Feasibility Study - Baltimore County Public Schools
Transcription
Feasibility Study - Baltimore County Public Schools
Assessment and Feasibility Study Limited Renovation Project Assessment DULANEY HIGH SCHOOL Prepared by: Baltimore County Public Schools With assistance from: Architect: Rubeling & Associates, a JMT Division Structural Engineer: Columbia Engineer, Inc. M/E/P and Fire Protection Engineer: JMT Engineering Estimating: Lewicki Estimating Services, Inc. February 25, 2016 Creating a Culture of Deliberate Excellence DULANEY HIGH SCHOOL FEASIBILITY STUDY TABLE OF CONTENTS A. Introduction ...................................................................................................................................... 2 B. Executive Summary ......................................................................................................................... 4 C. Limited Renovation Assessment 1. 2. 3. 4. 5. 6. 7. Structural Systems .............................................................................................................. 8 Mechanical Systems ......................................................................................................... 11 Plumbing Systems............................................................................................................. 17 Electrical ........................................................................................................................... 18 Fire Safety Systems .......................................................................................................... 21 Conveying Systems........................................................................................................... 21 Miscellaneous Systems ..................................................................................................... 22 D. Site Assessment ............................................................................................................................. 24 E. Educational Enhancements ............................................................................................................ 26 F. Schedule and Phasing ................................................................................................................... 30 G. APPENDIX Appendix A ................................................................................................................................. SITE PLAN Appendix B .............................................................................................. EXISTING UTILIZATION PLAN Appendix C ............................................................................... EDUCATIONAL ENHANCEMENT PLAN Appendix D ................................................................................................... STRUCTURAL ISSUES PLAN Appendix E............................................................................................................. FOOD SERVICE MEMO Appendix F ........................................................................................................................ COST ESTIMATE Appendix G .................................................................................................... ENVIRONMENTAL REPORT Appendix H ...................................................... LIMITED RENOVATIONS PROJECTS MEMORANDUM Appendix I ............................................................................................................... ACKNOWLEDGMENTS Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Table of Contents | Page 1 February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY A. INTRODUCTION 1. BACKGROUND INFORMATION Dulaney High School is located at 255 Padonia Road in Timonium, Maryland 21093. The 250,286 square foot facility includes the original 184,790 Sq. Ft. building constructed in 1964, a 720 Sq. Ft. addition in 1971 and the 64,776 Sq. Ft. 3-story addition constructed in 1999. Other recent renovations have included replacing the original building roof in 1997, Fire alarm system was replaced in 1999. The gym bleachers were replaced in 2000 and the science labs were renovated in 2001. The auditorium and stage lighting were upgraded in 2002. The boilers, exterior doors and lighting were replaced in 2004. Student’s toilet rooms in the original building were renovated and are ADA compliant. Corridor ceiling and lighting in the original building were renovated in 2014. The school occupies approximately 43 acre that includes the school facility building, ball fields, courts and track. Most of the existing building layout is one story. One of the 1971 classroom wings is three stories and the 1999 addition is three stories as well. Individual classrooms are generally sized per the recommended state square footage of 750s.f. Currently, the average class size is 28-29 students per class. Most of the school is ADA accessible. Each three story building has a working elevator. However, the original elevator is not ADA compliant. The team visited the school to observe existing conditions. As part of this study, we have evaluated the Site, Architectural, Structural, Mechanical, Plumbing, Electrical, Fire Safety, Conveying systems and Miscellaneous Systems such as Telecommunications, Security Systems and ADA systems. We also reviewed the building for Building Code, Life Safety and Accessibility requirements. The existing facility shows the effects of intensive utilization, and no longer meets some current building, fire and life safety codes. Benchmarking the school’s need to the state rated capacity and allowable square footage per student (150 sf per student) indicates the following: The current state rated capacity is 1,984 students. The current enrollment of 1,804 students is below the state rated capacity. Using the current enrollment of 1,804 students x 150 sf/student = 270,600 of allowable square footage. (According to the state formula) Baltimore county Public Schools 2014 Annual Report of Student Enrollments and School Utilization updated in March 2015 projects enrollment at Dulaney High School is projected to be : SRC 1984 2014 actual 1804 2015 1797 2016 1768 2017 1760 2018 1839 2019 1882 2020 1938 2021 2006 2022 2056 2023 2100 2024 2107 As part of the analysis, we have identified needed Educational Enhancements to the existing school to meet current programmatic requirements as well as needed for additional instructional and support space. Dulaney High School should be considered for Limited Systemic renovations and Educational Enhancements in order to create a 21st century learning environment for its students within the 51 year old structure. The major costs associated with Dulaney High School will be for Limited Renovation Upgrades including providing Air Conditioning for the entire school, fire suppression system for the 1964 and 1971 structures as well as Programmatic Enhancements. Due to the age of the building and the lack of any prior major renovations, all areas of work will disturb Asbestos Containing Materials. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Introduction | Page 2 February 25, 2016 This report is organized around the Systems for Limited Renovation identified as the priority for the study. The assessment also focused on applicable codes, life safety and ADA compliance concerns. As part of the study, we met with school representatives to identify and prioritize educational needs to establish our scope of work. The determination of priorities will be evaluated and finalized in context of multiple schools being funded during the time period. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Introduction | Page 3 February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY B. EXECUTIVE SUMMARY 1. SUMMARY The following potential scope items, and the costs associated with them, are all of the deficiencies found at Dulaney High School during the facilities evaluation for the Feasibility Report. The proposed scope has been established based on the estimated costs for these items and the budget available for this ‘limited renovation’. A ‘limited renovation’ allows for additional systemic work that could not be done during the ‘limited renovation’ to be eligible for state funding in the immediate future. 2. SCOPE Site Improvements (exterior work will be limited to supporting interior work and exterior building repairs) • Upgrade of water service to the building for new sprinkler system (price included in fire protection). • Replace sidewalks main entry. • Miscellaneous site repairs. • Replace exterior ramp at Tech wing (price included in ADA) Architectural (Interior) • Replace, modify or install handrails and guards at all stairs steps and ramps to meet IBC and NFPA life safety code requirements. • ADA modifications to the existing administrative areas where non-compliant. • New classroom casework. • New security vestibule in front lobby. • Install new ceilings in classrooms. • Replace classroom VAT flooring with VCT flooring. • Repair/remove terrazzo flooring, limited. • Replace auditorium seating. Structural (Interior work) • Concrete repairs, miscellaneous. • New addition slab repairs. • Infill pit in the library. Structural (exterior work) • Repair spalling on exterior concrete slab. • Repair concrete columns • Limited tuck-pointing and brick replacement around building. • Enclose exterior breezeway. Mechanical Systems • Provide new heating, ventilating, air conditioning and exhaust systems throughout building. • Modification of existing boiler equipment as required to support new work. • New or Reprogramming of the control system. • Replace kitchen exhaust and add make-up air unit. Plumbing Systems • Replacement of domestic water system (including hw, cw and vent). • Select replacement of plumbing fixtures (sinks, water closets, urinals, drinking fountains). • High pressure washing of underground sanitary and storm water piping. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Executive Summary | Page 4 February 25, 2016 Electrical Systems • Replacement of the existing switchboard. • Modify existing switchboard as required. Existing service entrance equipment will be reused. Replacement has been included as Add Alternate #1. • New distribution panel boards where required (approximately 50% to be replaced the remaining are included in Add Alternate #4). • Replacement of the existing branch circuit panel boards where required. • Provide new LED lighting interior and exterior applications. • Provide new code compliant interior lighting controls. • Replace the public address and intercom system. Roofing Systems • Replace building roof (roof will be 19 years old when complete) Window Systems • Replace exterior windows • Remove and reinstall sun screens Fire Protection Systems • Install new Fire Suppression system in unprotected building. Tie into existing system. • Upgrade water service to accommodate fire service requirements. • Update Fire Alarm system to accommodate new sprinkler system. Security Systems • Upgrade and replace to meet current BCPS standards. Elevator/Conveying System • Install upgrade to controls for existing elevator. • Install new lifts (2) at level transition. Americans with Disabilities Act Improvements (ADA) • Remove and replace non-compliant stair railings. • Modify classroom entrances, increase width to ADA standards. • Renovate select toilet rooms to ADA. • Replacement of corridor doors and door hardware to be ADA compliant (all remaining doors are included in Add Alternate #3. • Provide ADA signage Information Technology (Add Alternate #5) • Technology upgrades including new teachers wall in all teaching spaces and library to support short throw projector. Educational Enhancements • Renovate Library/Media center. • Renovate Art classrooms. • Relocate Health Suite. • Renovate Technology classrooms. • Renovate Child Care. • Renovate Locker Rooms. • Replace Locker Room lockers. • Renovate Administration/Guidance. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Executive Summary | Page 5 February 25, 2016 • • • Renovate Food/Nutrition. Replace kitchen equipment. Replace chalkboards/tack boards with new marker boards. Interior/Exterior Aesthetic Issues • Clean and repair terrazzo flooring throughout corridors, lobbies and stairs. • Clean and reseal existing concrete floors. • Infill glazed clearstory. • Repair and clean glazed CMU portions of walls. • Clean and repair ceramic wall tile in corridors. • Clean and repair ceramic tile on walls in classrooms. • Paint all interior spaces after systemic renovations. • Repaint canopy soffit Note: The italicized tasks are those that are anticipated to be included in the scope of work to be accomplished within the proposed budget. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Executive Summary | Page 6 February 25, 2016 3. COST ESTIMATE1 Site Improvements Architectural Systems (Interior) Structural Systems (Exterior) Structural Systems (Interior) Mechanical Systems Air Conditioning Systems2 Other than for installation of AC Plumbing Systems Electrical Systems Fire Protection System Security Systems Elevator/Conveying System Americans with Disabilities Act Improvements (ADA) Renovate Program Space (minor) $58,000 $73,000 $134,000 $61,000 $19,207,000 $64,000 $1,300,000 $912,000 $1,239,000 $720,000 $65,000 $1,566,000 $49,000 Educational Enhancements Relocated Health Suite Renovate Administrative Main Office area including Guidance Renovate Library/Media Center Renovate Technology Classrooms Renovate Childcare Renovate Food/Nutrition Replace kitchen equipment Renovate Locker Rooms including lockers Renovate Art classrooms Replace white boards/tack boards $64,000 $285,000 $219,000 $199,000 $60,000 $74,000 $884,000 $449,000 $216,000 $692,000 Interior Aesthetic Issues (non-essential) Replace Auditorium seats $675,000 $533,000 Alternates 1. Add electrical switchgear upgrade to 4000A 2. Add emergency generator 3. Add replacing all remaining doors (public corridors doors are in base bid) 4. Add upgrade electrical panels, select branch circuit device and wiring 5. Add cost of technology upgrade 6. Add clean & seal precast concrete spandrels $255,000 $402,000 $393,000 $550,000 $1,021,000 $62,000 Original Estimated Construction Cost Complete Estimated Project Cost (Design, Construction, and Other costs) $35,750,000 $43,960,000 Limited Renovation Construction Cost (just those italicized tasks) Full Renovation Construction Cost (all tasks included) $32,481,000 $32,481,000 Note: 1 Includes wage rate adjustment, G.C. overhead and profit, bond, contingency, escalation. Note: 2 Upgrade cost inclusive of all related costs to Air Condition the building: Demolition and replacement of all existing HVAC equipment, temporary classrooms, roof, exterior windows, terminal equipment, ceilings, light fixtures, all casework in classroom, replace classroom VAT flooring with VCT flooring, associated electrical work. Total air conditioning upgrade includes multiple systems; HVAC, ceiling, lighting, millwork, flooring, roofing, and windows. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Executive Summary | Page 7 February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY C. LIMITED RENOVATION ASSESSMENT 1. STRUCTURAL SYSTEMS Introduction The existing systems that are part of the Structural component category include roof, walls, floors, ceilings, windows and doors. These systems and the building configuration have been evaluated for compliance with the following codes: IBC 2015 and International Existing Building Code 2015 NFPA 101, 2015 Americans with Disabilities Act 2010 Dulaney High School was originally constructed in 1964 and has undergone one major structural addition in 1999. One minor addition to a locker room was added in 1971. The original building consists of 7 interconnected areas as follows from the north end: a one story cafeteria and industrial arts wing, a one story gymnasium and locker room wing, a one story administration wing, a one story science wing, a one story library/media center, a three story classroom wing and a one story auditorium/music wing with a balcony and mezzanine projection room. The addition in 1997 consists of a three story classroom wing. The high school is predominantly a steel framed structure with concrete floors and an insulrock fiber or gypsum roof. The structure is also composed of various other structural materials and systems including concrete caissons and grade beams at the auditorium and precast concrete Lin Tees at the gymnasium. Roof Structure The roof deck of the original three story classroom wing, the administration wing, science wing, library wing, cafeteria and industrial arts wing, and support spaces for the gymnasium and auditorium consists of a 3” thick insulrock fiber deck. The insulrock fiber deck is supported by steel joists, wide-flange steel girders, and tube steel columns. The steel joists are generally spaced at 48” on center maximum and long span steel joists are utilized at the cafeteria. The roof of the gymnasium is composed of 36" deep precast concrete Lin Tees which are topped with 2" of lightweight concrete. Lin Tees are prestressed and have a single web. The Lin Tees are supported by steel wide flange beams and columns. The roof deck of the auditorium addition is a 3” thick insulrock deck and bulb tee sub-purlins. The insulrock slab is supported by wide flange steel sub-purlins, steel trusses, and steel columns. The roof deck of the three story classroom addition, the one story locker room and recreation storage additions is 1 1/2" corrugated metal deck supported by steel joists. At the classroom addition bar joists spaced at approximately 5’0” on center and are supported by steel wide flange beams and columns. At the two smaller additions, the joists are spaced less than 5'-0" on center. The small additions utilize masonry bearing walls. Framed Floor Structure The framed floor of the original classroom building is of a 2 ½” thick concrete slab on corruform deck. The slab is supported by steel joists at 24” on center maximum and steel wide flange girders. The girders are supported by steel tube columns. The elevated floor structure at the auditorium is a 2"-3 ½” thick concrete slab over corrugated form deck. The slab is supported by steel wide flange beams and girders. Some of the girders cantilever over wide flange steel columns. The catwalk at the auditorium is composed of a plywood deck supported by steel angles which are hung from the roof structure. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 8 February 25, 2016 The floor structure of the classroom addition is a 5 ½” total thickness concrete slab over 2” composite metal deck. The slab is supported by steel wide-flange beams, steel wide-flange girders, and steel wide flange columns. First Floor Structure The first floor of the entire building, including the various additions, is predominantly a 5” thick concrete slab on grade. Portions of the floor (i.e. tunnels at the library) are elevated with corrugated form deck to allow passage of the mechanical ductwork underneath the slab. Foundation and Walls The foundation system for the entire building including the additions is spread concrete footings founded on natural soil with the exception of the auditorium area. The auditorium area is supported on concrete grade beams spanning between concrete caisson deep foundations. The foundation walls are a mixture of masonry and cast in place concrete which vary in thickness. The above grade exterior walls are a combination of brick veneer with in general concrete masonry unit back up or curtain wall. The interior partitions are generally concrete masonry unit walls. Lintels over punched masonry openings are a mixture of steel channels, steel angles, steel wide flange shapes, and precast concrete beams. Site Observations and Existing Conditions Dulaney High School was visually surveyed in September 2015. Columbia Engineering, Inc. was able to access most of the major structural components during the visit. As expected, the accessible structure corroborates the information contained in the original structural documents made available to the design team. Below is a list of structural condition issues which were noted during the survey. Primary and Interior Structure The primary steel structure appears to be in good condition. It appears to be free from signs of deterioration and structural distress. Some minor cracks are present in the wall in the stairways and corridors of the original and addition classroom building wings. The slab on grade at the industrial arts wing, which is exposed, has a number of cracks. There are a couple patched terrazzo floor areas in the connecting corridor at between the classroom wing and the music classrooms behind the auditorium. The floor slab on grade in the 1997 addition has a minor downwards slope from the center of the corridor toward the walls. Cracked and separated floor tiles are present due this settlement. Cracks are also observed at the vinyl tiles near the floor slab diamonds around the interior columns where the slab appears to have settled. Exterior Structure The brick veneer is in good condition for a building of this age. Some cracks in the mortar were noted. These areas were generally near the walls corners which is likely due to the lack of control joints in the walls. There are several locations of the precast spandrel panels where the concrete has cracked, spalled and the reinforcing has rusted, in particular the north side of the original three story classroom wing and the north face of the administration wing. The east elevation of the three story classroom addition has weep holes at the lower level exterior masonry veneer however at the upper level, weep holes were not observed. There is a stair stepped crack in the brick veneer at the southwest corner of the library wing. The precast concrete sill blocks at the east windows of the connecting corridor between the library and the original three story classroom wing are loose and have tilted inward. Discussion and Recommendations The majority of the deteriorated conditions noted above are due to the age of the building and for exterior issues, long term exposure to the elements. The issues can be grouped into three main material categories – masonry, steel, and Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 9 February 25, 2016 concrete. The masonry issues are mostly cracked or worn mortar. The steel issues found generally concerned corrosion of the element. The concrete issues tend to stem from corrosion of the internal steel reinforcement. All of these issues are not unusual for a building which is over fifty years old. One item that should be discussed in more detail is the possible settlement of the 1997 Classroom Addition. While our survey indicated areas at the lower level where the slab had clearly settled, it is unclear whether settlement is continuing. That said, further investigative work, analysis, and possible geotechnical study would be needed in order to confirm this opinion and should be done if BCPSS is concerned about the foundation in this part of the school. The following items are recommended as part of the renovation: Repoint cracks in brick veneer where necessary. The window sill precast units at the library corridor should be removed and reset after the brick veneer attachment is inspected. A portion of the brick veneer may need to be removed and reset with new masonry anchors. Repair spalls and corroded reinforcement in concrete elements by removing loose concrete, squaring up all edges, cleaning reinforcement of rust, and patching area with a concrete repair mortar. This may require special patching compounds to simulate the exposed aggregate precast panels. Clean and repaint rusted steel. Specific areas include the exposed brick support angle at the girls locker room side of the gymnasium and the steel channel support at the bridge between the science wing and the classroom wing. Remove portions of the existing slab on grade at the 1997 Addition adjacent to the columns where the slab has settled and investigate the cause of the settlement, then patch the slab. The primary structural concerns associated with renovating the existing building are as follows: The existing contract drawings indicate that the roof structure was designed to support a uniform live load of thirty pounds per square foot. Building codes used at the time of design of the existing building did not require the engineer to consider the effects of drifting snow. The International Building Code now requires that the designing engineer consider snow drifts at roof elevation changes and against roof obstructions, such as large mechanical units. The existing building has areas with roof elevation changes where drifting snow load may exceed the original design live load. The International Building Code does not require the existing structure to be analyzed and strengthened unless additional superimposed dead load is placed on the structure or the structural framing is altered. Consequently, it is important to limit the installation of new roof top mechanical units to avoid costly structural rehabilitation. If roof top mechanical units are used, it is important to avoid locating them in areas prone to drifting snow. Locating mechanical units in these areas could result in the need for widespread reinforcement of the structure. Relocation of masonry partitions at elevated floors will require an analysis of the floor structure. It is unlikely that the structure is capable of supporting heavy masonry wall loads without rehabilitation, so any new partitions should be constructed using light weight materials. At the time of the design of the original building, codes did not typically require a lateral analysis for low-rise structures. The addition of new superimposed dead loads on the structure, including heavy mechanical units, may require that a structural analysis be performed and a new lateral resisting system may need to be introduced. Also, modifications to the existing lateral resisting structural elements should be avoided. The interior and exterior masonry walls typically act as the primary lateral system for this type of building. Therefore, relocating, modifying, or removing masonry walls could result in the need for a new lateral resisting system. Introducing new lateral resisting systems into existing buildings is often intrusive and costly. New floor or roof penetrations will require an analysis of the existing structural system. New steel frames will need to be installed around large penetrations to support the existing floor or roof deck. Openings should be limited to the space between main steel members to avoid costly structural reinforcing of the floor or roof. