NON-HABITABLE PROPRIETARY GARAGE UP TO 50m2

Transcription

NON-HABITABLE PROPRIETARY GARAGE UP TO 50m2
Council
Use Only
BAM 002-G
Building Consent No.
SR
Date received
Fee
Paid
$
NON-HABITABLE PROPRIETARY GARAGE UP TO 50m2
APPLICATION FOR A BUILDING CONSENT (RESIDENTIAL ONLY)
Section 33 or 45, Building Act 2004 (form 2)
Note: Complete all items applicable to your project
PART 1 – APPLICATION
I request that you issue a
Building Consent only
Building Consent and Project Information Memorandum (additional $75 fee applies)
Council processes building consent applications electronically. However, Council does not currently accept building consents in
electronic format. Please submit one copy of your application in hard copy only (including all relevant documents).
I wish to receive my building consent/PIM and approved documentation in the following format:
Electronically on USB stick
Hard copy (additional costs apply; maximum size A3)
The Building (Project Location)
Building name:
Building street address:
Location of building within site:
Legal description Lot
DP
Proposed lot: (if subject to new subdivision)
Survey district:
Valuation roll number:
Number of levels: (include below ground, ground and above ground)
Level/unit No:
Number of units:
Total floor area: (area affected by the building work )
m2 (up to 50m2)
Estimated building work value: $
per m2
Current lawfully established use: (include number of occupants per level and per use if more than one level) N/A
Year building first constructed: (approximate date is acceptable e.g. 1920’s or 1960-1970) N/A
Does this property have a cable car?
Yes
No
Owner (must be completed for all applications)
Owners name: (if the owner is not an individual, provide the company name and a contact person’s name)
Owner’s mailing address:
Street address/registered office:
Landline:
Mobile:
After hours:
Fax:
Email:
Website:
Agent (only required if application is being made on behalf of the owner – agent will receive invoices)
Council will send a copy to the owner of any correspondence sent to the agent.
Name of agent: (if the agent is not an individual, provide the company name and a contact person’s name)
Agent’s mailing address:
Street address/registered office:
Landline:
Mobile:
After hours:
Fax:
Email:
Website:
Relationship to owner:
BAM 002-G Application for installation of non-habitable proprietary garage (A116361).docm
Page 1 of 6
1/05/2015
BAM 002-G
First point of contact (will receive any correspondence/requests for further information prior to issue of consent)
Council will send a copy to the owner of any correspondence sent to the first point of contact.
Agent
Owner
Other first point of contact name:
Mailing address:
Phone number:
Fax number:
Email address:
Key personnel
Complete as far as possible in all cases. Note: Registered Gasfitter and Electrician are required to be nominated only when (a) the
work undertaken is to be covered by a Compliance Schedule; (b) the owner wishes to obtain a Building Consent for the energy work
(the owner will incur additional cost of checking and certification).
Name
Address
Telephone No
Registration No
Builder:
Designer:
Registered Drainlayer:
Registered Plumber:
Registered Gasfitter:
Registered Electrician:
Registered Engineer:
Other:
Declaration and Signature
I/we understand that the pre-paid fees charged at lodgement are based on average processing times and number of inspections,
and that if this application requires longer to process or additional inspections are required, the Council will charge me/us for any
additional costs payable, as described under section 2 of the Building Unit Fees and Charges 2014/15. These will be paid before the
consent is granted.
Under Section 49 of the Building Act, 2004, a building consent authority is not required to grant a building consent until it receives
any charge or fee fixed by it in relation to the consent and any levy payable.
All of the information contained in this application is, to the best of my knowledge, true and correct.
I/we understand that work must not commence until the building consent is issued and uplifted.
Signed by the owner
OR
Signed by the agent (on behalf of, or with the authority of
the owner)
Signature
Signature
Name
Name
Date
Date
General information
Privacy Act
Pursuant to the Privacy Act 1993 the following information is brought to your attention.
This document collects personal information about you and is collected pursuant to Section 33 and/or Section 45 of the Building Act
2004. Pursuant to Section 217 of the Building Act 2004, the information contained in this document may be made available and
passed on to the public on request. The information contained in the document is being collected and held by the Nelson City
Council. You do have the right of access to and correction of this information subject to the provisions of the Privacy Act 1993.
