Allnex Norway
Transcription
Allnex Norway
26 May 2015 Allnex Norway Energy Management – ISO 50001 Roger Søråsdekkan, Allnex Site leader, Lillestrøm www.allnex.com 1 OUR BUSINESS • $ 1.5 billion company with main focus on coating resins • A global leader in the $35 billion coating resins industry • Our 4 product lines: - Liquid Resins & Additives Radiation Curable Resins Powder Coating Resins Crosslinkers (Lillestrøm) Radiation Curable Resins 26 % Crosslinkers 23 % Powder coating resins 22 % Liquid Resins & Additives 29 % • Multiple end-user segments: - Automotive Industrial Packaging Coating and Inks Protective Consumer Electronics & Industrial Plastics Specialty Architectural Global Sales 2014 2 OUR GLOBAL BUSINESS • 17 manufacturing facilities certified with ISO 14001, ISO 9001 & OHSAS 18001, 2 sites with ISO 50001. • 11 research & technology centers • 3 joint ventures (China, Korea & Japan) N. America Sales 23% EU, Middle East & Africa Sales 48% Asia Pacific Sales 24% L. America Sales 4% More than 2000 MULTI-CULTURE EMPLOYEES WORLDWIDE 3 OUR TECHNOLOGIES End user applications Key segments Key technologies Allnex Liquid Resins & Additives Radiation Curable Resins Waterborne PUD, Alkyds, Epoxies, Acrylics CED Resins Solventborne Alkyds, Epoxies, Acrylics Coating Additives Urethane Specialties Oligomers Urethane Acrylates, Epoxy Acrylates, Polyester Acrylates, Amino Acrylates Monomers UVEKOL® Glass Lamination VANCRYL® Acrylics Automotive Protective & General Metal Architectural Plastic Inks & Overprint Varnishes Industrial Wood Electronics Plastic Powder Coating Resins Crosslinkers Polyester Resins Hybrid, Standard Durable Super Durable UV Powder Resins Additives & Master batches Amino Crosslinkers Formaldehyde-Free Crosslinkers Phenolic Coating Resins Technical Phenolics Architectural Extrusions Domestic Appliances General Metal Industrial Wood Metal Packaging Automotive Tires & Rubber Products Broad Products Portfolio for the Coating Industry 4 LOCATION 26 May 2015 5 LIILESTRØM LOCATION OVERVIEW Allnex Norge DYNEA AS 56 employees - Wood Adhesives - Panel Board Resins - Site Support -160 employees M-I Prod. Chem. 9 employees Microbeads 4 employees Invitrogen 37 employees Capacity: 36.000 MT amino resins.6 26 May 2015 6 LILLESTRØM REACTOR TRAINS 1 22 3 4 5 6 35m3 15m3 15m3 15m3 45m3 45m3 45m3 Butylated Methylated 26 May 2015 7 CHEMISTRY • Multistep reaction - Two main reactions • • Methylolation : Formaldehyde + NH2 containing compound Alkylation : Reaction between intermediate and an alcohol + HCHO Monomethylol melamine Melamine + 3 HCHO Trimethylol melamine + 6 HCHO Hexamethylol melamine (HMM) Hexamethylol melamine Hexa-alkyl methylol melamine 26 May 2015 8 RAW MATERIAL RECOVERY 26 May 2015 9 LILLESTRØM MANUFACTURING – INPUT AND OUTPUT Air Emission Raw Materials Number of: 30+ Quantity: 60,000 MT CYMELS CYREZ CYCAT Steam, 135,000 MT (=75 500 MWh) Products Number of: 70 Quantity: 30,000 MT Electricity, 7,600 MWh Solid Waste Waste Water 30,000 MT 120 MT COD 26 May 2015 10 Energy Management Standard ISO 50001 Hvordan gjorde vi det? www.allnex.com Oppstartsmøte med mai 2013 Kartlegging med juli 2013 GAP analyse med august 2013 Oppfølging og lukking av GAP Q4 2013 og Q1 2014. Sertifisering av www.allnex.com i juni 2014 13 17% LILLESTRØM ENERGY POLICY: VISION & MISSION Vision Be recognized as the leading plant at Allnex to have energy management as a continuous and sustainable improvement area. Mission • Allnex Norway will reduce and economically optimize our consumption of energy. • Lillestrøm is a LEAN plant, and will use appropriate tools and innovation to maintain sustained reduced energy consumption. Results • No unnecessary energy consumption • Reduce green house gas emissions • Become more competitive operation 26 May 2015 14 OVERALL ENERGY ANALYSIS AND OPERATION CONTROL New steam meters installed 26 May 2015 15 ENERGY CONSUMPTION FOR SOME TYPICAL PRODUCTS (2014) Energi forbruk pr produkt og pr produklinje med hjelp fra : 26 May 2015 16 Goals and effectiveness of energy use and indicators Energy models based on standards, climate and level of production predict energy usage. Analysing devaitions from model reveals waste of energy. See next two slides Electricity: Modeled