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 10 February 25, 2016 2. MECHANICAL SYSTEMS Introduction Criteria for Feasibility Study The existing mechanical systems have been evaluated for safety, code compliance, life expectancy, and capacity for expansion in accordance with the listed codes and standards. International Mechanical Code (IMC), 2015 International Energy Conservation Code (IECC), 2015 ASHRAE Standard 90.1-2012 ASHRAE/Industry Standards for Equipment Life Expectancy Maryland State Department of Education Standards Baltimore County Public Schools Facility Standards Mechanical Systems Existing Conditions Overview Dulaney High School was originally constructed in 1964; with a major addition (3-story classroom/science lab) following in 1999. While there have been localized minor renovations in the following years. In 2001 the only major mechanical renovation occurred, with the scope being replacement of the two (2) original boilers and the domestic water heaters. Presently, the 1999 building systems do have environmental temperature control, while the 1964 building does not (except the administrative offices and a few classrooms). Estimated Life Expectancy (ASHRAE/Industry Standards) ASHRAE is the industry organization that sets the standards and guidelines for HVAC equipment. The following Equipment Life Expectancy has been listed for the following equipment: Boilers (Fire-tube): 25 years, assuming proper water treatment and thermal shock prevention Boilers (Cast iron): 30-35 years, assuming proper water treatment and thermal shock prevention Burners: 21 years Air Handling Unit coils (DX, water, steam): 20 years with proper filtration to prevent clogging on the airside of coils and water treatment to prevent scaling on the water side of the coils. Fans (centrifugal): 25 years Fans (ventilating, roof mounted) 20 years Chillers: 20-23 years Air Cooled Condensing units: 20 years Air Conditioner window unit: 10 years Terminal Air Conditioner, split package: 15 years Fan Coil Units: 20 years Unit Ventilators: 20 years with proper filtration to prevent clogging on the airside of coils and water treatment to prevent scaling on the water side of the coils. Unit heaters (hydronic): 20 years Fans: 15-25 years Pumps (base mounted): 20 years Pumps (pipe mounted): 10 years Pumps (condensate) 15 years Electric motors; 18 years Temperature Controls: 12-20 years, depending on technology improvements and technical support from manufacturer and service technicians Mechanical Piping: 30-35 years with proper water treatment Diffusers, grills, registers: 27 years Ductwork/Dampers: 30/20 years Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 11 February 25, 2016 Insulation: 20-24 years Dulaney High School is heated using a central heating water plant. Cooling is provided by unitary equipment for a few critical spaces. Ventilation, which is Code compliant for the occupant is provided by terminal equipment. All mechanical equipment although well maintained, has surpassed its useful life expectancy and should be replaced. Central Heating Water Plant The existing heating system for the 1964 building consists of two (2) 300 HP fire-tube boilers, which were replaced in 2004, are located in a ground level boiler room. The boilers were converted to gas-fire, as opposed to oil-fired as part of this replacement project. The boilers appear to be in good condition and have approximately ten (10) years remaining on their estimated life. These boilers provide 180 degree (0F) water for the heating loop and presently do not utilize hot water reset schedule to adjust the heating water temperature as the outdoor air temperature increases. The boilers are sized for redundancy at 150 percent, to handle building heating load in all conditions. The combustion louvers do not meet present Code, which requires a high-low outdoor/combustion air louver configuration. The existing heating system for the 1999 addition consists of two (2) gas-fired 51 HP hot water boilers. These boilers appear to be in excellent/good condition, and have years remaining on their estimated life. Central Chilled Water Plant – (1999 building only) The 1999 addition contains a 200 Ton air cooled chiller with a remote air cooled condensing unit on the roof. It is in good condition. Hydronic Distribution The heating water is distributed throughout the building via a piped system. This piping (sized for heating loads) is original to the initial construction, is in poor condition and has outlived its service life expectancy. There have been numerous leaks, which have been repaired on a case by case basis as they occur. The piping insulation (heating service only) is in poor condition, and should be replaced with the new piping. In the 1964 building, the heating water is divided into three (3) zones. Water is transported in each zone through the pipes through hydronic base mounted centrifugal pumps. The existing piping and pumps in these zones are original and are sized for heating only and therefore should be replaced. Zone 1 has two (2) 10HP, 330 GPM pumps serving the cafeteria, shop areas and gymnasium. Zone 2 has two (2) 15HP, 288 GPM pumps serving the music and classroom wing. Zone 3 has two (2) 5HP, 127 GPM pumps serving the auditorium. The 1999 building piping distributes dual temperature water. The piping is installed as a two-pipe system, with two (2) 20HP, 380 GPM dual temperature base mounted centrifugal pumps. The dual-temp piping insulation and hangars should be serviceable for chilled water duty; but should be field verified. Mechanical Equipment Dulaney High school is served by floor mounted unit ventilators throughout the classrooms in the 1967 building. These mechanical terminal units provide heating and ventilation into each space. The ventilation air enters each space through multiple louvers located along the perimeter of the building which are integral to the function of each unit ventilator. The fresh air passes over the unit ventilator’s hydronic heating coil and then is mixed with the re-circulated room air. Excess room pressurization is prevented by louvers in the corridor classroom doors, which allows air to transfer through the corridors until enters a plenum space behind the lockers and it is finally mechanically exhausted (through a ducted system) via roof top exhaust fans. This method is not code compliant and must be rectified during the next project. Relief air may not use a corridor (egress) as it is against life safety code. All unit ventilators are in poor condition (age related) and should be replaced. Science rooms located in the 1964 building were renovated in 2001, which replaced the unit ventilators. These units were sized for heating load only, along with the associated piping, and will need to be replaced (unless the outdoor ventilation can be decoupled). If the units are to remain, all pipe insulation will need to be demolished Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 12 February 25, 2016 and replaced for cooling service. The exhaust ductwork and fume hoods are Code compliant and in excellent condition In the 1999 building, the spaced is heated, cooled, and ventilated via both floor mounted unit ventilators, and ceiling mounted unit ventilators. The ventilation air is supplied into the classrooms in the method described above. In addition, in approximately 1/3 of the units utilize an economizer cycle which theoretically introduce up to 100% outside air in an attempt to free cool spaces. This sequence does not allow the opportunity to dehumidify the air, which may cause issues. These units have outlived their service expectancy and should be replaced. The cafeteria is served by a 10,000 CFM (940 MBH) H&V air handling unit and finned tube radiation. The air handling unit is in a penthouse that will not accommodate a modular air handling unit. Ancillary cooking and serving spaces are served by unit heaters, cabinet heaters, and finned tube radiation. The auditorium is located in the 1964 building and is heated by four (4) heating and ventilating (H&V) units with a total capacity of 20,900 cfm (840 MBH). The main auditorium is served by two (2) H&V units; each unit supplies 6,000 cfm (250 MBH). The balcony area is served by a single 4,700 cfm (200 MBH) H&V unit. The area under the balcony is served by a single 4,200 cfm (140 MBH) H&V unit. These air handlers have outlived their life expectancy and should be replaced. In order to replace the associated ductwork in the auditorium the entire ceiling will need to be demolished and replaced. Ductwork should be replaced, as well as all insulation, diffusers, dampers, etc. The library is located in the 1964 building and is served by a single 6,000 cfm (300 MBH) H&V multi-zone air handling unit. This unit distributes air through ductwork that is located in the floor. Floor ductwork shall be abandoned in place and shall not be reused. The library is cooled by undersized window air conditioners that shall not be reused. The gymnasium is located in the 1964 building and is served by four (4) H&V air handling units with a total capacity of 34,000 cfm (1,800 MBH). The locker rooms are also located in the 1964 building and are each served by 6,600 cfm (620 MBH) H&V air handling units. The activity rooms are each served by 3,500 cfm (250 MBH) H&V air handling units. The lobby is served by a 1,000 cfm (95 MBH) air handling unit. The current units, original to the building are placed in inaccessible locations, which make replacement difficult. A new roof hatch and other structural modifications may be necessary for new equipment installation. Ductwork should be replaced, as well as all insulation, diffusers, dampers, etc. The administrative offices, including guidance and health (1964 building) are served by unit ventilators for heating and window air conditioners for perimeter cooling. There are three (3) Heating Ventilating, and Air Conditioning (HVAC) units located in the 1999 building, serving the choir / guitar classroom, the weight training room, and the satellite cafeteria. These units are in good condition. The associated ductwork may be able to be retained since it has sufficient life expectancy remaining. Rooms currently served by window air conditioners are dispersed throughout the 1964 building. The age of these units vary. Once air conditioning is provided centrally, these units will become obsolete and will be removed. Mechanical Systems Proposed Modifications The objective of BCPS is to provide cooling to all portions of the school. Three options may be analyzed by the design consultant during the schematic design phase. These systems will be analyzed for feasibility of providing code compliant cooling and ventilation capabilities. Option 1 is a Fan Coil Unit and Dedicated Outside Air System, Option 2 is a Variable Refrigerant Flow and Dedicated Outside Air System, and Option 3 is a Variable Air Volume Rooftop Air Handling Units. Each of the options developed concentrates on the classroom spaces due to ventilation requirements. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 13 February 25, 2016 Option 1 Fan Coil Unit and Dedicated Outside Air System (General Discussion) This system includes adding a chiller to the central plant of the 1964 building to produce chilled water. The unit ventilator in each classroom would be replaced with a hydronic fan coil unit. Ventilation would be provided by a packaged self-contained air-cooled Dedicated Outside Air System (DOAS) with hydronic heating. There are many benefits to decouple the outside air in its own system. Heating Water Plant: The existing heating water plant has sufficient capacity to provide heat for the terminal equipment. A heating water plant boiler controller should be installed to interface the heating water plant with the Building Automation System. Heating water pumps shall be added to create a primary-secondary pumping arrangement. Chilled Water Plant: An air-cooled chiller shall be installed near the existing boiler room to produce chilled water for distribution to terminal equipment throughout the school. The chiller would need an engineered acoustical enclosure to minimize noise proliferation and to protect the chiller from vandalism. Within the boiler room chilled water pumps would be installed for a primary-secondary pumping arrangement. Hydronic Distribution: Not only is the existing piping and insulation in poor condition it is also too small to accommodate the chilled water flow rate required by the terminal equipment. The distribution pumps shall be replaced to create a primary-secondary pumping arrangement. Fan Coil Unit: The terminal fan coil units would have a dual temperature coil. The fan coil units would receive chilled or heated water from the central physical plant and associated distribution piping. The fan coil units will not provide ventilation to the rooms. They will be sized to accommodate the room envelope and occupant load only. Dedicated Outside Air System: The Dedicated Outside Air System (DOAS) provides code compliant ventilation air flow for each room while simultaneously exhausting all of the rooms to prevent overpressurization in a code compliant manner. The DOAS equipment will be packaged stand-alone units connected to the hydronic system for heating only. The DOAS will be equipped with a hot gas reheat coil. The hot gas reheat coil allows the unit to reheat the chilled, dehumidified air to a room neutral temperature which will help to prevent overcooling of the spaces and also complies with building codes for energy recovery. The DOAS equipment will be connected to the dual temperature hydronic piping network, but will be configured to use only heating water. Remaining Spaces: The remaining spaces will be conditioned using hydronic Air Handling Units (AHUs) or Roof Top Air Handling Units (RTUs) connected to the central plant. Spaces requiring 12 month cooling will include also include a DX coil. The AHUs /RTUs will be variable volume units with the capability of modulating supply air flow as needed to condition the spaces. Option 2 VRF and Dedicated Outside Air System This system replaces the unit ventilators in each classroom with a refrigerant based fan coil unit and ventilates with a Dedicated Outside Air System (DOAS). A perimeter heating system would still be included to provide supplemental heat. Heating Water Plant: The existing heating water plant has sufficient capacity to provide heat for the terminal equipment. A heating water plant boiler controller would be installed to interface the heating water plant with the Building Automation System. Heating water pumps would be added to create a primary-secondary pumping arrangement. Hydronic Distribution: The existing piping and insulation is in poor condition and would be replaced to serve the terminal equipment. The distribution pumps would be replaced to create a primary-secondary pumping arrangement. Chilled Water Plant: This solution does not include a central chilled water plant. VRF: The Variable Refrigerant Flow (VRF) system is a way of providing cooling to terminal spaces while eliminating the need for a major hydronic distribution system. The VRF system uses multiple pieces of terminal equipment connected to a refrigerant piping network and a single outdoor compressor unit. The Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 14 February 25, 2016 refrigeration circuit modulates as needed to increase efficiency and optimize thermal comfort and can utilize a heat exchanger to minimize energy usage. Dedicated Outside Air System: The Dedicated Outside Air System (DOAS) provides code compliant ventilation air flow for each room while simultaneously exhausting all of the rooms to prevent overpressurization in a code compliant manner. The DOAS equipment will be packaged stand-alone units connected to the hydronic system for heating. The DOAS can be equipped with a hot gas reheat coil. The hot gas reheat coil allows the unit to reheat the chilled, dehumidified air to a room neutral temperature which will help to prevent overcooling of the spaces and also complies with building codes for energy recovery. Heating would be accomplished using the hydronic heating water system. Supplemental Heating: To supplement the heating capabilities of the VRF system, a perimeter heating water finned tube system would be installed. This system would be a backup system to the VRF for normal operation and could also be used to implement a heating season setback schedule that would be unfeasible to achieve with VRF alone. Remaining Spaces: The remaining spaces will be conditioned using direct expansion Air Handling Units (AHUs) with hydronic heating. The AHUs will be variable volume units with the capability of modulating supply air flow as needed to condition the spaces. Hot water reheat will be provided for spaces on an asneeded basis. Option 3 Variable Air Volume System This system removes the unit ventilators from all of the classrooms and uses Variable Air Volume (VAV) Rooftop Air Handling Units (RTU) to supply the room with conditioned air and ventilation. With this system the central chilled plant is eliminated. The units use direct expansion (DX) cooling and hot water heating. The hydronic piping infrastructure would be replaced. Heating Water Plant: The existing heating water plant has sufficient capacity to provide heat for the terminal equipment. A heating water plant boiler controller would be installed to interface the heating water plant with the Building Automation System. Heating water pumps would be added to create a primary-secondary pumping arrangement. Hydronic Distribution: The existing piping and insulation is in poor condition and would be replaced to serve the terminal equipment. The distribution pumps would be replaced to create a primary-secondary pumping arrangement. Chilled Water Plant: This solution does not include a central chilled water plant. VAV ACU: The VAV ACUs would be installed on the roof. Ductwork would be routed to the ceiling spaces of the classroom wings. The quantity of ACUs would be determined by the maximum ductwork sizes that can be installed in the corridor ceilings. Cooling capabilities for the units would come from either a remote or integral condensing unit depending on whether the indoor or rooftop option was selected. The heat source for these units would be a hydronic heating water coil connected to the central heating water plant. VAV Boxes: Parallel fan-powered VAV boxes would be installed in the classrooms to control the air volume and temperature as needed for each room. The VAV boxes would be provided with reheat capability in order to provide sufficient zone temperature control. Remaining Spaces: The remaining spaces will be conditioned using direct expansion Rooftop Units (RTUs) with hydronic heating. The RTUs will be variable volume units with the capability of modulating supply air flow as needed to condition the spaces. Hot water reheat will be provided for spaces on an as-needed basis. Proposed System Analysis To evaluate each of the systems, each option will be analyzed for the criteria of constructability, system performance, and long term operation. Option 1 Fan Coil Unit and Dedicated Outside Air System Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 15 February 25, 2016 Constructability: The fan coil units will generally be installed in the same location as the existing unit ventilators. Dual temperature hydronic piping will follow the existing pipe path in the corridor ceilings. The only feasible location for the DOAS units is on the roof. The ductwork distribution system would be located adjacent to the deck in the classroom spaces visible to the occupants. With the multi-floor construction of this building, ductwork routing would have to pass through