Pursuant to Section 217 of the Building Act 2004 the building owner may request the plans and specifications be marked confidential
for the purposes of security. Such a request must be in writing and addressed to: Manager Building PO Box 645 Nelson 7040.
Application information
Council do not currently accept building consents in electronic format. Please submit one copy of your application in hard
copy only (including all relevant documents).
Please ensure that you have compiled your documents carefully and completed the check sheet to avoid delays in processing your
application. Building Consent processing time is stopped whenever further information is required and starts again when the
information is received.
One hour or processing and three inspections have been allowed for in the fee that has been paid. If this consent takes more than
one hour to process or more inspections are required, you will incur additional fees.
Work must not start until all fees relating to the Building Consent are paid, the Building Consent is issued, and any Resource Consent
requirements have been dealt with (e.g. amended plans have been provided to comply with the Resource Management Plan) or a
Resource Consent has been granted. Under the Building Act 2004 this consent will lapse 12 months after issue if work has
not commenced.
BAM 002-G Application for installation of non-habitable proprietary garage (A116361).docm
Page 2 of 6
1/05/2015
BAM 002-G
Inspections
During the process of construction, inspections will be necessary to confirm all work complies with your approved Building Consent
documentation. Please ring the Council on 546 0334 well in advance of requiring an inspection to ensure that a time can be
arranged.
The inspections required will be set out in the Building Consent documentation issued by the Building Consent Authority. Failure to
have a prescribed inspection carried out and to be provided with confirmation that the work has been approved by the Inspecting
Authority may put the issue of the Code Compliance Certificate for the work at risk.
Code Compliance Certificate
A building consent is not completed until it has been issued with a Code Compliance Certificate. The Owner is required to complete a
separate application form to apply for a Code Compliance Certificate as soon as practicable after the building work is completed. In
any event no later than two years after the granting of the building consent Council is required to decide whether or not a Code
Compliance Certificate can be issued.
PART 2 – PROJECT
General information
Description of Building Work: (sufficient to enable scope of work to be fully understood)
New
Used
Relocation
Details:
Intended life of the building (if less than 50 years):
Estimated value of the building work on which the building levy will be calculated: (including GST). State estimated value as defined
in section 7 of the Building Act 2004 $
The following matters are involved in the project: (provide
relevant information on plans/documentation)
Comments:
Resource Consent
Application No:
New or altered locations and/or external dimensions of
buildings
New or altered access for vehicles
Building work over or adjacent to any road or public
place
Building work over any existing drains or sewers or in
close proximity to wells or water mains
Other matters known to the applicant that may require
authorisations from the Territorial Authority (e.g.
Planning Approvals, other licenses)
Specify:
BAM 002-G Application for installation of non-habitable proprietary garage (A116361).docm
Page 3 of 6
1/05/2015
BAM 002-G
PART 3 - COMPLIANCE
Do not fill in this section if this application is only for a Project Information Memorandum
All documentation, including plans, specifications, calculations and producer statements, used to show building consent compliance
must be formally listed as attachments in the accompanying checklist.
The building work will comply with the building code as follows
Please ensure that any details of the listed compliance elements are shown on drawings and/or specifications.
Means of compliance
Building Code Clause
B1:
Structure
B2:
Durability
Acceptable Solution
B1/AS1
B1/AS3
Verification
Method
B1/AS2
B1/VM1
B1/VM4
B2/AS1
Access routes
D1/AS1
D2:
Mechanical installation for access
D2/AS1
D2/AS3
E1:
Surface water
E1/AS1
E2:
External moisture
E2/AS1
F2:
Hazardous building materials
F2/AS1
F3:
Hazardous substances and processes
F4:
Safety from falling
F4/AS1
F5:
Construction and demolition hazards
F5/AS1
F7:
Warning systems
F7/AS1
G9:
Electricity
G9/AS1
Alternative
Solution
See and use BAM
123
B2/VM1
C/AS1
C/AS3
C/AS5
C/AS7
C1–6: Protection from fire
D1:
NZS 4121
Accessible
Design
C/AS2
C/AS4
C/AS6
C/VM1
C/VM2
D1/VM1
D2/AS2
E1/VM1
E2/AS2
E2/VM1
F3/VM1
G9/VM1
G13/AS1
G13: Foul water
G13/AS2
G13/VM1
G13/AS3
G13/VM4
Waivers and/or modifications
Provide details of any waivers and/or modifications required for any sections of the New Zealand Building Code. Specify parts of the
code; supporting documentation must be attached. It not applicable, state n/a:
PART 4 – COMPLIANCE SCHEDULE
Do not fill in this section if this application is only for a Project Information Memorandum
When a building has/requires safety features which require a Building Warrant of Fitness.
