping.
Enviro Analysts & Engineers Pvt. Ltd.
10
Proposed residential development - ' ARAMNAGAR'
Form 1
4.7 Construction or demolition wastes
Yes
Demolition waste
Sr.
Waste
No
1
Excavation
Demolition
Debris for
2
existing
structures
Rein. Steel
3
for existing
Structures
Structural
Steel for
4
existing
Structures
Wooden
5
Door Frames
6
Door shutters
Aluminium
7
Window
8
A.C Sheet
9
G.I Sheet
10
Tiles
11
Stones
12
Glass
Qty
Units
26,196
Cum
43,034
Cum
454
MT
479
MT
8,135
Cft
4,685
Sqm.
1,977
Sqm.
7,290
17,011
65,408
2,883
1,977
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Construction Waste
Sr.
Waste
No
1
Excavated earth
2
Rein. Steel Scrap
3
Cement
4
Concrete waste
5
Bricks / Blocks
6
Sand
7
Tile
Stone
8
(Marble,Granite,
Quartz,Kota)
10
Gypsum plaster
4.8
Redundant machinery or equipment
4.9
Contaminated soils
materials
4.10 Agricultural wastes
or
other
4.11 Other solid wastes
Enviro Analysts & Engineers Pvt. Ltd.
No
Qty
Units
2,36,151
411
2,912
2,184
192,223
33,493
1,77,661
Cum
MT
Bags
Cum
Nos
Cft
Sft
65,531
Sft
354,673
Kgs
No
All Equipments used for construction will be of
standard quality and maintained on regular basis.
No contaminated soil found.
No
Not Applicable
No
Not Applicable
11
Proposed residential development - ' ARAMNAGAR'
Form 1
5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)
Sr.
No.
Information/Checklist
Confirmation
Yes/No
5.1
Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes
5.2
Emission
from
production
processes
Emissions from materials handling
including storage or transport
No
5.3
Yes
5.4
Emissions
from
construction
activities including plant and
equipment
Yes
5.5
Dust or odours from handling of
materials including construction
materials, sewage and waste
Yes
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
Emissions from DG set when it is
operated in case of emergency.
Emissions from Automated construction
Machinery and Heavy vehicles during
Construction Phase. Emissions from light
vehicles during Operations Phase.
There is no production as the proposed
project is Residential.
Emissions will be generated while
handling and transportation of materials
to site, this will be temporary in nature.
The project may cause rise in dust levels
during construction phase. Precautions
would be taken to reduce dust generation
during construction phase:
 Tarpaulins will be used to cover
trucks carrying debris.
 Transport distance between storage
materials and site shall be minimum.
 Water sprinkling will be done at
regular intervals to reduce control of
dust generation on unpaved roads.
Construction Phase:
Dust emissions will be generated due to
movement of vehicles and material
handling.
Operation Phase:
During Operation Phase, emissions will
be generated from operation of DG sets
in emergency cases.
To reduce emissions from movement of
vehicles, the vehicles shall be spyaed
with water. to reduce rise of dust.
5.6
Emissions from incineration of
waste
Enviro Analysts & Engineers Pvt. Ltd.
No
MBBR technology shall be used which
an efficient STP methodology and
results in lower odour generation. The
STP
shall be naturally and mechanically
ventilated for dispersion of odour and
harmful gases.
Not Applicable
12
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr.
Information/Checklist
Yes/No Details thereof (with approximate
No.
Confirmation
quantities/ rates, wherever possible)
with source of information data
5.7 Emissions from burning of waste
No
The construction debris shall be
in open air (e.g. slash materials,
responsibly disposed as per CPCB
construction debris)
norms. No burning of waste shall take
place.
5.8 Emissions from any other sources
No
-------------------
6.0 Generation of Noise and vibration, and emissions of Light and heat
Sr.
No.
1
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
From operation of equipment e.g.
Yes
Noise generation from construction
engines,
ventilation
plant,
equipments used for transporting, drilling,
crushers
cutting operations.
During Operation Phase, Noise will be
generated due to operation of DG sets. This
will be about 75 dB (A) at source. All DG
sets will be enclosed as per CPCB rules
and will confirm to noise standards.
It is likely that noise will affect the
residents in operation phase being located
at the major road junction.
6.2
From industrial
processes
or
similar
Enviro Analysts & Engineers Pvt. Ltd.
No
For control of noise following measures
shall be adopted:
 The construction site shall be baricaded
to avoid the noise spread in the
surrounding areas.
