Construction Status Reports
Transcription
Construction Status Reports
Additions - Various Schools Administrative Data Architect: General Contractor: Phase of Work: Bulletin Board Various Various Design and Construction Vital Statistics Before n/a n/a State Rated Capacity Gross Square Footage After n/a n/a Scope of Work Ongoing program to provide additions at various schools. Odenton ES Current Status See following sheet for details Area of Concern Woodside ES Project Schedule Approved Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Actual See following sheet for details Fiscal Data Plans & Engineering Construction FF&E Total Approved BoE Program* $575,000 9,000,000 425,000 $10,000,000 Approved Current AACo Program* Appropriation Encumbered $575,000 See Additions Project Page 9,000,000 425,000 $10,000,000 Change Orders Cost Remarks To Date Total * FY 2017 1 of 26 CSR 2016-7 Anne Arundel County Public Schools Facilities Division Additions at Various Schools Schools in Design: School Marley ES Project Const. Cost Fiscal Year Description 4 Classroom $2,000,000 Addition Estimate FY18 Ed Specs/ Schematic Design Dev./ Const. Doc. Start Const. Substantial Completion Architect General Contractor Current Status Apr-16/ Sept-16 Dec-16/ Feb-17 Jul-17 Mar-18 BWH TBD Design 3% Apr-16/ Sept-16 Dec-16/ Feb-17 Jul-17 Mar-18 BWH TBD Design 3% Ed Specs/ Schematic Design Dev./ Const. Doc. Start Const. Substantial Completion Architect General Contractor Current Status Sep-15 May-16 Jul-16 Aug-17 TCA North Point Builders Construction 2% Jul-16 Mar-17 WRA Tech Contracting Construction 2% Sep-16 Mar-17 WRA TBD Bidding Schematic Design phase underway. Solley ES 6 Classroom $2,500,000 Addition Estimate FY18 Schematic Design phase underway. Schools in Construction: School Odenton ES Project Const. Cost Fiscal Year Description 6 Classroom $3,656,000 Addition FY 2017 Contract awarded June 22, 2016, at the Board of Education Meeting. Gym Addition $2,281,700 FY 2015 Aug-14 Mar-15 Woodside ES Contract awarded June 22, 2016, at the Board of Education Meeting. Gym Addition $3,009,000 FY 2017 Aug-14 Mar-15 Millersville ES Out to bid. 2 of 26 CSR 2016-7 Arnold ES - Replacement Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board GWWO Architects Jacobs, Inc. Design Vital Statistics Before 456 56,255 State Rated Capacity Gross Square Footage After 565 88,741 Scope of Work The design and construction of a replacement school for Arnold Elementary School. Current Status Construction Document phase of design is continuing. Project is on schedule for bidding in December. Area of Concern Project Schedule Approved Sep-13 Nov-13 Jul-14 Nov-14 Mar-15 Sep-15 Jan-16 Apr-16 Aug-18 Dec-18 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Sep-13 Mar-14 Sep-15 Dec-15 Aug-16 Sep-16 Jan-17 Apr-17 Jun-19 Dec-19 Actual Nov-13 Mar-14 Sep-15 Dec-15 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $3,271,000 31,071,000 2,111,000 895,000 Approved AACo Program $3,271,000 31,071,000 2,111,000 895,000 Total $37,348,000 $37,348,000 Current Appropriation $3,271,000 15,536,000 Encumbered $2,386,460 358,000 $19,165,000 $2,386,460 Change Orders Cost Remarks To Date Total 3 of 26 CSR 2016-7 Benfield ES - Modernization Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board GWWO Architects Jacobs, Inc. Construction Vital Statistics Before 353 42,234 State Rated Capacity Gross Square Footage After 552 82,775 Scope of Work The design and construction for the modernization of Benfield Elementary School. Current Status Phase II, renovation of original primary wing is 