ATVS15 Coverage Calcrulator
Transcription
ATVS15 Coverage Calcrulator
ATVS15CoverageCalcrulator Use the charts and/or the procedure below to determinehow fast to drive your ATV when spreading to achievethe propercoverage. ATVSpeeds for Fertilizer Coverage (approx.1/16"dia.grainsize& 20 ft. spreadwidth) Coverage Speedwith gate fully open kU,) 15#per 5,000ft' l5# per'10,000 ft' 30# per 10,000ft' 30# per 15,000ft? 40# per 10.000ft' 40# per15,000ft? Speedwith gatehalfopen 9.5mph l B . 9m o h ' 9.5 mph 4.8mph 9.5mph 4.8mpl" ra,z rrrPI /. I mpn 3.6mph 5.3 mph 2.9mph 7.1 mph '10.6 mphn 50#per10,000 ft' .?.5 5.7mph 8.5moh 50# per 15,000ft' - jt{ Speed with with Speed fullyopen gaiehalfopen ,c,( sgate ft, l0# Der 3.000ft' 10#per 5,000ff 25#oer 6,250ft' ;lr 25# per 8,250ft' l0# 25# oer 12,500ft'? .L4 l . Bm p h 4 . 1m p h 6.3mph 1 . 8m p h 4 . 1m p h 6.3mph 5.5 mDn 8.2 mph '12.5 mph' 3.5 mph 8.2 moh 12.5mph* * It is not recommended to spread mateilal packasins. C avgekh{ Step Two: With the spreader gate closed fill the hopper at least half full with a known quantity of a material. Record the amount of (Example50#) material here TIP: Usethe sameunits of weight or volume that is used in the spread coverage from step one. v{/6H7- 4.3moh ATVSpeeds for GrassSeedCoverage (18ft. spreadwidth) Coverage Step One: Record the coverage you are trying to obtain here (Example15# per 5,000 sq ft). See material driving over 10 mph. If your material is not iisted above this procedure will help you calculate the ATV speedto get the correctcoverage. Step Three: With the spreaderon, openthe feed gate for one or two secondsand measure the spread width for your material. Record the spread width (diameter) here (Example20 feet) 5 l4eqo 6tr oTt| stepFour:usins ^*?rl{ frfl?dfrJ,Y#"ffiP of time it takes all the material to f10w through the hopper here (ExampleL min 2 sec) This step is best done when the spreader is running. Mounding material on spinner may slow down the material fiow. f//16 /./r//€R ro {rPry Calculations: Area from Coverage(Sqft) From steo one Weight or Voiume From Coverage (Lbs,bag,'cubicft) Weight or Voiume Tested (Lbs, bag, cubic ft) From Step two 1 MeasuredSpread Time to Flow Width (ft) From step three From Frurr ste'onl sLeP "tiur,b, ilr"v ^^ui'' ly or*j. ElwN-Joi *n, -,t' <-<*JVF"*srolt frc7-an_ .lting ppeed.is greater than 10 mph d"ivide n h4 andusea half oftn Oatesetting. \ 1..467ftlsec (pur) (50# 5,000sqft) 1, lmph __ X D(___==____ (62 sec", 1..467 t5# /1 ( -I-2Aft ftlsec nuuurrdtlr*\ = ATV Speed(mph) X Test Material (Sec) From step four t,gk) -{ 1 mph +trd t ln r\ () 1/2OPENGATE WHENSPREADER IS BMPTY MEASURE AND SETSTOP Rev.A 3006072