 Properly maintained equipments with
mufflers will be used.
 High noise generating construction
activities would be carried out only
during day time.
 Workers working near high noise
construction machinery would be
supplied with ear muffs/ear plugs.
Not Applicable
13
Proposed residential development - ' ARAMNAGAR'
Form 1
6.3
From construction or demolition
Yes
Machineries will be regularly maintained
to avoid excess vibration and noise arising
from them.
Following precautions shall be taken to
control noise pollution :
 High noise generating construction
activities would be carried out only
during day time.
 Installation, use and maintenance of
mufflers on equipment.
 Workers working near high noise
construction machinery would be
supplied with ear muffs/ear plugs.
6.4
From blasting or piling
No
Not Applicable.
6.5
6.6
6.7
From construction or operational
traffic
From lighting or cooling systems
From any other sources
Yes
No.
No
During Construction phase:
There will be transport of materials for
Construction work. Precautions will be
taken to reduce the impact of the vehicular
movement such as vehicular trips will not
be at peak traffic hours.
During Operation Phase :
The vehicular parking will be restricted
only in the adequate parking area provided,
which would help in reducing noise
pollution due to traffic congestion.
Adequate tree plantation along the
boundary will also help to reduce the noise
level and enhance air quality.
All the workmen in noise area will be
provided with proper PPEs.
----------------------------------
7.0 Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea
Sr.
No.
Information/Checklist
Confirmation
7.1
From handling, storage, use or
spillage of hazardous materials
7.2
From discharge of sewage or
other effluents to water or the
land (expected mode and place of
discharge)
Enviro Analysts & Engineers Pvt. Ltd.
Yes Details thereof (with approximate quantities/
/No rates, wherever possible) with source of
information data
No The diesel oil to be used for D.G.Set of
cumulative
capacity
3290KVA
during
emergency shall be stored as per MSIHC rules.
No The sewage shall be treated in a designated STP
of cumulative capacity 1410 KLD. After
utilizing 493 KLD for flushing and 100 KLD
for landscaping, the excess treated water
559KLD shall be drained into the municipal
sewers.
14
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr.
Information/Checklist
Yes Details thereof (with approximate quantities/
No.
Confirmation
/No rates, wherever possible) with source of
information data
7.3 By deposition of pollutants No  Dust will be generated during construction
emitted to air into the land or into
phase from earthworks and movement of
water
vehicles.
 Appropriate
dust
control
measures,
including water sprinkling of exposed areas
and dust covers for trucks, will be provided
to minimize any impacts.
 DG exhaust will be provided as per CPCB
norms.
7.4 From any other sources
No --------------------7.5 Is there a risk of long term build No There is no risk of long term build up of
up of pollutants in the
pollutants
environment from these sources?
8.0 Risk of accidents during construction or operation of the project, which could affect
human health or the environment
Sr.
No.
Information/Checklist
Confirmation
Yes/No
8.1
From explosions, spillages, fires
etc from storage, handling, use or
production
of
hazardous
substances.
Yes
8.2
8.3
From any other causes
Could the project be affected by
natural
disasters
causing
environmental
damage
(e.g.
floods, earthquakes, landslides,
could burst etc)?
Enviro Analysts & Engineers Pvt. Ltd.
No
No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
 Fire accidents possible due to electrical
failures.
 Fuel leakages from vehicles used for
construction operations.
The risk can be reduced by:
 Use of PPE during construction work.
 Regular inspection of vehicles before
entering the site.
 Signages shall be displayed in local
language to warn construction workers.
 Educating workers regarding risk for fire
hazard for increasing awareness.
-----------------The project falls under seismic zone-III as
per IS1893 (Part-1):2002, The structural
design shall be accordingly performed.
15
Proposed residential development - ' ARAMNAGAR'
Form 1
9.0 Factors which should be considered (such as consequential development) which could
lead to environmental effects or the potential for cumulative impacts with other existing
or planned activities in the locality
Sr.
No.
Information/Checklist
Confirmation
9.1
Lead
to
development
of
supporting utilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.:
Supporting infrastructure (roads,
power supply, waste or waste
water
treatment,
etc)
Yes/No Details
thereof
(with
approximate
quantities/ rates, wherever possible) with
source of information data
Yes
Supporting and ancillary development will
take place. The project provides a well
designed residential housing area for the
occupants.