the second floor to the first floor. This creates a need to phase the construction vertically in some cases. The project would have to be phased with the concentration on the central plant. The chiller and the central plant modifications would need to be near completion prior to initiating operation of any of the hydronic cooling equipment. Once cooling is available then individual DOAS units and fan coil units could be brought online. Performance: The DOAS unit would be configured to assist with the room cooling requirement, in order to optimize selections for FCUs. With the DOAS system assisting with the cooling capabilities of the room, the thermal capacity of the fan coil units would be minimized. This system will be highly reliable and robust with redundant systems for heating, cooling and hydronic distribution. The fan coil units are reliable with low failure rates. The DOAS units have a potential of losing cooling capability since each unit relies on a compressor. But since the fan coil units are using the chilled water system, a loss of a DOAS unit would not result in a system failure. If the central chiller plant fails, the DOAS unit will provide some cooling capability allowing the school to continue operations. Operation: This system will require filter changes at the terminal equipment. Fan coil units will be floor mounted for easy access and the DOAS units would be on the roof easily accessible for maintenance. School operations staff would have to periodically maintain the boilers and chiller and central plant equipment with major repairs requiring a system specialist. Strainers and belts at terminal equipment would have to be periodically maintained by school operations staff. Option 2 VRF and Dedicated Outside Air System Constructability: Indoor units will be floor mounted similar to fan coil units, with outdoor units being roof mounted. Refrigerant lines would be routed above the ceiling with pipe drops occurring at the perimeter walls near the terminal units. The DOAS ductwork would be located adjacent to the deck in the classroom spaces visible to the occupants. With the multi-floor construction of this building, ductwork routing would have to pass through the second floor to the first floor. This creates a need to phase the construction vertically in some cases. This system offers the greatest flexibility of the proposed options for phased construction. Without a dependency on the central chilled water plant, any portion of the school could begin construction at any time. Phasing would not be dependent on the HVAC system, all HVAC systems could be modified to accommodate building operations and phasing. Performance: With the ability to make each classroom a separate zone, this system offers individual room occupant comfort as the system can provide independent means of heating and cooling to all spaces. Locations would have to be established for branch selector boxes. The DOAS system would be sized to assist with room heating and cooling capacity. Finned tube would be used to maintain space temperature during unoccupied heating and to recover the building after temperature setback operation, and to provide backup heating should there be a VRF system failure in heating. BCPS has installed many VRF systems in administration/guidance/health suites to much success in occupant comfort. Operation: This system will require filter changes at the terminal equipment. Fan coil units will be floor mounted for easy access and the DOAS units would be on the roof easily accessible for maintenance. A VRF specialist and DOAS specialist would be needed for performing maintenance of the outdoor units. School operations staff would have to periodically maintain the boilers and central plant equipment with major repairs requiring a system specialist. Option 3 Variable Air Volume System Constructability: Existing unit ventilators would either be removed or abandoned in place. The quantity of units would be dictated by the maximum ductwork size that could be installed. Duct work mains for the ACU would be run through the classrooms adjacent to the deck visible to the occupants. The VAV boxes would be tapped off of the mains with the piping package also visible to the occupants. Linear slot diffusers would be installed near the Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 16 February 25, 2016 perimeter wall to minimize temperature stratification across the room. With the multi-floor construction of this building, ductwork routing would have to pass through the second floor to the first floor. This creates a need to phase the construction vertically in some cases. The ductwork for this option will be considerably larger than the other options. This system would have to be phased with a focus on the Rooftop Units. Only the rooms being served by an air handling unit would need to be disturbed Performance: With the ability to serve each room with a fan powered VAV box, this system offers individual room occupant comfort. The fan powered boxes for each room have a potential of creating fan noise in the space since there is no ceiling to conceal the equipment. Operation: This system will require filter changes at the terminal equipment. VAV boxes will be mounted in the classrooms adjacent to the deck which limits accessibility for maintenance. The Rooftop Units would be on the roof easily accessible for maintenance. School operations staff would have to periodically maintain the boilers and central plant equipment with major repairs requiring a system specialist. Any repairs to the compressors in the Rooftop Units would have to be performed by a specialist. Life Cycle Cost During the schematic design phase, a life cycle analysis will be performed by the engineering consultant to evaluate the systems above. These results will be discussed with Baltimore County Public Schools in great detail. The life cycle cost for Dulaney High School will be calculated with the aid of computer load computing software. Based on a combination of the analysis of the design criteria and the life cycle cost, recent results often indicate that Option 1: Fan Coil Unit with DOAS has the best life cycle returns. This solution is a robust system that has a combination of a central plant concept as well as a distributed concept. This hybrid system does not allow failure of a single piece of equipment to disrupt school operation. The engineering consultant will also look at utilizing a VRF system for the administration/guidance/health areas. 3. PLUMBING SYSTEMS Introduction Criteria for Feasibility Study The existing mechanical systems have been evaluated for safety, code compliance, life expectancy, and capacity for expansion in accordance with the listed codes and standards. National Standard Plumbing Code (NSPC), 2015 Maryland State Department of Education Standards Baltimore County Public Schools Facility Standards Baltimore County Health Department Standards Plumbing Systems Existing Conditions Overview The 1964 building is served by city water and sewer, and the piping is original and has never been replaced. The 1999 addition has a separate water and sewer connection. The two lines are connected in the interior of the school by a valve and are both sized to accommodate the entire school should one fail. Both lines are 6”, with the 6” new line. Except for a small renovation that occurred in the kitchen, the domestic water supply piping for the 1964 building is original. The system has developed multiple leaks over the years. As pipes have aged, discolored drinking water has been identified, when the pipes have not been properly flushed. The domestic water heaters were replaced in the 2001 (with the 1997 water heater still in good condition. The remainder of the plumbing system including the piping, fixtures, sanitary and vent lines is original to the building. Proposed System Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 17 February 25, 2016 The domestic hot and cold water piping and associated insulation should be replaced. These systems have exceeded their life expectancy and are also run in the locations where the ductwork and piping distribution systems of the proposed HVAC systems have been identified. Fixture modifications would be performed on an as-needed basis to accommodate an ADA bathroom renovation. Sanitary will only be disturbed as needed to accommodate restroom renovations. 4. ELECTRICAL SYSTEMS Introduction Electrical Systems Existing Conditions Power Service/Distribution The existing electrical service from BGE the school consist of 500 KVA BGE transformer and 3 sets of 500 Kcmil, Aluminum. The existing Square D Power-Style 3000-amp, 480/277-volt switchboard was replaced in 1998 and remains in good condition, but does not comply with BCPS guidelines for a High School electrical service, which require 4000-amp, 480/277-volt service. The existing Peak Demand of 628 KVA was obtained from BGE but contradict with the 1023 KW, data received from the EnergyWatchdogPro (Web based Utility Bill Management software). BGE was contacted but has not yet responded. The building’s power distribution equipment consists of 480Y/277-volt panelboards that serve primarily the lighting and major HVAC equipment, and 208Y/120-volt panelboards that power general receptacles and miscellaneous small HVAC equipment loads. Most of the panelboards including the associated conduit and wiring are original to the 1964 building and 1971 addition, and have far outlived their recommended life cycle of 30 years. Dedicated Computer Load (TIMS) panelboards installed in 1999 are in good condition and can be maintained. Emergency Power System The school currently does not have a stand-by/emergency generator for back-up power. The emergency egress and exit lighting consists of emergency battery units and fixtures with integral battery packs. General Lighting In general, the existing classrooms 1’ x 4’ pendant mount fluorescent fixtures are original (1964) and are in poor condition. Most of surface mounted fluorescent fixtures the corridors were replaced in 2014 and are in good condition. The existing average foot-candle (fc) levels in the classrooms is around 30-40 fc, which is low per BCPS, International Energy Conservation Code (IECC), and Illumination Engineering Society (IES) standards. The Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 18 February 25, 2016 BCPS and IES standards recommend 50 to 70 fc in classrooms. Both the illumination level and the lighting power density from the existing lighting is insufficient for all areas of the school. The lighting throughout the building will have to be replaced in order to comply with the current IECC, IES, and Baltimore County standards. The current lighting control system utilizes manual wall switches. The wall switches will be maintained or replaced where necessary, and ceiling mounted vacancy sensors will be incorporated to automatically turn off the lights in accordance with the ASHRAE 90.1 Energy Conservation Standard. The parking lot lighting and exterior building mounted lights are original to the building, and many of the fixtures are broken or no longer working. Fire Alarm System The fire alarm system (EST-2) was upgraded in 1999. The EST manufacturer no longer supports the manufacturing of EST-2 panel components. The initiating and notification devices throughout the school are a mix of devices original to the building and devices installed with the upgrade. Intercom/PA/Master Clock Systems Existing Intercom (Telecor II) unit is over capacity and 16+ years old. The system consists of central control unit, wall mounted speakers, call switches, and other auxiliary devices. All wiring is original. Existing clocks in hallways are battery operated. The existing system does not comply with current BCPS standards. Local PA in Gymnasium was upgraded around 2000. Technology The current data/voice/video system was installed in 1999. The systems include voice and data distribution, CATV, and classroom audio/video systems. The existing data/communications infrastructure does not meet current BCPS technology standards. Security Systems The Video Surveillance System was installed in 2007. There are 26 “Legend IP” PTZ cameras. The system was modified in 2014 to include four NVRs. The intrusion detection systems include control units, entry keypads, motion detectors, door contacts. The existing system is in good condition. Electrical System Recommendations Power Distribution The main service for the school may need to be upgraded to support the existing and anticipated additional load associated with the HVAC upgrade. Much of the existing power distribution equipment is inadequate to accommodate the renovation or is past the equipment’s standard life cycle and is recommended to be replaced. In general the 480V/277-volt panelboards that serve the lighting and major HVAC equipment will be replaced. The 208V/120-volt panelboards that serve the general receptacles and miscellaneous HVAC equipment are also past their useful life and will be replaced. Panelboards that are more than 30 years old will be replaced regardless of what equipment they serve as these panels present a safety hazard. The computer receptacle (TIMS) panelboards and associated transformers are in good condition and can be maintained in place. Emergency Power System An emergency generator is the typical and recommended approach for support of life safety and other critical systems. It is recommended to install 350 KW diesel powered generator in sound attenuation enclosure as well as automatic transfer switches and other relevant power distribution equipment. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 19 February 25, 2016 General Lighting It is recommended to replace all interior lighting (except corridors). Most corridor lighting appear to be in good condition and acceptable for continued use. It is recommended to replace the building’s lighting system with energy efficient LED fixtures and utilize vacancy sensors with manual wall switches per current BCPS standards for lighting control. Providing LED fixtures will provide the required foot-candle levels and meet the lighting power density requirements per ASHRAE 90.1 standards. Daylight harvesting will be required per ASHRAE 90.1 Energy Conservation Standard, however daylight harvesting is usually limited to rooms with large (250 sq. ft.) windows. In our experience, this is typically the cafeteria only and not the classrooms. It is recommended that the exterior building mounted lights and parking lot lighting be replaced. The new fixtures will utilize LED lamps. Using LED lamps will greatly reduce energy costs and lamp maintenance. The site lighting will use a combination of photocells and time of day controls through the building’s automation system. Connecting the site lighting to the building automation system has become a BCPS standard to enable control of the exterior lights through schedules and from remote locations. Fire Alarm System It is recommended to replace the Head-End Control panel and remote annunciator panels with an EST3X panels. This would allow to reuse all existing (except devices original to the building) field devices (horn/strobes, pull stations, smoke detectors, etc.) and still maintain the UL rating and compatibility. Notification devices and manual pull stations will be added where required. The devices original to the building will be replaced and most of the remaining devices will be maintained. Any new fire alarm devices that have to be added including HVAC equipment duct smoke detectors and associated fan shut down modules will be connected to the new EST3X control panel. Intercom/PA/Master Clock Systems It is recommended to replace the existing Intercom/PA system including speakers and call switches with new (Rauland-Borg Telecenter) system as per BCPS standards. The original wiring, speakers/phones in original area of school should be replaced. The Head-End unit should be relocated out of the main office area. Existing battery clocks in hallways should be removed and replaced with a new Master Clocks (Sapling) system as per BCPS standards. Local Cafeteria and Auditorium PA systems shall be upgraded. Local PA in Gymnasium was upgraded around 2000, but still may require the additional modification. Technology The school’s technology systems do not meet the current BCPS technology standards. A technology upgrade would include data/voice/video systems upgrade, modification to MDF and IDF rooms as well as dedicated cooling and emergency power. Security Systems The intrusion detection and video surveillance systems are in good condition, however existing cameras do not meet BCPS current security standards and should be replaced. The existing intrusion detection system is in good condition but needs an additional evaluation. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 20 February 25, 2016 5. FIRE SAFETY SYSTEMS Introduction Criteria for Feasibility Study The existing fire suppression systems have been evaluated for safety, code compliance, life expectancy, and capacity for expansion in accordance with the listed codes and standards. National Fire Protection Association (NFPA) Life Safety Code, 2012 Baltimore County Fire Protection Code, 2013 Baltimore County Public Schools Facility Standards Fire Prevention Code, NFPA 1, 2012 Fire Suppression System The 1964 building currently has no automatic fire suppression. The original school does have an active standpipe system. The 1999 addition was constructed with a full automatic fire suppression system and a standard pipe system. The existing building has limited sprinkler system piping serving only the trash room and portion of the boiler room. The 1999 addition is a wet pipe sprinkler system and the fire connection has blanked off portions that appear to be sized for connection to the original building. This system is provided by its own 6” water connection to the building. The 1999 addition is separated into 3 zones, one per floor. All areas of the addition are classified as light hazard except for storage rooms, mechanical rooms, and electrical rooms. NFPA requires 65 psi at the top of the sprinkler standpipe; this would require a fire pump, however most jurisdictions will allow a waiver to this policy proving there is enough flow for the sprinkler system. The 1999 addition did not include a fire pump and did not meet the 65 psi requirement. The sprinkler zones should be coordinated to match the fire alarm zones. The auditorium is part of the 1964 building and is not sprinkled. The stage was built before smoke control ventilation was required and therefore may not meet the current requirements. This will be investigated as part of the next school renovation. Recommendations for Fire Suppression System The existing domestic water service line is not large enough to accommodate the water demand of a full coverage automatic fire suppression system. A fire flow test will need to be performed during the design phase to develop the parameters. Once the water service upgrade is complete, the automatic fire suppression system can be installed to serve the entire facility. 6. CONVEYING SYSTEMS Introduction Currently school has two working elevators, one in the original building serving the 3 story building and the other in 1999 addition. The elevator in the original building is not ADA compliant and needs replacement. There is a level change between the main floor and the shop wing. ADA compliant ramp has been built at this level change. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 21 February 25, 2016 7. MISCELLANEOUS SYSTEMS Window System All exterior windows are un-insulated window wall system. Existing window wall system must be replaced in kind with insulated glass and insulated wall panels and include the installation of new horizontal louver blinds. Door System All exterior doors have been replaced. All interior doors need to be replaced. The existing wood doors are nonrated. The replacement doors will be solid core, have ADA compliant hardware, removable mullions and code compliant vision panels Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 22 February 25, 2016 Life Safety System The existing fire gates and overhead doors in the school do not meet current life safety code. In addition, the existing open stairs both on the interior also do not meet code. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovation Assessment | Page 23 February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY D. SITE ASSESSMENT 1. Site Assessment Introduction Dulaney High School occupies approximately 43 acres in the north central region of the County, bounded by 3 County public roads and a private apartment complex. It is situated in a site mostly comprised of detached single family residences and apartment building complexes. The site contains 5 baseball / softball diamonds, 4 multi-purpose fields, one football / soccer / lacrosse field within a 400 meter running track, 4 tennis courts, and an outdoor basketball / hardcourt. The original school building was built in 1964 with additions added in 1971 and 1999. There are 2 large parking lots, one at the north end of the building and one on the south end adjacent to the addition. Site Grades The lowest elevation on the site is at the south end along Treherne Rd, and rises along Padonia Rd from elevation 490 to 514 in the front of the building, while quickly rising to elevation 515 at the rear fields. The rear elevation behind the school building of 523 rises to another tier at elevation 532, which contains the hard courts, track and field area. Grades at the rear of the track area fall off to elevation 516 toward the County road. Other fields on the north end are all below elevation 518. The peak elevation of the property is near the center of the parcel, behind the building and near the tennis courts and track. Some slopes along Treherne Ave and behind the track are 3:1. The site drains south and east, and is part of the Loch Raven watershed. Zoning on the site is predominantly DR 3.5. Soils Soils from actual boring reports indicate surface layers of sand, clay, and mica, which vary from 1 foot to 18 feet deep, along with many areas of shallow rock. Rock is also at the surface in some locations. One small storm water management surface facility exists just south of the addition, near the southern parking lot. The remainder of the site is traditional inlet and storm drain construction, including roof runoff piped through the building to the close pipe system. Hydrology The site is surrounded by traditional surface inlets and curb inlets. There appears to be an adequate number of drains for the site. However, the condition of the inlets, head pieces, and boxes is fair to marginal, and many need repair or replacement. Vehicle circulation Vehicle circulation seems tight at this site. The available space for bus parking does not appear sufficient. Bus and car traffic are not entirely separated. There is a restricted maintenance access from the northern lot to the rear of the building, which is not continuous and does not connect to the southern lot. The maintenance access road is continued to the track area. Grounds maintenance has a small, fenced equipment compound area adjacent to the rear of the building. The condition of most of the paving is poor. The concrete driveway aprons are cracked and in poor condition as well. Many of the storm drain inlets need repair. There is evidence of water laying in some areas due to insufficient slope on some gutters, partly caused by condition of the concrete and some heaving. Some of the concrete sidewalks are in poor to fair condition. There are very few ADA access areas. