YILMAZ REDÜKTÖR VR Serisi
Transcription
YILMAZ REDÜKTÖR VR Serisi
YILMAZ REDÜKTÖR Yilmaz Workflow and Gearbox Manufacturing R & D Department Murat Cem Ünal 21.06.2011 Monthly Annual Target IFS/ERP (Planning Department) Weekly Monthly Reports Material Requirements Plan (MRP) Orders of customers Processing Commands Buying Demands Manufacturing Purchasing M, D, T, K, H, Y Series K, P, R, B Series P, R Series (compact) E Series (irreversibility) Helix angle: 8 - 25 ̊ Profile angle Normal module Reference circle diameter Reference pitch Helix angle Transverse module Reference circle diameter Number of teeth Reference pitch Generation of an involute profile: Involute Involute Base circle Root circle Base circle Reference circle Outside circle Base cylinder Involute Raw material input Saw Turning machine Hobbing Keyway Heat treatment Grinding Sub Storage Hobbing Shaper Internal Gear External Gear Gear milling Continuous Gear Grinding Gear Grinding with Disc AGMA 390.03 DIN 3961 ISO 1328 Japan JIS AQ10 Q7 7 3 AQ11 Q6 6 2 AQ12 Q5 5 1 AQ13 Q4 4 - AQ14 Q3 3 0 Manufacturing process Quality in accordance with ISO Grinding 2–7 Shaving 5–7 Hobbing 6–9 Milling 6–9 Sintering 8 – 12 Shaping 6–9 Better Raw material input Saw Centering drill Keyway Grinding Storage Turning machine Casting Sandblasting Cleaning Storage Priming Milling Storage Collecting of all parts Assembly of Gearbox Red Box Assembly Department Assembly of Gearbox with Motor Quality Control Oil Filling Painting Transport Special Order Special order means minor changes like diameter change of flange or shaft and not a completely new gearbox design Research & Development Planning Department Manufacturing Rearranging Manufacturing Rearranging Workflow Machine Setup Adjustments Machine setup after failed part: Machine Setup Manufacturing Process Approving Red Box No machine setup after approved part: Machine Setup Manufacturing Process Approving Production interrupt after failed part: Machine Setup Manufacturing Process Continuous production without any failed product: Manufacturing Process Controlling according to sample procedure Controlling according to sample procedure 100 % control of manufactured parts Red Box Dimension and topology measuring After Hobbing After Hobbing Runout of middle axis of gear will be calculated from the values above. After Grinding Required Quality Actual Quality After Grinding Runout will be calculated from the values above.