and Actual Usages Steam: Modeled and Actual Usages 8 000 actual 7 000 6 000 MWH MWH modeled 750 700 650 600 550 500 450 400 350 300 modeled actual 5 000 4 000 3 000 2 000 Month “We will use the developed energy model to monitor performance and take actions” Month Performance 2013 Month To Date Modele usage d Actual varianc Total energy energy e Savings Plant (MWH) (MWH) (MWH) (k$) Drogenbos 9665 7783 1882 $104 Fengxian 3621 3325 296 $12 Hamburg 3228 2769 459 $25 Kalamazoo 9256 8555 701 $22 Langley 1670 1721 -51 $0 Lillestrom 6441 5587 854 $87 North Augusta 6248 6386 -138 -$5 Rayong 1265 1258 7 -$1 Romano 4892 5523 -631 -$28 Schoonaarde 1690 1656 34 $3 Seremban 1851 1464 387 $12 Shimonoseki 3824 3812 12 $2 Urethanes 2862 3157 -295 -$1 Wallingford 11906 12099 -193 -$6 Werndorf 3732 3623 109 $4 Wiesbaden 2405 2683 -278 -$3 Year To Date Modele usage Monthl d Actual varianc Total y Goal energy energy e Savings YTD Goal k$ (MWH) (MWH) (MWH) (k$) k$ $25 105320 90610 14710 $803 300 $3 43408 40079 3330 $160 41 $5 34877 32451 2426 $155 58 $6 110266 107041 3225 $131 77 $2 20612 20164 447 $30 25 $17 69822 63324 6497 $661 203 $7 86400 84917 1482 $34 89 $2 15880 15621 260 $12 20 $8 50539 50947 -408 $24 91 $4 23457 24198 -742 -$43 45 $3 24415 22833 1582 $54 32 $12 41186 39846 1340 $194 149 $5 56365 56885 -520 $26 58 $16 147309 144435 2873 $119 188 $6 40141 39178 963 $11 68 $5 28281 30826 -2545 $83 57 We measure our energy effectiveness in $ savings, for 2013 the figures for Lillestrøm where 6497 MWh or k$ 661. TARGETS AND PROGRESS • Activity bridge Tracks unit energy consumption and total energy consumption of the different activities implemented. 26 May 2015 19 ENERGY MANAGEMENT • Achieved ISO 50001 certification in 2014 - Supported by Enova and Norsk Industri • Plan to reduce energy concumtion by 10% by 2017 with 2012 baseline - Achieved 2/3 of this target by end of 2014 Total Energy Intensity (MWh/ton) 3,500 3,300 3,100 2,900 2,700 2,500 2,300 2,100 1,900 1,700 1,500 2009 2010 2011 2012 2013 2014 2015 2016 2009 2010 2011 2012 2013 2014 2015 2016 Target 2017 Target 2017 26 May 2015 20 OVERALL ENERGY ANALYSIS AND OPERATION CONTROL • Other activities & ideas to reduce energy consumption (not quantified) - Reduce free form charge. (i.e water/methanol stripp) Split D80 pipe from LUWA Insulation where needed (pipes) Implement action from compressed air leakages audit (Firma) Implement action from heat leakages audit (Norisol) Control water cooling “We will use the improvement tracker to manage and monitor actions for energy reduction. Yearly goals will be defined in our business plan.” 26 May 2015 21 OVERALL ENERGY ANALYSIS AND OPERATION CONTROL Suggestions brought up during management review • • • • • • • • • • • • Morten/Ronald: Kjell Even: Trond: Geir: Roger: Jan Erik: Ingvar/Kjell Even: Ingvar/Kjell Even: Alle: Ronald: Roger: Trond: 2015) Demontere topp A1 og vurdere performance før sommertopp Legge inn audit av «energy program» i audit program Øke bevissthet: Hva får vi ut av PI? Info på plant TV? PI oppfølging på kolonner Beregne energi effekten av ny mix (etter footprint) inn i bridge Process review for C1161 og C303, C1123 Autostopp på trucker? Vurdere el trucker? Ledelsen oppmuntre til å entre flere energiavvik Beregne på energiforbruk i SSA Beste energi: Vi gir gavekort fra XXL til Runar, ok 25.2.2015. Avtalt gjennomgang av REA med Jo minken (3 sessjoner i 26 May 2015 22 TARGETS AND PROGRESS • Co2 beregninger.... CO2 reduction CO2 reduction reellt (Kg) (Nordic mix) Energy activity goals and estimated savings (yearly) D80 distillate (m3) MVR unit (h) batches on "hot formalin" Bottom B1 to WWTP (MT of steam) Process improvements (less steam) New column B2 (less steam) Supplier: Schutz: 200 IBC's trough return system N2 blåsing for å redusere fri form Greif transport Supplier: Solvang: transportation of pallets D80 distillate (m3) R4 & R5 Achieved savings in 2014 Adittional 2015 savings Target Amount Saving/unit NOK KWh 3 700 300 999 000 2 053 500 200 630 126 000 200 300 500 429 214 500 360 750 300 0 0 500 300 150 000 277 500 750 300 287 100 482 850 159 968 38 057 28 102 21 617 48 285 10 000 CO2 reduksjon EU mix CO2 reduksjon Global mix 0,19 Kg CO2/Kwh 0,345 Kg CO2/Kwh 0,535 Kg CO2/Kwh 390 165 708 458 1 098 623 38 057 69 104 107 161 68 543 124 459 193 001 0 0 0 52 725 95 738 148 463 91 742 166 583 258 325 10 000 10 000 10 000 3 600 3 600 3 600 654 831 1 177 941 1 819 172 1 000 1 776 600 3 374 900 1 303 500 2 342 100 473 100 1 032 800 296 029 Goal for 2015 should be implementation of a NOK 500 000 savings. 