100% complete. Phase III, renovation of former intermediate wing has started and is 2% complete. Project is 73% complete. Area of Concern Project Schedule Approved Jun-11 Sep-11 Mar-12 May-12 Oct-12 Jan-13 May-14 Aug-14 Jan-17 Jan-18 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Jun-11 Sep-11 Mar-12 May-12 Mar-14 Jul-14 Jul-14 Sep-14 Jan-17 Jan-18 Actual Jun-11 Sep-11 Mar-12 May-12 Mar-14 Jul-14 Jul-14 Oct-14 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $2,542,000 31,137,000 2,217,000 1,700,000 Approved AACo Program $2,542,000 31,137,000 2,217,000 1,700,000 Total $37,596,000 $37,596,000 Current Appropriation $2,542,000 29,580,000 1,330,000 1,360,000 Encumbered $2,593,056 27,643,100 830,262 85,656 $34,812,000 $31,152,074 Change Orders Cost Remarks $241,609 To Date Total $241,609 4 of 26 CSR 2016-7 Crofton Area HS - New School Administrative Data Architect: Construction Manager: Phase of Work: GWWO Jacobs, Inc. Design Vital Statistics Before n/a n/a State Rated Capacity Gross Square Footage After 1,696 271,824 Scope of Work Construct a new high school to serve the Crofton and surrounding communities. Current Status Educational Specifications approved by Board of Education on May 4, 2016. Schematic Design underway. Area of Concern Project Schedule Approved May-16 n/a Aug-16 Dec-16 Aug-17 Aug-17 Dec-17 Jan-18 Aug-20 Dec-20 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current May-16 n/a Aug-16 Oct-16 Aug-17 Aug-17 Jan-18 Jan-18 Aug-20 Dec-20 Actual May-16 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $10,578,000 104,581,000 8,287,000 1,549,000 Approved AACo Program $10,078,000 104,581,000 8,287,000 1,549,000 Current Appropriation $6,215,000 Total $124,995,000 $124,495,000 $6,215,000 Encumbered Change Orders Cost Remarks To Date Total 5 of 26 CSR 2016-7 Edgewater ES - Feasibility Study Administrative Data Architect: Construction Manager: Phase of Work: Grimm + Parker Architects n/a Planning Vital Statistics Before 455 52,326 State Rated Capacity Gross Square Footage After 624 87,502 Scope of Work Complete a feasibility study covering the five options: do nothing, patch and paint, revitalization, modernization, and replacement. Current Status Educational Specifications approved by the Board of Education on May 4, 2016. Feasibility Study is underway with school and committee participants. Area of Concern Project Schedule Approved May-16 Nov-16 Sep-17 Jan-18 Aug-18 Jan-19 Mar-19 Apr-19 Aug-21 Dec-21 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current May-16 Nov-16 Mar-18 Jul-18 Feb-19 Jul-19 Sep-19 TBD TBD TBD Actual May-16 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $3,497,000 32,134,000 2,199,000 896,000 Approved AACo Program $3,497,000 32,134,000 2,199,000 896,000 Total $38,726,000 $38,726,000 Current Appropriation $1,007,000 Encumbered $1,007,000 Change Orders Cost Remarks To Date Total 6 of 26 CSR 2016-7 George Cromwell ES - Revitalization Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board Hord Coplan Macht Oak Contracting, LLC Design Vital Statistics Before 322 42,110 State Rated Capacity Gross Square Footage After 451 72,817 The design and construction for the revitalization of George Cromwell Elementary School. Current Status Schematic Design is being presented at the July 13, 2016, Board of Education Meeting. Area of Concern Project Schedule Approved Sep-13 Nov-13 Jul-14 Nov-14 Mar-15 Sep-15 Jan-16 Apr-16 Aug-18 Dec-18 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Sep-13 Mar-14 Jun-16 Oct-16 Jan-17 Mar-17 Apr-17 Jul-17 Dec-19 Mar-20 Actual Nov-13 Mar-14 Jul-16 