Yes
Roads
18.30m wide Internal D.P. Road
18.30m wide existing J.P Road (abutting the
plot).
35.60m wide proposed D.P Road
Power Supply
Cumulative Connected Load : 30340 KW
Cumulative Demand Load : 11374 KW
Source : Reliance Energy/ TATA power
Water Supply
Domestic water supply for 985 KLD shall be
met through Municipal water supply.
Flushing water: requirement for 493 KLD
shall be met through
treated water.
A Cumulative STP of 1410 KLD Shall be
provided for treating onsite waste water.
Housing development
Yes
The project provides a well designed
residential housing area for the occupants.
Extractive industries
No
Not Applicable
9.2
9.3
Supply industries
No
Other
Lead to after use of the site,
which could have an impact on
the environment
Set a precedent for later
developments
No
No
Enviro Analysts & Engineers Pvt. Ltd.
Yes
Not Applicable.
Similar projects are being carried out in the
entire region.
16
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr.
Information/Checklist
Yes/No Details
thereof
(with
approximate
No.
Confirmation
quantities/ rates, wherever possible) with
source of information data
9.4 Have cumulative effects due to
No
Currently no construction projects are in
proximity to other existing or
place in the immediate vicinity. However
planned projects with similar
future development around the surrounding
effects
are can have a cumulative effect on the
environment.
(iii) Environmental Sensitivity
Sr.
No.
1
2
3
4
5
6
7
8
9
Areas
Name/ Aerial distance (with 15-km) Proposed
Identity project location boundary
Areas
protected
under
Yes
Mangrove present to the north of the project
international
conventions,
at an aerial distance of 1.5 km
national or local legislation for
their ecological, landscape,
cultural or other related value
Areas which are important or
No
No Notified eco sensitive receptors in the
sensitive of ecological reasons –
surounding areas. However, Mangrove
wetlands, water courses or other
cover present at Versova village to the
water bodies, coastal zone,
North of the proposed site at an aerial
biospheres, mountains, forests
distance of 1.5 km
Areas used by protected,
important or sensitive species of
flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
Inland, coastal, marine or
underground waters
State, national boundaries
No
-
No
-
No
Routes or facilities used by the
public for access to recreation or
other tourist, pilgrim areas
Defense installations
Densely populated or built-up
area
No
The project is located within Municipal
limits of Greater Mumbai.
Not Applicable.
Areas occupied by sensitive man
made land uses (hospitals,
schools, places of worship,
community facilities)
No
Yes
No defense installation in the neighborhood.
The surrounding area is Residential &
Commercial in terms of Land use.
Proposed project site is located in densely
populated area.
Yes
1.
Nearest
Hospital.
Kokilaben
Hospital
1 Km
2.
Nearest
School
Kamlaben
Mehta high
school
0.1 Km
7 Bunglow
0.5 Km
Andheri
Sports
1.5 km
3.
4
Enviro Analysts & Engineers Pvt. Ltd.
Nearest
Market
Nearest
Sports
17
Proposed residential development - ' ARAMNAGAR'
Form 1
Sr. Areas
Name/ Aerial distance (with 15-km) Proposed
No.
Identity project location boundary
Complex
5
10
11
12
Areas containing important, high
quality or scarce resources
(ground water resource, surface
resources, forestry, agriculture,
fisheries, tourism, minerals)
Areas already subjected to
pollution
or
environmental
damage. (those where existing
legal environmental standards
are exceeded)
Areas susceptible to natural
hazard which could cause the
project to present environmental
problems
(earthquakes,
subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
conditions)
Nearest
Place of
Worship
Complex
Hare Rama
Hare Krishna
Temple,
Iskcon
2 km
No
No resources exist near the proposed project
site.
No
--
No
The area falls in Seismic Zone III which is
low seismic activity zone. The proposed
construction is designed for earthquake as
per IS 456: 2000.
(b) The following shall be inserted at the end, namely:“I hereby given undertaking that the data and information given in the application and enclosures
are true to the best of my knowledge and belief and I am aware that if any part of the data and
information submitted is found to be false or misleading at any stage, the project will be rejected
and clearance give, if any to the project will be revoked at our risk and cost.”
Date: 13-2-2015
Place: Mumbai
Mr. Anubhav Aggarwal,
(Project Proponent)
th
RNA Corporate Park, 6 floor, Near Collector office,
Kalanagar, Bandra (E), ,Mumbai -400051.
Enviro Analysts & Engineers Pvt. Ltd.
18