Rhino Oil and Gas Exploration South Africa (Pty) Ltd

Transcription

Rhino Oil and Gas Exploration South Africa (Pty) Ltd
Rhino Oil and Gas Exploration South Africa (Pty) Ltd
BACKGROUND INFORMATION ON PROPOSED PETROLEUM EXPLORATION
ON VARIOUS FARMS IN NORTHERN KWAZULU-NATAL (108 TCP)
February 2016
INTRODUCTION
Rhino Oil and Gas Exploration South Africa (Pty) Ltd intends to
lodge an application for an exploration right with the Petroleum
Agency South Africa (PASA) in terms of section 79 of the
Minerals and Petroleum Resources Development Act, 28 of
2002 (MPRDA). The application will be made over the area
where Rhino Oil & Gas currently holds a Technical Co-operation
Permit (108 TCP). Minerals included in the application are oil,
gas, condensate, coal bed methane, helium and biogenic gas.
The exploration area is broad and encompasses large parts of
northern KwaZulu-Natal (see Figure 1).
In this application Rhino Oil & Gas will only apply for approval to
undertake early-phase exploration for oil and gas which might
be located within suitable geological strata. The purpose of the
work would be solely to determine the presence of any possible
petroleum resource which could be investigated further. The 3year exploration work programme will be restricted to noninvasive techniques, as well as seismic surveys and the drilling
of less than 10 core boreholes.
ENVIRONMENTAL AUTHORISATION PROCESS
Prior to the granting of an Exploration Right for the proposed
project an environmental assessment process must be
conducted and approved by PASA in terms of the National
Environmental Management Act, 107 of 1998 (NEMA). Rhino
Oil & Gas will make an application to PASA for environmental
authorisation. The 2014 Environmental Impact Assessment
Regulations (GN R982 promulgated in terms of NEMA) are
applicable as the need for an exploration right triggers activity
18 in Listing Notice 2 (GN R984). The EIA Regulations define the
assessment process which includes: a scoping phase,
environmental impact assessment (EIA) phase and an
environmental management programme (EMPr). Public
participation is a key component of the environmental
assessment process.
SLR Consulting (Pty) Ltd (SLR), an independent firm of
environmental consultants, has been appointed by Rhino Oil &
Gas to manage the environmental assessment process. This
document has been prepared by SLR to inform you about:
∗ the application and proposed project activities;
∗ the environmental assessment process to be followed; and
∗ how you can have input into the environmental assessment.
The primary objective of the scoping process is to identify the
key issues that need to be addressed in the assessment phase
that will follow.
FRACKING or NOT?
No hydraulic fracturing (fracking) is included in
the 3-year exploration programme proposed.
Rhino Oil & Gas have stated that there is not
currently enough information to determine
what techniques might be required for future
gas extraction.
If a resource was identified and subsequently
proven to be commercial, then hydraulic
fracturing could be one of the potential
techniques for gas production. However, a lot
of investigation, multiple environmental
assessments and authority approvals would be
required before reaching that point. This
includes:
1. Complete the early phase exploration as
proposed and approved through this
application.
2. If the early-phase exploration were to
confirm the presence of a potential resource,
then Rhino Oil & Gas would seek further
approval from PASA for the additional
exploration work required to investigate this.
Any further approval would be subject to an
additional environmental assessment process
with further public consultation. Approvals are
also likely to be required under other
legislation.
3. Undertake the detailed phases of exploration
as approved.
4. If the detailed exploration led to the
discovery of a commercial resource suitable for
development then Rhino Oil & Gas would need
to secure a production right from PASA. Any
application for a production right has to be
subject to an environmental assessment
process with further public consultation.
Approvals are also likely to be required under
other legislation.
5 Develop the production project.
All future exploration or production activities
that may arise if resources are discovered are
therefore beyond the scope of the current
scoping and EIA process.
HOW TO RESPOND
Responses to this document can be submitted by means of the attached comments sheet, by direct submission
and/or through communication with SLR.
WHO
SLR Consulting (Africa) (Pty)
LtdTO CONTACT: Matthew Hemming or Ntsako Baloyi
(011) 467 0945 (Tel)
or
(011) 467 0978 (Fax) or
[email protected] or [email protected]
1
108 TCP
SLR Consulting (Africa) (Pty) Ltd
2
BRIEF OVERVIEW OF PROPOSED EXPLORATION
APPLICATION
Once an application for an exploration right is lodged by
Rhino Oil and Gas, it may be accepted by the Petroleum
Agency South Africa. Acceptance of the application by PASA
only permits the applicant to continue with the necessary
process and does not constitute authorisation.
An application for environmental authorisation in terms of
the National Environmental Management Act, 1998 will then
be required by PASA. The scoping and EIA process will be
subject to the timeframes prescribed in the Environmental
Impact Assessment Regulations 2014.
GENERAL
The 3-year exploration work programme proposed by Rhino
Oil and Gas is aimed at determining if there is an oil or gas
resource in the area that would warrant further exploration.
Year 1: the evaluation of geological data through a
comprehensive desk-top study. Much of this data is only
available to parities whom hold exploration rights. Subsurface structural features and stratigraphy will be mapped.
Data on source-rock geochemistry will be acquired.
Geological models may be developed.
Year 2: further geochemical data analysis as well as the
possible use of apatite fission track analysis and full tensor
gradiometry gravity (FTG) surveys.
Year 3: purchase and/or undertaking seismic surveys. The
final exploration activity would be the drilling of core
boreholes at target sites identified from the earlier work.
No pressure testing, hydraulic fracturing or water abstraction
is included in the proposed exploration work.
LOCATION
In broad terms the exploration right application extends
from Newcastle/Utrecht in the north west across to Vryheid
and to Pongola in the north east. In the south east the area
includes Melmoth and is inland of the N2 highway. The
southern boundary is contiguous with the boundary of the
other Rhino application (291 ER). It includes nearly 5 500
farms over an area of just less than 2 000 000 ha. (see
attached Figure and list of farms).
Physical, on-the-ground exploration activities will only be
undertaken at a limited number of sites. The exact location
of the target sites can only be determined once Rhino has
completed the initial phases of exploration and examined
the available data.
The application area excludes all properties where the
granting of an exploration right is prohibited by Section 48
of the MPRDA. All other properties are included, even where
a constraint may restrict exploration activity. Rhino Oil & Gas
will ensure that their activities are only undertaken at sites
where it is lawful and environmentally responsible to do so.
FTG SURVEYS
and require no access to farms.
DRILLING
A maximum of 10 core holes are planned across the
exploration area. These are stratigraphic wells with no
purpose beyond exploration. Core holes would be drilled by
a truck or trailer mounted, mobile drilling rig very similar in
size to a water borehole rig. Drill sites will be accessed using
existing roads and farm tracks. The drill rig will be
accompanied by supporting equipment (vehicles, trailers,
compressors, water tanks, pumps, caravan etc). A typical
exploration rig and equipment requires an operating area of
approximately 1 000 m2. See photos below.
Rock core will be extracted from the target strata and
removed to a laboratory. Samples will be examined,
described and tested for gas related properties.
Once drilling is completed the rig, all associated equipment
and waste products will be removed from site. The core hole
will be capped pending further investigation or sealed with
cement if not required further.
SEISMIC SURVEYS
Rhino will purchase seismic data where available and may
commission seismic surveys to image subsurface geology.
During a survey low frequency acoustic waves are generated
and the reflected waves recorded. Analysis of the return
waves provides information about rock types and possible
gases or fluids in rock formations.