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Site Assessment | Page 24 February 25, 2016 Pedestrian Circulation While the front and main entrance to the school is relatively flat and contains a nice concrete plaza area without steps to the front door, the ADA accessibility to the school is extremely poor. In one location at the front, there exists an ADA curb ramp on the opposite side of Padonia Rd at a main crosswalk, but there is no opposing ramp on the school side. The ADA parking spaces are not configured to current code. The access places people in the drive areas, and they must cross 2 driveways while traveling a good distance to the front door. There are very few, and in some cases zero, curb ramps at driveway crossings. Accessibility to the playing fields and courts is also restricted. Some of the baseball diamonds on the north end are accessible, however the hard courts, running track, football field and bleacher area are not accessible from the school. In this case, without portable toilets, the bleachers do not have an accessible route to rest room as well. There does exist 3 accessible parking spaces just outside of the track area. One set of bleachers contains a ramp and ADA seating area. However, access to the parking from the main road requires passage into the maintenance road, through the post chain and lock. There would need to be some security / control to restrict access only for the ADA parking during a game event and keep others out of the access road. Amenities The running track has a latex rubber surface, but is showing signs of age and wear. The football field is natural grass, and is heavily worn along with the other multi-purpose fields on the site. The tennis court and hard court surfaces are in need of resurfacing. The court fencing is rusted and should be replaced. Most of the ball diamond backstop fencing is corroded as well. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Site Assessment | Page 25 February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY E. EDUCATIONAL ENHANCEMENTS 1. EDUCATIONAL ENHANCEMENTS Introduction The existing building has a number of educational deficiencies that involve room size, program proximities and current programmatic standards. Most of the building instructional spaces in the 1964 building are not air-conditioned. The three story 1999 addition is air-conditioned. Administration and Main Entrance The front doors are controlled with a remote strike that must be released by office staff when a visitor buzzes in at the entrance. Once admitted into the school, there is no security vestibule to limit access into the building. The main office and guidance suite do not provide adequate space for security and operations for a high school. Staff toilet rooms are small and are not ADA compliant. Corridors Doors are not fire rated and individual door leafs have louvers. The clearstory wire-glass from the corridor into the classrooms no longer meets current code. Drinking fountains in the corridors are not ADA compliant. The breezeway between the two classroom wings and to the new addition are open which poses safety and security concerns. This has the potential for dangerous conditions during freezing weather. The breezeway railings do not meet current codes. Health Suite Health Suite does not meet current BCPS spatial and privacy requirements. The toilet rooms and exam rooms are not ADA accessible. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Educational Enhancements | Page 26 February 25, 2016 Stairs Stair railings are not ADA and code compliant and should be replaced. Typical Classrooms Most classrooms have chalkboards and projectors are portable units on carts or stands. Entrances to the rooms are not ADA accessible. Door hardware is not ADA compliant. The existing casework is mostly original and should be replaced. Existing flooring and ceiling tiles contain asbestos. Lighting levels are inadequate. Electrical capacity in the classrooms is inadequate to meet the demands of the users. Art Classrooms Currently one classroom is located in the Tech wing and two classrooms in 1999 addition. Art classrooms located in the Tech Wing will require complete renovations. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Educational Enhancements | Page 27 February 25, 2016 Special Education Currently all Special Ed classrooms are located in the classroom wings and will need complete renovations. Faculty Learning Spaces Currently there are no large group assembly space available for faculty learning. Auditorium The auditorium has limited ADA access and will require a renovation for full ADA compliance. There is no way for a handicapped audience member to get on the stage without needing to leave the auditorium space. Gymnasium The gymnasium bleachers were replaced and are in good condition. Boys and Girls Locker Rooms and associated toilet rooms are not ADA accessible. All gym area lockers will need replacement. The Activity Room and Weight Room is located at the rear of gym access to these areas are thru the gym and are not ADA accessible. Both the Activity Room and Weight Room will require separate chairlift for accessibility. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Educational Enhancements | Page 28 February 25, 2016 Toilet Rooms There are no toilet rooms in the classroom wing across the corridor from the office and library in the one story portion of the 1964 building. Toilet rooms are located in the three story classroom wing of the original building have been renovated and are ADA compliant. Toilet rooms across from cafeteria near the Gym entrance have been renovated and are ADA compliant. Locker room toilet areas are not ADA compliant. Faculty toilet rooms and Custodial toilet rooms have not been renovated are not ADA compliant. Faculty Offices Currently, all faculty offices are located in one location. It would be preferred to have offices dispersed throughout the school. Elevators The elevator in the original 1964 main building provides access to three level classroom wing and to the auditorium. This elevator needs new controls to meet ADA standards. The elevator in the 1999 addition meets ADA requirements. TV Studio The TV studio space located in the 1999 addition is outdated and does not meet current BCPS requirements. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Educational Enhancements | Page 29 February 25, 2016 DULANEY SCHOOL FEASIBILITY STUDY F. SCHEDULE AND PHASING 1. SCHEDULE AND PHASING Schedule An outline of key milestone dates are shown below for information purposes only. This schedule is approximate and subject to change. Design Phase Construction Documents Complete Contractor Procurement Notice to Proceed Substantial Completion Final Completion January 2016 - October 2016 October 2016 November 2016 – February 2017 March 2017 August 2019 October 2019 Phasing The final determination of the types and extent of building systems included in the limited renovation and the quantity of educational enhancements implementation will impact the design and construction schedules. The duration of construction phasing will be impacted by the limited renovation and the quantity of educational enhancements final selection for this project. It is anticipated that the project will require phasing to allow three full summers within the duration of the construction. Construction phasing to accommodate the educational enhancements for Library/Media Center, Art Classroom, Technology Classrooms due to size constraints are usually require a duration exceeding the limited eight weeks available for summer construction and will thus require relocation of these educational enhancements in a large double wide relocatable. It is anticipated that the limited renovation will require six to eight temporary classrooms and one large double wide relocatable. It is also anticipated that cooling will not be on line until substantial completion. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Schedule and Phasing | Page 30 February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX A: SITE PLAN Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Site Plan-Appendix A February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX B: EXISTING UTILIZATION PLAN Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Existing Utilization Plan-Appendix B February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX C: EDUCATIONAL ENHANCEMENT PLAN Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Educational Enhancement Plan-Appendix C February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX D: STRUCTURAL ISSUES PLAN Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Structural Issues Plan-Appendix D February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX E: Food Service Memo Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Food Service Memo-Appendix E February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX E: FOOD SERVICE MEMO A. GENERAL DESCRIPTION: Dulaney High School kitchen operates as a full-service/production facility equipped to produce meals for the students and staff of Dulaney High as well as three feeder elementary schools. Dulaney High School opened in 1964, which is when the two of the three existing serving lines were installed. Much of the equipment, although well maintained, is old, outdated, insufficient, non-compliant with current codes and has seen its useful life. The kitchen had a minor renovation in 2001 which included the addition of a four-compartment pot washing sink, the installation of a walk-in freezer and the replacement of the kitchen hood. B. EXISTING CONDITIONS: 1. FINISHES Floors. Kitchen and main serving area are thick-set quarry tile. The floor has been maintained; however, due to smooth surfaces, tiles can be very slippery when wet or laden with grease. Walls. The walls in the serving line area and kitchen are covered by a 4”x6” ceramic tile and appear to be well maintained. There are six individual doors leading from the cafeteria into the serving area. A row of large ribbon windows extends above the tiling on this wall. Ceilings. High, painted ceilings extend through the serving are and kitchen. Lighting. Lighting in the serving area is 2’x4’ recessed fluorescence. Most of the kitchen has 1’x4’ surface mounted lights; however, a portion has 1’x4’ recessed lights. Overall, the lighting levels are poor. 2. AREAS Dry Storage. Dry Storage is a small room with items stored on perimeter shelving; however, the room does not appear to be over packed. The ceilings are painted drywall. The walls are the covered with the same ceramic tiles as the kitchen and serving area and the floor is quarry tile. Walk-in Coolers and Freezer Storage. The freezer was installed in 2001, has a diamond plated floor and appears to be in good condition. There is adequate space in the freezer. The cooler, acquired in 1993 is small, crowded and needs attention, including the concrete floor which needs to be repainted. The refrigeration system for the cooler was replaced in 2010. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Food Service Memo-Appendix E | Page 1 February 25, 2016 Kitchen. The kitchen is an interior space, which lacks windows and air conditioning and gets hot during the warmer months. A new HVAC system should be installed to control the temperatures in the winter and provide air conditioning in the summer to temper the space to avoid overheating the area. The cooking equipment in the kitchen does not match the menu and should be reevaluated to include the proper equipment. Serving. The serving line area consists of three serving lines. These serving lines are original. Two of these lines are single construction units. Several of the components of this equipment has failed and is no longer functional, included the ice cream coolers and milk coolers. In 1996, these lines were modified to add two drop-in-cold wells for milk. The third line is thrown together to form a make-shift serving line. This area should be redesigned to provide U-shaped serving lines with individual pieces of equipment, matching BCPS’ current standards. This would provide better service and less wasted space by components which no longer function. Dishwashing. BCPS uses all-disposable dinnerware. Area contains a four-compartment pot washing sink and shelving to store pots and pans. Janitor Closet. The kitchen has two rooms, on opposite sides of the kitchen. There is a narrow room which holds the mops, buckets and a shelf. The second room is small and has a wall mounted custodial sink and should be replaced by a floor mounted mop sink. Receiving. A double door with screen leads out the back of the kitchen to a hallway accessible by both staff and students. Workers must pass turn the corner to reach a receiving room. This area has a large coiling metal door which is manually operated and exits to the loading dock. Also in this area, is a paper storage room which holds cups, napkins and lunch trays. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Food Service Memo-Appendix E | Page 2 February 25, 2016 3. EQUIPMENT Exhaust Hood. This is the original exhaust hood from 1961 and should to be replaced. Current Cooking Equipment. 1) (2) Double-Deck Convection Oven (1996 & 2010) 2) (2) Steam Kettle (2001) 3) (1) Double-Deck Steamer (1972) The 1972 steamer should be replaced and one of the steam kettles should be removed and replaced with an additional double-deck steamer. Serving Counters. The serving equipment is original and is single construction. Several components are non-functioning; however cannot be removed as they are all integrated together. This equipment should be replaced. Worktables, Prep Sinks, Pot Sinks. Many of the worktables and prep tables are the original equipment and should be replaced. C. CONCLUSION: Although large in space, rooms are scattered throughout the kitchen making it labor-intensive to perform the work required. Also, despite that some systems have been updated, the kitchen would greatly benefit from a renovation to reorganize the available space to bring order to the kitchen. Additionally, the serving line equipment should be redesigned to provide a better functioning area to better serve the students and the employees that serve the food. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Food Service Memo-Appendix E | Page 3 February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX F: COST ESTIMATE Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Cost Estimate-Appendix F February 25, 2016 LEWICKI ESTIMATING SERVICES, INC. 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS PRECONSTRUCTION SERVICES FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION LABOR EQUIPMENT/ SUBCONTRACT MATERIAL TOTAL 01 02 03 04 05 06 07 08 09 10 11 12 13 14 GENERAL REQUIREMENTS EXISTING CONDITIONS CONCRETE MASONRY METALS WOOD & PLASTICS THERMAL & MOISTURE PROTECTION OPENNINGS FINISHES SPECIALTIES EQUIPMENT FURNISHINGS SPECIAL CONSTRUCTION CONVEYING SYSTEMS $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,090,000 $1,136,103 $177,950 $40,000 $302,500 $102,300 $2,095,000 $2,042,050 $2,783,648 $316,250 $640,800 $632,700 $0 $60,000 $3,090,000 $1,136,103 $177,950 $40,000 $302,500 $102,300 $2,095,000 $2,042,050 $2,783,648 $316,250 $640,800 $632,700 $0 $60,000 21 22 23 25 26 27 28 FIRE SUPPRESSION PLUMBING HVAC INTEGRATED AUTOMATION ELECTRICAL COMMUNICATIONS ELECTRONIC SAFETY & SECURITY $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $649,285 $1,303,888 $4,686,872 $0 $2,030,466 $172,524 $649,285 $649,285 $1,303,888 $4,686,872 $0 $2,030,466 $172,524 $649,285 31 32 33 EARTHWORK EXTERIOR IMPROVEMENTS UTILITIES $0 $0 $0 $0 $0 $0 $0 $114,750 $90,000 $0 $114,750 $90,000 SUBTOTAL PREVAILING WAGE SCALE PREMIUM 6% CONTRACTOR OH / P 5% P & P BOND / INSURANCE1.5% DESIGN / ESTIMATING CONTINGENCY 15% INFLATION 8% TOTAL Dulaney HS FS COMMENTS Incl. w/ Div 23 $23,116,371 $1,386,982 $1,225,168 $385,928 $3,917,167 $2,402,529 Q2 - 2017 construction start $32,434,146 1 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES NO. 01 DESCRIPTION GENERAL CONDITIONS: General Conditions Temporary trailers Temporary trailers - Double wide Packing & storage UNIT QUANTITY Mo Ea Ea Allow 30 8 2 1 UNIT COST LABOR MATERIAL $55,000 $130,000 $175,000 $50,000.00 EQUIPMENT/ SUBCONTRACT $1,650,000 $1,040,000 $350,000 $50,000 AMOUNT TRADE SUBTOTAL COMMENTS $1,650,000 $1,040,000 $350,000 $50,000 $3,090,000 Total General Conditions 02 EXISTING CONDITIONS: Demo at classroom entrances Rmv doors & frames Demo at public restrooms Rmv glazed clearstory Rmv chalk boards Rmv auditorium seating Rmv VCT floor & base Rmv lockers Misc demo Tools & equipment Haulaway Hazmat Abatement Floor tile & mastic Rmv terrazzo Floor Weatherproof membrane - HVAC Vibration isolators - HVAC Boiler Room gaskets Mudded pipe fittings -HVAC Mudded pipe fittings -Plumbing Piping insulation - Plumbing Sink mastic Window caulking Transite board Fire doors Chalk / tackboard mastic Ceramic wall grout Auditorium ceiling Testing & monitoring Loc Ea Sf Lf Rms Ea Sf Hr Hr Ea Lds Sf Sf Sf Ea Ea Ea Ea Lf Ea Wndw Sf Ea Sf Sf Sf Ea 60 205 2,725 5,800 60 1,204 120,510 1,100 500 1 125 $250.00 $50.00 $7.50 $8.75 $350.00 $15.00 $0.50 $35.00 $35.00 $15,000.00 $600.00 $15,000 $10,250 $20,438 $50,750 $21,000 $18,060 $60,255 $38,500 $17,500 $15,000 $75,000 $15,000 $10,250 $20,438 $50,750 $21,000 $18,060 $60,255 $38,500 $17,500 $15,000 $75,000 72,600 $3.00 500 $16.00 100 $5.00 6 $50.00 60 $100.00 500 $20.00 400 $20.00 800 $20.00 20 $50.00 840 $300.00 $5.00 2,400 210 $75.00 11,800 $5.00 3,000 $7.00 500 $20.00 1 $157,000.00 $217,800 $8,000 $500 $300 $6,000 $10,000 $8,000 $16,000 $1,000 $252,000 $12,000 $15,750 $59,000 $21,000 $10,000 $157,000 $217,800 $8,000 $500 $300 $6,000 $10,000 $8,000 $16,000 $1,000 $252,000 $12,000 $15,750 $59,000 $21,000 $10,000 $157,000 $1,136,103 Total Existing Conditions Dulaney HS FS 2 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES NO. 03 DESCRIPTION CONCRETE: Concrete repairs after plumbing work Ramp replacement - Tech wing Flash patch floors Exterior concrete spalling repairs slab Concrete column repairs New addtion slab repairs Infill pit at Library Misc concrete repairs Equipment pads UNIT QUANTITY Ea Ea Ls Allow Allow Ea Sf Allow Ls 1 1 1 1 1 1 530 1 1 UNIT COST LABOR MATERIAL $25,000.00 $20,000.00 $30,000.00 $35,000.00 $20,000.00 $10,000.00 $15.00 $25,000.00 $5,000.00 EQUIPMENT/ SUBCONTRACT $25,000 $20,000 $30,000 $35,000 $20,000 $10,000 $7,950 $25,000 $5,000 AMOUNT TRADE SUBTOTAL COMMENTS $25,000 $20,000 $30,000 $35,000 $20,000 $10,000 $7,950 $25,000 $5,000 $177,950 Total Concrete 04 MASONRY: Exterior brick replacement Limited tuckpointing Allow Allow 1 1 $10,000.00 $30,000.00 $10,000 $30,000 $10,000 $30,000 $40,000 Total Masonry 05 METALS: Structural upgrades for HVAC equipment Structural upgrades for HVAC equipment Rmv & replace misc stair railings Replace misc. ramp & stair railings Misc. metals Shop drawings Loc Loc Ea Ls Ea Ea 3 13 6 1 1 1 $15,000.00 $15,000.00 $2,500.00 $10,000.00 $35,000.00 $2,500.00 $45,000 $195,000 $15,000 $10,000 $35,000 $2,500 $45,000 $195,000 $15,000 $10,000 $35,000 $2,500 DOAS RTU $302,500 Total Metals 06 WOOD & PLASTICS: Roof blocking Finish carpentry Sf Hr 167,200 1,100 $0.25 $55.00 $41,800 $60,500 $41,800 $60,500 $102,300 Total Wood & Plastics 07 THERMAL & MOISTURE PROTECTION: Rmv & replace existing roof & sht. Metal Caulking Sf Ea 167,200 1 $12.50 $5,000.00 $2,090,000 $5,000 $2,090,000 $5,000 $2,095,000 Total Thermal & Moist. Protec. Dulaney HS FS 3 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES NO. 08 DESCRIPTION OPENNINGS: Corridor doors, fames, hardware Enclose exterior breezeway Security Vestibule Rmv & replace exterior windows Rmv & reinstall sun screens UNIT Ea Sf Ls Sf Ls QUANTITY 175 900 1 28,230 1 UNIT COST LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $1,250.00 $55.00 $30,000.00 $60.00 $50,000.00 $218,750 $49,500 $30,000 $1,693,800 $50,000 AMOUNT TRADE SUBTOTAL COMMENTS $218,750 $49,500 $30,000 $1,693,800 $50,000 $2,042,050 Total Opennings 09 FINISHES: Classroom entry drywall & ceramic tile 2 x 4 ACT ceilings VCT flooring & base Infill glazed clearstory Clean & repair terrazzo floors Interior painting of school Repaint canopy soffit Program Area Renovations Renovate Library / Media Center Renovate Art classrooms Relocate Health Suite Renovate Technology classrooms Renovate restrooms Renocate Child Care Renovate Locker Rooms RenovateAdmin & Guidance area Renovate Food / Nutrition Loc Sf Sf Lf Sf Sf Ea Sf Sf Sf Sf Sf Sf Sf Sf Sf 60 185,000 120,510 5,800 38,000 185,000 1 $1,500.00 $2.55 $3.75 $30.00 $1.50 $1.50 $2,500.00 $90,000 $471,750 $451,913 $174,000 $57,000 $277,500 $2,500 $90,000 $471,750 $451,913 $174,000 $57,000 $277,500 $2,500 5,190 4,410 1,500 7,080 2,725 1,407 5,400 5,800 1,425 $30.00 $35.00 $30.00 $20.00 $75.00 $30.00 $50.00 $35.00 $30.00 $155,700 $154,350 $45,000 $141,600 $204,375 $42,210 $270,000 $203,000 $42,750 $155,700 $154,350 $45,000 $141,600 $204,375 $42,210 $270,000 $203,000 $42,750 $2,783,648 Total Finishes 10 SPECIALTIES: White board & tackboards ADA Signage Locker room lockers Mis. Specialties Rms Ea Ea Ls 60 1 50 1 $4,500.00 $20,000.00 $225.00 $15,000.00 $270,000 $20,000 $11,250 $15,000 $270,000 $20,000 $11,250 $15,000 $316,250 Total Specialties Dulaney HS FS 4 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES NO. 11 DESCRIPTION EQUIPMENT: Kitchen equipment Residential appliances at Food & Nutrition Range Exhaust hood Dishwasher Refrigerator UNIT QUANTITY UNIT COST Ea 1 $630,000.00 Ea Ea Ea Ea 6 6 6 6 LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $450.00 $150.00 $400.00 $800.00 AMOUNT $630,000 $630,000 $2,700 $900 $2,400 $4,800 $2,700 $900 $2,400 $4,800 TRADE SUBTOTAL COMMENTS $640,800 Total Equipment 12 FURNISHINGS: Auditorium seating Classroom casework Entrance mats Ea Rms Ea 1,204 60 1 $300.00 $4,500.00 $1,500.00 $361,200 $270,000 $1,500 $361,200 $270,000 $1,500 $632,700 Total Furnishings 14 CONVEYING SYSTEMS: Elevator controls upgrade Chair lift Ea Ea 1 2 $30,000.00 $15,000.00 $30,000 $30,000 $30,000 $30,000 $60,000 Total Conveying Systems 21 22 FIRE SUPRESSION: Wet Sprinkler System Fire Pump SF EA 185,510 0 $3.50 $42,500.00 $1.50 $2,500.00 $2.00 $40,000.00 $0.00 $0.00 $649,285 $0 PLUMBING: Demolition Plumbing Fixtures Drains, Carriers & Specialties Kitchen Plumbing Condensate Drain Storm Water Piping Waste & Vent Piping Insulated Domestic Water Piping Start-Up & Test SF SF SF LS SF SF SF SF SF 185,510 185,510 185,510 1 185,510 185,510 185,510 185,510 185,510 $0.60 $1.60 $0.75 $35,000.00 $0.33 $0.46 $0.55 $2.35 $0.20 $0.50 $0.35 $0.20 $20,000.00 $0.11 $0.12 $0.15 $0.85 $0.18 $0.10 $1.25 $0.55 $15,000.00 $0.22 $0.34 $0.40 $1.50 $0.