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $2,855,000 27,889,000 1,932,000 915,000 Approved AACo Program $2,855,000 27,889,000 1,932,000 915,000 Total $33,591,000 $33,591,000 Current Appropriation $2,855,000 Encumbered $167,878 $2,855,000 $167,878 Change Orders Cost Remarks To Date Total 7 of 26 CSR 2016-7 High Point ES - Modernization Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board Smolen, Emr, Ilkovitch & Associates (SEI) J. Vinton Schafer & Sons, Inc. Design Vital Statistics Before 574 75,764 State Rated Capacity Gross Square Footage After 747 97,817 Scope of Work The design and construction for the modernization of High Point Elementary School. Current Status Construction Document phase of design is continuing. Project is on schedule for bidding in November 2016. Area of Concern Project Schedule Approved Jun-14 Sep-14 Jan-14 May-15 Nov-15 Feb-16 Mar-16 Jun-16 Aug-18 Dec-19 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Jun-14 Sep-14 Sep-15 Dec-15 Aug-16 Sep-16 Dec-16 Apr-17 Aug-19 Dec-19 Actual Jun-14 Sep-14 Sep-15 Dec-15 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $3,500,000 33,801,000 2,301,000 923,000 Approved AACo Program $3,500,000 33,801,000 2,301,000 923,000 Total $40,525,000 $40,525,000 Current Appropriation $3,500,000 16,901,000 Encumbered $2,343,372 369,000 $20,770,000 $2,343,372 Change Orders Cost Remarks To Date Total 8 of 26 CSR 2016-7 Jessup ES - Replacement Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board Grimm + Parker Architects Heery International, Inc. Design Vital Statistics Before 435 83,686 State Rated Capacity Gross Square Footage After 598 89,082 Scope of Work The design and construction of a replacement school for Jessup Elementary School. Current Status Construction Document phase of design is continuing. Design schedule has been modified to reflect site entrance being moved to current traffic light at 175 and Brock Bridge Rd. Project is on schedule for bidding in December. Area of Concern Project Schedule Approved Sep-13 Nov-13 Jul-14 Nov-14 Mar-15 Sep-15 Jan-16 Apr-16 Aug-18 Dec-18 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Sep-13 Mar-14 Sep-15 Dec-15 Oct-16 Dec-16 Feb-17 Apr-17 Jun-19 Dec-19 Actual Nov-13 Mar-14 Sep-15 Dec-15 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $3,477,000 32,950,000 2,203,000 897,000 Approved AACo Program $3,477,000 32,950,000 2,203,000 897,000 Total $39,527,000 $39,527,000 Current Appropriation $3,477,000 16,475,000 359,000 $20,311,000 Encumbered $1,604,476 $1,604,476 Change Orders Cost Remarks To Date Total 9 of 26 CSR 2016-7 Kindergarten Additions - Various Schools Administrative Data Architect: General Contractor: Phase of Work: Bulletin Board Various Various Design and Construction Vital Statistics Before n/a n/a State Rated Capacity Gross Square Footage After n/a n/a Scope of Work Ongoing program to provide kindergarten classroom additions at various schools. Eastport ES Current Status See following sheet for details Area of Concern Georgetown East ES Project Schedule Approved Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Actual See following sheet for details Fiscal Data Plans & Engineering Construction FF&E Project Support Total Approved BoE Program* $600,000 8,985,000 650,000 300,000 $10,535,000 Approved Current AACo Program* Appropriation Encumbered $600,000 See Kindergarten Additions 8,985,000 Projects Page 650,000 300,000 $10,535,000 Change Orders Cost Remarks To Date Total * FY 2017 10 of 26 CSR 2016-7 Anne Arundel County Public Schools Facilities Division Kindergarten Additions