26 May 2015 23 RESULTS OF INTERNAL/EXTERNAL AUDITS 26 May 2015 24 TRAINING AWARENESS & COMPETENCE • Senior Engineer responsible for training other employees about energy awareness • Energy saving activities discussed weekly with shift members • Monthly energy performance meeting with all sites, sharing BESP • Morning market twice weekly follow up on key energy indicators • Allnex Academy (online Allnex training platform) used for operator training and awareness • Energy projects (CAPEX) followed in monthly CAPEX meetings • 3 training sessions planned in WWTP (Renseanlegg) treatment plants in 2015 “We will promote a high level of energy awareness among all employees.” 26 May 2015 25 OVERALL ENERGY ANALYSIS AND OPERATION CONTROL • Changes in operations affecting energy consumption 2013-2014 • 2013: Nitrogen generation plant (=> + 400 MWH) • 2014: Globalization of free form spesifications (=> + 330 MWh) • 2014: Summer shut down: New main steam meeter installed • Smaller changes (not included in energy bridge) • New workshop with use of exess energy from nitrogen generation • Reduce number of diesel forklifts from 4 to 3 • Others? 26 May 2015 26 COMMUNICATION WITH EXTERNAL STAKEHOLDERS Enova • Final report submited in August and compensation of KNOK 1 000 for implementing ISO 50001 program given in September. • Support investments and worked hours (1 832) on energy management • Total cost of project KNOK 3 260 Allnex Employee Hours 90 80 70 60 50 40 30 20 10 0 January February March April May June July August September October November December 26 May 2015 27 ? 26 May 2015 28 26 May 2015 Thank you www.allnex.com ADDITIONAL INFORMATION AND RESOURCES • Allnex energy management in articles at Norsk Energi og Standard Norge: • http://www.standard.no/standardisering/suksesshistorier/sukse sshistorie-allnex-norway/ • http://www.energi.no/allnex-norway-ks-har-best%c3%a5tteksamen-i-energiledelse 26 May 2015 30 disclaimer Notice: Trademarks indicated with the ®, ™ or * are registered, unregistered or pending trademarks of Allnex IP Sàrl or its directly or indirectly affiliated Allnex Group companies. Disclaimer: Allnex Group companies (“Allnex”) decline any liability with respect to the use made by anyone of the information contained herein. The information contained herein represents Allnex's best knowledge thereon without constituting any express or implied guarantee or warranty of any kind (including, but not limited to, regarding the accuracy, the completeness or relevance of the data set out herein). Nothing contained herein shall be construed as conferring any license or right under any patent or other intellectual property rights of Allnex or of any third party. The information relating to the products is given for information purposes only. No guarantee or warranty is provided that the product and/or information is adapted for any specific use, performance or result and that product and/or information do not infringe any Allnex and/or third party intellectual property rights. The user should perform its own tests to determine the suitability for a particular purpose. The final choice of use of a product and/or information as well as the investigation of any possible violation of intellectual property rights of Allnex and/or third parties remains the sole responsibility of the user. © 2015 Allnex Belgium SA. All Rights Reserved 26 May 2015 31
Similar documents
Phenolic Resins Market Analysis Forecast to 2020 by P&S Market Research
The key drivers behind the growing demand of global phenolic resins include growing demand from construction and transports application, and increased usage of fire retardant materials in automotive and aircraft components. However, the volatility in crude oil prices is expected to restrain the growth of the global phenolic resins market, as crude oil is a major raw material needed for the manufacturing of phenolic resins.
More information