Rhino is planning up to 125 km of two-dimensional (2D)
surveys. Survey teams generate controlled acoustic energy
(using explosives, air gun or seismic vibrator) and record the
return waves in geophones laid at set spacing in a linear
alignment.
Survey teams require short-term access to farms to place
survey equipment and record the data. Survey lines will
follow existing access roads and disturbances with due
consideration of environmental constraints.
STAFF AND HOUSING
Early phase exploration will create relatively few job
opportunities as most work is contracted to specialist service
providers. The company will recruit locally as far as possible.
A seismic survey team comprises about 2o staff. A drill-rig is
normally manned by a crew of up to 5 persons. No on site
housing facilities are planned. Staff will be accommodated
in nearby towns or at locations agreed with land owners.
TIMING
The exploration work programme is planned over a 3 year
period. The programme is divided in phases with successful
completion of one phase informing the next.
FTG surveys are completed in a matter of hours. Seismic
surveys are undertaken over a period of months but the
personnel and equipment are on site for short periods.
Drilling at each site can take 1 to 3 months to complete.
ENVIRONMENTAL MANAGEMENT
Full tensor gradiometry gravity (FTG) surveys will be
undertaken to image subsurface geology in order to aid An environmental management programme will be written
exploration. Such surveys will be flown in fixed wing aircraft to prescribe commitments needed to ensure
SLR Consulting (Africa) (Pty) Ltd
3
environmentally responsible operations. A key aspect will be
the restriction or prohibition of exploration activities at sites
which have been identified to be incompatible with
exploration.
The establishment, management and rehabilitation of all
exploration sites will be done in consultation with land
owners. The process of managing the operations, the
impacts thereof and rehabilitating the exploration sites will
be conducted in terms of the EMPr approved by PASA.
LAND ACCESS
It is likely that access will be required to only a few of the
properties within the exploration area and then for a short
period. Private property will only ever be accessed with prior
consent of the landowner and then in terms of a written
agreement.
Schematic of seismic survey
The locality of exploration sites is largely flexible and can be
adapted to minimise disturbance to land owners, occupiers,
agriculture and the environment.
MOTIVATION FOR THE PROPOSED PROJECT
Petroleum products remain a vital source of energy. Natural
gas comprises mostly methane and is a relatively clean,
environmentally friendly form of energy. It can be used to
generate electricity or provide heat for domestic and
industrial purposes. Once extracted gas can be easily
contained, transported and safely used in many applications.
The type of downstream use is entirely dependent on the
commercial scale of the resource.
FUTURE EXPLORATION OR PRODUCTION
The current application is only to authorise the work as
described above (and in detail in the Scoping Report). Any
further exploration work to evaluate an identified resource or
a future production would require further approval from
PASA in terms of the MPRDA & NEMA. Such approvals will
be subject to the relevant legal requirements which include
further public consultation and environmental assessment.
Rhino maintains that is not useful to speculate on the
possible future direction of the project as the range of
options is vast and the available information very limited.
Example of drilling operations
PHOTOS
Rock core recovered for analysis
Typical FTG Survey plane
SLR Consulting (Africa) (Pty) Ltd
4
PUBLIC RESPONSE TO DATE
Rhino Oil & Gas is currently in progress with 4 other
exploration right applications similar to this one,
including one in the adjacent area of central KwaZuluNatal (KZN 291 ER).
See:http://www.rhinoresourcesltd.com/areas or
http://www.petroleumagencysa.com/index.php/maps
Consultation in those areas has elicited significant
response to the applications. Overall the public
response is very much opposed to the exploration
right application. The issues that have been raised are
too numerous to elaborate on here but are detailed in
the reports for those projects. Various key issues arose
and SLR consulted with PASA on the issues that were
material to the overall application and the EIA process.
A summary of each issue and an extract of the response
from PASA are provided below:
Issue 1: Most persons participating in the EIA process
stated their opposition or lodged an objection. Many of
the objections were made with reasons relating to
production and fracking. It is clear that the EIA process
will not be able to resolve such objections. What
mechanisms exist for these objections to be addressed?
PASA: “There is no mechanism under NEMA to address
objections, however as part of the EIA process the EAP
must consider issues raised and engage with respective
parties to resolve or provide clarity on issues raised.
Section 10 of the MPRDA provides for the Regional
Mining Development and Environmental Committee to
consider and advise the Minister on objections received in
respect of applications.”
Issue 2: Most IAPs have demanded that the current EIA
process present details on production and undertake an
assessment of potential production (including fracking)
related impacts, even though the current application
does not cover further exploration or production. What
is PASA’s instruction with regards the scope of the
current EIA?
PASA: “The current EIA is aligned with the proposed
exploration work programme submitted with the
application for an exploration right. If the applicant
wanted to pursue any activities beyond the scope of the
proposed work programme then environmental
authorisation for such activities would have to be
obtained. This process provides for further engagement
with IAPs and in-depth assessment of the associated
issues.”
Issue 3: Many IAPs have asked why the current Karoo
Strategic Environmental Assessment (SEA) on Shale
Gas Development is not applicable to all areas of South
Africa. Moreover, the IAPs have demanded that all
exploration right applications and related EIA processes
be stopped until the SEA is complete. What is PASA’s
response in this regard?
PASA: “The scope and terms of reference for the SEA are
finalised and the assessment has commenced. Queries on
the SEA should be directed to the Department of
Environmental Affairs as the driver of that process.”
SLR Consulting (Africa) (Pty) Ltd
Issue 4: IAPs have raised the concern that many
properties/sites within the application areas are either
protected outright or incompatible with exploration
and/or the production of oil and gas. In some instances
legislation prevents exploration work from taking place
in these areas. The question has been asked “why
undertake an EIA to obtain exploration rights in areas
where any gas, if it were to be found, would not be able
to be extracted because of the restrictions imposed by
protected area legislation and Regulation 122 of the
Petroleum Regulations (GN R 466 of 2015) relating to
the location of wells?”. The demand is that the
application be stopped, all of the future noncompatible/unlawful areas removed and then a new EIA
be commenced for the revised area. What is PASA’s
response in this regard?
PASA: “The EAP has the responsibility to identify
environmental attributes; to assess the risks and impacts
and provide appropriate mitigation measures. In doing so
the EAP has the obligation to consider and apply the
provisions of the relevant environmental legislation.
PASA, as the regulator, has no authority to direct the
EAP or applicant to stop the EIA to remove incompatible
areas. The application will be evaluated in line with the
provisions of NEMA and other relevant legislation. The
Agency will make recommendations that will be aligned
with the relevant provisions to ensure that specified
environment receives the necessary protection.”
The application and the scoping and EIA process for this
project will be undertaken in accordance with the
guidance from PASA.
PUBLIC MEETINGS
The following public scoping meetings have been
arranged, the details are as follows:
Date and Time
Venue
Ulundi, Multi-Purpose Hall,
Wednesday 2 March
Cnr King Zwelethini & King
14h00
Mpande Streets
Dundee High School, Cnr
Thursday 3 March at
Tatham & Oxborrow
14h00
Streets,
Monday 7 March at
Pongola, Thokoza Hall,
14h00
adjacent to TSB Sugar Mill
Tuesday 8 March at
Melmoth Town Hall,
14h00
Reinhold Street,
Vryheid, Cecil Emmett Hall
Wednesday 9 March at
at Eeufees Sports Centre,
14h00
Utrecht Road
Thursday 10 March at
Newcastle, Richview Civic
14h00
Hall, off Boundary Street
Dannhauser, Annieville
Friday 11 March at
Community Hall, Annieville
14h00
Road
You are invited to attend.
