Greenhouse and Energy Minimum Standards (Exemption) Instrument

Comments

Transcription

Greenhouse and Energy Minimum Standards (Exemption) Instrument
Greenhouse and Energy Minimum Standards
(Exemption) Instrument (No.1) 2017
Greenhouse and Energy Minimum Standards Act 2012
I, Michelle Croker, being the person occupying the position of GEMS Regulator, make this
instrument under subsections 37(1) and (2) of the Greenhouse and Energy Minimum
Standards Act 2012.
Dated 24 February 2017
______________________________
Michelle Croker
GEMS Regulator
Authorised Version F2017L00188 registered 03/03/2017
1
Name of Instrument
This Instrument is the Greenhouse and Energy Minimum Standards (Exemption)
Instrument (No.1) 2017.
2
Authority
This Instrument is made under subsections 37(1) and (2) of the Greenhouse and
Energy Minimum Standards Act 2012.
3
Commencement
This Instrument commences the day after it is registered.
4
Definitions
In this Instrument:
Act means the Greenhouse and Energy Minimum Standards Act 2012.
Determination means the Greenhouse and Energy Minimum Standards (Three
Phase Cage Induction Motors) Determination 2012.
Exempt Model: see section 5 of the Instrument.
Note:
5
Several other words and expressions used in this instrument have the meaning given
by section 5 of the Act. For example:

GEMS

GEMS determination

GEMS labelling requirements

GEMS level requirements

model

model identifier

product classes

supply
Exemption
The model specified in clause 1 of the Schedule (the Exempt Model) is exempt
from the requirements of the Determination as described at clause 2 of the
Schedule with respect to the supplies of the exempt model specified at clause 3 of
the Schedule.
6
Conditions of exemption
The conditions at clause 4 of the Schedule are specified for the purposes of
subsection 37(2) of the Act.
Note:
Subsection 37(2) of the Act provides that the exemption may specify conditions to
which the exemption is subject. Subsection 37(3) provides that a person must comply
with a condition of an exemption to the extent that it applies to the person.
Authorised Version F2017L00188 registered 03/03/2017
Schedule
Exemption and conditions of exemption
Part 1
Exemption
1
Specification of exempt models
2
Brand
Model No.
Description of motor
Bronzoni Motori
Electtrici s.r.l.
R003A-999
4kW 2P 132M
Bronzoni Motori
Electtrici s.r.l.
R003A-999
15 kW 2P 132M
Requirements from which model is exempt
Requirements of the Determination as follows:
GEMS level
requirements (section 6)
3
The models are exempted from the energy use
requirements mentioned in section 6 of the
Determination.
Supplies to which the exemption applies
This exemption only applies in relation to the supply of three phase cage induction
motors with the specifications set out in clause 1 above.
4
Specification of conditions of exemption
The exemption is subject to the condition that the supply of the products specified
in clause 1 above is restricted to the Ichthys LNG Onshore Project located at
Bladin Point in Darwin.
Authorised Version F2017L00188 registered 03/03/2017

Similar documents