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $111,306 $296,816 $139,133 $35,000 $61,218 $85,335 $102,031 $435,949 $37,102 None included $649,285 Total Fire Suppression $1,303,888 Total Plumbing Dulaney HS FS 5 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES NO. 23 DESCRIPTION HVAC Demolish HVAC System Air Cooled Chiller Assembly- 350 Ton Chilled Water Pump Heating Water Pump Roof Top Unit Dedicated OA System Kitchen Exhaust & Makeup Air Hydronic Specialties Split systems at computer classrooms Fan Coil Unit Split system at IDF & MDF rooms Insulated Hydronic Piping Miscellaneous Terminal Unit Sheet Metal Ductwork Ductwork Insulation Chemical Treatment Automatic Temperature Control Start-Up, Test, & Balance Commissioning UNIT SF EA EA EA CFM CFM EA SF LS SF LS SF SF SF SF SF SF SF SF QUANTITY UNIT COST 185,510 $1.75 1 $255,000.00 4 $19,900.00 4 $16,400.00 150,600 $6.50 19,266 $9.00 1 $45,000.00 185,510 $0.77 1 $35,000.00 185,510 $1.75 1 $25,000.00 185,510 $2.65 185,510 $0.25 185,510 $3.15 185,510 $0.55 185,510 $0.13 185,510 $4.40 185,510 $0.53 185,510 $0.40 LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $1.50 $0.25 $20,000.00 $235,000.00 $5,500.00 $14,400.00 $4,400.00 $12,000.00 $1.00 $5.50 $1.25 $7.75 $25,000.00 $20,000.00 $0.22 $0.55 $15,000.00 $20,000.00 $0.25 $1.50 $10,000.00 $15,000.00 $1.20 $1.45 $0.05 $0.20 $2.10 $1.05 $0.35 $0.20 $0.04 $0.09 $0.00 $4.40 $0.45 $0.08 $0.34 $0.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AMOUNT TRADE SUBTOTAL COMMENTS $324,643 $255,000 $79,600 $65,600 $978,900 $173,394 $45,000 $142,843 $35,000 $324,643 $25,000 $491,602 $46,378 $584,357 $102,031 $24,116 $816,244 $98,320 $74,204 $4,686,872 Total HVAC 26 ELECTRICAL: Service & Distribution Base Building Demolition Modify Existing Switchboard Concrete Pad, Grounding Grid & Duct Bank Panelboard Upgrade Motor Starter/Disconnect Motor Feeder Conduit & Wire Power Feeder Conduit & Wire Grounding Start-Up & Independent Testing Commissioning Lighting & Power Base Building Interior Lighting Lighting Control System Branch Circuit Conduit & Wire SF EA EA SF SF SF SF SF SF SF 185,510 1 1 185,510 185,510 185,510 185,510 185,510 185,510 185,510 $0.60 $50,000.00 $10,350.00 $0.85 $0.65 $0.95 $0.39 $0.09 $0.50 $0.40 $0.55 $30,000.00 $1,450.00 $0.20 $0.25 $0.30 $0.14 $0.05 $0.36 $0.30 $0.05 $20,000.00 $8,900.00 $0.65 $0.40 $0.65 $0.25 $0.04 $0.14 $0.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $111,306 $50,000 $10,350 $157,684 $120,582 $176,235 $72,349 $16,696 $92,755 $74,204 SF SF SF 185,510 185,510 185,510 $4.65 $1.00 $0.54 $1.20 $0.25 $0.24 $3.45 $0.75 $0.30 $0.00 $0.00 $0.00 $862,622 $185,510 $100,175 $2,030,466 Total Electric Dulaney HS FS 6 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES NO. 27 28 DESCRIPTION UNIT QUANTITY UNIT COST LABOR EQUIPMENT/ MATERIAL SUBCONTRACT AMOUNT COMMUNICATIONS: PA / Intercom SF 185,510 $0.93 $0.33 $0.60 $0.00 $172,524 ELECTRONIC SAFETY & SECURITY: Fire Alarm System Modifications Security System Upgrades SF SF 185,510 185,510 $0.75 $2.75 $0.25 $1.25 $0.50 $1.50 $0.00 $0.00 $139,133 $510,153 TRADE SUBTOTAL COMMENTS $172,524 Total Communications $649,285 Total Electronic Safety & Security 32 EXTERIOR IMPROVEMENTS: Brick & block chiller enclosure Chiller pads Replace exterior ramp @ Tech wing Replace sidewalks @ main entry Site repairs Lf Ea Ea Sf Ls 80 1 1 3,500 1 $500.00 $3,500.00 $30,000.00 $7.50 $15,000.00 $40,000 $3,500 $30,000 $26,250 $15,000 $40,000 $3,500 $30,000 $26,250 $15,000 $114,750 Total Site Improvements 33 UTILITIES: Water service - fire Ea 1 $90,000.00 $90,000 Dulaney HS FS $90,000 $90,000 Total Utilities 7 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS ALTERNATES ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION ALT 1 4000 A SWITCHGEAR UPGRADE Alter Existing Switchboard Demolish Existing Switchboard New Switchgear 4000A Roll Up Generator Connection Assembly New Ductbank Wire Trough & Splicing Grounding Start-Up & Independent Testing Commissioning UNIT EA SF EA EA LF EA EA EA EA QUANTITY UNIT COST -1 $50,000.00 1 $6,400.00 1 $158,000.00 1 $10,400.00 100 $210.00 1 $9,000.00 1 $2,000.00 1 $4,400.00 1 $6,400.00 LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $30,000.00 $20,000.00 $4,800.00 $600.00 $46,000.00 $112,000.00 $1,400.00 $9,000.00 $88.00 $122.00 $3,200.00 $5,800.00 $600.00 $1,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,400.00 $6,400.00 AMOUNT TRADE SUBTOTAL COMMENTS ($50,000) $6,400 $158,000 $10,400 $21,000 $9,000 $2,000 $4,400 $6,400 $167,600 $67,040 Markups $234,640 Total Construction Add $20,000 BG & E Fee- Allow $254,640 Total Add ALT 2 EMERGENCY GENERATOR New Emergency Generator 250 KW Automatic Transfer Switch Emergency Branch Panelboard Emergency Distribution Panels Concrete Pad, Grounding Grid & Duct Bank Power Feeder Conduit & Wire Start-Up & Independent Testing Commissioning EA EA EA EA EA LF EA EA 1 $142,900.00 2 $21,000.00 6 $5,700.00 1 $15,050.00 1 $14,200.00 800 $32.50 1 $4,500.00 1 $7,800.00 $7,900.00 $135,000.00 $2,500.00 $18,500.00 $1,500.00 $4,200.00 $2,750.00 $12,300.00 $2,200.00 $12,000.00 $14.50 $18.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,500.00 $7,800.00 $142,900 $42,000 $34,200 $15,050 $14,200 $26,000 $4,500 $7,800 $286,650 $114,660 Markups $401,310 Total Add ALT 3 DOOR REPLACEMENT Rmv existing doors & hardware Haul away Interior Doors & hardware Ea Lds Ea 244 20 244 $50.00 $600.00 $1,050.00 $12,200 $12,000 $256,200 $12,200 $12,000 $256,200 $280,400 $112,160 Markups $392,560 Total Add Dulaney HS FS 8 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS ALTERNATES ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION ALT 4 ELECTRICAL PANEL UPGRADE Demolition Panelboard Upgrade Power Feeder Conduit & Wire Branch Circuit Device Branch Circuit Conduit & Wire Start-Up & Independent Testing Commissioning UNIT QUANTITY SF SF SF SF SF EA EA 185,510 185,510 185,510 185,510 185,510 1 1 UNIT COST $0.08 $0.85 $0.39 $0.32 $0.36 $8,800.00 $11,750.00 LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $0.08 $0.20 $0.14 $0.22 $0.16 $0.00 $0.00 $0.00 $0.65 $0.25 $0.10 $0.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $8,800.00 $11,750.00 AMOUNT TRADE SUBTOTAL COMMENTS $14,841 $157,684 $72,349 $59,363 $66,784 $8,800 $11,750 $391,570 $156,628 Markups $548,198 Total Add ALT 5 TECHNOLOGY UPGRADE Teaching wall Data/Comupgrade Fire Protection-Preaction system @ MDF Start-Up & Independent Testing Commissioning Lf SF LS EA EA 1,500 185,510 1 1 1 $45.00 $3.30 $27,800.00 $9,400.00 $12,200.00 $1.40 $3,800.00 $0.00 $0.00 $1.90 $24,000.00 $0.00 $0.00 $67,500 $0.00 $0.00 $9,400.00 $12,200.00 $67,500 $612,183 $27,800 $9,400 $12,200 $729,083 $291,633 Markups $1,020,716 Total Add ALT 6 CLEAN & SEAL PRECAST CONCRETE SPANDRELS Precast spandrels Sf 16,050 $2.75 $44,138 Dulaney HS FS $44,138 $44,138 $17,655 Markups $61,793 Total Add 9 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION AC SYSTEMS General Conditions Temporary trailers Temporary trailers - Double wide Packing & storage Rmv VCT floor & base Misc demo Tools & equipment Haulaway Hazmat Abatement Floor tile & mastic Rmv terrazzo Floor Weatherproof membrane - HVAC Vibration isolators - HVAC Boiler Room gaskets Mudded pipe fittings -HVAC Mudded pipe fittings -Plumbing Piping insulation - Plumbing Sink mastic Window caulking Transite board Ceramic wall grout Auditorium ceiling Testing & monitoring Concrete repairs after plumbing work Flash patch floors Equipment pads Structural upgrades for HVAC equipment Structural upgrades for HVAC equipment Misc. metals Shop drawings Finish carpentry Enclose exterior breezeway Security Vestibule Rmv & replace exterior windows Rmv & reinstall sun screens Classroom casework 2 x 4 ACT ceilings VCT flooring & base UNIT COST LABOR EQUIPMENT/ MATERIAL SUBCONTRACT AMOUNT UNIT QUANTITY Mo Ea Ea Allow Sf Hr Ea Lds 30 8 2 1 120,510 500 1 125 $55,000 $130,000 $175,000 $50,000.00 $0.50 $35.00 $15,000.00 $600.00 $1,650,000 $1,040,000 $350,000 $50,000 $60,255 $17,500 $15,000 $75,000 $1,650,000 $1,040,000 $350,000 $50,000 $60,255 $17,500 $15,000 $75,000 Sf Sf Sf Ea Ea Ea Ea Lf Ea Wndw Sf Sf Sf Ea Ea Ls Ls Loc Loc Ea Ea Hr Sf Ls Sf Ls Rms Sf Sf 72,600 $3.00 500 $16.00 100 $5.00 6 $50.00 60 $100.00 500 $20.00 400 $20.00 800 $20.00 20 $50.00 840 $300.00 2,400 $5.00 3,000 $7.00 500 $20.00 1 $157,000.00 1 $25,000.00 1 $30,000.00 1 $5,000.00 3 $15,000.00 13 $15,000.00 1 $35,000.00 1 $2,500.00 1,100 $55.00 900 $55.00 1 $30,000.00 28,230 $60.00 1 $50,000.00 60 $4,500.00 185,000 $2.55 120,510 $3.75 $217,800 $8,000 $500 $300 $6,000 $10,000 $8,000 $16,000 $1,000 $252,000 $12,000 $21,000 $10,000 $157,000 $25,000 $30,000 $5,000 $45,000 $195,000 $35,000 $2,500 $60,500 $49,500 $30,000 $1,693,800 $50,000 $270,000 $471,750 $451,913 $217,800 $8,000 $500 $300 $6,000 $10,000 $8,000 $16,000 $1,000 $252,000 $12,000 $21,000 $10,000 $157,000 $25,000 $30,000 $5,000 $45,000 $195,000 $35,000 $2,500 $60,500 $49,500 $30,000 $1,693,800 $50,000 $270,000 $471,750 $451,913 TRADE SUBTOTAL COMMENTS DOAS RTU $7,392,318 Subtotal Dulaney HS FS 10 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION AC SYSTEMS HVAC Demolish HVAC System Air Cooled Chiller Assembly- 350 Ton Chilled Water Pump Heating Water Pump Roof Top Unit Dedicated OA System Hydronic Specialties Split systems at computer classrooms Fan Coil Unit Split system at IDF & MDF rooms Insulated Hydronic Piping Miscellaneous Terminal Unit Sheet Metal Ductwork Ductwork Insulation Chemical Treatment Automatic Temperature Control Start-Up, Test, & Balance Commissioning Electrical Demolition Motor Starter/Disconnect Motor Feeder Conduit & Wire Interior Lighting Lighting Control System Branch Circuit Conduit & Wire Brick & block chiller enclosure Chiller pads UNIT SF EA EA EA CFM CFM SF LS SF LS SF SF SF SF SF SF SF SF SF SF SF SF SF SF Lf Ea QUANTITY UNIT COST 185,510 $1.75 1 $255,000.00 4 $19,900.00 4 $16,400.00 150,600 $6.50 19,266 $9.00 185,510 $0.77 1 $35,000.00 185,510 $1.75 1 $25,000.00 185,510 $2.65 185,510 $0.25 185,510 $3.15 185,510 $0.55 185,510 $0.13 185,510 $4.40 185,510 $0.53 185,510 $0.40 185,510 185,510 185,510 185,510 185,510 185,510 80 1 $0.60 $0.65 $0.95 $4.65 $1.00 $0.54 $500.00 $3,500.00 LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $1.50 $0.25 $20,000.00 $235,000.00 $5,500.00 $14,400.00 $4,400.00 $12,000.00 $1.00 $5.50 $1.25 $7.75 $0.22 $0.55 $15,000.00 $20,000.00 $0.25 $1.50 $10,000.00 $15,000.00 $1.20 $1.45 $0.05 $0.20 $2.10 $1.05 $0.35 $0.20 $0.04 $0.09 $0.00 $4.40 $0.45 $0.08 $0.34 $0.06 $0.55 $0.25 $0.30 $1.20 $0.25 $0.24 $0.05 $0.40 $0.65 $3.45 $0.75 $0.30 AMOUNT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $324,643 $255,000 $79,600 $65,600 $978,900 $173,394 $142,843 $35,000 $324,643 $25,000 $491,602 $46,378 $584,357 $102,031 $24,116 $816,244 $98,320 $74,204 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40,000 $3,500 $111,306 $120,582 $176,235 $862,622 $185,510 $100,175 $40,000 $3,500 TRADE SUBTOTAL COMMENTS $13,634,119 Subtotal $5,572,814 Markups $19,206,932 Total AC Systems SITE IMPROVEMENTS Replace exterior ramp @ Tech wing Replace sidewalks @ main entry Site repairs Ea Sf Ls 1 3,500 1 $20,000.00 $7.50 $15,000.00 $20,000 $26,250 $15,000 $20,000 $26,250 $15,000 $61,250 Subtotal $25,113 Markups $86,363 Total Site Improvements $19,293,295 PAGE SUBTOTAL Dulaney HS FS 11 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION STRUCTURAL SYSTEMS - EXTERIOR Exterior concrete spalling repairs slab Concrete column repairs Exterior brick replacement Limited tuckpointing UNIT QUANTITY Allow Allow Allow Allow 1 1 1 1 UNIT COST LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $35,000.00 $20,000.00 $10,000.00 $30,000.00 $35,000 $20,000 $10,000 $30,000 AMOUNT TRADE SUBTOTAL COMMENTS $35,000 $20,000 $10,000 $30,000 $95,000 Subtotal $38,950 Markups $133,950 Total Structural Systems Exterior NEW ROOF Roof blocking Rmv & replace existing roof & sht. Metal Caulking Sf Sf Ea 167,200 167,200 1 $0.25 $12.50 $5,000.00 $41,800 $2,090,000 $5,000 $41,800 $2,090,000 $5,000 $2,136,800 Subtotal $876,088 Markups $3,012,888 Total New Roof ARCH. & STRUCTURAL SYSTEMS - INTERIOR New addtion slab repairs Ea Infill pit at Library Sf Misc concrete repairs Allow 1 530 1 $10,000.00 $15.00 $25,000.00 $10,000 $7,950 $25,000 $10,000 $7,950 $25,000 $42,950 Subtotal $17,610 Markups $60,560 Total Structural Systems Interior MECHANICAL SYSTEMS - BEYOND AC Kitchen Exhaust & Makeup Air EA 1 $45,000.00 $25,000.00 $20,000.00 $0.00 $45,000 PLUMBING SYSTEMS Demolition Kitchen Plumbing Condensate Drain Storm Water Piping Waste & Vent Piping Insulated Domestic Water Piping Start-Up & Test SF LS SF SF SF SF SF 185,510 1 185,510 185,510 185,510 185,510 185,510 $0.60 $35,000.00 $0.33 $0.46 $0.55 $2.35 $0.20 $0.50 $20,000.00 $0.11 $0.12 $0.15 $0.85 $0.18 $0.10 $15,000.00 $0.22 $0.34 $0.40 $1.50 $0.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $111,306 $35,000 $61,218 $85,335 $102,031 $435,949 $37,102 $45,000 Subtotal $18,450 Markups $63,450 Total HVAC Beyonf AC $867,940 Subtotal $355,855 Markups $1,223,795 Total Plumbing Systems $4,494,643 PAGE SUBTOTAL Dulaney HS FS 12 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION ELECTRICAL SYSTEMS Modify Existing Switchboard Concrete Pad, Grounding Grid & Duct Bank Panelboard Upgrade Power Feeder Conduit & Wire Grounding Start-Up & Independent Testing Commissioning PA / Intercom UNIT EA EA SF SF SF SF SF SF QUANTITY 1 1 185,510 185,510 185,510 185,510 185,510 185,510 UNIT COST LABOR $50,000.00 $10,350.00 $0.85 $0.39 $0.09 $0.50 $0.40 $0.93 $30,000.00 $1,450.00 $0.20 $0.14 $0.05 $0.36 $0.30 $0.33 EQUIPMENT/ MATERIAL SUBCONTRACT $20,000.00 $8,900.00 $0.65 $0.25 $0.04 $0.14 $0.10 $0.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AMOUNT TRADE SUBTOTAL COMMENTS $50,000 $10,350 $157,684 $72,349 $16,696 $92,755 $74,204 $172,524 $646,562 Subtotal $265,090 Markups $911,652 Total Electrical Systems SECURITY SYSTEMS Security System Modifications SF 185,510 $2.75 $1.25 $1.50 $0.00 $510,153 FIRE SAFETY SPRINKLER & FIRE ALARM Wet Sprinkler System Fire Alarm System Modifications Water service - fire SF SF Ea 185,510 185,510 1 $3.50 $0.75 $90,000.00 $1.50 $0.25 $2.00 $0.50 $0.00 $0.00 $90,000 $649,285 $139,133 $90,000 $510,153 Subtotal $209,163 Markups $719,315 Total Security Systems $878,418 Subtotal $360,151 Markups $1,238,569 Total Fire Safety ADA Demo at classroom entrances Haz mat fire door removal Rmv doors & frames Demo at public restrooms Ramp replacement - Tech wing Rmv & replace misc stair railings Replace misc. ramp & stair railings Classroom entry drywall & ceramic tile Plumbing Fixtures Drains, Carriers & Specialties Corridor doors, fames, hardware Renovate restrooms Elevator controls upgrade Chair lift ADA Signage Loc Ea Ea Sf Ea Ea Ls Loc SF SF Ea Sf Ea Ea Ea 60 210 205 2,725 1 6 1 60 185,510 185,510 175 2,725 1 2 1 $250.00 $75.00 $50.00 $7.50 $20,000.00 $2,500.00 $10,000.00 $1,500.00 $1.60 $0.75 $1,250.00 $75.00 $30,000.00 $15,000.00 $20,000.00 $0.35 $0.20 $1.25 $0.55 $15,000 $15,750 $10,250 $20,438 $20,000 $15,000 $10,000 $90,000 $0.00 $0.00 $218,750 $204,375 $30,000 $30,000 $20,000 $15,000 $15,750 $10,250 $20,438 $20,000 $15,000 $10,000 $90,000 $296,816 $139,133 $218,750 $204,375 $30,000 $30,000 $20,000 $1,135,511 $465,560 $1,601,071 $28,258,544 Dulaney HS FS Subtotal Markups Total ADA TOTAL LIMITED RENOVATIONS 13 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS INTERIOR AESTHETIC ISSUES ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION Rmv glazed clearstory Rmv lockers Rmv auditorium seating Mis. Specialties Infill glazed transoms Clean & repair terrazzo floors Interior painting of school Repaint canopy soffit Auditorium seating Entrance mats UNIT Lf Hr Ea Ls Lf Sf Sf Ea Ea Ea QUANTITY 5,800 1,100 1,204 1 5,800 38,000 185,000 1 1,204 1 UNIT COST LABOR EQUIPMENT/ MATERIAL SUBCONTRACT $8.75 $35.00 $15.00 $15,000.00 $30.00 $1.50 $1.50 $2,500.00 $300.00 $1,500.00 $50,750 $38,500 $18,060 $15,000 $174,000 $57,000 $277,500 $2,500 $361,200 $1,500 AMOUNT TRADE SUBTOTAL COMMENTS $50,750 $38,500 $18,060 $15,000 $174,000 $57,000 $277,500 $2,500 $361,200 $1,500 $996,010 Subtotal Interior Aesthetics Issues $408,364 Markups $1,404,374 Total Interior Aesthetics Issues Dulaney HS FS 14 LEWICKI ESTIMATING SERVICES,INC. 02/05/16 PRECONSTRUCTION SERVICES DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS EDUCATIONAL ENHANCEMENTS ARCHITECT: RUBELING & ASSOCIATES NO. DESCRIPTION Chalk / tackboard mastic-Haz Mat Rmv chalk boards Renovate Library / Media Center Renovate Art classrooms Relocate Health Suite Renovate Technology classrooms Renocate Child Care Renovate Locker Rooms RenovateAdmin & Guidance area Renovate Food / Nutrition Range Exhaust hood Dishwasher Refrigerator Kitchen equipment White board & tackboards UNIT Sf Rms Sf Sf Sf Sf Sf Sf Sf Sf Ea Ea Ea Ea Ea Rms QUANTITY UNIT COST LABOR EQUIPMENT/ MATERIAL SUBCONTRACT 11,800 $5.00 60 $350.00 5,190 $30.00 4,410 $35.00 1,500 $30.00 7,080 $20.00 1,407 $30.00 5,400 $50.00 5,800 $35.00 1,425 $30.00 6 $450.00 6 $150.00 6 $400.00 6 $800.00 1 $630,000.00 60 $4,500.00 $59,000 $21,000 $155,700 $154,350 $45,000 $141,600 $42,210 $270,000 $203,000 $42,750 $2,700 $900 $2,400 $4,800 $630,000 $270,000 AMOUNT TRADE SUBTOTAL COMMENTS $59,000 $21,000 $155,700 $154,350 $45,000 $141,600 $42,210 $270,000 $203,000 $42,750 $2,700 $900 $2,400 $4,800 $630,000 $270,000 $1,965,410 Subtotal Educational Enhancements $805,818 Markups $2,771,228 Total Educational Enhancements SUMMARY LIMITED RENOVATIONS INTERIOR AESTHETIC ISSUES EDUCATIONAL ENHANCEMENTS $28,258,544 $1,404,374 $2,771,228 $32,434,146 Dulaney HS FS 15 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX G: ENVIRONMENTAL REPORT Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Environmental Report-Appendix G February 25, 2016 TITLE 40 CFR PART 763 ASBESTOS-CONTAINING MATERIALS IN SCHOOLS THREE-YEAR AHERA RE-INSPECTION REPORT - 2015 Dulaney High School 255 Padonia Road Baltimore, Maryland 21093 Prepared for: Baltimore County Public Schools Department of Facilities Environmental Office Assessments Made By: Joe G. Lewis III EPA-accredited Asbestos Inspector Certification #: 15001781 Report Prepared by: Derek Kwon EPA-accredited Asbestos Management Planner Certification #: 129050 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 TABLE OF CONTENTS I. INTRODUCTION .....................................................................................................................3 II. INSPECTION ............................................................................................................................4 A. Scope of Work ...........................................................................................................................4 B. Process of Inspection .................................................................................................................4 C. Data Gap Analysis .....................................................................................................................5 D. Results ........................................................................................................................................6 Table I Observed Asbestos-containing Material...............................................................................8 Table II Room by Room Inventory .................................................................................................18 III. RECOMMENDATIONS .................................................................................................55 IV COST ESTIMATES ..................................................................................................................55 APPENECIES APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E APPENDIX F APPENDIX G School Inventory Form Accreditation Information Friable Homogeneous Area Assessment Site Drawing Inspector and Management Planner Licenses Re-Inspection Management Plan Summary Summary of Abatement Actions 2 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 I. INTRODUCTION Arc Environmental, Inc performed an Asbestos Hazard Emergency Response Act (AHERA) three-year reinspection for Baltimore County Public Schools (BCPS) at Dulaney High School in compliance with 40 CFR Part 763. The school property is located at 255 Padonia Road in Baltimore, Maryland. The inspection was conducted in accordance with AHERA requirements for asbestos-containing building materials (ACBMs). Mr. Joe G. Lewis III, an EPA-accredited Asbestos Inspector, conducted the re-inspections on July 20 and 21, 2015. Prior to the re-inspection, previous reports, abatement records, and sampling data were reviewed. 3 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 II. INSPECTION A. Scope of Work The purpose of the re-inspection was to assess the conditions of previously identified ACBMs and assumed ACBMs within the building interior. The re-inspection was nondestructive and limited to only accessible areas throughout the building. Inaccessible areas were documented and are identified in this report. It should be noted that inaccessible areas include, but are not limited to, wall cavities, pipe chases, and areas above fixed ceiling systems (i.e. plaster, sheetrock, splinted tile). The scope of work performed during the three-year AHERA re-inspections and by the EPA-accredited Asbestos Inspector is summarized below: 1. Visually inspected and assessed the conditions of all known friable and/or assumed ACBMs; 2. Visually inspected and touched materials that were previously considered non-friable ACBM to determine whether it had become friable since the last inspection or re-inspection; 3. Identified all homogeneous areas and materials that had become friable since the previous inspection or re-inspection; 4. Collected bulk samples (as approved by BCPS) for each homogeneous area of newly friable material assumed to be ACBM, and submitted suspect materials for laboratory analysis; and 5. Assessed the condition of newly friable materials in the areas where samples were collected, and in areas where materials are assumed to be ACBM. B. Process of Inspection To determine the various types and locations of ACBMs, Arc Environmental, Inc. reviewed original management plans, abatement records, and re-inspection reports, as well as, any other relevant sampling or survey data for the school building. Information collected during the re-inspection was recorded on asbestos inspection forms, and included room identification, homogeneous area numbers, ACBM description, ACBM AHERA classification, total quantities observed, and sample information from previous re-inspection reports. Previous inspection reports were utilized to reconcile the location of materials that are identified as asbestos-containing and/or are assumed to be asbestos-containing. In instances where new materials were observed, unique homogeneous area numbers and material descriptions were generated by onsite personnel. Based on observations, a total of four (4) additional homogenous areas of suspect materials were identified during the re-inspection. The additional homogeneous area numbers and corresponding material descriptions are provided below: BG1 – Boiler Gasket TR1 – Transite Sink TR2 – Transite Fume Hood VB2 – Brown Black Vinyl Baseboard and Mastic 4 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 As part of this inspection, ACBMs were visually assessed to determine their condition. The EPA has formulated a seven (7) category numerical assessment code depending on the type and condition of ACBM as follows: 1. 