e-Highway2050 Project, Gérald Sanchis

Transcription

e-Highway2050 Project, Gérald Sanchis
e-Highway2050 project
Gérald Sanchis (RTE) – Coordinator of the project
1
InnoGrid2020+
InnoGrid2020+ II e-Highway2050
e-Highway2050
II 1
1 April
April 2015
2015
European project e-Highway2050
“Planning for European Electricity Highways to ensure the reliable
delivery of renewable electricity and Pan-European market integration”
2050
< - 80%
Greenhouse Gas
Emissions
?
?
The Energy Roadmap 2050
is the basis for developing a
long-term European
framework
40 month project, from September 2012 to December 2015
2
InnoGrid2020+ I e-Highway2050
I 1 April 2015
The steps of e-Highway2050 project
Scenarios quantification
Scenario
definition
European
grid model
Grid
development
Five scenarios
100%
RES
Big &
market
Large
scale
RES
Fossil
&
nuclear
Small
&
local
3
InnoGrid2020+ I e-Highway2050
I 1 April 2015
The steps of e-Highway2050 project
Scenarios quantification
Scenario
definition
Clusters
Grid
development
European
grid model
Equivalent grid model
Grid 2014 +
TYNDP ‘14*
4
InnoGrid2020+ I e-Highway2050
I 1 April 2015
4
* All reinforcements included in CIM Data-Set (April ‚13)
The steps of e-Highway2050 project
Scenarios quantification
Scenario
definition
Grid
development
European
grid model
Installed capacities and demand at :
Europe level
Country level
Cluster level
InnoGrid2020+ I e-Highway2050
I 1 April 2015
5
The steps of e-Highway2050 project
Scenarios quantification
Scenario
Definition
Grid
development
European
grid model
?
Grid 2014 + TYNDP ‘14
2050
6
InnoGrid2020+ I e-Highway2050
I 1 April 2015
Large
scale
RES
100%
RES
Grid architectures
for 2050
Small
&
local
Fossil
&
nuclear
Big &
market
7
InnoGrid2020+ I e-Highway2050
I 1 April 2015
Impact of massive development of RES
regard to power system
• What is the present situation in Europe?
Installed capacities
in Europe
GW
Load profile at
European
level in winter
time.
17%
83%
now
intermittent
non- intermittent
In order to ensure the adequacy,
the generation sources must match with the load
at any time.
The figure shows the quick rise of the demand:
+120 GW (+25%) in 4 hours.
8
InnoGrid2020+ I e-Highway2050
I 1 April 2015
Impact of massive development of RES
regard to power system
• What are the forecast for generation mix in Europe?
today
2030
2050
sources
Progressive shift from non-variable (non-intermittent)
generation to variable (intermittent generation).
9
InnoGrid2020+ I e-Highway2050
I 1 April 2015
Impact of massive development of RES
regard to power system
• Example of situation in Europe in 2050
-200 GW
+400 GW
• Case with only RES (wind, PV, and hydro).
 Needs for solutions (additional generation, Demand Side
Response, grid, storage,….), in order to ensure adequacy
(+400 GW/ -200GW).
10
InnoGrid2020+ I e-Highway2050
I 1 April 2015
Thank you for your attention!
Contact : [email protected]
Web: www.e-highway2050.eu
Follow us on Twitter: @e_Highway2050