Addendum1 to RFP 15-01 Measure Q - Monterey
Transcription
Addendum1 to RFP 15-01 Measure Q - Monterey
Addendum 1 to RFP #15-01 To: All Interested Parties From: Sandra Amorim Purchasing Manager Monterey-Salinas Transit Re: RFP #15-01 Measure Q 15 Year Plan – Addendum Number 1 This Addendum Number 1 to the above referenced RFP responds to clarifications and questions asked with the MST response. Please note that some questions refer to data that has been posted on a website for shared access to large files.. Any other party who wishes access may send a request to [email protected] or access the MST website at www.mst.org Question 1 It is indicated that the Siemens system has been installed fleet wide. Could you provide samples of boarding data forms for the RIDES ADA- Paratransit, and RIDES-ST Paratransit? 2 Please provide a sample of the Siemens Transit Master boarding data for the fixed route/senior shuttles. Response DJ3 20140901 20150228.zip Sample Report of Voucher Trips for SYC Currently taxi voucher vendors enter redeemed vouchers directly into the Mobility Activities Recording System (MARS) database and MARS tracks them and provides reports. The vouchers themselves are then sent on to Kevin for verification and final approval. MARS reports are also the basis for determining how much to reimburse taxi vendors for voucher services. He forwards this information onto Accounts Payable where they process claims and pay the vendors claim. 3 Could you also please supply a sample of the reporting forms for the RIDES and senior discount taxi vouchers? 1|Page Screen Shot of Voucher Redemption. Addendum 1 to RFP #15-01 4 On your website it is indicated that Senior Shuttles are designed to go where surveyed seniors requested to travel. What surveying was done to make that determination and is the percentage of senior ridership tracked on those routes currently. Meetings were held with the residents who lived in large senior housing developments along the routes. They helped design and schedule the routes based on where and when they wanted to go. No scientific surveys were done on these routes and ridership of seniors is not tracked separately. 5 What is the anticipated study time frame? Are there anticipated dates for implementation of the program, since receipt of funds begins April 1st? We would like to have the report completed by our December board meeting – December 14, 2015. 6 How many copies of the RFP response does MST want to receive? RFP says 1 original and two (3) copies One original, and two (2) copies. 7 Is there a hard date by which MST needs the final report? Or, does MST have in mind a desired study period? We would like to have the report completed by our December board meeting – December 14, 2015. 8 MST’s DBE/SBE directory? MST uses the most updated DBE information that is located at, http://www.dot.ca.gov/hq/bep/find_certified.htm Other than those specifically listed above, no other sections, terms or conditions of the above cited solicitation are being altered at this time. All other sections conditions and language not specifically cited as altered in this document are still in full and original effect. Submitted: Sandra Amorim Sandra Amorim, Purchasing Manager Dated: March 30, 2015 2|Page