at Various Schools Schools in Design: School Park ES Const. Cost Fiscal Year Ed Specs/ Schematic Design Dev./ Const. Doc. Start Const. Substantial Completion Architect General Contractor Current Status $3,200,000 Estimate FY 2018 Apr-16/ Sept-16 Dec-16/ Feb-17 Jul-17 Mar-18 WRA TBD 3% Dec-16/ Feb-17 Jul-17 Mar-18 WGM TBD 3% Dec-16/ Feb-17 Jul-17 Mar-18 TCA TBD 3% Schematic Design phase underway. Riviera Beach ES $2,500,000 Estimate FY 2018 Apr-16/ Sept-16 Schematic Design phase underway. Shady Side ES $2,500,000 Estimate FY 2018 Apr-16/ Sept-16 Schematic Design phase underway. Schools in Construction: School Const. Cost Fiscal Year Ed Specs/ Schematic Design Dev./ Const. Doc. Start Const. Substantial Completion Architect General Contractor Current Status $2,729,502 FY 2016 Jun-14 Oct-14 Aug-15 Aug-16 WGM North Point Builders 80% Jun-14 Oct-14 Jun-15 Aug-16 HCM Tech Contracting 75% Jun-15 May-16 Aug-16 Aug-17 HCM Tech Contracting 2% Sep-15 May-16 Jul-16 Aug-17 TCA North Point Builders 2% Eastport ES Phase II of work is underway. Georgetown East ES $2,916,000 FY 2016 Phase II is complete. Phase III is 15% complete. $2,305,200 FY 2017 North Glen ES Contractor mobilized. $3,970,000 FY 2017 Odenton ES Contractor mobilizing on-site and preparing for summer interior classroom modifications. $1,800,000 FY 2016 Jun-14 Sep-15 Apr-16 Mar-17 Ruebling North Point Builders 18% Aug-16 Aug-17 WRA Tech Contracting 2% West Meade EEC Hollow metal frames and sprinkler pipe installation in progress. $ 2,360,100 FY 2017 Jun-15 May-16 Woodside ES Contract awarded June 22, 2016, at the Board of Education Meeting. 11 of 26 CSR 2016-7 Manor View ES - Revitalization Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board WGM Architects Whiting-Turner Contracting Co. Design Vital Statistics Before 529 72,267 State Rated Capacity Gross Square Footage After 454 70,934 Scope of Work The design and construction for the revitalization of Manor View Elementary School. Current Status Construction Document phase of design is continuing. Project is on schedule for bidding in November 2016. Area of Concern Project Schedule Approved Jun-14 Sep-14 Jan-15 May-15 Nov-15 Feb-16 Mar-16 Jun-16 Aug-18 Dec-18 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Jun-14 Sep-14 Jan-15 May-15 Aug-16 Sep-16 Dec-16 Apr-17 Aug-19 Dec-19 Actual Jun-14 Sep-14 Sep-15 Dec-15 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $2,962,000 28,620,000 1,926,000 891,000 Approved AACo Program $2,962,000 28,620,000 1,926,000 891,000 Current Appropriation $2,962,000 14,310,000 Total $34,399,000 $34,399,000 $17,629,000 Cost Encumbered $1,681,632 357,000 $1,681,632 Remarks To Date Total 12 of 26 CSR 2016-7 Open Space Enclosures - Various Schools Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board Various Various Design and Construction Vital Statistics Before n/a n/a State Rated Capacity Gross Square Footage After n/a n/a Scope of Work Provide full height walls, modification of ceilings, lighting systems, fire alarm, public address systems, and HVAC systems as required to meet current codes. Glen Burnie HS Current Status See following sheet for details Area of Concern Glen Burnie HS Project Schedule Approved Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Actual See following sheet for details Meade HS Fiscal Data Plans & Engineering Construction FF&E Project Support Total Approved BoE Program* $500,000 6,000,000 500,000 $7,000,000 Approved Current AACo Program* Appropriation Encumbered $500,000 See Open Space Enclosures 6,000,000 Projects Page 500,000 Meade HS $7,000,000 Change Orders Cost Remarks To Date Total * FY 2017 13 of 26 CSR 2016-7 Anne Arundel County Public Schools Facilities Division Open Space Enclosures at Various schools Schools in Design: School Brock Bridge ES Const. Cost Fiscal Year Ed Specs/ Schematic Design Dev./ Const. Doc. Start Const. Substantial Completion Architect General Contractor Current Status $2,700,000 Estimate FY 2018 Apr-16/ Sept-16 Dec-16/ Feb-17 Jul-17 Aug-18 TCA TBD 3% Dec-16/ Feb-17 Jul-17 Aug-18 TCA TBD 3% Schematic Design phase underway. Shady Side ES $2,700,000 Estimate FY 2018 Apr-16/ Sept-16 Schematic Design phase underway. Schools in Construction: School Const. Cost Fiscal Year Ed Specs/ Schematic Design Dev./ Const. Doc. Start Const. Substantial Completion Architect General Contractor Current Status $6,268,800 FY 2017 Jun-15 May-16 Aug-16 Aug-18 BWH E. Pikounis Constr. Co. Inc 0% Apr-15 Oct-15 Apr-17 BWH Baltimore Contractors Inc. 70% Oct-14 Apr-16 SEI Phillips Way, Inc. 100% Chesapeake HS Construction to start August 2016. $2,050,488 FY 2015 Jun-14 Glen Burnie HS Phase II, is 75% complete. Phase III started July 11, 2016. $3,650,000 FY 2015 Jan-14 Jul-14 Meade HS Project is in closeout. Last report for this project. 14 of 26 CSR 2016-7 Richard Henry Lee ES - Feasibility Study Administrative Data Architect: Construction Manager: Phase of Work: Grimm + Parker Architects n/a Planning Vital Statistics Before 479 61,000 State Rated Capacity Gross Square Footage After 578 84,134 Scope of Work Complete a feasibility study covering the five options: do nothing, patch and paint, revitalization, modernization, and replacement. Current Status Educational Specifications approved by the Board of Education on May 4, 2016. Feasibility Study is underway with school and committee participants. Area of Concern Project Schedule Approved May-16 Oct-16 Sep-17 Dec-17 Aug-18 Jan-19 Feb-19 Apr-19 Aug-21 Dec-21 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current May-16 Oct-16 Mar-17 Jul-17 Feb-18 Jul-18 Aug-18 TBD TBD TBD Actual May-16 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $3,243,000 30,419,000 2,074,000 919,000 Approved AACo Program $3,243,000 30,419,000 2,074,000 919,000 Total $36,655,000 $36,655,000 Current Appropriation $944,000 Encumbered $944,000 Change Orders Cost Remarks To Date Total 15 of 26 CSR 2016-7 Rolling Knolls ES - Replacement Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board Grimm + Parker Architects SPN, Inc. Construction Vital Statistics Before 362 38,951 State Rated Capacity Gross Square Footage After 598 84,588 Scope of Work The design and construction of a replacement school for Rolling Knolls Elementary. Current Status New school is occupied, punch list is ongoing. Phase II asbestos abatement, is complete and the former building has been demolished. Recycling operations complete. Entrance driveway construction starting. Project is 91% complete. Area of Concern Project Schedule Approved Jun-11 Sep-11 Feb-12 May-12 Oct-12 Jan-13 Jun-13 Jul-13 Aug-15 Nov-15 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Jun-11 Sep-11 Feb-12 May-12 Jan-13 Apr-14 Mar-14 Jun-14 Bldg. Mar-16/Site Nov-16 Actual Jun-11 Sep-11 Feb-12 May-12 Jan-13 May-14 Mar-14 Jun-14 Mar-16 Jan-17 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $2,607,000 25,061,000 1,884,000 3,092,000 Approved AACo Program $2,607,000 25,061,000 1,884,000 3,092,000 Current Appropriation $2,607,000 29,061,000 1,884,000 3,092,000 Encumbered $1,768,359 25,227,768 1,120,526 143,501 Total $32,644,000 $32,644,000 $36,644,000 $28,260,154 Change Orders