5
POTENTIAL ENVIRONMENTAL IMPACTS
Relevant issues identified during scoping will be
investigated as part of the EIA process. The following
issues and impacts are examples of concerns related to
exploration. Their inclusion in this list is no relation to
the probability of occurrence nor an indication of
possible significance.
Farm Safety – Access by unknown persons to farms has
the potential to influence security on farms. Operating
heavy vehicles and equipment may pose safety risks.
Run away fires may present a potential safety risks for
both people and livestock.
Farm Infrastructure – farms roads, gates and fences
may be damaged during exploration activity.
Soil and land capability– activities at the seismic and
drill sites may affect soils and land capability if poorly
regulated and not rehabilitated.
Biodiversity – activities at the seismic and drill sites
have the potential to disturb and/or destroy vegetation,
habitat units and related ecosystem functionality,
including the disturbance of protected species.
Surface water – The proposed activities at the seismic
and drill sites has the potential to pollute surface water
resources through consumptive use and the discharge
of contaminants.
Groundwater – the proposed drilling has the potential
to consume and contaminate groundwater resources
which could impact availability to other groundwater
users and the ecosystem.
Air – The proposed project has the potential to
contribute to air pollution, particularly through dust
emissions from vehicles on gravel roads and the release
of gas from boreholes.
Noise and vibrations – The proposed project has the
potential to cause noise pollution during drilling
activities. Seismic surveys may cause damage to
structures and disturb livestock and wildlife.
Visual – the placement of seismic and drilling
equipment has the potential to create short-term visual
impacts.
Heritage resources – the proposed project has limited
potential to damage heritage resources.
Land use –The seismic and drill sites may conflict with
land use for the duration.
Socio-economic – Positive impacts include limited job
creation and stimulation of the local and regional
economy. Potential negative socio-economic impacts
include potential for increased crime, spread of disease
and pressure on support services provision.
SLR Consulting (Africa) (Pty) Ltd
Cumulative and future impacts – although the current
work may have limited impacts, a concern is that
approval of this work could open the way for future,
larger-scale projects in the area. There is concern that
these may have much greater impact. Approval might
be difficult to stop if investment has been made.
ENVIRONMENTAL ASSESSMENT
The assessment process will aim to:
• provide information on the project & alternatives
• provide information on the potentially affected
environment;
• provide an assessment of the significance of the
identified impacts;
• report on management measures required to
mitigate impacts to an acceptable level; and
• allow for informed, transparent and accountable
decision-making by the relevant authorities.
STEPS IN THE ASSESSMENT PROCESS
Pre Application phase (January to April 2016)
Identify and inform IAPs & regulatory authorities of the
proposed project (via direct consultation, newspaper
advertisements, site notices, this document)
Receive issues and responses from IAPs.
Submit application to PASA (ito NEMA)
Scoping phase (April 2016 to June 2016)
Continued consultation and receipt of responses.
Identify issues that need to be addressed.
Define outstanding issues and terms of reference for
work to address potential impacts
Compile scoping report
Make draft scoping report available for review by IAPs
and other regulatory authorities.
Collect IAP comments, update Scoping Report and
forward to decision making Authorities (by 20 April).
EIA and EMP phase( July to December 2016)
Undertake any specialist investigations.
Assess impacts of proposed project and compile EIA and
EMP report.
Make this available to IAPs and regulatory authorities
for review.
Host possible public-feedback meetings.
Collect IAP comments, update EIA and EMPr and
forward to decision making Authorities.
Decision and Appeal
PASA to review EIA and EMPr and make a decision.
Notify IAPs and regulatory authorities.
Appeal process in terms of Appeal Regulations
REGISTER AND COMMENT
All stakeholders are invited to register as Interested &
Affected Parties (IAP). You must register as an IAP if
you would like more information or wish to participate
in the environmental assessment of the project.
To register, or to raise any environmental issues or
concerns regarding the project, please complete the
