Capital Improvement Projects in Progress Precinct 2

Transcription

Capital Improvement Projects in Progress Precinct 2
PUBLIC WORKS DEPARTMENT
Project:
CW Traffic Signals Project
Precinct: 1 & 2
Location / Limits:
Next intersections:
- Alamo Ranch Parkway at
Alamo Parkway Pct 1.
- Alamo Ranch Parkway at Lone
Star Parkway Pct 1.
- Alamo Ranch Parkway at
Westwood Loop Pct1.
- Shaenfield Rd at Wildhorse
Parkway Pct 2.
Scope:
Project involve the study, design
and construction of traffic signals
at four intersections .
Status: Preliminary Design
Additional Information:
Consultant: Klotz Associates Bid Opening: TBD Contractor: TBD Construction Start Date: TBD Construction Cost : $ 1,250,000 Construction End Date: TBD Joint Bid: N/A May 11, 2015
PUBLIC WORKS DEPARTMENT
Project: FM 471 (Culebra Rd)
Precinct: 1 & 2
Location / Limits:
From FM 1560 to Old FM 471.
Scope:
The construction will complete the
capacity gap that currently exists on
FM 471 from FM 1560 to Old FM
471. The proposed improvements
will widen Culebra Road from its
existing two-lane configuration to a
four-lane divided roadway with
anticipated bicycle and pedestrian
amenities.
Status: Final Design, Utility
Relocation /Adjustments.
Additional Information:
Consultants: CP&Y Advertise Date: 2 Q 2015 Contractor: TBD Construction Start Date: 3 Q 2015
Construction Cost: $ 14,719,463 Construction End Date: 1 Q 2017 Joint Bid: SAWS, CPS Gas. Pass Thru Project (TX DOT)
May 11, 2015
PUBLIC WORKS DEPARTMENT
Project:
Galm Road Phase II
Precinct: 2
Location / Limits:
Silver Bells St to Government
Canyon State Natural Area.
Scope:
Reconstruct Galm Road from Silver
Bells to Government Canyon State
Natural Area and alleviate flooding at a
low water crossing.
The drainage work includes a new
bridge and earthen channel along the
Culebra creek and improving and
widening
roadway
section
and
roundabout
intersection
at
“Government Canyon State Natural
Area” entrance.
Status: Construction. (81 %)
Additional Information:
Consultants: HNTB Bid Opening: Dec. 13, 2013 Contractor: Capital Excavation Construction Start: 1 Q 2013
Construction Cost: $ 6,663,529 Construction End Date: 2 Q 2015
Joint Bid: SAWS, CPS With Flood Control Component
May 11, 2015
PUBLIC WORKS DEPARTMENT
Project:
Galm Road Phase III
Precinct: 2
Location / Limits:
From FM 471 to Government
Canyon State Park.
Scope:
Galm Rd is currently a 2 lane
Roadway and will be reconstructed
to include 4-12’ travel lanes, turn
lanes, curb and gutter, drainage
improvements 6’ sidewalk 5’ bike
lanes.
Status: Negotiations
Additional Information:
Consultants: HNTB Bid Opening: TBD Contractor: TBD Construction Start: TBD Construction Cost: $ 7,500,000 Construction End Date: TBD
Joint Bid: N/A MPO Project
May 11, 2015
PUBLIC WORKS DEPARTMENT
Project:
Steubing Rd
Precinct: 2
Location / Limits:
FM 1560 to Shaenfield Rd.
Scope:
Proposed roadway reconstruction
with concrete pavement.
Status: Negotiations.
Additional Information:
Consultant: Gonzalez de la Garza & Assoc. Advertise Date: TBD Contractor: TBD Construction Start Date: TBD Construction Cost: $ 2,500,000 Construction End Date: TBD
Joint Bid: TBD
May 11, 2015
PUBLIC WORKS DEPARTMENT
Project: Shaenfield Place
Subdivision
Precinct: 2
Location / Limits:
Various
streets
within
Shaenfield Place Subdivision.
Scope:
The scope of this project is to
provide
mill/overlay
and
reconstruction of multiple streets
within Shaenfield Subdivision.
Status: Negotiatios
Additional Information:
Consultant: Gonzalez – De la Garza Advertise Date: TBD Contractor: TBD Construction Start Date: TBD
Construction Cost: $ 3,000,000 Estim. Construction End Date: TBD.
Joint Bid: TBD
May 11, 2015