Cost Remarks $452,184 To Date Total $452,184 16 of 26 CSR 2016-7 Severna Park HS - Replacement Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board GWWO Architects Oak Contracting, LLC Construction Vital Statistics Before 1,805 296,191 State Rated Capacity Gross Square Footage After 2,141 354,162 Scope of Work The design and construction of a replacement school for Severna Park High School. Current Status Building shell complete. Paving 30%, mechanical, electrical, and plumbing rough-ins are 90%, and finishes are 30% complete. Building Phase I is 75% complete. Project is 53% complete. Area of Concern Project Schedule Approved Jul-10 Jul-10 Mar-12 Sep-12 Feb-13 May-13 May-13 Aug-13 Feb-16 Apr-18 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Jul-10 Feb-11 Mar-12 Oct-12 May-13 Apr-14 Jan-14 May-14 Actual Jul-10 Feb-11 Mar-12 Oct-12 May-13 Jun-14 Feb-14 Jun-14 Bldg. Jan-17/Site Mar-18 Nov-18 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $7,729,000 113,333,000 6,708,000 2,395,000 Approved AACo Program $7,729,000 113,333,000 6,708,000 2,395,000 Current Appropriation $7,729,000 110,824,000 4,025,000 2,395,000 Encumbered $7,364,879 100,850,685 1,158,707 297,237 Total $130,165,000 $130,165,000 $124,973,000 $109,671,508 Change Orders Remarks Cost $140,109 To Date Total $140,109 17 of 26 CSR 2016-7 Systemic Projects Various Schools - Building Systemics Administrative Data Architect: General Contractor: Phase of Work: Bulletin Board Various Various Design and Construction Vital Statistics Before n/a n/a State Rated Capacity Gross Square Footage After n/a n/a Scope of Work Building system replacement projects at selected schools. Broadneck HS Current Status See following sheet for details Area of Concern Magothy/Severn MS Project Schedule Approved Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Actual See following sheet for details Meade HS Fiscal Data Plans & Engineering Construction FF&E Project Support Total Approved BoE Program* $1,400,000 18,600,000 $20,000,000 Approved Current AACo Program* Appropriation Encumbered $1,400,000 See Systemic Projects Page 18,600,000 $20,000,000 Change Orders Cost Remarks To Date Total * FY 2017 18 of 26 CSR 2016-7 Anne Arundel County Public Schools Facilities Division Building Systemics Schools in Construction: School Project Description Const. Cost Fiscal Year Phase of Work Const. Doc. Start Const. Substantial Completion Engineer General Contractor Current Status Boiler/Controls $1,033,280 FY 2016 II of II n/a Jun-15 Aug-16 GannettFleming Heer Brothers, Inc. 92% I of II Dec-15 Jul-16 Aug-17 GannettFleming Heer Brothers, Inc. 5% I of II Jan-16 Jun-16 Aug-17 Gale Associates SGK Contracting 15% n/a n/a Feb-16 Jul-18 Posey Phillips Way, Inc. 22% I of II n/a Oct-15 Aug-16 Weigand Heer Brothers, Inc. 90% I of II Dec-15 Jun-16 Aug-17 JMT Heer Brothers, Inc. 5% n/a n/a Jun-14 Aug-17 JMT Phillips Way, Inc. 85% Broadneck HS Final stages of controls and equipment installation underway. J. A. Adams Academy Windows & HVAC $2,897,000 FY 2017 Submittal and mobilization process underway. Jones ES Roof Replacement $849,500 FY 2017 Phase I roof replacement in progress. MacArthur MS HVAC, Ceiling & $17,146,000 Lights FY 2016 HVAC rough-ins progressing in the kitchen and cafeteria. HVAC Controls $3,747,780 FY 2016 Magothy/Severn MS All administration and classroom space complete. Maryland City ES Windows & HVAC $3,529,000 FY 2017 Submittal and mobilization process underway. Meade HS HVAC, Ceiling & Lights $11,758,646 FY 2015 New mechanical equipment installation is ongoing in boiler room