Response Form and return it to SLR at your earliest
convenience. IAPs registered on the project’s database
will receive notification of further meetings, report
review periods and the decision.
6
Rhino Oil and Gas Exploration South Africa (Pty) Ltd
BACKGROUND INFORMATION ON PROPOSED PETROLEUM EXPLORATION ON
VARIOUS FARMS IN NORTHERN KWAZULU-NATAL (108 TCP)
REGISTRATION AND RESPONSE FORM FOR INTERESTED AND AFFECTED PARTIES
NAME
FARM/PROPERTY or
ORGANISATION
STREET OR POSTAL
ADDRESS
POSTAL CODE
WORK/ DAY TELEPHONE
NUMBER
CELL PHONE NUMBER
FAX NUMBER
PREFERRED CORRESPONDENCE (circle)
POST
DATE
Signature
E-MAIL
FAX
EMAIL
SMS
DETAILS OF OTHER PEOPLE WHO OWN LAND IN THE AREA OR YOU FEEL SHOULD BE INFORMED:
PLEASE IDENTIFY YOUR INTEREST IN THE PROPOSED PROJECT:
PLEASE WRITE YOUR COMMENTS AND QUESTIONS HERE:
(use additional pages if required)
Please return completed forms to:
Matthew Hemming or Ntsako Baloyi
(011) 467 0978 (Fax) or Po Box 1596, Cramerview 2060
[email protected] or [email protected]
SLR Consulting (Pty) Ltd
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
Farm Name & Number
Registration Division: GT
MCHJEAANE
2254
BOSCHFONTEIN
3307
SNIP FONTEIN
3748
DUNDEE
4339
CRAIGSIDE
2272
EARNSCLIFF
3308
PALMIET FONTEIN
3750
CARDWELL
4340
WASBANK
1076
COALFIELD
2273
HAZELDEEN
3311
KRAAI FONTEIN
3751
DAVELSFONTEIN
4348
UITHOEK
1078
STRATFORD
2367
GAINSFORD
3313
JAKHALS FONTEIN
3752
ALLETTA
4350
VERMAAKS KRAAL
1124
KILBURNIE
2390
DOORN KOP
3314
KLIP HOEK
3753
WILLIAMS GELUK
4444
SOM'S HOEK
1151
LYELL
2393
OVERTON
3315
REDBANKS
3755
FORFAR
4473
KLEINE WATERVAL
1152
LENNOX
2395
KNOSTROPE
3316
KALKOEN KRANTZ
3786
KELVIN GROVE
4474
ASYN KRAAL
1158
LANGE FONTEIN
2397
HUDDERSFIELD
3319
DEIGHTON
3805
STONY BRAES
4475
RUIGTE FONTEIN
1179
MOOI SPRUIT
2398
MENTEITH
3328
FORT AGNEW
3808
NURSLING
4495
GELEGENFONTEIN
1204
DEWAAR
2400
MORGENSTOND
3347
SPIES
3858
STIRLING
4570
UITVAL
1244
BEITH
2401
HELENA
3479
BLAIKIESTON
3950
SOFIERO
4577
KLEIN FONTEIN
1262
TENTEN'S KRAAL
2405
CHURCH GROUND
3491
KLIP RUGH
4092
RODEKOP
4656
BOSCH HOEK
1312
KELVIN
2407
LIVINGSTONE
3539
DROOGMYNKEEL
4093
REST
4658
UITHOEK
1335
STANMORE
2412
YOUNGERHILL
3540
UITZICHT
4112
THE CORNER
4659
ZONDAGRIVIERSPOORT
1361
DALRY
2413
KEMPENFELDT
3541
GLASGOW
4122
STONEHAMMAR
4723
FITTY PARK
1364
OUTFALL
2414
THE PADDOCK
3615
KIRKLAND
4124
PERSBERG
4732
KROMME-ELLEMBOOG
UITKYK
1365
PRESTWICK
2415
HATTING DALE
3626
HELPMAKAAR
4126
LINDE
4733
MAYBOLE
2419
GARDENHILL
3665
ZUUR KOP
4127
LOT 2
4761
LINKS OF BUFFALO
2420
HLUNGWAN
3684
SUMMERVILLE
4245
ONTBEMEND
4972
OPMERKZAAMHEID
1394
CRAIGMILLAR
2971
STONTON
3691
MERAN
4247
ZUURFONTEIN
4980
KUICK VLEI
1396
BALGOWNIE
2972
MEYERSLAND
3692
ST GEORGE
4248
FREIBURG
4985
BUFFELS HOEK
1931
DRIE FONTEIN
3107
CHARD
3697
BULWER
4250
BAVIAAN-KLOOF
5031
HOLLYWOOD
2028
AMSIBIE
3110
GOWANBRAE
3701
VAN ROOYEN
4252
VERMAAK
5045
KROM POORT
2155
ZWARTWATER
3213
TERRACE
3707
BALFOUR
4260
WINKLE
5054
UITKYK
2156
PADDAFONTEIN
3214
KLIP RAND
3723
LINDISFARNE
4263
SPETSKOP
5063
KLIP BERG
2158
RAMA
3231
MARIA
3727
CARNARVON
4264
BLOEMHOF
5080
GOWRIE
2248
COBURG
3232
MARIA
3740
UITZIGHT NO 2
4276
HOPE
5088
BEAUVALE
2249
DAVELS BERG
3286
LEEUW KUIL
3743
HARRIOT DALE
4324
LOWLEVEL
5089
WHITE BANK
2251
BURNSIDE
3287
DROOG PLAATS
3744
GLADSTONE
4331
GROOTE VLEI
5112
CINDERFORD
2252
STERK STRUUM
3306
NOOITGEDACHT
3747
COTSWOLD
4332
ONGEGUND
5116
VALKOP
2253
SLR Consulting (Pty) Ltd
1366
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
HESOMDALE
5129
BAVIAANTRAP
6000
IGNISDALE A
7865
STRIIJBANK
8449
SCHROEDERS HOPE
8865
ELSINOR
5135
ORANGE
6001
BESTERDALE B
7868
WOODLANDS
8485
EXTENSION
8946
DEVILS KLOOF
5136
B OF ROODE RAND
6453
WILD DUCK VLEI A
7871
OUW KLIP
8489
MOUNTAIN TOP
8954
LOT T
5137
RAEMOIR 1
6504
JOBS DALE B
7876
DONDOLA A
8493
GROVE
9011
EASTKEAL
5138
6534
MIDDEL PUNT A
7903
UMNAMATA
8508
SHEEPRIDGE A1
9031
GARNET
5180
PETERSBURG OF ORIBI
VLAKTE
SLAAF
NIETGEDAG B
7938
GERTS KLOOF
8535
BESTERDALE C
9044
KLIP KUIL
7995
KELVIN GROVE NO 2
8548
IZEMFERNE A
9146
AMO
6710
DROOGE REF
8032
BANNOCKBURN NO 2
8549
DRIEHOEK
9171
DOUBLE KRAAL
6754
DRIE HOEK
8033
OVERDALE
8551
ADELAIDE
9187
EAST HESLERTON
6783
LOT AB ISIBINDI
8067
HAYFIELD
8568
SPIESDALE
9313
DUMMY
6830
DUMMY
8108
JACK'S CORNER
9440
6897
EBENEZER
8113
UMGEN
9449
LANGLAAGTE
6898
NKANGALA OF
TANGENT
FORT PINE
8569
STRUISVOGEL POORT
DWARS NEK
9450
BELLEEK
6934
LERRYN
8602
GRIMSTON
9540
RAEMOIR A
6942
HALIFAX
8603
HILLSIDE
9553
BESTERDALE A
7267
LOT W
8610
LINCOLN
9693
LOT B OF SHEPLEGH
7296
NORTHFIELD
8615
HAYFIELD
9722
VERDRUK
7329
SUSHARA
8651
SPRINGFIELD
9753
CLIPSHAM
7330
LUSIENNE
8663
SWISS VALLEY
9768
SCUUR RAND NO 1