2. 3. 4. 5. 6. 7. Damaged or significantly damaged thermal system insulation asbestos-containing material (ACM); Damaged friable surfacing ACM; Significantly damaged friable surfacing ACM; Damaged or significantly damaged friable miscellaneous ACM; ACBM with potential for damage; ACBM with potential for significant damage; and Other or any remaining friable ACM or friable suspected ACBM. ACBMs were re-inspected and categorized within one of these assessment codes. Following the assessment and review of assessment data, response actions were developed for each material. With regards to controlling asbestos in buildings, the EPA defines response action as removal, repair, encapsulation, enclosure, and operations and maintenance (O&M) program. The following is a brief description of each response action: Removal – removing the ACBM from the building. If performed properly, the hazards associated with disturbance and subsequent exposure from the material is eliminated. Enclosure – Airtight, impermeable, permanent barrier constructed around an ACBM; an enclosure is only effective if it remains undamaged. Encapsulation – Treatment of an ACBM with a material that surrounds or embeds the material with an adhesive matrix to prevent the release of fibers. The encapsulant creates a membrane over the surface of the material (bridging encapsulant) or penetrates and binds material components together (penetrating encapsulant). Repair – returning damaged ACBM to an undamaged condition or an intact state so as to prevent a fiber release; if an ACBM has become damaged, the damage should be repaired immediately. Operations and Maintenance (O&M) Program – Work practices developed to maintain ACBM in good condition, ensure the clean-p of asbestos fibers previously released, and to prevent further release by minimizing and controlling ACBM disturbances or damage. The O&M Program must be implemented until all of the asbestos-containing material is removed from the facility. It should be noted that for all response actions, with the exception of removal, the hazardous material remains in the building and must be monitored periodically. Warning labels should be attached immediately adjacent to any friable and non-friable ACBM and suspected ACBM assumed to be ACM located in routine maintenance areas at the school. C. Data Gap Analysis Previous inspection reports, as well as sampling data from demolition surveys and various abatement projects were utilized to reconcile materials that are identified as asbestos-containing and/or are assumed to be asbestos-containing. Through these efforts, a number of materials have been removed from the presumed ACBMs identified in previous reports. 5 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Surfacing Plaster Ceiling and Wall Finishes In November of 2011, Advanced Air Analysis, Inc. (AAA) conducted a plaster and drywall survey to determine the asbestos content of suspect materials. During the survey, AAA collected bulk samples of various plaster finishes from randomly selected locations throughout the school building. A total of thirtyone (31) bulk samples were collected and submitted for laboratory analysis by Polarized Light Microscopy (PLM) and Transmission Electron Microscopy (TEM). Laboratory analysis indicated that the skim coat layer of acoustical plaster is asbestos-containing. The asbestos-containing acoustical plaster appears to be restricted to ceiling finishes within the auditorium and auditorium lobby. Based on the review of previous inspection reports and available sampling data, the remaining plaster located throughout the school building does not contain asbestos. Miscellaneous Drywall Wall and Joint Compound During the plaster and drywall survey conducted by AAA in November of 2011, total of twelve (12) bulk samples of drywall and joint compound were collected and analyzed by PLM and TEM microscopy. Based on the laboratory analysis, the drywall remaining in the school building does not contain asbestos. Ceiling Tile In March of 2011, AAA performed a survey throughout the building to determine if any asbestos-containing ceiling tiles were present. AAA identified seven (7) types of ceiling tile differentiated by size, color, and texture. A total of twenty-seven (27) bulk samples were collected and submitted for laboratory analysis via PLM and TEM analysis. Laboratory analysis indicated that none of the sampled ceiling tile contained asbestos. Tectum Board In February 2001, KCI Technologies, Inc. (KCI) performed a hazardous materials survey as part of renovation to the science laboratories within the school. During the survey, multiple samples of Tectum board were collected from the ceiling plenum of each renovation space and submitted for laboratory analysis via PLM and TEM. Based on the laboratory analysis, the Tectum board within the school does not contain asbestos. D. Results An effort was made to locate and assess the rooms listed below; however, visual confirmation was not acquired before the issuance of this report. All remaining portions of the building were included in the inspections. The following locations could not be surveyed: 6 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Following the review of previous inspection reports, abatement records, and sampling data, a total of fiftythree (53) homogenous materials are considered asbestos-containing at Dulaney High School. Thermal System Insulation Four (4) materials were identified and categorized as Thermal System Insulation (TSI) during the reinspection. These materials include mudded pipe fittings, pipe insulation, duct insulation, and breeching insulation. Sample data from previous inspection indicated that the mudded pipe fittings with the school are asbestos-containing, all remaining TSI is assumed to be asbestos-containing. Miscellaneous Floor Tiles and Associated Mastics Both asbestos-containing and assumed asbestos-containing floor tiles were identified within the school building. Floor tiles that have not been sampled are assumed as asbestos-containing materials until negated through bulk sampling and laboratory analysis. Fire Doors, Sink Undercoating, and Vibration Dampener Cloth Fire doors, sink undercoatings, and vibration dampening cloth were identified throughout the school building during the inspection. Due to the destructive nature of sampling, and the potential to negatively impact the integrity and/or function, these materials are assumed to be asbestos-containing. Adhesive and Mastics Various adhesives utilized for hanging materials such as chalkboards were identified throughout the building. The adhesives and mastics utilized within the school are assumed to be asbestos-containing. Transite Panels, Sinks, Window Sills, and Thresholds Transite materials were identified throughout the school building. Sample data from previous hazardous materials surveys indicate that several of these products, including fume hoods, contain Chrysotile asbestos. All transite materials are assumed to be asbestos-containing. Table I below identifies the locations and quantities of ACMs within the building, and summarizes information regarding sample history. 7 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA Material Description Material Location Existing Quantity Sample Number Sample Results 0872-003 Duct Mastic Electrical Data, Custodian 1, Storage by 321, 321 Electrical/Data 92 LF - Assumed 0872-005 Pipe Insulation M1, Storage Room, Former Furnace Room 66 LF - Assumed 0872-006 Sink Insulation Library Conference Room, Nurse, Offices, 229, 231, 233, 305 26 EA - Assumed 0872-009 Terrazzo Flooring Hallway 2, Hallway 3, Hallway 100 – 111, Roof Access, Corridor by S-200, Hallway 11, Hallway 9, Hallway 10, Hallway 12, Hallway 7, Cafeteria, Physical Education Office, Hallway at S-205, Girls Corridor, Auditorium Upstairs Corridor, Corridor by 311 33,146 SF *08621-0729-01 <1% Chrysotile 0872-011 Transite Window Sill 312 Faculty Lounge 2 EA - Assumed 8 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA 0872-015 AD-1 Material Description Material Location Existing Quantity Sample Number Sample Results Gray Window Caulking 107, 108, 109, 110, 111, Office Adjacent to 107, Office Adjacent to 114, 112, 113, 115, 117, 116, 118, 119, 120, 121, 123, 122, 122 Office, M2, 103, 105, 106, Corridor by Storage Room, 100, 102, Office adjacent to Electrical Data, 213, 212, 215, 215 Prep Room, 214, 217, 216, 219, 218, 200, Satellite Cafeteria, 201, 203, Faculty Room, 209, 210, 211, 204 205, 206, 207, 208, 220, 221, 222, Science Office, 223, 224 ,225, 226, 227, Library, Room 231, 228, 229, 229B, 232, 230, 233, Cafeteria, Faculty Lunch Room, Boy’s Locker Room, Girl’s Locker Room, S0205, 234, 235, 300, 302, 303, 304, 305, 307, 306, 208, 309, 310, Corridor by 311, 311, New Wing (314), 312A, 312 Faculty Lounge, 313, 315, 316, 318, 317, 319, 320, Office by 321 Electrical / Data, 322, 323, Auditorium Corridor, Hallway 7, 104, 202, 239 10,935 LF - Assumed Chalkboard Mastic 108, 109, 110, 111, 103, 105, 106, 107, 100, 101, 102, 104, 215, 214, 217, 216, 219, 218, 200, 201, 202, 203, 209, 210, 211, 204, 205, 206, 207, 208, 220, 221, 222, 223, 226, 227, 231, 228, 229, 232, 230, 234, 238, 240, 236, 300, 301, 302, 303, 304, 305, 307, 306, 308, 309, 310, 311 11,175 SF - Assumed 9 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA Material Description Material Location Existing Quantity Sample Number Sample Results AD-2 Carpet Mastic Library 324 SF - Assumed AD-3 Stair Tread Mastic Library 110 SF - Assumed AP-1 Acoustical Plaster Ceiling Auditorium Lobby, Auditorium Upstairs Corridor 8,292 SF 10048-0120-01 25% Chrysotile BG1 Boiler Gasket Boiler Room 12 EA - Assumed BM-1 Residual Baseboard Mastic Office 3, 114, 115, 117, 116, 118, 119, 121, 123, 122B, 122, Lower Level Auditorium, M1, M4, 107, Office by S100, 213, 212, 212 Prep and Storage Room, 215, 215 Prep Room, 214, 214 Prep and Storage, 217, 216, 219, 219 Prep Room, 218, 218 Prep Room, 200, 202, 203, 222 Dark Room, 222 Prep Room, Library, Library Conference Room, Nurse's Office, Nurse Office and Waiting Room, Nurse, Offices, Hallway 9, 229B, 230, Hallway 12, 236 301, S-301, 304, 305, 208, 310, 316, 318, 317, 321, 322, Auditorium, Sound Room, Auditorium Upstairs Corridor, Auditorium Corridor 3,977 LF - Assumed BR-1 Breeching Insulation Gym Attic, Boiler Room 696 SF - Assumed CK-1 White Door Caulking Mechanical Room 312 24 LF - Assumed DA-1 White Seam Mastic on Canvas Wrapped Fiberglass Duct Insulation 239, Mechanical Room 312, 215 Prep Room 445 LF - Assumed 10 ^ Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA Material Description Material Location Existing Quantity Sample Number Sample Results DA-2 Gray Duct Mastic on Bare Metal Duct 124 Boiler Room, Electrical Data, Custodial adjacent to S-203, Science Office Storage, Mechanical Room 312 122 LF - Assumed DA-3 Brown Duct Mastic on Foil Duct Insulation 212 Prep and Storage Room, 215 Prep Room, Satellite Cafeteria 200 LF - Assumed DA-4 Red Duct Mastic on Bare Metal Duct Science Office Storage 4 LF - Assumed DI-1 Duct Insulation Gym Attic, Former Furnace Room 648 SF - Assumed FC-1 Fire Curtain Stage 1 EA - Assumed FP-1 Fire Proofing Trash Chute Door Corridor by 311 1 EA - Assumed White with Blue Streaks 12"x12" Vinyl Floor Tile and Associated Mastic 315 A, 315 C / Radio Control Room, 317, Server, 319, 320, Foyer New Wing 3rd Floor Corridor, 321, 323, 212, 212 Prep and Storage Room, 214, 218, 218 Prep Room, 318, 116, 120 A Men’s Changing Room, 120 B Women’s Changing Room, 121, 121 A, 301 13,428 SF - Assumed FT-1 11 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials Material Description Material Location Existing Quantity Sample Number Sample Results FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics Office adjacent to Electrical Data, New Wing (314), 312 Faculty Lounge, 313, 315, 316, 316 A, 316 B, 318 B, Services Custodian Closet by 327, 327 / Electrical Closet, Storage by 321 Electrical / Data, New Wing 3rd Floor Corridor, Office next to 114, 114, Storage at 144, 112, 113, Hallway 4 by 114, 115, 117, Custodian next to 117, Hallway 5, 118, 118 Storage, 119, 120, 120C Storage Room, 123, 122A, 122B, 122, 122 Office, 124 Storage, Hallway 6, Satellite Cafeteria, Custodian next to 117, Storage, 213, 215, 215 Prep Room, Custodian 1, 217, 216, 219, 219 Prep Room, Science Office, Science Office Storage 37,480 SF - Assumed FT-3 Light Blue Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Hallway 4 by 114, Hallway 5, New Wing 3rd Floor Corridor 322 SF - Assumed FT-4 Green Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Hallway 4 by 114, Hallway 5, New Wing 3rd Floor Corridor 322 SF - Assumed FT-5 Maroon Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Hallway 4 by 114, Hallway 5, New Wing 3rd Floor Corridor, Satellite Cafeteria 2,022 SF - Assumed HA 12 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials Material Description Material Location Existing Quantity Sample Number Sample Results FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 103, 105, 106, 107, Office adjacent to 107, Art Storage, 100, 102, 104, 203, Special Education Office, S-203, Office 4, Audio Visual Room, 229B, Baseball/Lacrosse Office, 234, Office 5, 301, 305, 308, 311, Sound Room, 12,282 SF - Assumed FT-7 Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic 107, Office adjacent to 107, 102, 103, 104, 305, 311 336 SF - Assumed FT-8 Olive Green Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 221 1,200 SF - Assumed Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 226, 300, S-301, 305, 307, 309, 310, Auditorium, Office 3, 108, 109, 110, 111, Lower Level Auditorium, 105, 106, 101, 200, Elevator near 200, 201, Office 3, Faculty 226, Nurse’s Office and Waiting Room, Nurse, Offices, 231, 232, Faculty Lunch Room, Physical Education Office 22,951 SF - Assumed Room 301 180 SF - Assumed Room 301 40 SF - Assumed HA FT-9 FT-10 FT-11 Beige 9"x9" Vinyl Floor Tile with Black Streaks and Associated Mastic Brown 9"x9" Vinyl Floor Tile with Black and Beige Streaks and Associated Mastic 13 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA FT-13 FT-14 FT-15 Material Description Brown Mottled 12"x12" Vinyl Floor Tile with Black Specks and Associated Mastics White 12"x12" Vinyl Floor Tile with Beige Mottling and Associated Mastic Beige 9"x9" Vinyl Floor Tile with Light Beige Streaks and Associated Mastic FT-16 Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic FT-18 FT-19 FT-20 FT-21 FT-22 KL-1 Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Beige 9"x9" Vinyl Floor Tile with Red and Light Tan Streak and Associated Mastic Black 12"x12" Vinyl Floor Tile and Associated Mastic Yellow Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Vinyl sheet flooring w/ associated mastic Kiln Material Location Existing Quantity Sample Number Sample Results Hallway #11 132 SF - Assumed 214A Storage, 214 Prep Room 476 SF - Assumed Audio Visual, Library Classroom 732 SF - Assumed 12,927 SF - Assumed 20,880 SF - Assumed 7,183 SF - Assumed Office 1, 222 Dark Room, Office by S100 408 SF - Assumed Stage 3000 SF - Assumed Stairway # 1 228 SF - Assumed 120 1,392 SF - Assumed 240 storage Closet 1 EA - Assumed M1, C, M4, M2, Library, Library Conference Room, Nurse, Activity Room 1, A 202, 203, Faculty Room, 209, 210, 211, 204, 205, 206, 207, 208, 220, 222, 223, 223 Prep Room, 224, 225, 222 Prep Room, 225 Storage, 224 Storage 228, 228 Prep, 230, 302, 303, 304, 306 105, 106, 102, 103, 227, 229, 233, 238, 236 14 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA Material Description PA-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation ST-1 Vinyl Stair Treads Material Location Storage at 114, 124 Boiler Room, S101, S-100, Stage, Storage by M1, S100 Storage, Storage by 202, Custodial adjacent to S-203, Storage Closet by Office, Science Office Storage, Boiler Room, Mechanical Room 312 , Athletic Storage 2, Stairway # 1 TR1 Transite Sink 213, 212, 212 Prep and Storage, 215, 215 Prep, 214, 217, 216, 219, 219 Prep, 218, 218 Prep, 220, 221, 222, 223, 224, 225, 226, 228, 228 Prep, 230, Faculty 226 TR2 Transite Fume Hood 228, 228 Prep 15 Existing Quantity Sample Number Sample Results 1,024 LF - Assumed 76 SF - Assumed 188 EA - Assumed 3 EA **103009 20% Chrysotile Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA USA-03 USA-21 Material Description Material Location Existing Quantity Sample Number Sample Results Mudded Pipe Fitting Utility Room by Mechanical, Auditorium Lobby, Crawl Space b/w Restroom, M1, M2, Storage Room by M1, Storage Room, Storage Office Room, Hallway #6, 105, Machine Room, Corridor by Storage Room, S100, 101, 102, Hallway #11, Corridor by S-200, 202, 205, 208, S-204, Hallway #10, Cafeteria, Laundry Room, Hallway #12, Ice Room, Physical Education Storage, Coaches Room, Athletic Storage 2, Custodial next to S-205, 240, Room at the bottom of Boiler, Janitorial Closet 238, Room 235 Closet 1, 239 Dark Room, 238, 236 235 Office, Gym Attic, Auditorium Corridor, Hallway #7, Office 3, 109 996 EA **103012 **103013 3% Chrysotile Fire Door Office 3, Hallway #1 100-111, Hallway #4 by 114, Former Furnace Room, Stairway #1, Utility Room by Mechanical, Lower Level Auditorium, Storage Room, Storage Office Room, Corridor by Storage Room, Electrical Room, Storage, Corridor by S-200, 220, 221, 222, 223, 224, 225, 228, Office 4, Prep Storage, 228 Prep, 230, Cafeteria, Boiler Room, Corridor by 311, Mechanical Room 312, Sound Room, Auditorium Corridor, Hallway #7, Chiller Room , Room 235 Closet 1, 235 Office, Room at bottom of Boiler 100 EA - Assumed 16 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table I. Observed Asbestos Containing Materials HA Material Description Material Location Existing Quantity Sample Number Sample Results USA-28 Transite Panel Corridor by Storage Room, 300, 301, 302, 303, 304, 305, Corridor by 311, 311, 306, 308, 309, 310 236 SF - Assumed USA-30 Vibration Dampener Gym attic 7 EA - Assumed VB-1 Black Vinyl Baseboard and Mastic and Mastic Rooms: 108, Office 1, 112, 113, Stairway #1, 106, 101, 103, 213, 201, Office 3, Faculty Room, 209, 210, 211, 204, 206, 207, 208, 220, 221, 222, 223, 223 Prep Room, 224, 225, 225 Storage, 224 Storage, 227, 229, 302, 303, 307, New Wing (314) 319, 320, 323, 228, 228 Prep 233, 311 11,994 LF - Assumed VB2 Brown Black Vinyl Baseboard and Mastic and Mastic Faculty 226, 231 226 LF - Assumed The following reports were utilized for sampling data referenced above: * Advanced Air Analysis, Inc. – 2008– Hazardous Material Survey – Dulaney High School ^ Advanced Air Analysis, Inc. – 2011– Hazardous Material Survey – Dulaney High School **KCI Technologies, Inc. – 2001– Hazardous Material Survey – Dulaney High School Table II below summaries the ACBMs on a room by room basis for Dulaney High School; in addition, the condition of materials and recommended response actions are included. For assumed materials, it is recommended that the materials first be sampled to determine whether they are asbestoscontaining prior to removal. 17 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action First Floor Office 3 Room 108 Room 109 Room 110 Office 1 Room 111 USA-13 Mudded Pipe Fitting 6 EA Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 108 SF Non-Friable Good O&M USA-21 Fire Door 1 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 42 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 729 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 6 EA Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 696 SF Non-Friable Good O&M USA-13 Mudded Pipe Fitting 6 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 720 SF Non-Friable Poor O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M FT-19 Beige 9"x9" Vinyl Floor Tile with Red and Light Tan Streak and Associated Mastic 144 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 56 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 720 SF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M 18 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Office next to 114 HA Material Description Estimated Quantity Friability Condition Response Action FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 144 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Poor O&M Corridor Elevator Hallway # 1 100-111 Former Furnace Room Room 114 No suspect ACM USA-03 Mudded Pipe Fitting 100 EA Friable Good O&M USA-21 Fire Door 4 EA Non-Friable Good O&M 0829-009 Terrazzo flooring 2560 SF Non-Friable Good O&M USA-21 Fire Door 3 EA Non-Friable Good O&M USA-03 Mudded Pipe Fitting 2 EA Friable Good O&M 0872-005 Pipe Insulation 3 LF Friable Good O&M DI1 Duct Insulation 48 SF Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 864 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 5 LF Non-Friable Good O&M 8 LF Non-Friable Good O&M 72 SF Non-Friable Good O&M 896 SF Non-Friable Good O&M Gray Window Caulking 20 LF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 5 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 869 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 20 LF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 5LF Non-Friable Good O&M USA-21 Fire Door 2 EA Non-Friable Good O&M PA-1 Storage at 114 FT-2 FT-2 Room 112 Room 113 Hallway # 4 by 114 0872-015 White Mastic on Paper Wrapped Fiberglass Pipe Insulation White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 19 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA FT-2 FT-3 FT-4 FT-5 Room 115 Room 117 Material Description White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics Light Blue Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Green Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Maroon Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Condition Response Action 418 SF Non-Friable Good O&M 22 SF Non-Friable Good O&M 22 SF Non-Friable Good O&M 22 SF Non-Friable Good O&M Gray Window Caulking 45 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 840 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 14 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 60 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 1064 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 20 SF Non-Friable Good O&M Non-Friable Good O&M 2820 SF Non-Friable Good O&M 100 SF Non-Friable Good O&M 100 SF Non-Friable Good O&M No suspect ACM FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics Boys Restroom next to 117 48 SF No suspect ACM FT-2 Hallway # 5 Friability 0872-015 Girls Restroom next to 117 Custodian next to 117 Estimated Quantity FT-3 FT-4 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics Light Blue Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Green Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 20 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 116 Stairway # 1 Room 118 118 Storage Room 119 Room 120 HA Material Description Estimated Quantity Friability Condition Response Action FT-5 Maroon Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 100 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 60 LF Non-Friable Good O&M FT-1 White with Blue Streaks 12"x12" Vinyl Floor Tile and Associated Mastic 1440 