area. Ridgeway ES Roof Replacement $1,344,125 FY 2017 I of II Oct-15 Jun-16 Aug-17 Gale Associates SGK Contracting 15% n/a Jan-16 Jun-16 Nov-16 GannettFleming Warwick Supply 5% n/a Jan-16 Jun-16 Aug-17 James Posey TBD Awaiting Award I of II Jan-16 Jun-16 Aug-17 Gale Associates SGK Contracting 15% n/a Jan-16 Mar-16 Aug-17 James Posey North Point Builders 2% Feb-16 Apr-16 Aug-17 James Posey BoMark 8% Phase I roof replacement in progress. Shipley's Choice ES Replace Windows $329,000 FY 2017 Submittal and mobilization process underway. South River HS Replace Controls $1,344,125 FY 2017 Waiting on comments from the State. South Shore ES Roof Replacement $905,750 FY 2017 Phase I roof replacement in progress. Windows & HVAC West Meade EEC $4,539,600 FY 2017 Submittals in progress. Contractor has mobilized on-site. Electrical & Gas Up-Grades $611,000 estimate FY 2017 n/a Crawlspace installation in progress. Gear delivery week of July 20, 2016. 19 of 26 CSR 2016-7 Systemic Projects - TIMS Electrical Upgrades Administrative Data Architect: General Contractor: Phase of Work: Bulletin Board Various Various Design and Construction Vital Statistics Before n/a n/a State Rated Capacity Gross Square Footage After n/a n/a Scope of Work Electrical system distribution upgrade projects at selected schools. Meade Heights ES Current Status See following sheet for details Area of Concern Park ES Project Schedule Approved Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Actual See following sheet for details West Meade EEC Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program* $70,000 430,000 Total $500,000 Approved Current AACo Program* Appropriation* Encumbered $70,000 See TIMS Projects Page 430,000 $500,000 Change Orders Cost Remarks To Date Total * FY 2017 20 of 26 CSR 2016-7 Anne Arundel County Public Schools Facilities Division TIMS Electric Schools in Construction: School Project Const. Cost Description TIMS $200,000 Phase of Work Design Dev. Const. Doc. Start Const. Substantial Completion Engineer General Contractor Current Status n/a Dec-15 Jan-16 Jul-16 May-17 BKM TBD Bidding n/a Dec-14 Jun-15 Sep-15 Jul-16 BKM Action Electric 95% n/a Dec-14 Jun-15 Sep-15 May-16 BKM Bomark Electric 95% n/a Dec-15 Jan-16 Jun-16 Aug-17 Posey North Point Builders 2% Hilltop ES Waiting on comments from the State. TIMS $185,400 Meade Heights ES Preparing for closeout. TIMS $187,000 Park ES Preparing for closeout. TIMS $200,000 West Meade EEC Submittals in progress. Contractor has mobilized on-site. 21 of 26 CSR 2016-7 Tyler Heights ES - Feasibility Study Administrative Data Architect: Construction Manager: Phase of Work: Grimm + Parker n/a Planning Vital Statistics Before 479 61,000 State Rated Capacity Gross Square Footage After 578 84,134 Scope of Work Complete a feasibility study covering the five options: do nothing, patch and paint, revitalization, modernization, and replacement. Current Status Educational Specifications approved by the Board of Education on May 4, 2016. Feasibility Study is underway with school and committee participants. Area of Concern Project Schedule Approved May-16 Oct-16 Sep-17 Dec-17 Aug-18 Jan-19 Feb-19 Apr-19 Aug-21 Dec-21 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current May-16 Oct-16 Mar-17 Jun-18 Feb-19 Jul-19 Aug-19 TBD TBD TBD Actual May-16 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $3,679,000 34,488,000 2,267,000 923,000 Approved AACo Program $3,679,000 34,488,000 2,267,000 923,000 Total $41,357,000 $41,357,000 Current Appropriation $1,053,000 Encumbered $1,053,000 Change Orders Cost