IMPATI HEIGHTS
9950
WONDERDAM B
9963
LOT 4 NQUTU
9971
8703
FARM MORTON
9972
8738
LOT 11 NQUTU
9973
EXTREMITY A
10022
10023
MANDHLENI
5248
SALBO
5252
ROOIFONTEIN
LOT ISIBINDI AA
ISIBINDI B
SHEPLEGH B
BEDRUG
DAAS KRANTZ
5270
5271
5272
5281
5288
5311
KLIP KOP
5323
KLIP ROTS
5324
LUHUNGU
SHEEPRIDGE B
SUNSET
ROODE RAND A
NORA
SIR GARNET
5381
5429
5433
5483
5488
5511
ALVA
5554
SIGTUNA A
5561
SIGTUNA B
DOONE
5562
5566
LOT B OF
JOHANNESBURG
A OF JOHANNESBURG
5613
STOCKHOLM
5642
TROSA
SLR Consulting (Pty) Ltd
5614
5858
6594
MANOR PARK
HEILBRON NO 2
8147
8148
DRIE VOET
8163
ROOIKOP
8190
BIRKENHEIM
8207
8600
8230
7331
AMALINDA OF
PADDAVLEI
HENNING A
8240
CELLE
8671
SCUUR RAND NO 2
7332
CHITRAL
8266
TRY AGAIN
8674
THE OAKS
7441
FARVIEW
8290
8697
CASURINAS
7442
JOB'S DALE
8291
LEKSAND
7538
LUCK
8341
TRANSVAALIA OF
DONDOLA
GOEDE GELOOF
THORNHILL
7612
PADDAVLEI A
8357
YATTON
7647
UELZEN
8419
LOT OSCARSBERG'S
RESERVE A
SWEETWATERS
EAST LYNNE
7670
CORNWALL B
8420
IZEMFENE B
8802
2 OF SHEEPRIDGE A
7683
RENIER
8421
WILD DUCK VLEI B
8806
A OF WONDERDAM OF
EXTREMITY
LOT 5 NQUTU
PREETZ B OF ORIBI
VLAKTE
KARLSRUHE OF ORIBI
VLAKTE
7826
FALKENBERG OF
HENNING
WILLOWS
8430
ROCKY SPRUIT A
8842
GLUTZ
10130
BEACON KOP
8863
IMPATI
10260
CORNELIUSDALE
8864
LOT 18 NQUTU
10585
7829
8432
8748
10077
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
WHINSTONE
10616
BONISA
11959
NONDWENI PLAATS
NO 4
OSTEND
10634
CAIRNMORE
12014
14522
LANGSAAN
16200
EARNSCLIFF
17612
14523
CHERHAM PARK
16213
TANGENI
17706
PADDOCK
12027
BANNOCKBURN
ANNEXE C
BANNOCKBURN SAR
14524
RHINO
16214
DURNACOL
17900
GORDON'S LUCK
12072
SUB PIETERSDALE OF
IGNISDALE
GOWAN BRAE NO 2
10674
PATAT
16229
KYKWEER
16294
CHITARA
17917
VERDRUK S A R
14549
10675
LOT 3 NQUTU
OUDEPLAAS
16315
NYATHINI
18022
MOSSWAN
14807
LOT 17 NQUTU
10781
ST CUTHBERTS
12444
LOT B OF 14 NQUTU
10782
BUFFALO BEND
12648
PLATBERG
16318
RORKE'S DRIFT
18352
OTHELLO
14846
BERGHEIM
16324
HLATHI
18486
RIETBOKSTROOM
14977
LOT 16A NQUTU
10783
HAZELDENE
BORDEAUX
16341
ALTCELLE
14978
MELROSE
11067
NO 2 NONDWENI
12746
HAYSPOOR
16386
17903
BIGGARSGAT
12753
BOB'S FOLLY
14979
SPOORSTONE
16399
MOOIHOEK
1
GIBA
15095
HARROWDALE
11080
12826
MOORLANDS
11127
WILD DUCK VLEI
ANNEXE
WHINSTONE ANNEXE
BLINKWATER
16470
ZANDSPRUIT
2
KALWERFONTEIN
15122
KLEINHOUD
16660
ERFSTUK
4
12845
POST OFFICE
15172
FUGITIVES DRIFT
11158
BESTERDALE
16679
AFGESNIJ
5
12935
BRINK
15335
SOLMAR
16680
ROODEKOP
7
SIGWEJE
15409
11262
DE JAGERSDRIFT
SOUTH
OSAKA
NAVARRE
11174
FARVIEW
GROENEHOEK
16784
KARNSPEK
8
MINORCA
15414
GIFT
11263
MATATANA
13024
NHLAWE
16911
LEKKERWATER
9
SWARTWATER
15417
16914
VERKOCHT
13
LENTEDAL
15474
16980
KWEEKSPRUIT
22
DIEPKLOOF
15521
FORLORN HOPE
17044
PAARDEFONTEIN
25
LONGLANDS
15523
KRUISFONTEIN
17062
NOOITGEDACHT
33
HEILBRON
15594
SUNSHINE
17128
EENKANTLANGS
47
CLEVELAND
15597
KARLSRUHE
17207
BRAKSPRUIT
52
KLIPROTS
15625
ILANGA
17222
RUIGTEFONTEIN
54
BOYUP
15647
WINTERHOEK
17223
WELGELUK
56
CRAIGHEAD
15739
PADDOCK
17317
NOOITGEDACHT
60
BRICKFIELDS
15750
GT
17318
WATERHOEK
61
RESERVE NO 18
15838
BRACKSTONE
17319
GROOTVLEI
66
IRONDALE A
15935
17320
POLITIEK
67
SPRINGLAKE
16151
17328
MOOIPLAATS
72
SEELANDKOP
16199
NOOITGEDACHT
73
10643
LOT 2 NQUTU
12179
12180
12649
12977
TAYSIDE
11319
BONNY DOONE
13065
GOOD HOPE
11443
STRUISLAAGTE
13066
DE JAGERS DRIFT
11477
CORNVILLE
13457
CORBY ROCK
11509
ROOIFONTEIN
13483
DOORNHOEK
11595
SOLMAR NO 2
13553
ROCKBOURNE
11596
RAMAK
13696
SLEDMERE
11614
GLENWOOD
13707
MOUNT NONNIE
11669
NO 1 NONDWENI
13709
WILDERNESS
11859
BUFFALO GORGE
13828
SUNRISE
11863
THE ALOES
14309
VLEI POORT
11918
LENTEPLAAS
14432
CLEAR SPRINGS
11957
MAMRE
14459
LA ROCHELLE
11958
WEIDEFELD
14474
SLR Consulting (Pty) Ltd
GT
14543
HARMONIE
THUTHUKANI
17902
Registration Division: HT
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
FRISCHGEWAAGD
75
STRYDFONTEIN
163
WELGEVONDEN
287
GOLDEN VALLEY
751
DAVELS SPRUIT
3742
VLAKPLAATS
83
ROODEZAND
165
FRAAIUITZICHT
291
BRAKFONTEIN
779
SLOOTEN HOEK
3745
NOVEMBERSDRIFT
87
ROOIPOORT
166
KLIPFONTEIN
316
ZAAILAAGTE
780
RIET POORT
3754
COMMISSIEKRAAL
90
TUSSCHENBIJ
167
UITVLUCHT
319
DAGBREEK
786
OMDRAAI
3855
ZWARTKOP
91
ONVERWACHT
169
DOORNHOEK
340
BEAUFORT
787
GOEDE HOOP
3857
LUVUNO
17498
TWYFELHOEK
17817
STERKSTROOM A
344
798
WITTEKLIP
4257
UITKOMST
95
KROMELLEBOOG
170
WELGEVONDEN
350
LEARYDALE
4259
KWAGGASDRIFT
96
WEIHOEK
171
NOOITGEDACHT
356
WALMSLEY
4266
VAALBANK
103
DOORNKOP
172
WELTEVREDEN
371
KEMPS HOEK
4271
FRISCHGEWAAGD
105
WAAIHOEK
173
WATERFALL
374
LOT A12
DUBBELRECHT
LOT A13
DUBBELRECHT
LOT A 15
DUBBELRECHT
LOT A10
DUBBELRECHT
LOT A 5 DUBBELRECHT
FOUNTAINDALE NO 3
4272
SPOOKMILL
4273
STRUISVOGEL KOP
4275
LUBECK
808
ROCKYDALE
4277
