New additive CCBit113AD® : perfect affinity bitumen/aggregates
Transcription
New additive CCBit113AD® : perfect affinity bitumen/aggregates
New additive CCBit113AD® : perfect affinity bitumen/aggregates EA Equipm ent& AdditivesU G New additive CCBit 113AD®: perfect affinity bitumen/aggregates •CCBit113AD® isabitum enm odifierofthenew generation •CCBit113AD® connectsthequalitiesoflow viscousbitum enforw arm asphaltm ixesw ithan excellentadhesionbehaviouratcritical aggregates •CCBit113AD® isused foralltypesofrolled asphaltand m asticasphalt •CCBit113AD® isstoragestableand isnot hazardoustohealth New additive CCBit113AD ® : perfect affinity bitumen/aggregates Improvement of the Stability C C B it11 3A D ® (organic ad d itive forlowerviskos ity ofbitu m en) c au s e an im proved s tability ofthe as phaltin ad d ition. Earlier traffic release A s phaltpaved with red u c ed tem peratu res c an being u s ed early (Frankfu rtairport). Compaction aid W ithou tu s age ofthe tem peratu re lowering a betterc om pac tibility m ay be u s ed E s pec ially for: m anu alpaving, bad weatherc ond itions , thin layers , hard c om pac table as phalt(s tiffas phalt) Less ageing inclination of the binder The lowerprod u c tion and paving tem peratu re red u c es the therm alone A geing ofthe bind er. Excellent affinity bitumen / critical aggregates P articu larly good res u lts by u s ing Granite, q u artzite and q u artz porphyry New additive CCBit113AD ® : perfect affinity bitumen/aggregates Modification of the structures of the modifier (CCBit113AD®) is realised by: • Doublefunctionality • S hortandm obilechainsw ithacidic,basicandneutralfunctionsfortheinteractionw iththe aggregates • L ongchainsfortheaffinity w iththebitum en • Crystallinepartsforincreasingtheringandballpointofthebitum en waterstorage, 80°C Straight run bitumen 50/70, 48 h waterstorage, 80°C CCBit113AD® modified Bitumen, 48 h CCBit113AD® M odification– R esultsR ing& Ball, P enetration M astercurvesforR ussianBitum en CCBIT113AD® modification Plasticity >130grd!! Mastercurve Ring and Ball °C Target8 5°C 1, 8 % 2, 2% 2, 2% 2 , 5% Penetration 1/10mm M od ification with CCBit 113AD ® in % 4, 0 % 2, 2% 2, 8 % 2 , 5% Target60 1 /1 0 m m 1 , 3% 1, 8 % 2, 8 % 4, 0 % Plasticity of straight run, polymer and CCBit113AD® bitumen Bitumen 50/70 25/55-55 BHV NV 35 PG Ring and Ball °C 46 - 54 ≥55 ≥ 85 Penetration 1/10mm 50 – 70 25-55 ≤35 Breaking point Fraaß °C ≤ -8 ≤ -10 ≤ -10 Elastic recovery % NR ≥ 50 NR 0 + +++ Straight run SBS mod. CCBit113AD® ≥64 ≥65 ≥95 Adhesion to critical aggregates Multigrade behaviour grd Plasticity Multigrade Behavior 50/70 25/55-55 BVH N V 35 P G 100 80 °C 60 85 40 20 0 -20 54 55 -8 -10 -10 BITUMEN R ingand Ball BP Fraas LABORATORY AND FIELD TESTS WTT - Wheel Tracking Test, Hamburg Device WTT Normal Bitumen WTT CCBit113AD® mod. WTT - Wheel Tracking Test, Hamburg Device WTT Normal Bitumen WTT CCBit113AD® mod. New additive CCBit113AD : WTT wheel tracking test, Hamburg device Bitum en50/70 Bitum en25/55-55 (P m B 45A) CCBit113AD® • development R&B in °C (LENC, Sao Paulo, Brazil Feb. 10, 2010) •120 •100 R&B in °C •80 •60 •97 •40 •20 •107 •68 •52,5 •0 Adding CCBit113AD® to Bitumen CAP 30-45 in % •4 0 Adhesion Bitumen / Aggregates (waterstorage test 20 h @ 600 C) Bitumen CAP 30-45 CCBit113AD® Modified •4 2 MODIFICATION Modification plant or raffinery D om es tic bitu m en M od ification CCBit mod bitu m en Trans portation m od . bitu m en 2006 Mobile modifcation unit in Aserbaidshan, near Baku Errectionofam obilem odificationplant(container)connected w itha asphaltm ixingplant Crude oil BITUMEN O X ID IS E D B ITUM E N STRAIGHT RUN BITUMEN MODIFIED BITUMEN PmB CCBit113AD® Combination of PmB and CCBit113AD® Dr. Hutschenreuther Polymer WmB (LT) CCBit113AD P&WmB (LT)Pol/Wax RmB 25 Rubber Targets WAM – Dr. H. TECHNOLOGIES® USING CCBit113AD® lower energy consumtion √ Lower emmissions (fumes and aerosols) √ Better workability √ High stability against rutting √ Perfect high and low temperature behaviour - 35°C to 100°C √ Perfect affinity to all aggregates (also granite, quarzite) √ Zero loss method during production and 100% recycable √ Easy handling and storage stability of modified bitumen √ No hazardous to health √ Development of new technologies (PMA, PFA) √ Cost reduction connected with longer lifetime √ Maintenance free roads (min. 5 years) √ Examples 2014/2015 GRU International Airport Sao Paulo 2014 - 2015 01 / 02 GRU International Airport Sao Paulo 2015 03 Examples 2014/2015 Täbriz, IRAN Reconstruction of Bus Lanes (existing pavement) Täbriz, IRAN Reconstruction of Bus Lanes (new pavement) For more information, please visit us at: w w w .hutschenreuther.de w w w .ccbit113ad.com Youtube: Search for „pfa asphalt“ and „pma asphalt“ EA Equipm ent& AdditivesU G
Similar documents
CCBit113AD - Dr. Hutschenreuther Ingenieurgesellschaft mbH
Dr. Hutschenreuther Ingenieurgesellschaft für bautechnische Prüfung mbH
More information