NONEL System
Transcription
NONEL System
® Teknisk Informasjon AnB System ® Above and below ground NONEL Systemet SnapDet No.:SnapDet_sw Utgave: bodies. In other words, they consist of a truck chassis with a loading or transport unit mounted on top, which contains the necessary amount of prepared Anolit. An AnB production unit, which mixes the raw materials on site just prior to the loading, may also be used. The explosives are loaded through a loading hose into the boreholes by use of compressed air. Loading of the whole blast can generally be done from ground level, or from the existing access to the pallet. the customer along with a deliveryoch fördröjning mellan raderna ytkopplingsenhet. Sammankoppling acknowledgement. This type of sker med NONEL Unidet εclip eller SnapLine. Salvan startas upp på documentation allows the customer konventionellt sätt. loading, thus to obtain optimal Supplying Anolit directly to the boreholes offers a number of advantages: • High degree of safety • No need to store explosives • Pre-programmed amount of loaded Anolit per hole • Large capacity NONEL SnapDet ärloading en kombinationssprängkapsel bestående av en • Efficient loading requiring minimal borrhålssprängkapsel i ena änden av slangen ochlabour en ytkopplingsen i den andra. • No leftover explosives het • Accurate documentation NONEL SnapDet kompletterar NONEL Unidet-systemet och förenklar • No handling of packaging uppkopplingsarbetet utan att ge avkall på möjligheten att ge varje • Dewatering system För att kunna dra fördelar av och utnyttja systemets möjligheter på Theoptimalt operator controls loading with the a radio-operated ett sätt krävs the att arbetsplatsen har aid en of standardiserad arremote control system attached to the operator’s belt. One betscykel med återkommande borr- ladd- och tändplaner. person can therefore carry out the entire loading operation. It is Lämpliga arbetsplatser är bergtäkter, dagbrott och stora ovanjordsalso possible to pre-program the desired amount of explosive per entreprenader. borehole. This is of course most useful in situations where there are L® System enskilt borrhål individuell upptändning. Samtliga i salvan har samma typ av NONEL SnapDet sprängLoadinghål control – documentation kapslar. Fördröjningen mellan raderna åstadkoms SnapDets By using the AnB System, a cost-conscious customermed will be utilizing minimizing cost. The printouts also En av fördelarna med NONEL SnapDet serve as valuable documentation in är att lagerhållningen kan hållas på miniminivå. av SnapDet och en sort av εclip cases where the Endast blastingenis sort being carried out on behalf of utföra a thirdperfekta sprängningar. eller SnapLine behövs för att party. a large number of identical boreholes, and only one type of loading. Observera! ytfördröjningssprängkapseln är sammankopplad A PLC unitEftersom mounted on the loading unit records the amount in andborrhålssprängkapseln, the number of each är borehole. We would to emphasis med det av största vikt attlike ytkopplingsenthat the system’s products are delivered in accordance ex.vis to the heten inte AnB blir utsatt för yttre påverkan under laddningsarbetet, customer’s specifications wishes, and that it is the customer vid förflyttning av utrustningand på pallen. who is responsible for the loading and blasting work. Orica Mining Services wishes nevertheless to play an active supporting role. Loading waterlogged holes Waterlogged holes have previously presented difficulties for loading with ANFO explosives. This problem has been (significantly) reduced through AnB System’s dewatering technique. Each individual The explosives are transported to a loading container mounted Tekniske spesifikasjoner borehole can now dewatered immediately before loading. The water on load cells. This makes it possible to determine at any given clearing is done by inserting a plastic hose with a rubber bellow on time what amount has been loaded. Not only does this system Borrhålssprängkapsel the end into the borehole. The hose and bellow is then subjected to provide continuously updated information on the total amount Sort pressure, and the water is pressed out of the hole through a return delivered, but also information on the amount of explosives NPED* in each borehole. A summary report containing this information500 is ms hose. A radio control unit attached to the operator’s belt operates Fördröjningstid the dewatering process. All of our loading units have AnB system’s printed out immediately after finished loading, and is delivered to Styrka Nr. 8 dewatering equipment. the most up-to-date loading control, which provides valuable and necessary documentation. Sprängämne Product / colorcode on Diameter the bag Användningstemperatur Density kg/dm3 Volume Ytkopplingsenhet strenght approx. % Sort Energy MJ/kg Fördröjningstid Energy MJ/dm3 Detonation velocity m/s Slangtyp approx. confined Kapacitet Gasvolume l/kg 1 g PETN/RDX Anolit (standard) Anolit Light 7,5 Anolit mm Light 50% 30% 0,85 0,52 100 50 3,9 3,2 3,3 1,7 > 2400 2000 970 795 -35°C till0,40 +50°C εclip eller SnapLine 30 Anolit Extra Anolit A Anolit Extra A 0,83 0,88 0,86 90 125 114 NPED* sprängämne ca 0,3 g PETN 2,5 3,6 4,7 4,4 0 - 285 ms 1,0 3,0 4,1 3,8 > 2400 > 2700 > 2700 985 895 920 Standard1300 3L röd 8 slangar 650 *Sprängkapseln är av NPED-typ i vilken vid sprängämne. Detta Water resistance Poorprimärsprängämnet Poor (blyazid) har ersatts Poor med ett sekundär Limited Poorökar säkerheten Limited tillverkning och hantering. US patent No.4.727.808 Approval and classification Proper shipping name Explosive, Blasting, Type