FLENSBURG
815
BRAAK FONTEIN
4278
816
SCHOONVLAK
4279
ALLEEN 2
4280
840
SUSPENSE
4326
799
800
804
KLIPSPRUIT
106
GOEDE HOOP
177
METSELFONTEIN
379
HARTEBEESTSPRUIT
111
BEROUW
179
NOOITGEDACHT
388
VAALSPRUIT
115
GOEDGELOOF
180
BRAKPAN
389
BRAKFONTEIN
116
LIJNSPRUIT
181
EENSGEVONDEN
408
ROODEKOPPE
119
NYEMBE
184
BRANDKRAAL
505
WELTEVREDEN
122
KLIPFONTEIN
185
DUBBELRECHT
508
KLIPSPRUIT
124
RIETVLEI
186
POTGIETERS RUST
530
LOT A 18
DUBBELRECHT
NOOITGEDACHT
BLOEMHOF
127
SCHAAPKOPJE
194
WIEMANS RUST
549
DASSIESHOOGTE
843
FORVIE
4520
ZAAIFONTEIN
143
VAALKOP
209
APOLOGIE
562
BETA
844
DARTRY
6968
WATERVAL
148
VAALBANK
224
HARTEBEESTBULT
578
WIEMANS RUST
876
GARDENS
7239
WASBANK
149
VAALKOP
228
MIDLUM
609
YARL
2962
WESTPORT
7490
LEEUW
17499
AANSTOOT
231
LANGVERWACHT
616
DOORN KOP
2963
JESSIE
7491
SPARTELSPRUIT
150
SCHUILHOEK
243
BETHEL
623
FOUNTAIN DALE
3608
KAAL VLAKTE
7496
RUSTVERWACHT
151
BRAKFONTEIN
246
GEGUND
626
WELTEVREDEN
3625
CRONJE'S FLAT
7506
GROOTHOEK
152
DOORNLAAGTE
262
MERCY MANOR
18474
GEDULT
3700
POONA
7511
WAAIKRAAL
153
266
ARCADIA
660
MOOIDOORN HOEK
3722
ENNIS
7524
VAALBANK
154
DORPSGRONDEN VAN
UTRECHT
GOEDGEDACHT
VLEIPLAATS
664
KAKANINIS KRAAL
3724
CLARE
7525
SCHEEPERS NEK
687
ELIZABETH
3726
PERTH
7540
NOOITGEDACHT
278
SANDHURST
703
SPOOKMILL NO 2
3735
MOY
7549
NOOITGEDACHT
279
STERKSTROOM B
720
VAALBANK
3737
BEAUFORT
286
WATERVAL
GELUK
ZANDSPRUIT
SLR Consulting (Pty) Ltd
157
158
162
273
805
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
Registration Division: HS
UP AND DOWN
8701
GORDON
9481
CLONTARF EAST A
12960
WYKOM
16958
13052
LEOKOP EAST
16984
BRAK HOEK
16985
SCHUILKLIP
17759
13822
DUMFIRMLINE
17809
RIVER BANK
8185
NIL DESPERANDUM A
8771
LONG KLIP
9492
MINSTER B
8292
CLONTARF EAST
8773
SPOT
9758
MUNRO'S WINKEL
8293
TIPPERARY EAST
8774
MDAGAS KRAAL
9785
ROCKETDALE ANNEXE
A
ROCKETDALE ANNEXE
B
S A R COLINDALE
GLEN CALDER
8260
STERKFONTEIN A
8772
MOOI KRANTZ
9562
MOORFIELD WEST
8294
LEOKOP EAST
8793
INKWELO SIDE
10291
WHITE HOUSE
14178
TIPPERARY WEST
17810
TROWS REST
8298
MINSTER A
8817
TUIN NO 2
10494
REDMAIN
14492
THE RUINS
17828
LANGTON
8327
LINCOLN
8820
THE NECK
10548
MEADOWSTREAMS
14701
STONY RIDGE
18005
MORGEN ZON
8328
KROMHOEK
8879
GREY RIDGE NO 3
10559
LOSKOP
14724
HS
18010
PIETS RUST
8329
NIL DESPERANDUM B
8894
MAJUBA SOUTH
10614
WARM HOEK
14976
POONGA'S KRAAL
18041
MACCLESFIELD
8418
HAWARDEN
8915
INKWELO
10640
222 POLICE CAMP
15083
TIGER KLOOF
18084
LANG'S NEK A
8441
KNOWESLEY
8926
LAST ATTEMPT
10877
DUMBANY
15101
LANG'S NEK B
8442
KINGSTON
8943
ATTEMPT
18624
CECILIA
15106
GARDINIA
8486
ALBANY
8944
LEASE D
11288
KLEINDAL
15177
GREENWICH
8487
THE STRIP
8957
GLENDALE
11290
LEYBEL
15291
FORTS
8502
KNOCKBREX
9018
TOP
11634
BUFFALO PETROLEUM
15461
HERONS COURT
8521
GREY RIDGE
9021
LEOPARD KLOOF
11849
BUFFELSHOEK
15469
13053
Registration Division: HU
WELVERDIEND
10
BLOEMENDAL
18
WIJDGELEGEN
24
NOOITGEDACHT
36
ZWAARVERDIEND
39
DRIEFONTEIN
42
LOOTSKLOOF
48
BANKEROET
50
LEEUWNEK
51
GROOTGELUK
52
PARADISE
54
ARMAGH
8555
EAGLES CLIFF
9049
STEEP GLEN
11865
WOODBURN
15470
COOTHILL
8556
SPECTACLE SPRUIT
9079
UNION
11925
MODDERLAAGTE
15517
COLINDALE
8578
HEATHFIELD
9089
THE REST
11994
WYKOM
15763
RIVER BEND
8585
ERIN
9110
LANDS NEK RAIL A
12795
BOSCOBEL
15775
INNISKILLING
8590
WONDERDRAAI
9189
LANGS NEK RAIL B
12796
15790
HIGHTON
8591
MOORFIELD EAST
9194
LANGS NEK RAIL C
12797
VAN NIEKERK'S
STROOM
ROCKHILL
8611
HARTEBEEST BULT
9197
LANGS NEK RAIL D
12798
BATTLEFIELD
8618
GALWAY
9202
LANGA NEK RAIL E
12799
KONIGSBERG
16293
BEGINSEL
56
16376
WATERVAL
57
BLESBOK
8639
GANTON
9242
LANGS NEK FOREST A
12800
CLON
CHELMSFORD
8642
VULTURES HOME
9269
LANGS NEK FOREST B
12801
TARF
16377
PONGOLA
61
LEOPARD DALE
8643
MARDENASH NO 3
9400
LANGS NEK FOREST C
12802
TIPPERARY A
16391
KOPPIE ALLEEN
63
BLACKMOOR
8665
MARDENASH NO 2
9401
12834
TIPPERARY B
16393
MVUTSINI
67
DRIFT
8684
TRESPASS
9425
CHONTARF EAST
ANNEXE
ROCKETDALE RAIL
TWEEFONTEIN
16423
HARLOO
68
LENTEVLEI
16524
MHLATI
69
SLR Consulting (Pty) Ltd
12918
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SPITZKOP
70
VRISCHGEWAAGD
179
GROENEWEIDING
345
DONKERHOEK
512
LLANWARNE
603
PONGOLA
71
WATERVAL
180
UITHOEK
348
TOOVERNAARSRUST
518
WELVERDIEND
610
SUNLAND
72
RONDEBOSCH
185
ZILVERKLIP
351
ZALFLAGER
525
MISGUND
611
UITZICHT
73
LANGVERWACHT
190
LANGKRANS
367
MOOIPLAATS
537
NAAUWKLOOF
612
RIVERSDALE
75
GOEDGELOOF
197
RIVERSDALE
372
WELTEVREDE
540
NOOITGEDACHT
614
RENDSBURG
80
STEENBOKLAAGTE
202
MAGDALENA
376
WAGENDRIFT
541
VEEPLAATS
615
TAMBOTI RIDGE
81
ONGELUK
211
GELUK
377
GELUK
545
PIETERSRUST
617
DUBULA
91
LANGVERWACHT
18093
MOOIBANK
378
WITKLOOF
546
VERWYDERD
618
BEDROG
97
LANGVERWACHT
226
MPISINI
17756
ONVERWACHT