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 12 LF Non-Friable Good O&M FT-21 Yellow Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 228 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 21 LF Non-Friable Good O&M USA-21 Fire Door 1 EA Non-Friable Good O&M ST-1 Vinyl Stair Treads and Associated Mastic 76 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 80 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 960 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 30 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 40 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 80 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 960 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 20 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 12 LF Non-Friable Good O&M FT-22 Vinyl sheet flooring w/ associated mastic 1392 SF Non-Friable Good O&M 72 SF Non-Friable Good O&M 128 SF Non-Friable Good O&M FT-2 120A Men's Changing Room FT-1 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics White with Blue Streaks 12"x12" Vinyl Floor Tile and Associated Mastic 21 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA 120B Women's Changing Room FT-1 120C Storage Room FT-2 FT-1 Room 121 Material Description White with Blue Streaks 12"x12" Vinyl Floor Tile and Associated Mastic White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics White with Blue Streaks 12"x12" Vinyl Floor Tile and Associated Mastic Room 123 122A 122B Room 122 122 Office Friability Condition Response Action 112 SF Non-Friable Good O&M 56 SF Non-Friable Good O&M 840 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 20 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 80 LF Non-Friable Good O&M 121 storage 121A Estimated Quantity No suspect ACM FT-1 White with Blue Streaks 12"x12" Vinyl Floor Tile and Associated Mastic 120 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 40 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 840 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 20 LF Non-Friable Good O&M 120 SF Non-Friable Good O&M 340 SF Non-Friable Good O&M FT-2 FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics BM-1 Residual Baseboard Mastic 88 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 100 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 1156 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 38 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 128 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 20 LF Non-Friable Good O&M 22 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number 124 Boiler Room HA Material Description Estimated Quantity Friability Condition Response Action PA-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation 250 LF Non-Friable Good O&M DA-2 Gray Duct Mastic on Bare Metal Duct 50 LF Non-Friable Good O&M 124 Boiler Room Storage No suspect ACM 124 Storage FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 240 SF Non-Friable Good O&M Chiller Room USA-21 Fire Door 2 EA Non-Friable Good O&M USA-03 Mudded Pipe Fitting 15 EA Friable Good O&M USA-21 Fire Door 1 EA Non-Friable Good O&M 0872-008 Terrazzo flooring 312 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 32 EA Friable Good O&M AP-1 Acoustical Plaster Ceiling 6240 SF Friable Good O&M USA-21 Fire Door 18 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 116 SF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 2020 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 16 EA Friable Good O&M 5 EA Friable Good O&M 35 LF Non-Friable Good O&M 25 LF Non-Friable Good O&M Utility Room by Mech Hallway # 2 Auditorium Lobby Lower Level Auditorium Crawlspace b/w Restrooms Men's Restroom Behind Auditorium Women's Restroom Behind Auditorium No suspect ACM No suspect ACM USA-03 S101 Stage PA-1 PA-1 Mudded Pipe Fitting White Mastic on Paper Wrapped Fiberglass Pipe Insulation White Mastic on Paper Wrapped Fiberglass Pipe Insulation 23 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Hallway # 3 M1 HA Material Description Estimated Quantity Friability Condition Response Action FC-1 Fire Curtain 1 EA Non-Friable Good O&M FT-20 Black 12"x12" Vinyl Floor Tile and Associated Mastic 3000 SF Non-Friable Good O&M 0872-008 Terrazzo flooring 312 SF Non-Friable Good O&M 0872-005 Pipe Insulation 3 LF Friable Good O&M USA-03 Mudded Pipe Fitting 6 EA Friable Good O&M FT-16 Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 1344 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 38 LF Non-Friable Good O&M 96 SF Non-Friable Good O&M 96 SF Non-Friable Good O&M 2112 SF Non-Friable Good O&M C FT-16 A FT-16 M4 M2 FT-16 Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic BM-1 Residual Baseboard Mastic 140 LF Non-Friable Good O&M FT-16 Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 2499 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 6 EA Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M Prop and Make-up Room Storage by M1 Hallway # 6 No suspect ACM PA-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation 50 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 4 EA Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 4128 SF Non-Friable Good O&M 24 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action USA-03 Mudded Pipe Fitting 30 EA Friable Good O&M Non-Friable Good O&M Faculty Women's Restroom Faculty Men's Restroom Satellite Cafeteria No suspect ACM No suspect ACM FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 2160 SF Fitness No suspect ACM Male Locker Room No suspect ACM Custodian next to 117 Room 103 FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 48 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 720 SF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M Gray Window Caulking 128 LF Non-Friable Good O&M 726 SF Non-Friable Good O&M 8 SF Non-Friable Good O&M 2 SF Non-Friable Good O&M 0872-015 FT-6 Room 105 FT-9 FT18 Machine Room Room 106 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic USA-03 Mudded Pipe Fitting 6 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 3 EA Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 8 SF Non-Friable Good O&M 25 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA FT18 FT-6 Office adjacent to Room 107 Storage Office Room Corridor by Storage Room Friability Condition Response Action 2 SF Non-Friable Good O&M 728 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M Chalkboard mastic 240 SF Non-Friable Good O&M 0832-015 Gray Window Caulking 228 LF Non-Friable Poor O&M 1000 SF Non-Friable Good O&M 56 SF Non-Friable Good O&M FT-7 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 154 LF Non-Friable Good O&M 0832-015 Gray Window Caulking 48 LF Non-Friable Poor O&M 205 SF Non-Friable Good O&M 200 SF Non-Friable Good O&M FT-6 FT-7 Storage Room Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Estimated Quantity AD-1 FT-6 Room 107 Material Description Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic USA-03 Mudded Pipe Fitting 25 EA Friable Good O&M USA-21 Fire Door 3 EA Non-Friable Good O&M 0872-005 Pipe Insulation 60 SF Friable Good O&M USA-03 Mudded Pipe Fitting 2 EA Friable Good O&M USA-21 Fire Door 1 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 14 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 24 EA Friable Good O&M USA-21 Fire Door 7 EA Non-Friable Good O&M USA-28 Transite panel 12 SF Non-Friable Good O&M 26 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action Electrical Room USA-21 Fire Door 1 EA Non-Friable Good O&M USA-21 Fire Door 1 EA Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 60 SF Non-Friable Good O&M Non-Friable Good O&M 5 EA Non-Friable Good O&M 25 LF Non-Friable Good O&M 30 LF Non-Friable Good O&M 168 SF Non-Friable Good O&M Storage Girls restroom near 107 Art Storage No suspect ACM FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Boys Restroom next to 107 No suspect ACM USA-03 S-100 S-100 Storage Office by S-100 Room 100 Room 101 200 SF PA-1 PA-1 FT-19 Mudded Pipe Fitting White Mastic on Paper Wrapped Fiberglass Pipe Insulation White Mastic on Paper Wrapped Fiberglass Pipe Insulation Beige and Light Beige Streaked 9"x9" Vinyl Floor Tile and Associated Mastic BM-1 Residual Baseboard Mastic 52 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 650 SF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 728 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 8 EA Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M AD-1 Chalkboard mastic 160 SF Non-Friable Good O&M Janitor Closet by 101 No suspect ACM 27 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA FT-6 FT18 Room 102 FT-7 Material Description Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic Estimated Quantity Friability Condition Response Action 767 SF Non-Friable 3 SF Damaged Remove 10 SF Non-Friable Good O&M 10 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 6 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M 775 SF Non-Friable Good O&M 6 SF Non-Friable Good O&M 7 SF Non-Friable Good O&M 128 LF Non-Friable Good O&M FT-6 FT18 Room 103 FT-7 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic 0872-015 Gray Window Caulking VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M 0872-015 Window Caulk 8 LF Non-Friable Good O&M 731 SF Non-Friable Good O&M 2 SF Non-Friable Good O&M 240 SF Non-Friable Good O&M FT-6 Room 104 FT-7 AD-1 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic Chalkboard mastic Second Floor Hallway # 11 0872-009 Terrazzo flooring 1206 SF Non-Friable Good O&M FT-13 Brown Mottled 12"x12" Vinyl Floor Tile with Black Specks and Associated Mastics 132 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 112 EA Friable Good O&M 28 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action Electrical Data DA-2 Gray Duct Mastic on Bare Metal Duct 36 LF Non-Friable Good O&M Office adjacent Electrical Data FT2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 144 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 22 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 1176 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 100 LF Non-Friable Good O&M TR1 Transite Sink 7 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 40 SF Non-Friable Good O&M 0872-003 Duct mastic 40 LF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastics 1176 SF Non-Friable Good O&M TR1 Transite Sink 13 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 8 LF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastics 300 SF Non-Friable Good O&M TR1 Transite Sink 1 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 45 LF Non-Friable Good O&M DA-3 Brown Duct Mastic on Foil Duct Insulation 10 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 1176 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M TR1 Transite Sink 15 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M Room 213 Electrical Data Room 212 212 Prep and Storage Room Room 215 29 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number 215 Prep Room Room 214 HA Material Description Estimated Quantity Friability Condition Response Action AD-1 Chalkboard mastic 20 SF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 300 SF Non-Friable Good O&M TR1 Transite Sink 2 EA Non-Friable Good O&M DA-1 White Seam Mastic on Canvas Wrapped Fiberglass Duct Insulation 25 LF Non-Friable Good O&M DA-3 Brown Duct Mastic on Foil Duct Insulation 40 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 8 LF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 45 LF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastics 1120 SF Non-Friable Good O&M TR1 Transite Sink 12 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M Chalkboard mastic 40 SF Non-Friable Good O&M 168 SF Non-Friable Good O&M 308 SF Non-Friable Good O&M 72 SF Non-Friable Good O&M AD-1 214 A Storage 214 Prep and Storage FT-14 FT-14 White 12"x12" Vinyl Floor Tile with Beige Mottling and Associated Mastic White 12"x12" Vinyl Floor Tile with Beige Mottling and Associated Mastic BM-1 Residual Baseboard Mastic Men's Restroom No suspect ACM Custodian 1 FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 48 SF Non-Friable Good O&M 0872-003 Duct mastic 12 LF Non-Friable Good O&M Non-Friable Good O&M Women's Restroom Room 217 No suspect ACM FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 30 1176 SF Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 216 Room 219 219 Prep room Room 218 HA Material Description Estimated Quantity Friability Condition Response Action TR1 Transite Sink 15 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 48 LF Non-Friable Good O&M AD-1 Chalkboard mastic 40 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 1176 SF Non-Friable Good O&M TR1 Transite Sink 15 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M AD-1 Chalkboard mastic 20 SF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 1176 SF Non-Friable Good O&M TR1 Transite Sink 15 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 48 LF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M AD-1 Chalkboard mastic 20 SF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics 264 SF Non-Friable Good O&M TR1 Transite Sink 1 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 38 SF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastics 1176 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 32 LF Non-Friable Good O&M TR1 Transite Sink 15 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M AD-1 Chalkboard mastic 20 SF Non-Friable Good O&M 31 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number 218 Prep Room Room 200 HA Material Description Estimated Quantity Friability Condition Response Action FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastics 392 SF Non-Friable Good O&M TR1 Transite Sink 1 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 100 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 616 SF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 4 LF Non-Friable Good O&M 750 SF Non-Friable Good O&M 1700 SF Non-Friable Good O&M FT-2 Satellite Cafeteria FT-5 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics Maroon Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 0872-015 Gray Window Caulking 50 LF Non-Friable Good O&M DA-3 Brown Duct Mastic on Foil Duct Insulation 150 LF Non-Friable Good O&M Satellite Cafeteria Storage S-200 Corridor by S-200 Elevator near 200 Room 201 No suspect ACM No suspect ACM USA-03 Mudded Pipe Fitting 30 EA Friable Good O&M USA-21 Fire Door 4 EA Non-Friable Good O&M 0872-009 Terrazzo flooring 4160 SF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 35 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 702 SF Non-Friable Good O&M 32 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M S-201 Office 3 Room 202 Storage by 202 No suspect ACM FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 100 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 40 LF Non-Friable Good O&M 0872-015 Window Caulk 128 LF Non-Friable Poor O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 720 SF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 6 EA Friable Good O&M BM-1 Residual Baseboard Mastic 4 LF Non-Friable Good O&M PA-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation 16 LF Non-Friable Good O&M Men's Faculty Restroom No suspect ACM Access hatch next to Room 202 No suspect ACM Room 203 Faculty Room 0872-015 Gray Window Caulking 160 LF Non-Friable Poor O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 1008 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 4 LF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 288 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 64 LF Non-Friable Poor O&M VB-1 Black Vinyl Baseboard and Mastic 50 LF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 400 SF Non-Friable Good O&M 33 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 209 Room 210 Room 211 HA Material Description Estimated Quantity Friability Condition Response Action 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 720 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 720 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M 720 SF Non-Friable Good O&M 672 SF Non-Friable Good O&M FT-17 FT-17 Room 204 Room 205 Room 206 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M USA-03 Mudded Pipe Fitting 17 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 720 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M 34 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 207 Room 208 HA Material Description Estimated Quantity Friability Condition Response Action VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 720 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 720 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M USA-03 Mudded Pipe Fitting 10 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 720 SF Non-Friable Good O&M Men's Restroom 206 No suspect ACM Women's Restroom 206 No suspect ACM Room 220 Room 221 0872-015 Gray Window Caulking 228 LF Non-Friable Poor O&M AD-1 Chalkboard mastic 170 LF Non-Friable Good O&M USA-21 Fire Door 2 EA Non-Friable Good O&M TR1 Transite Sink 2 EA Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 1200 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 170 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Poor O&M USA-21 Fire Door 2 EA Non-Friable Good O&M 35 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 222 Custodial adjacent S203 Science Office HA Material Description Estimated Quantity Friability Condition Response Action FT-8 Olive Green Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 1200 SF Non-Friable Good O&M TR1 Transite Sink 3 EA Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 170 LF Non-Friable Good O&M AD-1 Chalkboard mastic 160 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Poor O&M AD-1 Chalkboard mastic 80 SF Non-Friable Good O&M USA-21 Fire Door 2 EA Non-Friable Good O&M TR1 Transite Sink 15 EA Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 1200 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 170 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 10 EA Friable Good O&M DA-2 Gray Duct Mastic on Bare Metal Duct 4 LF Non-Friable Good O&M PA-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation 40 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 26 LF Non-Friable Good O&M 170 SF Non-Friable Good O&M 45 SF Non-Friable Good O&M 10 LF Non-Friable Good O&M FT-2 FT-2 Science Office Storage PA-1 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastics White Mastic on Paper Wrapped Fiberglass Pipe Insulation DA-2 Gray Duct Mastic on Bare Metal Duct 12 LF Non-Friable Good O&M DA-4 Red Duct Mastic on Bare Metal Duct 4 LF Non-Friable Good O&M Women's Faculty Restroom No suspect ACM 36 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 223 HA Material Description Estimated Quantity Friability Condition Response Action 0872-015 Gray Window Caulking 228 LF Non-Friable Good O&M AD-1 Chalkboard mastic 160 SF Non-Friable Good O&M TR1 Transite Sink 7 EA Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 170 LF Non-Friable Good O&M USA-21 Fire Door 2 EA Non-Friable Good O&M 1200 SF Non-Friable Good O&M 280 SF Non-Friable Good O&M FT-17 223 Prep Room 222 Dark Room Room 224 Room 225 Room 226 FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic VB-1 Black Vinyl Baseboard and Mastic 56 LF Non-Friable Good O&M FT-19 Beige 9"x9" Vinyl Floor Tile with Red and Light Tan Streak and Associated Mastic 96 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 36 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Poor O&M USA-21 Fire Door 2 EA Non-Friable Good O&M TR1 Transite Sink 6 EA Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 1200 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 170 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Poor O&M USA-21 Fire Door 2 EA Non-Friable Good O&M TR1 Transite Sink 6 EA Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 1200 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 170 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M 37 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number 222 Prep Room HA Material Description Estimated Quantity Friability Condition Response Action FT9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 754 SF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M TR1 Transite Sink 2 EA Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 160 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 56 LF Non-Friable Good O&M 222 Prep Room Storage 225 Storage 224 Storage Room 227 Special Education Office S-203 Office 4 No suspect ACM FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 160 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 56 LF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 160 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 56 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-18 Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 720 SF Non-Friable Good O&M AD-1 Chalkboard mastic 80 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 LF Non-Friable Good O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 234 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 85 LF Non-Friable Good O&M 80 SF Non-Friable Good O&M 108 SF Non-Friable Good O&M 1 EA Non-Friable Good O&M FT-6 FT-6 USA-21 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Fire Door 38 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA FT-15 Audio Visual Room FT-6 Faculty 226 Beige 9"x9" Vinyl Floor Tile with Light Beige Streaks and Associated Mastic Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Friability Condition Response Action 60 SF Non-Friable Good O&M 480 Non-Friable Good O&M Transite Sink 2 EA Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 392 SF Non-Friable Good O&M Non-Friable Good O&M Non-Friable Good O&M TR-1 Stair 1 Transite Sink 1 EA Brown Black Vinyl Baseboard and Mastic 56 LF and Mastic No suspect ACM FT-16 Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 4800 SF Non-Friable Good O&M AD-2 Carpet mastic 324 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 260 LF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 150 SF Non-Friable Good O&M AD-3 Stair tread mastic 110 SF Non-Friable Good O&M Mech. Room 3 Library Conference room Estimated Quantity TR1 VB-2 Library Material Description No suspect ACM FT-16 Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 260 SF Non-Friable Good O&M 0872-006 Sink Insulation 1 EA Non-Friable Good O&M Residual Baseboard Mastic 24 LF Non-Friable Good O&M 672 SF Non-Friable Good O&M 340 SF Non-Friable Good O&M 55 LF Non-Friable Good O&M BM-1 Library Classroom FT-15 Nurse's Office and Waiting Room FT-9 BM-1 Beige 9"x9" Vinyl Floor Tile with Light Beige Streaks and Associated Mastic Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics Residual Baseboard Mastic 39 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Nurse Offices Faculty across Room 226 Hallway # 9 Room 231 HA Material Description Estimated Quantity Friability Condition Response Action FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 545 SF Non-Friable Good O&M 0872-006 Sink Insulation 1 EA Non-Friable Good O&M FT-16 Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 120 Non-Friable Good O&M BM-1 Residual Baseboard Mastic 105 LF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 4688 