Clarifications issued for 1 MW Canal Top Solar Power Project
Transcription
Clarifications issued for 1 MW Canal Top Solar Power Project
Clarifications issued for 1 MW Canal Top Solar Power Project Gollavanitippa, Bhimavaram Rural Mandal, West Godavari district against clarifications sought by M/s Vikram Solar Pvt. Ltd S.No 1 2 3 4 Point Tender Page no Reference 1.25MVA with 10% over load 3.1.1 vii 44 capacity & secondary voltage rating 11KV Each solar PV module shall be warranted by the manufacturer for 3.2.3 output wattage, which should not be less than 92.5% at the end of 15 years and 82.5% at the end of 25 years. At the same time it will withstand storm condition with wind speed of 3.24 150 kmph or of wind speed applicable for the zone, as per relevant India wind loan codes, whichever is higher The PCU shall have provision for galvanic isolation. Each solid state 3.26 electronic device shall have to be protected to ensure long life of the inverter as well as smooth functioning of the inverter. 47 48 49 Clarification Sought Clarification issued Transformer secondary Confirmed the transformer secondary voltage rating should be voltage as 33 KV 33 kv as evacuation is on 33 kv. kindly confirm the same The amendment is already issued and Vikram modules have uploaded in the website as follows: guaranteed power of 90% (a) The SPV panels shall be warranty of for 12 years & 80% for 25 minimum 25 years. years (b) The SPV panel must be warranted for their output peak watt capacity which shall not be less than 90% at the end of 10 years and 80% at the end of 25 years We design structure in The structure should with stand storm compliance with IS 875 condition with wind speed of 150 kmph norms. So whatever max wind speed is required in the particular zone accordingly structure would be designed. Galvanic isolation will be The tender condition shall be followed provided at transformer level. The same will not be provided at inverter level. 5 6 7 8 9 Control & Monitoring of all the equipment of the Plant up to power 3.2.7 vii outlet shall be able to carry out from the SCADA. Data Centre: Remote Monitoring SCADA Server SW for the Plant 3.2.8 . 3 Remote Network support shall be capable of sending data to Remote 3.2.9 Monitoring SCADA Server- over low bandwidth and unreliable Internet connections like 2G/3G USB data cards HT Cables : 3 core XLPE Cable of 35 sq. mm. of suitable higher size 3.2.20 cooper armored cable conforming to IS 7098 LT power cables: LT Power Cable shall be 1100 V grade, single core, 300 Sq.mm or suitable higher size of Multi-standard copper conductor, XLPE insulated with PVC inner sheath and outer sheath made on 3.2.20 FRLS PVC compound. The armoring shall be of Aluminum / galvanized steel round wire. 52 53 53 60 60 Only monitoring in SCADA provided plant SCADA along with server will be provided. Data center connection to Solar plant in NREDCAP scope. A designated VPN network would be required to transfer data from plant local SCADA server to Central HO server. A designated VPN network would be required to transfer data from plant local SCADA server to Central HO server. This would be in scope of NREDCAP Agreed Agreed Agreed HT cable size & type will The tender condition shall be followed be decided at the time of detail engg taking into consideration the load. HT cable will be of A1 type. LT cable size & type of The tender condition shall be followed cable will be decided at the time of detail engg. Taking into consideration the load. LT cable will be of A1 type. 10 11 12 13 The cable used for 24V Battery Charger shall be of Two core, 6 Sqmm or Higher size Multi-standard copper conductor type. Minimum conductor cross section of power cables shall be 4 Sq.mm for lighting ventilation blowers, jet pump and other auxiliaries. HV winding Rated voltage: 11 KV 3.2.21 Variation of +/- 5% @ 2.5% Special Tests a) Short Circuit with stand test b) Measurement of Zero Sequence 3.2.21 C impedance for Three Phase Transformer c) Measurement of acoustic Sound level. d) Measurement of Harmonics of No load current e) Measurement of capacitance and Tan Delta between Windings to Earth and between windings. f) Measurement of Transient voltage transfer characteristics. g) Magnetic Balance test on Three phase Transformer h) Sweep Frequency Response Analysis Outdoor type Vacum Circuit Breaker (ABB/L&T/Siemens/any other 3.2.22 standard make) General Layout drawing of Solar PV power plant locating control room 3.2.30 62 65 66 73 HV winding rated voltage Agreed should be 33 KV as evacuation is in 33 kv Standard test certificate The tender condition shall be followed will be provided for type & routine test. Routine test report will be provided during inspection stage. No third party / special test shall be done by VSPL. VSPL proposes to add Agreed Schneider also as Outdoor VCB supplier. In order to prepare general The tenderer may inspect the site by layout please provide auto informing in advance the Executive building, module yard, internal roadways, drainage system, fencing, fate, water distribution line mentioning all lines and levels. 14 15 16 17 18 General Layout drawing of Solar PV power plant locating control room 3.2.30 building, module yard, internal roadways, drainage system, fencing, gate, water distribution line mentioning all lines and levels. SINGLE LINE DIAGRAM – 1 MW Annexure D Please confirm whether watch tower General & CCTV required for security & surveillance Please specify the point of metering General that will be considered for plant performance Evacuation from plant to nearest substation 11/33 KV s/s at General Gollavanitippa (around 2 km) in is whose scope ie., NREDCAP or VSPL please clarify cad drawing for canal and Engineer (RE), West nearby area. Mobile:9000550989 73 Godavari dist. Please specify type of Fencing along the project site shall be fencing that needs to be arranged. Further, it is the responsibility of considered the tenderer to maintain the project for 10 years period. SLD is having 250 kw The single line diagram is indicative. inverter connecting to 1.25 MVA transformer, please clarify Not required The energy meters shall be installed at the substation. It is under the scope of tenderer. VC & Managing Director