NEW TRANSLOADING TERMINAL
Transcription
NEW TRANSLOADING TERMINAL
NEW TRANSLOADING TERMINAL MAJOR SCOPE ITEMS New Truck Loading Rack New Rail Car Unloading Rack New pipe bridges and pipeway Piping, pumps, and nozzle modifica ons on 11 tanks Tank Farm improvements Truck Staging improvements Rail modifica ons DOYON ANVIL SERVICES Full service engineering, including: Engineering and cost es mates Process Hazard Analysis Work Packaging Structure Defini on & Detailed Design Procurement On‐site Construc on Coordina on & Field Support N EW TRUCK LOADING & RAIL C A R UNLOADING R AC K S This project upgraded an exis ng refinery’s product transloading capabili es to provide improved diesel blending, allow terminal services for oil products, and provide capabili es for future biodiesel receipt and shipping. The project also included an ergonomic design that ensured safe loading and unloading opera ons within a minimal meframe. Doyon Anvil completed mul ‐discipline engineering, design, procurement, and project management services from conceptual design through field construc on support to install a rail car unloading and truck loading facility, including ancillary piping and equipment and tank farm modifica ons . This facility is completed and operaƟonal. A Doyon Limited and Anvil CorporaƟon Joint Venture OIL & GAS SERVICES IN ALASKA & LOWER 48 www.doyonanvil.com 907.276.2747 087 For more informaƟon contact: Werner Plagge, President & General Manager SCOPE HIGHLIGHTS NEW RAIL CAR UNLOADING RACK Unloading sta ons for 10 rail cars to transfer gasoline or dis llate Adjustable gangways to accommodate varying car lengths Fire detec on and ESD pushbu ons with audible and visual alarms Designed non‐conven onal, submersible, top‐unloading pump system to sa sfy client environmental constraints NEW TRUCK LOADING RACK RAIL CAR UNLOADING RACK Two‐lane truck loading rack with 4 gasoline loading arms and 4 dis llate loading arms Con nuous blending of gasoline and ethanol Con nuous blending of dis llates Capacity to load 4 B‐train trucks per hour Glycol heated truck apron to prevent ice buildup Fire detec on and ESD pushbu on sta ons with audible and visible alarms Addi ve injec on from exis ng addi ve storage system Designed modular loading racks to reduce construc on me TRUCK LOADING RACK RAIL MODIFICATIONS Install 2 new tracks within the tank farm to handle LPG and to steam asphalt railcars and perform miscellaneous modifica ons to accommodate new tracks, including: Re‐route and route new steam/condensate piping underground Install new steam and condensate header to heat asphalt cars Modify and install new containment wall for ethanol tanks Provide structural protec on for underground piping TRUCK STAGING IMPROVEMENTS PRODUCT UNLOADING Relocated/redesigned truck entrance to enhance sequencing Stormwater sewer system with pump sta on Op mized truck rou ng to increase safety and ease of exi ng Status Lights for rack availability Concrete protec on for exis ng u lity lines Improved fire protec on systems Let our Engineering, Procurement, and Field ConstrucƟon support services bring proven experƟse to your next Transloading project. PIPE BRIDGES/PIPEWAY OIL & GAS SERVICES IN ALASKA & LOWER 48 www.doyonanvil.com 907.276.2747 087 For more informaƟon contact: Werner Plagge, President & General Manager