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 620 LF Non-Friable Good O&M 0872-006 Sink insulation 4 SF Non-Friable Good O&M TR1 Transite Sink 1 EA Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 400 SF Non-Friable Good O&M 0872-009 Terrazzo flooring 3320 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 16 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Poor O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 1508 SF Non-Friable Good O&M AD-1 Chalkboard mastic 80 SF Non-Friable Good O&M 0872-006 Sink insulation Brown Black Vinyl Baseboard and Mastic and Mastic White Mastic on Paper Wrapped Fiberglass Pipe Insulation 4 EA Non-Friable Good O&M 170 LF Non-Friable Good O&M 20 LF Non-Friable Good O&M VB-2 Storage Closet by Office Room 228 PA-1 TR1 Transite Sink 8 EA Non-Friable Good O&M TR2 Transite Fume Hood 2 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Good O&M 40 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action USA-21 Fire Door 2 EA Non-Friable Good O&M AD-1 Chalkboard mastic 168 SF Non-Friable Good O&M 1568 SF Non-Friable Good O&M 170 LF Non-Friable Good O&M 384 SF Non-Friable Good O&M FT-17 VB-1 FT-17 228 Prep TR1 Transite Sink 8 EA Non-Friable Good O&M TR2 Transite Fume Hood 1 EA Non-Friable Good O&M USA-21 Fire Door Black Vinyl Baseboard and Mastic and Mastic Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 1 EA Non-Friable Good O&M 90 LF Non-Friable Good O&M 96 SF Non-Friable Good O&M Fire Door 1 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-18 Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 1137 SF Non-Friable Good O&M AD-1 Chalkboard mastic 80 SF Non-Friable Good O&M 0872-006 Sink insulation 8 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 100 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 504 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 15 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 4 EA Friable Good O&M VB-1 Prep Storage FT-17 USA-21 Room 229 Room 229B S-204 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic Black Vinyl Baseboard and Mastic and Mastic Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 41 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 232 Room 230 HA Material Description Estimated Quantity Friability Condition Response Action 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 442 SF Non-Friable Good O&M AD-1 Chalkboard mastic 40 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Poor O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 1568 SF Non-Friable Good O&M AD-1 Chalkboard mastic 168 SF Non-Friable Good O&M TR1 Transite Sink 15 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 170 LF Non-Friable Good O&M USA-21 Fire Door 2 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 228 LF Non-Friable Good O&M 1456 SF Non-Friable Good O&M 70 LF Non-Friable Good O&M 0872-006 Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Black Vinyl Baseboard and Mastic and Mastic Sink insulation 4 SF Non-Friable Good O&M 0872-009 Terrazzo flooring 1848 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 20 EA Friable Good O&M 0872-015 Gray Window Caulking 548 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 50 EA Friable Good O&M USA-21 Fire Door 6 EA Non-Friable Good O&M 0872-009 Terrazzo flooring 5376 SF Non-Friable Good O&M Non-Friable Good O&M FT-18 Room 233 VB-1 Hallway # 10 Cafeteria Kitchen Faculty Lunch Room No suspect ACM 0872-015 Gray Window Caulking 42 128 LF Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Laundry Room Hallway # 12 HA Material Description Estimated Quantity Friability Condition Response Action FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 384 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 5 EA Friable Good O&M USA-03 Mudded Pipe Fitting 50 EA Friable Good O&M BM-1 Residual Baseboard Mastic 40 LF Non-Friable Good O&M 0872-009 Terrazzo flooring 4260 SF Non-Friable Good O&M Friable Good O&M 1600 SF Non-Friable Good O&M 114 SF Non-Friable Good O&M Gym Ice Room No suspect ACM USA-03 Mudded Pipe Fitting Boy's Activity Room Activity Room 1 No suspect ACM FT-16 FT-9 Physical Education Office 6 EA Light Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastics 0872-009 Terrazzo flooring 30 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 15 EA Friable Good O&M Coaches Room USA-03 Mudded Pipe Fitting 3 EA Friable Good O&M Boy's Locker Room 0872-015 Gray Window Caulking 140 LF Non-Friable Good O&M Girl's Locker Room 0872-015 Gray Window Caulking 140 LF Non-Friable Good O&M S-205 0872-015 Gray Window Caulking 140 LF Non-Friable Good O&M Hallway at S-205 0872-009 Terrazzo flooring 700 SF Non-Friable Good O&M Girls Locker Small No suspect ACM Girls Corridor 0872-009 Terrazzo flooring 357 SF Non-Friable Good O&M Baseball/Lacrosse Office FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 120 SF Non-Friable Good O&M Friable Good O&M Men's Basketball Office Athletic Storage 2 No suspect ACM USA-03 Mudded Pipe Fitting 43 4 EA Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action PA-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation 30 LF Non-Friable Good O&M Friable Good O&M Girls Restroom No suspect ACM Athletic Storage No suspect ACM Boys Bathroom No suspect ACM Women's Custodial Restroom Men's Custodial Restroom Girls Towel Supply No suspect ACM Girls Shoe Room No suspect ACM Weight Room No suspect ACM S-207 No suspect ACM Custodial next to S-205 No suspect ACM No suspect ACM USA-03 Mudded Pipe Fitting Community Room 240 Storage Closet Room 240 7 EA No suspect ACM KL-1 Kiln 1 EA Friable Good O&M 0872-015 Chalkboard mastic 280 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 1 EA Friable Good O&M 12 EA Friable Good O&M Gym Storage Room No suspect ACM Janitorial Storage No suspect ACM Room at the bottom of Boiler Boiler Room USA-03 Mudded Pipe Fitting USA-21 Fire Door 1 EA Non-Friable Good O&M BR-1 Breeching Insulation 96 SF Friable Good O&M BG1 Boiler Gasket 12 EA Non-Friable Good O&M PA-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation 320 LF Non-Friable Good O&M 44 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action USA-21 Fire Door 2 EA Non-Friable Good O&M Storage next to Boiler Office Room 234 No suspect ACM 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 672 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 15 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M Friable Good O&M Faculty Restroom 234 Boiler Room Corridor No suspect ACM USA-03 Mudded Pipe Fitting Custodian Room 45 EA No suspect ACM Janitorial Closet 238 USA-03 Mudded Pipe Fitting 8 EA Friable Damaged Remove Office # 5 FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 160 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M Room 235 Room 235 Closet 1 AD-1 Chalkboard mastic 125 SF Non-Friable Good O&M USA-21 Fire Door 1 EA Non-Friable Good O&M USA-03 Mudded Pipe Fitting 14 EA Friable Damaged Remove Room 235 Closet 2 239 Dark Room Room 238 No suspect ACM USA-03 Mudded Pipe Fitting 20 EA Friable Good O&M FT-18 Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 2100 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 15 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M 45 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 236 Room 235 Office Room 239 HA Material Description Estimated Quantity Friability Condition Response Action FT-18 Gray Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 1750 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 10 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 15 EA Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 10 EA Friable Good O&M USA-21 Fire Door 1 EA Non-Friable Good O&M 0872-015 Window Caulking 128 LF Non-Friable Poor O&M DA-1 White Mastic on Bare Metal Duct 20 LF Non-Friable Good O&M AD-1 Chalkboard mastic 320 SF Non-Friable Good O&M USA-28 Transite panel 8 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M 620 SF Non-Friable Good O&M 180 SF Non-Friable Good O&M 40 SF Non-Friable Good O&M 600 SF Non-Friable Good O&M 3rd Floor Room 300 FT-9 FT-10 FT-11 Room 301 FT-6 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Beige 9"x9" Vinyl Floor Tile with Black Streaks and Associated Mastic Brown 9"x9" Vinyl Floor Tile with Black and Beige Streaks and Associated Mastic Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 0872-015 Chalkboard mastic 240 SF Non-Friable Good O&M USA-28 Transite panel 11 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 4 SF Non-Friable Good O&M Boys Bathroom next to Room 307 No suspect ACM 46 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Girls Bathroom next to Room 307 S-301 Room 303 Room 304 Room 305 Friability Condition Response Action No suspect ACM FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 468 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 25 LF Non-Friable Good O&M Janitor Closet by 301 Room 302 Estimated Quantity Material Description No suspect ACM 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M AD-1 Chalkboard mastic 320 SF Non-Friable Good O&M USA-28 Transite panel 8 SF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 616 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M USA-28 Transite panel 11 SF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 816 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 4 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M USA-28 Transite panel 8 SF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 616 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 4 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 SF Non-Friable Good O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 630 SF Non-Friable Good O&M 47 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action FT-7 Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic 10 SF Non-Friable Good O&M AD-1 Chalkboard mastic 240 SF Non-Friable Good O&M USA-28 Transite panel 10 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 84 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 48 LF Non-Friable Poor O&M 308 SF Non-Friable Good O&M 28 SF Non-Friable Good O&M FT-6 Office b/w 305 & 307 Room 307 Room 306 Room 308 FT-9 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic USA-28 Transite panel 44 SF Non-Friable Good O&M 0872-006 Sink insulation 4 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Poor O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 1080 SF Non-Friable Good O&M AD-1 Chalkboard mastic 160 SF Non-Friable Good O&M USA-28 Transite Panel 44 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 10 LF Non-Friable Good O&M FT-17 Gray 12"x12" Vinyl Floor Tile with Black Blotches and Associated Mastic 616 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M AD-1 Chalkboard mastic 320 SF Non-Friable Good O&M USA-28 Transite panel 8 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 696 SF Non-Friable Good O&M AD-1 Chalkboard mastic 320 SF Non-Friable Good O&M 48 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Room 309 Room 310 HA Material Description Estimated Quantity Friability Condition Response Action USA-28 Transite panel 8 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 4 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 800 SF Non-Friable Good O&M AD-1 Chalkboard mastic 320 SF Non-Friable Good O&M USA-28 Transite panel 8 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 128 LF Non-Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 698 SF Non-Friable Good O&M AD-1 Chalkboard mastic 320 SF Non-Friable Good O&M USA-28 Transite Panel 8 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 4 SF Non-Friable Good O&M S-300 Corridor by 311 No suspect ACM USA-21 Fire Door 2 EA Non-Friable Good O&M 0872-015 Gray Window Caulking 40 LF Non-Friable Good O&M USA-28 Transite Panel 24 SF Non-Friable Good O&M 0872-009 Terrazzo Flooring 2500 SF Non-Friable Good O&M FP-1 Fire Proofing Trash Chute Door 1 EA Friable Good O&M Gray Window Caulking 128 LF Non-Friable Poor O&M 700 SF Non-Friable Good O&M 51 SF Non-Friable Good O&M 0872-015 FT-6 Room 311 FT-7 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic Green 9"x9" Vinyl Floor Tile with Light Beige and Black Streaks and Associated Mastic AD-1 Chalkboard mastic 320 SF Non-Friable Good O&M USA-28 Transite panel 24 SF Non-Friable Good O&M 49 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA VB-1 Office Black Vinyl Baseboard and Mastic and 4 SF Mastic No suspect ACM Storage New Wing (314) 312 A 312 Faculty Lounge Room 313 Room 315 Estimated Quantity Material Description Friability Condition Response Action Non-Friable Good O&M No suspect ACM FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 1344 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 8 SF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 728 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 1224 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M 0872-011 Transite Window Sill 2 EA Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 1400 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 64 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 800 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 64 LF Non-Friable Good O&M Fire Door 2 EA Non-Friable Good O&M 165 LF Non-Friable Good O&M 400 LF Non-Friable Good O&M 24 LF Non-Friable Good O&M USA-21 PA-1 Mechanical Room 312 DA-1 CK-1 White Mastic on Paper Wrapped Fiberglass Pipe Insulation White Seam Mastic on Canvas Wrapped Fiberglass Duct Insulation White Door Caulking 50 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number HA Material Description Estimated Quantity Friability Condition Response Action DA-2 Red Duct Mastic 20 LF Non-Friable Good O&M 224 SF Non-Friable Good O&M 176 SF Non-Friable Good O&M 1344 SF Non-Friable Good O&M 315 A FT-1 315 C / Radio Control Room FT-1 FT-2 Room 316 BM-1 Residual Baseboard Mastic 42 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 16 LF Non-Friable Good O&M 168 SF Non-Friable Good O&M 54 SF Non-Friable Good O&M 1344 SF Non-Friable Good O&M Residual Baseboard Mastic 6 SF Non-Friable Good O&M Gray Window Caulking 48 LF Non-Friable Good O&M 54 SF Non-Friable Good O&M 672 SF Non-Friable Good O&M Residual Baseboard Mastic 7 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 64 LF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic 168 SF Non-Friable Good O&M 316 A FT-2 316 B FT-2 FT-1 Room 318 BM-1 0872-015 318 B FT-2 FT-1 Room 317 Server White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic BM-1 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic Girls Bathroom by Room 327 No suspect ACM 51 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Service Custodian Closet by 327 Boys Bathroom by Room 327 Room 327 / Electrical Closet HA Material Description Estimated Quantity Friability Condition Response Action FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 36 SF Non-Friable Good O&M 48 SF Non-Friable Good O&M 588 SF Non-Friable Good O&M Black Vinyl Baseboard and Mastic 6 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 32 LF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic 672 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 6 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 64 LF Non-Friable Good O&M 432 SF Non-Friable Good O&M 168 SF Non-Friable Good O&M No suspect ACM FT-2 FT-1 Room 319 Room 320 Foyer New Wing 3rd Floor Corridor Office by 321 Electrical / Data Storage by 321 Electrical / Data 321 Electrical / Data Room 321 New Wing 3rd Floor Corridor VB-1 FT-1 FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 0872-015 Gray Window Caulking 24 LF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 168 SF Non-Friable Good O&M 0872-003 Duct mastic 20 LF Non-Friable Good O&M 0872-003 Duct mastic 20 SF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic 672 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 8 SF Non-Friable Good O&M FT-2 White 12"x12" Vinyl Floor Tile with Red Streaks and Associated Mastic 3000 SF Non-Friable Good O&M 52 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Estimated Quantity Friability Condition Response Action 200 SF Non-Friable Good O&M 200 SF Non-Friable Good O&M 200 SF Non-Friable Good O&M 728 SF Non-Friable Good O&M Residual Baseboard Mastic 8 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 32 LF Non-Friable Good O&M FT-1 White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic 728 SF Non-Friable Good O&M VB-1 Black Vinyl Baseboard and Mastic 8 LF Non-Friable Good O&M 0872-015 Gray Window Caulking 8 LF Non-Friable Good O&M HA FT-3 FT-4 FT-5 FT-1 Room 322 Room 323 BM-1 Material Description Light Blue Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Green Mottled 12"x12" Vinyl Floor Tile and Associated Mastic Maroon Mottled 12"x12" Vinyl Floor Tile and Associated Mastic White 12"x12" Vinyl Floor Tile with Blue Streaks and Associated Mastic S-300 Roof Access Gym Attic Auditorium No suspect ACM 0872-009 Terrazzo 25 SF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 60 EA Friable Good O&M USA-30 Vibration dampener 7 EA Non-Friable Good O&M BR-1 Breeching Insulation 600 SF Friable Good O&M DI-1 Duct Insulation 600 SF Friable Good O&M FT-9 Brown Mottled 12"x12" Vinyl Floor Tile and Associated Mastic 2500 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 300 LF Non-Friable Good O&M Mechanical Room Sound Room No suspect ACM FT-6 Beige 9"x9" Vinyl Floor Tile with Tan Streaks and Associated Mastic 200 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 60 LF Non-Friable Good O&M 53 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 Table II. Room by Room Inventory Room Number Auditorium Upstairs Corridor Auditorium Corridor Hallway # 7 HA Material Description Estimated Quantity Friability Condition Response Action USA-21 Fire Door 2 EA Non-Friable Good O&M AP-1 Acoustical Plaster Ceiling 2052 SF Friable Good O&M 0872-009 Terrazzo flooring 2052 SF Non-Friable Good O&M BM-1 Residual Baseboard Mastic 64 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 10 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 35 EA Friable Good O&M USA-21 Fire Door 3 EA Non-Friable Good O&M BM-1 Residual Baseboard Mastic 114 SF Non-Friable Good O&M 0872-009 Terrazzo Flooring 4128 SF Non-Friable Good O&M 0872-015 Gray Window Caulking 28 LF Non-Friable Good O&M USA-03 Mudded Pipe Fitting 90 EA Friable Good O&M USA-21 Fire Door 12 EA Non-Friable Good O&M 54 Three-Year AHERA Re-Inspection Report BCPS – Dulaney High School September 17, 2015 III. RECOMMENDATIONS The following recommendations are made based on the results of the re-inspections: IV. All materials identified in this report should be maintained in good conditions through the continuation of the Operations and Maintenance (O&M) Program Any damaged and/or significantly damaged ACBM identified in Table II of this ReInspection Report should be abated. Non-damaged ACBM should also be included in the O&M Program Materials which have not been sampled to determine asbestos content should be assumed to be ACBMS and included in the O&M Program COST ESTIMATES Estimated asbestos abatement costs are presented below. The cost estimates are applicable to large scale abatement projects or smaller scale project involving one mobilization. Floor Tile $4.00/SF Floor Tile Mastic $2.00/SF Residual Baseboard Mastic $2.00/SF Pipe Fittings <3” $22.00/EA Pipe Fittings >3” $45.00/EA Pipe Lagging (Insulation) <3” $15.00/LF Pipe Lagging (Insulation) >3” $25.00/LF Spray Applied Fireproofing Insulation $25.00/SF Mechanical Duct $15.00/SF Transited $4.00/SF Drywall (with Joint Compound) $3.00/SF Plaster $12.00/SF Fire Door $250.00/ EA Chalkboard Mastic $450.00/Chalkboard 55 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX H: LIMITED RENOVATIONS PROJECTS MEMORANDUM Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Limited Renovations Projects Memorandum-Appendix H February 25, 2016 Limited Renovation Projects Memorandum The limited renovation project designation was approved by the State of Maryland Interagency Committee on School Construction (IAC) on April 19, 2007. The IAC approved a motion that specifies “a limited renovation shall 1) Bring to current performance standards five or more building systems, and 2) Include widespread architectural improvements and enhancements of education programs, subject to evaluation by the IAC.” The building systems that are eligible for limited renovation project inclusion are outlined below. Systems for Limited Renovation Projects Baltimore County Public Schools Recommendation as a Comprehensive List May 12, 2008 1. 2. Structural Systems a. Roofs System b. Wall System c. Floors System d. Ceiling System e. Windows (Comprehensive upgrade) f. Doors (Comprehensive upgrade) i. Hardware (only) Mechanical Systems a. Heating System i. Boilers ii. Unit Ventilators (heat only) iii. Heating piping b. Ventilating System i. Ventilators (AHU) c. Air Conditioning System i. Chillers ii. Individual Zoned Roof-top Air Conditioners and Heating Units 1. Health Suite 2. Administrative Offices 3. Computer Labs 4. Science Labs iii. Cooling piping d. Mechanical Sub-systems i. New Gas Service 1 3. 4. 5. 6. 7. Plumbing Systems a. Water Supply i. Domestic Water Piping (interior) ii. Domestic Water Piping (exterior) b. Sanitary Sewer System Electrical System a. Power System (Comprehensive upgrade of Power including switchgear and distribution) i. New Service Exterior ii. New Gear/Power System iii. Generator (Natural Gas/Diesel) b. Lighting System i. Exterior ii. Interior Fire Safety a. Fire Alarm System b. Sprinklers Conveying Systems a. Chair Lifts b. Elevator (installation, replacement or renovation of elevator system) Miscellaneous Systems a. Telecommunications i. Internal CCTV ii. Phones iii. Speaker System/PA b. Security Systems i. Doors ii. Cameras and Servers iii. Card Reader iv. Door Mag Locks v. Alarms c. ADA Systems i. Chairlifts ii. Ramps iii. Bathrooms 2 8. Educational Enhancements (Must be included in all Limited Renovation projects as “sixth system” – these are improvements or enhancements to portions of the building that impact the education of a large percentage of the school’s population) a. Renovation/Updating of Science Rooms & Support Rooms b. Renovation/Updating of Math Rooms c. Renovation/Updating of Art Rooms d. Renovation/Updating of Music Rooms e. Renovation/Updating of Media Center & Support Rooms (Computer Labs) f. Renovation/Updating of Health Suite g. Updating/Conversion of Home Economics Rooms h. Updating/Conversion of ‘Shop’ or Industrial Arts Rooms i. Cafeteria Upgrades 3 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX I: ACKNOWLEDGMENTS Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Acknowledgments-Appendix I February 25, 2016 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX I: ACKNOWLEDGMENTS The following consultants assisted Baltimore County Public Schools Engineering and Construction staff in the evaluation and recommendation of the Assessment and Feasibility Study Limited Renovation Project Assessment: Architect Rubeling & Associates, a JMT Division Structural Engineer Columbia Engineer, Inc. M/E/P and Fire Protection Engineer JMT Engineering Estimating Lewicki Estimating Services, Inc. Baltimore County Public Schools Office of Engineering and Construction Dulaney High School Feasibility Study Acknowledgments-Appendix I February 25, 2016