From Startup to Mass Market – Challenges and

Comments

Transcription

From Startup to Mass Market – Challenges and
From Startup to
Mass Market – Challenges
and Opportunities
Dr. Marcus Groll
Director High Power Charging
Allego operating in NL, GER and BE since 2013
 Founded in 09 / 2013 with 10 employees
as subsidiary of Alliander Group in the
Netherlands
 Allego headquarter in Arnhem, ~60
employees
 Allego offices in Berlin and Düsseldorf,
for Germany, ~25 employees
 Allego office in Mechelen, Belgium,
3 employees
Allego Role and Positioning: Charge Point Operator
(CPO)
 Charge Point Supplier that is specializing itself in developing, producing and selling hardware for charging
infrastructure;
 Charge Point Operator (CPO) with the main focus on realizing, maintaining and operating charging
infrastructure incl. B2B billing function to MSPs and location owners. May also include providing related services
to location owners such as investments in charging infrastructure or other chargepoint related services such as
smart charging solutions;
 Mobility Service Provider (MSP) that grant access to charging stations and thus offers services to the
contracted EV-driver. At the moment the main service offered by the MSP is transaction services between EVdriver and multiple CPO’s;
 EV-driver as the user of charging infrastructure and services, having a contractual relation with the Service
Provider.
Allego Positioning
Charge Point Operator
Mobility Service Providers
Transaction Services
to e-driver
Charge
Point
Supplier
Installation
Maintenance
Investments
Operation
B2B
Billing
Smart-, opportunitypriority, balanced-,
slow and high speed
charging
@ home
Services
Card Services
Energy
Subscription Services
Location owners
Local services
Services
Public AC-Charging in the Netherlands and Germany
Netherlands
Germany
• ~1200 AC-charging
stations in operation
• Win of all three lots of
Berlin tender in 2015
• Cooperation model
with ~80 municipalities
(Open market model)
• 140 AC-charging
stations, 1 DC-Charger
operational
• Citizens can apply for
public charging point
by Web-based process
• Target of 200 ACcharging stations and
20 DC-Chargers in
2016
Allego Fastcharging network Netherlands
 Total of 58 locations (06/16)
 50 kW Triple-Charger
 Mainly on or close to highways
at restaurants, gas-stations,
hotels
 Installed in 2014 / 2015
Fast-E Germany and Belgium
 EU-funded research & infrastructure project with installations in Germany (D) & Belgium (BE)
 221 DC-chargers in Germany, 37 DC-chargers in Belgium (deployment by Allego) to be operational by end of 2016
 + 10 chargers from enviaM (integration only) and 10 chargers from RWE (synchronization only)
 Studies on Grid-impact and Battery-Storage for Fastchargers (Installing used EV-batteries from Renault)
Project funded by EU Ten-T
Ultra-E: New Ten-T project launched now
5 Locations in Netherlands
4 Locations in Belgium
12 Locations in Germany
4 Locations in Austria (Done by Verbund AG)
Consortium
Content
• Network planning for high power charging (>150kW) in
Europe and grid impact analysis (also part of R&D)
• Testing and Validation with Prototype-EVs of OEMs
• IT-solution for interoperability, automatic authentication
and potentially reservation
SLAM Germany: Preperation for High Power Charging
 Total of 40 Locations granted
 Subsidy by German ministry of economic affairs
(BMWi)
 Sites selected by RWTH Aachen and Fraunhofer
institutes
 Sites are already equipped with 1,2-1,6 MW
medium voltage grid connections for HPC
Status Quo 10/16: ~150 Allego Fastchargers in Operation
NL TODAY:
58
NL END 16:
80
GER TODAY:
30 Locations;
80 Chargers
BE TODAY:
15
GER END 16:
~50 Loc.; 120
Chargers
BE END 16:
20
High power charging for mass market EV´s
Biggest concerns about electric vehicles today: Price, Range, Charging Time
Development
2020
• Battery prices will drop by 63%
• Battery capacity will increase by 50%
• Range will increase by 72%
DC chargers with higher charging power on highways needed
Source: Aral Studie 2015, Goldman Sachs, Fraunhofer ISI
Expected: Short term growth long range EV’s
Mercedes ELC
Volvo (small SUV)
Mercedes ELA
Range >400 km (NEDC)
Range >400 km (NEDC)
Range >400 km (NEDC)
Introduction: 2018
Introduction: 2020
Introduction: 2020
Chevrolet Bolt
Range ~ 320 km (NEDC)
Porsche MissionE
Introduction: 2017
Range >500 km (NEDC)
Introduction: 2020
New Renault ZOE
Range >300 km (NEDC)
Introduction: end 2016
2016
2017
2018
2019
2020
Audi Q6 e-tron
Range >500 km (NEDC)
Introduction: spring 2018
VW Budd-e
BMW i5
Range >500 km (NEDC)
Range >400 km (NEDC)
Introduction: 2019
Introduction: 2020
Opel
Range ~ 320 km (NEDC)
VW eGolf 8
Introduction: 2018
Range >300 km (NEDC)
Jaguar / Land Rover
Introduction: 2019
Range >400 km (NEDC)
Introduction: 2018
New BMW i3
Range >300 km (NEDC)
Introduction: 2019
High Power Charging will enable long-distance driving
Challenges and Opportunities for Allego
Challenges
Opportunities
• Build up organization „on the
fly“
• Huge market for EV-charging
infrastructure expected
starting with mass market in
next decade (2020+)
• Well-defined, structured
processes and stable IT „are
everything“
• Getting the right people
(Smart, EV-background,
pragmatic, self-guided) is
most challenging
• Need for High Power
Charging in all European
markets evolving
• Pan-European service
providers required by
customers (e.g. Automotive,
Retail)
Thank you very much!
Dr. Marcus Groll
Allego GmbH
Oranienburger Straße 86a
10178 Berlin
[email protected]
+49 160 995 147 88