B / Ammoniumnitrate UN-number 0082 / 1942 Transport class 1.1 D / 5.1 The manufacturer reserves the right to modify products without prior notice. © Dyno Nobel Sweden AB Dyno Nobel Sweden AB Gyttorp, 713 82 Nora, Sweden Phone: +46 587 85000 - email:[email protected] www.oricaminingservices.com TD Aug ® AnB System NONEL Systemet® Above and below ground SnapDet the customer along with a delivery acknowledgement. This type of documentation allows the customer to obtain Färg optimal loading, thus Borrhålssprängkapsel minimizing cost. The printouts also Fördröjningstid (ms) serve as valuable documentation in Grön 500 cases where the blasting is being carried outGul on behalf of a third 500 party. bodies. In other words, they consist of a truck chassis with a loading NONEL ytkopplingsenhet or transport unit mounted on top, which contains the necessary amount of prepared Anolit. An AnB production unit, which mixes Ytkopplingsenhet Beteckning the raw materials on site just prior to the may also be εcliploading, eller SnapLine SnapDet are loaded through a loading hose into the used. The explosives Fördröjningstid (ms) boreholes by use of compressed air. Loading of the whole blast can 0 / 500 2 generally be done from ground level, or from the existing access to the pallet. 17 / 500 17 25 / 500 25 a number of Röd 500 Supplying Anolit directly to the boreholes offers The operator controls the loading with the aid of a radio-operated advantages: 42 / 500 42 Vit 500 remote control system attached to the operator’s belt. One • High degree of safety 67 /need 500to store explosives 67 500 operation. It is person can Blå therefore carry out the entire loading • No also possible to pre-program the desired amount • 109 Pre-programmed amount of loaded Anolit per hole / 500 109 Svart 500 of explosive per borehole. This is of course most useful in situations where there are • Large loading capacity 176 / 500 176 Orange 500 a large number of identical boreholes, and only one type of loading. • Efficient loading requiring minimal labour A PLC unitBrun mounted on the loading unit records • 285 No leftover / 500 explosives 285 500 the amount in and the number of each borehole. We would like to emphasis • Accurate documentation Borrhålssprängkapseln även fås med 400, 425, 450 eller 475 millisekunders grundfördröjning. that the AnB system’s products are delivered in accordance to the • No handlingkan of packaging customer’s specifications and wishes, and that it is the customer • Dewatering system who is responsible for the loading and blasting work. Orica Mining Services wishes nevertheless to play an active supporting role. Loading control – documentation By using the AnB System, a cost-conscious customer will be utilizing Loading waterlogged holes the most up-to-date loading control, which provides valuable and Waterlogged holes have previously presented difficulties for loading necessary documentation. with ANFO explosives. This problem has been (significantly) reduced through AnB System’s dewatering technique. Each individual The explosives are transported to a loading container mounted Uppkopplingsprincip SnapDet borehole can now dewatered immediately before loading. The water on load cells. This makes it possible to NONEL determine at any given clearing is done by inserting a plastic hose with a rubber bellow on time what amount has been loaded. Not only does this system the end into the borehole. The hose and bellow is then subjected to provide continuously updated information on the total amount pressure, and the water is pressed out of the hole through a return delivered, but also information on the amount of explosives in hose. A radio control unit attached to the operator’s belt operates each borehole. A summary report containing this information is the dewatering process. All of our loading units have AnB system’s printed out immediately after finished loading, and is delivered to dewatering equipment. Product / colorcode on Anolit Anolit Light Total fördröjning the bag (standard) 50% Density kg/dm3 0,85 0,52 Rekommenderade lagringsvillkor Volume 50 Lagringstid 2 år100 från produktionsdatum. strenght approx. % Produkter i bruten förpackning bör Energy MJ/kg 3,9 3,2 förbrukas inom 3 månader. Vid 3 Energy MJ/dm 3,3 hög fuktighet, 1 1,7 mycket månad Detonation velocity m/s Luftfuktighet Torrt och luftigt/svalt > 2400 2000 approx. confined Gasvolume l/kg Water resistance Destruktion av NONEL-slang Anolit Light 30% Anolit Extra Anolit A Anolit Extra A 0,40 0,83 0,88 0,86 Godkännande och klassificering 30 90 Notified Body (Godkännande Institut) 2,5 3,6 Godkännandenummer 1,0 3,0 Produktbeteckning/varunamn 1300 > 2400 UN-nummer 4,7 158401 4,1 1.1.B895 970 795 Transportklassificering985 650 Poor Poor Poor Limited 125 0402 (SP, Sverige) 114 4,4 3,8 Sprängkapslar, icke-elektriska > 2700 0360 Poor > 2700 920 Limited Approval and classification Spräng ut det reaktiva materialet med DynoStart och sänd till: Återvinning - Soptipp - Brännplats Proper shipping name Explosive, Blasting, Type B / Ammoniumnitrate UN-number 0082 / 1942 Transport class 1.1 D / 5.1 The manufacturer reserves the right to modify products without prior notice. © Dyno Nobel Sweden AB Utgivaren reserverar sig för tryckfel, ändringar i lagar och föreskrifter samt eventuella produktändringar © Orica Norway AS Dyno Nobel Sweden Orica Norway AS AB Gyttorp, 713 82 Nora, Sweden Postboks 614, 3412 Lierstranda Visitor address: Røykenveien 18, 3400 Lier Phone: +46 85000 Telefon: 32 587 22 91 00 - email:[email protected] email: [email protected] www.oricaminingservices.com