Is a cable car installed?
Yes (a compliance schedule is required, continue completing this section of the
form)
Removed
Added
Altered
New
The following system is
existing, being altered,
added to, or removed in
the course of the building
work
Existing
No
Inspection
performance
standards
Maintenance
performance
standards
For Council use
only - BCO
Checked
Reporting frequency
Cable car
Checked
If existing cable car, please state the Building Warrant of Fitness No.
Checked
BAM 002-G Application for installation of non-habitable proprietary garage (A116361).docm
Page 4 of 6
1/05/2015
BAM 002-G
ATTACHMENTS
Check Sheet
This check sheet shows you the information that has to be supplied with your building consent application.
Please attach one copy of the following information (unless otherwise specified) with your completed Building Consent Application
form.
Please tick each relevant box in the selection box as you attach the information. Please check each section carefully and
complete those sections that are relevant to your project. This check sheet is to be submitted with the building consent application.
Once you have attached all the required information, please check for completeness as an incomplete application or lack of any
supporting information will mean that your application cannot be accepted for processing.
Requests for further information cause delays in the issue of your building consent.
Tick box for
documents
provided
Attached documents included for:
Council use
only
CSO
1. General
Building Consent Application form
Checked
Completed and signed by the owner or by an agent on behalf of the owner
Floor Area
Checked
Total floor area is 50 m2 or less
Agent Authorisation
Checked
Signed by owner
Proof of ownership
One recent copy of current certificate(s) of title (not older than 3 months) and one copy of purchase agreement (if
recently purchased) or one copy of relevant portions of current lease
Checked
Locality plan showing:
Physical location of the subject building in relation to streets or landmarks, north point, name of building and lot and
DP number
Building Code Compliance
Checked
Checked
Schedule confirming the building work will comply with the Building Code is completed
Fee
Applications will not be accepted without payment of the appropriate fees. Fees payable are published in the
Building Fees and Charges document.
Supplier
Versatile
Ideal
Skyline
Goldpine
Total Span
Kiwi Span
Checked
Checked
Other:
2. Site
Exposure Zone
B
C
D
Wind Zone
Low
Medium
High
Very high
Extra high
Specific design
Contours / Levels / Site Datum Point
NCC Conditions Addressed
Driveway Construction
Specify sub coarse / reinforcing / surface
Positioning
Siting – site plan including north point, setout dimensions of proposed
Drainage Plan
Proposed Floor Plans (1:100 / 1:50)
3. Foundations / Floor
Foundation Plan (1:100 / 1:50) or Detail
4. Timber Framing
Stud
Height, size, spacing and preservative treatment
BAM 002-G Application for installation of non-habitable proprietary garage (A116361).docm
Page 5 of 6
1/05/2015
BAM 002-G
Wall Bracing Plan (1:100 / 1:50) showing:
Bracing details and calculations for wall bracing. Location, type and number of bracing elements to indicate
compliance with NZS 3604 (include calculations).
If the bracing was specifically designed by a structural engineer, provide calculations (required for specific design
wind zones).
5. External
Roofing
Truss design, roof framing plan. Pitch / roofing / underlay. Purlin size, span, spacing, fixings
Elevations (1:100 / 1:50)
Ground lines – show site topography.
Claddings / openings / glazing.
Flashings
Windows, junctions, parapet, etc.
6. Specification
Specification
Received by:
Customer Service Officer
BAM 002-G Application for installation of non-habitable proprietary garage (A116361).docm
Name:
Signature:
Page 6 of 6
1/05/2015