New additive CCBit113AD® : perfect affinity bitumen/aggregates

Transcription

New additive CCBit113AD® : perfect affinity bitumen/aggregates
New additive CCBit113AD® :
perfect affinity bitumen/aggregates
EA Equipm ent& AdditivesU G
New additive CCBit 113AD®:
perfect affinity bitumen/aggregates
•CCBit113AD® isabitum enm odifierofthenew
generation
•CCBit113AD® connectsthequalitiesoflow
viscousbitum enforw arm asphaltm ixesw ithan
excellentadhesionbehaviouratcritical
aggregates
•CCBit113AD® isused foralltypesofrolled
asphaltand m asticasphalt
•CCBit113AD® isstoragestableand isnot
hazardoustohealth
New additive CCBit113AD ® :
perfect affinity bitumen/aggregates
Improvement of the Stability
C C B it11 3A D ® (organic ad d itive forlowerviskos ity ofbitu m en)
c au s e an im proved s tability ofthe as phaltin ad d ition.
Earlier traffic release
A s phaltpaved with red u c ed tem peratu res c an being u s ed early
(Frankfu rtairport).
Compaction aid
W ithou tu s age ofthe tem peratu re lowering a betterc om pac tibility
m ay be u s ed
E s pec ially for: m anu alpaving, bad weatherc ond itions ,
thin layers , hard c om pac table as phalt(s tiffas phalt)
Less ageing inclination of the binder
The lowerprod u c tion and paving tem peratu re red u c es the therm alone
A geing ofthe bind er.
Excellent affinity bitumen / critical aggregates
P articu larly good res u lts by u s ing Granite, q u artzite and q u artz porphyry
New additive CCBit113AD ® :
perfect affinity bitumen/aggregates
Modification of the structures of the modifier (CCBit113AD®) is realised by:
• Doublefunctionality
• S hortandm obilechainsw ithacidic,basicandneutralfunctionsfortheinteractionw iththe
aggregates
• L ongchainsfortheaffinity w iththebitum en
• Crystallinepartsforincreasingtheringandballpointofthebitum en
waterstorage, 80°C
Straight run bitumen 50/70, 48 h
waterstorage, 80°C
CCBit113AD® modified Bitumen, 48 h
CCBit113AD®
M odification– R esultsR ing& Ball,
P enetration
M astercurvesforR ussianBitum en
CCBIT113AD® modification
Plasticity >130grd!!
Mastercurve
Ring and Ball °C
Target8 5°C
1, 8 %
2, 2%
2, 2%
2 , 5%
Penetration 1/10mm
M od ification with
CCBit 113AD ® in %
4, 0 %
2, 2%
2, 8 %
2 , 5%
Target60 1 /1 0 m m
1 , 3%
1, 8 %
2, 8 %
4, 0 %
Plasticity of straight run, polymer and CCBit113AD®
bitumen
Bitumen
50/70
25/55-55
BHV NV 35 PG
Ring and Ball
°C
46 - 54
≥55
≥ 85
Penetration 1/10mm
50 – 70
25-55
≤35
Breaking point Fraaß
°C
≤ -8
≤ -10
≤ -10
Elastic recovery
%
NR
≥ 50
NR
0
+
+++
Straight run
SBS mod.
CCBit113AD®
≥64
≥65
≥95
Adhesion to critical
aggregates
Multigrade behaviour
grd
Plasticity
Multigrade Behavior
50/70
25/55-55
BVH N V 35 P G
100
80
°C
60
85
40
20
0
-20
54
55
-8
-10
-10
BITUMEN
R ingand Ball
BP Fraas
LABORATORY
AND
FIELD TESTS
WTT - Wheel Tracking Test, Hamburg Device
WTT Normal Bitumen
WTT CCBit113AD® mod.
WTT - Wheel Tracking Test, Hamburg Device
WTT Normal Bitumen
WTT CCBit113AD® mod.
New additive CCBit113AD :
WTT wheel tracking test,
Hamburg device
Bitum en50/70
Bitum en25/55-55
(P m B 45A)
CCBit113AD®
•
development R&B in °C
(LENC, Sao Paulo, Brazil Feb. 10, 2010)
•120
•100
R&B in °C
•80
•60
•97
•40
•20
•107
•68
•52,5
•0
Adding CCBit113AD® to Bitumen CAP 30-45 in %
•4 0
Adhesion Bitumen / Aggregates
(waterstorage test 20 h @ 600 C)
Bitumen CAP 30-45
CCBit113AD® Modified
•4 2
MODIFICATION
Modification plant or raffinery
D om es tic bitu m en
M od ification
CCBit mod bitu m en
Trans portation m od . bitu m en
2006
Mobile modifcation unit in Aserbaidshan, near Baku
Errectionofam obilem odificationplant(container)connected w itha
asphaltm ixingplant
Crude oil
BITUMEN
O X ID IS E D B ITUM E N
STRAIGHT RUN BITUMEN
MODIFIED BITUMEN
PmB
CCBit113AD®
Combination of PmB and
CCBit113AD®
Dr. Hutschenreuther
Polymer
WmB (LT) CCBit113AD
P&WmB (LT)Pol/Wax
RmB
25
Rubber
Targets WAM –
Dr. H. TECHNOLOGIES® USING CCBit113AD®
lower energy consumtion
√
Lower emmissions (fumes and aerosols)
√
Better workability
√
High stability against rutting
√
Perfect high and low temperature behaviour - 35°C to 100°C
√
Perfect affinity to all aggregates (also granite, quarzite)
√
Zero loss method during production and 100% recycable
√
Easy handling and storage stability of modified bitumen
√
No hazardous to health
√
Development of new technologies (PMA, PFA)
√
Cost reduction connected with longer lifetime
√
Maintenance free roads (min. 5 years)
√
Examples 2014/2015
GRU International Airport Sao
Paulo 2014 - 2015 01 / 02
GRU International Airport Sao
Paulo 2015 03
Examples 2014/2015
Täbriz, IRAN Reconstruction of
Bus Lanes (existing pavement)
Täbriz, IRAN Reconstruction of
Bus Lanes (new pavement)
For more information, please visit us at:
w w w .hutschenreuther.de
w w w .ccbit113ad.com
Youtube:
Search for
„pfa asphalt“ and
„pma asphalt“
EA Equipm ent& AdditivesU G

Similar documents

CCBit113AD - Dr. Hutschenreuther Ingenieurgesellschaft mbH

CCBit113AD - Dr. Hutschenreuther Ingenieurgesellschaft mbH Dr. Hutschenreuther Ingenieurgesellschaft für bautechnische Prüfung mbH

More information