552
MERIBA
619
WELVERDIEND
104
DOORNHOEK
227
MORGENZON
390
WATERVAL
553
NOOITGEDACHT
620
MOUNTAIN VIEW
106
WELCOME
229
WEGSPRING
398
NAAUWPOORT
556
ERFENIS
621
DWARSRAND
110
OASIS
237
BERDINA
399
GOEDGETROFFEN
557
UITZICHT
624
KOUDELAGER
115
BETHEL
247
FRISCHGEWAAGD
401
MORGENZON
559
WELVERDIEND
630
MORGENZON
117
VOORDAG
251
WATERVAL
423
WONDERFONTEIN
560
LANGFONTEIN
632
DOORNKOP
118
ALOEBOOM
254
UITKOMST
424
LANGVERWACHT
561
LEGERPLAATS
634
ROODEPOORT
119
RUSTENBURG
257
NOOITGEDACHT
427
WELVERDIEND
563
ZEEKOEVLEI
635
MADEMOISELLE
123
LISBON
265
ONRECHT
428
ROOIPOORT
565
INGOLOZANA
18067
17708
LANGGEWACHT
275
UMHLOPA
443
GEWONNEN
572
DOORNHOEK
636
WELGEVONDEN
136
ZOMERVELD
277
VERDRUKT
444
HEELTEVREDEN
573
HLOMOHLOMO
638
KOLFONTEIN
138
VLAKFONTEIN
281
VAALBANK
450
LEEUWKOP
580
VERGELEGEN
639
ONVERWACHT
142
DAGERAAD
288
MORGENZON
460
BLOEMGAARD
585
GOEDGELOOF
640
RIETVLEI
150
WINTERSHOEK
295
LANGVERWACHT
476
GOEDHOOP
586
BOSCHHOEK
641
DRIEFONTEIN
151
SMEERTOUW
297
CHRISTINASDAL
480
GOEDENMOED
587
RIETBOKLAAGTE
642
BOSCHHOEK
156
VREDEHOF
299
BEVENSON
483
GOEDVERTROUW
592
DORDRECHT
643
DOORNBOSCH
157
ONGEMAAKT
301
WELTEVREDEN
490
ZEEKOEPAN
593
VERGEVAL
644
WYKOM
158
KROMELLEBOOG
303
FORTUIN
491
DOORNHOEK
594
MIDDERNACHT
645
BONA ESPERANZA
161
VAALKRANTZ
306
METSELFONTEIN
499
UITKOMST
596
LANGGEWACHT
646
RUSTPLAATS
165
WELKOM
314
WONDERBOOM
500
VETSPRUIT
597
LEEUWSPOOR
647
AVONDUUR
167
UITKIJK
315
UITZIGT
501
UITGEVALLEN
599
NOOITVERWACHT
648
TYGERSKLOOF
173
BEDROG EN ONRECHT
B
326
WELTEVREDEN
510
MEIJERSHOEK
602
BLOEMHOF
649
SLR Consulting (Pty) Ltd
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
UITSCHOT
650
KOEDOESBERG
747
ISIHLENGENI
857
HU
17598
LOT H 60
13654
ZANDDUINEN
652
RONDEKOP
752
ESENHLABENI
858
RONDEKOP
17619
CADILLAC
13666
PONGOLA
653
DORINGBOS
753
LEEUKOP
859
SWISS VALLEY
17662
BUKANDA
13711
BEDROG
654
LEEUWSPOOR
759
17981
CABARET
13712
SILVERHOUT
668
WELVERDIEND
766
KINGHOLME
868
MORGENZON
18094
BACHA
13719
BERG & DAL
670
NEGENUUR
769
VERGELEN
869
HU
18399
TARZAN
13727
BURGERSRUST
672
SOETVELD
775
ERIKA
872
BONZO
13728
HELENA
673
FIUME
806
WITWATER
873
TARANAKI
13868
PAARDENFONTIEN
674
ERINDALE
809
CLERKNESS
13459
LOT H 51
13092
BEUNA VISTA
14044
13693
LOT H 52
13093
MKUZI-WES
14403
13779
SUB A OF ITITIHOYA
13116
NTABANKOSI
14594
15832
BARTLOW
13117
SPES BONA
15856
16934
BAGNARA
13118
KULENI NO 9
15959
16935
BAGHMATI
13119
UNOHEMU
16012
13120
BETHEL
ISIHLENGENI
EMYATI
EKUHLENGENI
VERLIES
683
689
698
701
705
CONFERENCE
MAGUT A
MAGUT
MAGUT B
KORTIER
811
817
818
819
821
862
WISTOW
BORKUM
RESERVE NO 12
GLENDAWN
WILHARONA
Registration Division: HV
GROOTDRAAI
707
UITVAL
828
SIMDLANGETSHA
16956
BOMBOLO
IMPUNZI
16013
BEHOUD
708
TIERKLOOF
829
RIETBOKLAAGTE
16962
OKALWENI
13151
CAIRN BANE
16596
KEZA
713
DEMOINA
830
RIETBOKLAAGTE
16963
LOT H115
13180
ZAMAZAMA
16924
16986
BARTENHEIM
13194
GRANT
16945
17058
INGWENI STATION
13243
BRONTE
17383
17059
CLOETE
13350
TEMBE NORTH
17497
17155
ALKMAAR
13434
THANDA
17905
13436
WEGSPRING
HU
KLIPFONTEIN
NGOMI
718
727
728
729
MISTY VALLEY
LANGKRANS
UITKYK
UITKYK
831
833
834
835
GLENDAWN
VERGELEGEN
MOOIPLAATS
KRANSKOP
LELIESHOEK
730
HLOMOHLOMO
836
HU
17281
WARRICK
BONA ESPERANZA
736
CHENNELS
837
CONFERENCE
17314
BOYNE
13468
CARLSBAD
737
GROOTHOEK
839
L'AURENT
17315
LOT H 77
13533
MORRISFIELD
11436
MOOIPLAATS
739
HLOMO LODGE
842
MARICA
17330
LOT H 49
13543
MEDHAM
11558
13581
ATHALIE
11559
Registration Division: GV
KRETA
741
MARIANTHA
845
HU
17535
CHAOS
UITKYK
743
BEHOUD
851
HU
17542
JARABUB
13582
JEREMY
11560
BOSVELD
745
BLOEMENKRANS
853
HU
17543
POINCARE
13583
ASHBURTON
11686
HU
18658
CHICHESTER
855
WATERVAL
17560
ABU MADI
13584
HORSESHOE BEND
11688
LELIESHOEK
746
MAGDALENA
856
DORINGBOS
17592
DUKUMBANE
13626
LYNDHURST
11910
LOT H 59
13653
VEGA
12044
SLR Consulting (Pty) Ltd
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
LYTA
12045
LOT H47
13513
RODWIN
16244
HLUHLUWE RIVER
16537
LOT 43
16859
UBIZANE
12046
LOT H53
13514
RIADEN
16245
HLUHLUWE RIVER
16538
CRAIGHILL
16860
LOT H 27
12419
LOT H 2
13691
MBOMENI
16256
BONMART
16557
ROYDEN
16870
LOT H 28
12420
LOT H19
13996
ARBEIDSVREUGDE
16279
JOURNEY'S END
16566
NORTH COAST
17354
LOT H 12
12907
LOT H20
13997
ALBA FORESTRY
16297
DELVILLE
16587
MAKARIOS
17377
LOT H 11
12908
LOT H44
13998
MOKANA CANE
16298
GRANDIS
16588
THE HUTS
17391
LOT H 45
12969
LOT H 17
14168
RBM
16317
COTCANE
16633
PASENA
17671
LOT H 46
12970
LOT H 21
14169
BRANJO
16321
WOODLANDS
16672
NARROWS
17393
LOT H 7
12971
LOT H 22
14170
ARGYLL
16327
MPOSA
16685
DUKUDUKU
17395
LOT H 10
12984
ABERDOUR
14205
PEGGY NO 16328
16328
GLEN GRANT
16686
DUKUDUKU
17396
LOT H 8
13035
MTOLO
14390
ADPROP
16329
SOKHULU
16687
UMFOLOZI
