complete - Levi Strauss & Co
Transcription
complete - Levi Strauss & Co
BUILDING INTEGRITY | DEA SUMMARY REPORT ______________________________________________________________________________ SUPPLIER NAME Cosmopolitan Industries Pvt Ltd UNITS AUDITED One building with 6 ( Six ) Floors SUPPLIER ADDRESS Khejur Bagan, Boro Ashulia, Savar, Dhaka, Bangladesh AUDIT DATE January 2015 AUDIT PERFORMED BY Consultancy, Research and testing Services, Department of Civil Engineering, Dhaka University of Engineering and Technology (DUET) AUDIT TEAM 4 Members _____________________________________________________________________________ BUILDING OVERVIEW Item Building Usage Type Structure System Floor System No of Stories / Floor area Floor Load: Design drawing Foundation Type Soil Report Description Garment Manufacturing RC Beaming column frame ( Intermediate moment resisting ) RC beaming slab. 6 story with Mezzanine floor and a partial truss roofing in the top floor / approx. 61300 sqft/floor. Ground Floor: Sample & CAD section, Washing, Wrinkle Free, Laboratory, Chemical Store; Mezzanine: Finishing Unit – 1: Finishing, Packing, Alter & Repair, Substore, Quarantine, Spot cleaning, Mending, Office & Buyer Inspection Room; 1st Floor: Sewing section line 1-12 (Unit 1) and office; 2nd floor: Sewing section line 1-13 (Unit 2) and office; 3rd floor: Fusing Section, Quarantine, Finishing unit–2, Packing, Spot cleaning, Kill Garments, Mending & Cutting Section; 4th floor: Embroidery, Cutting unit–2, Canteen/dining area, Chiller Room, Machine Store, Leftover Store, Printing & Prayer Room (Male & Female) & Open Space; 5th floor : Roof (Open Space) Partially Available Isolated column footing Available BUILDING INTEGRITY DEA INSPECTION SUMMARY | CIPL | PAGE 1/3 BRIEF DESCRIPTION OF METHODOLOGY Detailed Engineering Analysis (DEA) as Bangladesh National Building Code (BNBC) DETAILED CONTENT Evaluation and Test ...................................................................................................................................... 2 CONCLUSION ................................................................................................................................................ 2 RECOMMENDATIONS.……………………………………………………………………………………………………………………………..3 DETAILED DESCRIPTION OF METHODOLOGY................................................................................................ 3 EVALUATION AND TEST Destructive and Non Destructive Test o Evaluation of concrete strength from core test. Number size and space of steel bars of reinforced concrete by electromagnetic scanning. Analysis of structural adequacy Assessment of Foundation Adequacy of structural loads on winds and earthquake Evaluation of Column Evaluation of Beams Evaluation of Slabs CONCLUSIONS Structure was analyzed under actual present loading conditions and under BNBC 2006 loading conditions. A few numbers of footings have been found marginally un conservative from punching shear capacity point of view. Safety against bearing capacity bearing capacity of soil underlying few footing found to vary from 2.08 to 4.29 Drifts of stories due to the lateral loads found vary from maximum allowable limits specified in BNBC (2006),Other Conditions are Safe. BUILDING INTEGRITY DEA INSPECTION SUMMARY | CIPL | PAGE 2/3 Recommendations: Recommended to remove the machinery equipment’s and 2 over head tanks to reduce the stress and gravity loads on respective footing and soils. Three footing to be strengthened to improve the structural safety and soil bearing capacity. Columns have double story height need to be braced near mid height to avoid Slenderness effects of the columns DETAILED DESCRIPTION OF METHODOLOGY Specification for Detail Structural Assessment Structural Analysis will be carried on according to BNBC (1993) and ACI code. I. Testing of Materials: Sub-soil Investigation Strength of concrete and steel reinforcement test ( Core cutting, UPV, Hammer Test, Rod testing) II. Investigation of Foundations Foundation Explorations III. Structural Evaluation (Design check): Analysis of sub-soil investigations report Development of computer simulated model Checking of structural stability and geometry Checking adequacy of foundation i.e. pile & pile cap or footing/raft Checking of lateral load resistance capacity of the Building BUILDING INTEGRITY DEA INSPECTION SUMMARY | CIPL | PAGE 3/3