Icon Benching Single Run Installation Guide
Transcription
Icon Benching Single Run Installation Guide
Icon Benching Single Run Installation Guide installation guide ICON Phase 1 1 Frame Assembly Screw the outer-to-inner horizontal beams (H-bar) to the top of each outside leg (O-Leg) using the M8*25 screws. Then screw the outer-to-inner H-bars to the bottom of each O-Leg using the M6*20 screws. 2 3 Icon Benching Single Run Installation Guide Adjust the glides to level the frame as needed. We suggest using a leveling glide for best accuracy. 2 Rest the outer-to-inner H-bars on the top of the inner legs (U-Leg). Then rest the inner-to-inner H-bars on top the U-legs. Screw the horizontal beam connectors and H-bars to the frame using the M6*20 screws. 3 1 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P2 Phase 2 Assembling Worksurfaces and Electrical 1 Lay the worksurfaces face down in a row. 2 Screw the troughs onto all the worksurfaces using lath screws.Troughs should be placed in the center 5” inches from the back edge of the worksurface. 3 Snap 2 duplexes into each of the double ½ junction blocks. Clip 2 H-brackets to each of the double ½ junction blocks. 4 Then snap the double ½ blocks into each of the trough cut outs. 5 Screw the H-brackets directly into the troughs and worksurfaces usings self-tappers. Place in center, 5” from the back edge of the worksurface. Icon Benching Single Run Installation Guide 3 2 4 1 5 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P3 Phase 3 Installing Worksurfaces to the Frame 1 Rest the completed worksurfaces on top of the frame, starting from the outer worksurfaces working towards the center. 2 Use a clamp to temporarily hold the worksurfaces together until they are ready to be permanently screwed to the frame. 3 If needed, adjust the frame width to open or close the gap between the worksurfaces using a rubber mallet. 4 Once everything is properly aligned, screw the outer worksurfaces to the frame using the counter-sunk screws. 5 Screw all worksurfaces to the H-bars along the center of the frame using counter-sunck screws. 6 Screw the worksurfaces together using a mending plate using counter-sunk screws. Icon Benching Single Run Installation Guide 1 3 2 1 6 2 Make sure worksurfaces are evenly flush to the frame. 3 5 4 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P4 Phase 4 1 Installing Optional Accessories Axil Monument Box: Take the Axil Monument Box and place it on the desired location on the back edge of the worksurface. Secure to worksurface using tightening bolt. 2 Icon Benching Single Run Installation Guide Monitor Arm Installation: We recommend to install a monitor arm equipped with clamp mount along the back edge of the worksurface. Please follow the recommended manufacturer instructions provided with your monitor arm. 1 2 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P5 Phase 5 STOP Installing Screens Icon Benching Single Run Installation Guide If you are installing a glass screen skip Step 1 and continue on to Step 2. 1 Take the fabric screens and measure the desired location of the screen clips and tighten using tightening screws. Be sure to use leveling guide to make sure the clips are leveled on each side. Make adjustments as needed. Skip Step 2 and continue on to Step 3. 2 Insert glass fit-sleeve into the screen clips. Attach the clips to the glass screen with the tightening screws. 3 Slide the screen clips onto the worksurface.Tighten to the worksurface using the hand-knob screw. * Clip kit includes fit-sleeve for glass screen. 2 Glass Screen Fabric Screen 1 2 3 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P6 Phase 6 1 Installing Jumpers Connect double ½ junction blocks to jumpers. STOP 2 Icon Benching Single Run Installation Guide Screw conduit mounting brackets to the worksurfaces using the counter-sunk screws The remaining installation of electrical must be installed by a professional electrician. If you are installing a Power Pole continue on to Phase 7. .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P7 Phase 7 Installing a Power Pole Icon Benching Single Run Installation Guide Make sure ceiling is prepped for the power pole location. You can use the ceilng cover as a guide to determine how big a cut out you need. 1 Screw the power pole (pp) brackets to the top and bottom of the O-leg using self-tappers. 4 Lift the pp up and screw into pp brackets. 2 Lay your pp on the floor and feed the ceiling feed through the bottom cutout of the pp. Loose wires should be at the top. 5 Connect jumper to ceiling feed. 3 Place the ceiling cover on the top of the pp. 5 Use the ceiling cover to secure pp to the ceiling. STOP The remaining installation of electrical must be installed by a professional electrician. * Use ceiling cover to secure pole to the ceiling. * Use self-tapping screw for attaching pole to leg beams. .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P8 Icon Benching Single Run Installation Guide AMQ Solutions, LLC 915 Walsh Ave Santa Clara, CA 95050 (877) 801-0370 [email protected] www.amqsolutions.com