17424
LOT H 9
13036
ROOIGROND
15170
LOT 11 MPOSA
16360
UMSUNDUZI
16688
DORPTOE
17514
LOT H 32
13041
RESERVE NO 3
15822
LOT 12 MPOSA
16361
ROSS SUGAR
16706
KENNEDY
17586
LOT H 33
13042
BRUDEE
16056
GREEN HILL C
16381
GV
16707
ROSS
17690
LOT H 98
13043
HLUHLUWE RIVER
16476
GREEN HILL F
16382
GV
16708
EVERGREEN
17894
LOT H 16
13044
HLUHLUWE RIVER
16477
SUGARLAKE
16385
LOT K41
16715
GV
18361
LOT H 23
13045
HLUHLUWE RIVER
16478
REDCROFT
16403
LOT K46
16716
GLENPARK
13069
HLUHLUWE RIVER
16479
S A R MPOSA
16434
LOT K47
16717
LOT H 34
13081
HLUHLUWE RIVER
16480
ZAPOLWANA HILL
16436
LOT K48
16718
DOORNKOP
20
LOT H 35
13082
HLUHLUWE RIVER
16482
MZINGAZI LAKE
16468
LOT K49
16719
SCHURWEKOP
27
LOT H 4
13097
HLUHLUWE RIVER
16483
HLUHLUWE RIVER
16486
LOT K50
16720
WELKOM
28
LOT U 184
13128
HLUHLUWE RIVER
16484
HLUHLUWE RIVER
16487
LOT K52
16721
WELGEVONDEN
29
LOT K 45
13130
HLUHLUWE RIVER
16485
HLUHLUWE RIVER
16488
LOT K53
16722
VLAKPOORT
32
LOT K 9
KWAMBONAMBI
LOT H 29
13133
EILANDSIG
16787
HLUHLUWE RIVER
16489
LOT K54
16723
WELTEVREDE
41
GLENPARK
16878
HLUHLUWE RIVER
16490
LOT K55
16724
NOOITGEZIEN
55
188
LOT H 30
13269
LOT H31
13270
LOT H 97
13271
LOT H6
13349
NCEDOMHLOPE
13363
SLR Consulting (Pty) Ltd
13268
Registration Division: GU
17238
HLUHLUWE RIVER
16491
LOT K56
16725
DEWAARD
BRIDGEFIELD
17515
BONMUIR
16497
PEASTON
16768
WELGEKOZEN
191
SUKARI
17516
BONELLA
16498
PEASTON
16773
MOORDPLAATS
193
MKONGE
17517
SOMKELE
16499
LAKELANDS
16777
DOORNHOEK
204
ETEZA
16220
FAIRWAY
16502
SPURWING
16839
ZOEKMY
207
KEURPLAATS
218
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
NOOITVERWACHT
221
VAALKRANS
564
VLAKBULT
6148
ELLINGHAM
11478
LOT 316 EMPANGENI
13051
VUURSTEEN
242
NOOITGEDACHT
567
SAXONY
6149
CANELANDS
11479
LOT 280 EMPANGENI
13074
SCHEEPERSLAAGTE
244
OVERVLOED
724
MERINO
6150
DRISDERNAN
11541
LOT 274 EMPANGENI
13216
STERKSTROOM
250
SCHOONSPRUIT
742
VERZETHOEK
6151
THORNCREEK
11542
LOT 310 EMPANGENI
13252
HEELGOED
258
HAMBROCK
748
MORGENZON
6152
GLENMORE
11543
LOT 252 EMPANGENI
13313
GOODLUCK
270
GRENSPLAAS
763
LANGGEWACHT
6153
MAJATCHA
11583
ENTONJANENI
13356
UITZOEK
317
STERKFONTEIN
6111
BURTON GARTH
11584
LOT 262 EMPANGENI
13375
322
DOORNHOEK A
6112
IMFULE MISSION
STATION
BARNEVELD
6154
ONVERWACHT
HILL CREST
11585
COOLIDGE
13386
NEWLANDS
11588
LOT 291 EMPANGENI
13387
WANDSBECK
6157
NTAMBANANA
11724
LOT 290 EMPANGENI
13388
GOLDEN REEF
6158
HILL TOP
11745
LOT 289 EMPANGENI
13389
FATIMA
11785
LOT 292 EMPANGENI
13399
SPES BONA
11829
LOT 285 EMPANGENI
13400
SANDOWN
12025
LOT 264 EMPANGENI
13548
SEVERNDALE
12135
LOT 269 EMPANGENI
13551
LOT 263 EMPANGENI
12144
LOT 311 EMPANGENI
13741
HANDLEY CROSS
12187
LOT 308 EMPANGENI
13742
LOT 2 NTAMBANANA
12365
LOT 320 EMPANGENI
13745
LOT 303 EMPANGENI
12670
LOT 307 EMPANGENI
13746
LOT 277 EMPANGENI
12671
STOCKVILLE
13904
LOT 312 EMPANGENI
12694
LOT 254 EMPANGENI
14014
LOT 275 EMPANGENI
12724
LOT 278 EMPANGENI
14015
LOT 279 EMPANGENI
12778
LOT 273 EMPANGENI
14129
LOT 281 EMPANGENI
12782
LOT 313 EMPANGENI
14334
MARS
12874
LOT 314 EMPANGENI
14335
LOT 272 EMPANGENI
12922
FULENI RESERVE
14375
VULCAN
12991
LOT 317 EMPANGENI
14404
LOT 315 EMPANGENI
13039
LOT 319 EMPANGENI
14405
LOT 321 EMPANGENI
13040
LOT 318 EMPANGENI
14496
LOT 309 EMPANGENI
13050
DUBE RIDGE
15223
PROSPERITY
KROONPLAATS
UITZICHT
UITKIJK
HOLLANDIA
WINTERSHOEK
323
335
349
353
384
400
LANGVERWACHT
410
OUDEWERF
426
WELTEVREDEN
6113
6156
KWAMAGWAZA
MISSION STATION
DIEPKLOOF
6115
6118
RUSTVERWACHT
6159
NOOITGEDACHT NO 96
6119
VERGELEGEN
6160
MORGENZON A
6126
GROENKOP
6161
BOSCHHOEK
6128
WITVOLOOS
6553
TEVREDEN
6129
MORGENZON B
6729
SWEETHOME
6130
OVERVLOED
7432
KEURPLAATS
6132
WINTERS HOEK
8299
ONGEGUNDE
BRAKSLOOT
ONTEVREDEN
432
433
VRISCHGEWAAGD
6133
WATERVAL
9144
TOGGEKRY
436
EIKENDAL
6134
149B
9500
OVERVLOED
441
PROTEST
6135
LOT 244 EMPANGENI
10574
KONINGSKROON
447
SPESBONA
6136
HLANGASA
10963
WITVOLOOS
453
NOOITGEDACHT
6137
PROSPECT ESTATE
10974
SCHOONSTROOM
474
VERGELEGEN
6139
PICCADILLY
10985
BOSCHHOEK
489
DEANE
6140
LOT 241 EMPANGENI
11058
VRIENDSCHAP
492
SCHUILHOEK
6142
EZULWINI
11065
GOEDGELOOF
496
ELIZABETH
6143
ARCADIA
11079
DORSTFONTEIN
526
NOOITGEDACHT
6144
LOT 1 NTAMBANANA
11372
LOTTERY
531
WELKOM
6145
NEEDMORE
11386
EENSGEVONDEN
551
ROSENBURG
6146
BLACKWOOD
11394
HOEDBERG
555
KONIGSBERG
6147
THE PYRAMIDS
11425
SLR Consulting (Pty) Ltd
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
WINDY RIDGE
15304
BOEGOENEK
15636
LOT 271 EMPANGENI
15728
DOORNHOEK B
15736
RESERVE NO 5
15824
RESERVE NO 11
15831
RESERVE NO 20
15840
SYLVIA
16305
NOBAMBA
16505
MDONI
16562
SKYE BLUE
16653
SPRINGFIELD
16670
COOLIDGE
17225
INHLAZATJE
17387
BHUCHANANA
17700
GU
18296
SLR Consulting (Pty) Ltd