Remarks To Date Total 22 of 26 CSR 2016-7 West Annapolis ES - Modernization Administrative Data Architect: Construction Manager: Phase of Work: Bulletin Board Gaudreau, Inc. Jacobs, Inc. Construction Vital Statistics Before 274 31,669 State Rated Capacity Gross Square Footage After 314 53,885 Scope of Work The design and construction for the modernization of West Annapolis Elementary School. Current Status Project is substantially complete and ahead of schedule. Administration has moved into the new building. Punch list is underway. Area of Concern Project Schedule Approved Jun-11 Sep-11 Mar-12 May-12 Oct-12 Jan-13 May-14 Jul-14 Jan-17 Apr-17 Education Specifications Feasibility Study Schematic Design Design Development Construction Documents Permits and Approvals Bid Opening Start Construction Occupancy Contract Closeout Current Jun-11 Sep-11 Mar-12 May-12 Dec-13 Nov-14 May-14 Nov-14 Dec-16 Aug-17 Actual Jun-11 Sep-11 Mar-12 May-12 Jan-14 Dec-14 Jul-14 Dec-14 Jul-16 Fiscal Data Plans & Engineering Construction FF&E Project Support Approved BoE Program $1,762,000 19,222,000 1,590,000 1,347,000 Approved AACo Program $1,762,000 19,222,000 1,590,000 1,347,000 Total $23,921,000 $23,921,000 Current Appropriation $1,762,000 19,222,000 1,590,000 1,347,000 Encumbered $1,825,882 19,790,655 1,015,729 13,604 $23,921,000 $22,645,870 Change Orders Remarks Cost $508,733 To Date Total $508,733 23 of 26 CSR 2016-7 MAJOR SUBDIVISIONS REVIEWED IN THE MONTHS OF APRIL THRU JUNE, 2016 Project A Heritage Overlook Project Status Preliminary Number/Type of Units 100 APTS B Magnolia Creek Sketch 79 SF C Saratoga at Parkside Sketch 103 TH D Parkside – Ph. 5C, Sec 2 Final 103 TH E Watershed at Two Rivers, Par. G, Ph. 1, Sec. 8 F Riverwalk at Crofton Final 102 TH Final 108 TH 64 CONDOS G St. Martin’s Hill at Severn Acres Final 16 SF H 1031 Old County Road Final 14 SF I Hagan Property Sketch 51 TH J Arnold Overlook Final 34 SF 24 of 26 Number of Students 18 11 11 19 6 7 27 8 10 27 8 10 23 9 13 39 16 22 3 2 2 3 2 2 10 5 7 6 3 4 School Hilltop Elementary Lindale Middle North County High Jessup Elementary Meade Middle Meade High Meade Heights Elementary MacArthur Middle Meade High Meade Heights Elementary MacArthur Middle Meade High Crofton Elementary Crofton Middle Arundel High Crofton Elementary Crofton Middle Arundel High Oak Hill Elementary Severna Park Middle Severna Park High Jones Elementary Severna Park Middle Severna Park High Arnold Elementary Severn River Middle Broadneck High Arnold Elementary Severn River Middle Broadneck High Development Process (Project Status) Sketch: Developer refines the concept drawing to include the location of housing units on a lot, streets, sidewalks, and public spaces. This is a topographic line drawing that receives indepth comments from the County review team. School capacities and the student population likely to be attributable to this development are recalculated. Site Development Plan: Applies to properties that will not be subdivided into individual lots, principally commercial and multi-family projects such as condominiums and apartments. Used to address APFO conformity. School capacities and the student population likely to be attributable to this development are recalculated. Final: Developer submits a detailed plan that addresses all of the County review team comments. Once a developer receives Final Submission Approval, applications for waivers and permits are submitted. 25 of 26 Project Reviews for March— June 2016 Anne Arundel County Subdivision Review A B C, D G H E, F 26 of 26 I, J CSR 2016-7