PDF - Jordan Development Zones
Transcription
PDF - Jordan Development Zones
The Dead Sea Development Zone: Phase 1 Master Plan for JDZ prepared by Sasaki, Sigma Consulting, Tetra Tech (PA), Buro Happold Introduction The Dead Sea Phase 1 Master Plan provides an updated, integrated, and detailed approach to development at the Dead Sea – with strategic marketing and infrastructure inputs. The Plan sets a feasible, phased growth adjacent to the Dead Sea for the future, and enhances the site’s activity offerings, development potential, and tourism investment for years to come. The Phase 1 Study Area – (40 kilometer square) Bypass Road Rt. 40 Dead Sea Parkway Phase 1 Mujib Reserve The Dead Sea Highway Baseline Analysis Baseline Analysis – Building on Previous Studies Previous Planning at the Dead Sea: Sigma Study (1997-1998) Ministry of Water, SIGMA Focused on lands immediately adjacent to the Dead Sea; recommended intensive development Previous Planning at the Dead Sea: PLUMP Study (2003-2004) Ministry of Water, JVA, USAID, CC Covered a large portion of the Jordan Valley; promoted conservation of resources – wadis, springs, IBA’s, and archaeological sites; recommending limited development Previous Planning at the Dead Sea: Land Use Plan (2008) Ministry of Planning, USAID, SABEQ Project, Bearing Point Took a balanced approach, promoting both conservation of resources and increased economic development through tourism and other community based industry Baseline Analysis – the Physical Setting The Dead Sea Today- Itineraries 1. Crossroads of History 2. Natural Wonders 3. Health and Well Being 4. Modern Dead Sea Committed Land Private Al Buhaira 250 Rooms Under Construction Hilton 285 Rooms Al Sanabel 196 Rooms Swiss Bell 161 Rooms Al Jazera 250 Rooms Dead Sea Spa Hotel 271 Rooms Sharm 392 Rooms Al Thoraya 100 Rooms Emaar Emaar Emaar Jordan River Investment 300 Rooms Amwaj Rotana 250 Rooms Sama Al-Khair 250 Rooms Salam 120 Rooms Operating Developments Movenpick 346 Rooms Amber Valley 78 Rooms Holiday Inn 202 Rooms Process / In Process Pella 61 Rooms Convention Center Crown Plaza 420 Rooms Kempinski 345 Rooms Marriott 263 Rooms Porto 150 Rooms Amman Beach “O” Beach Crystal 253 Rooms Proposed RSCN Lodges 50 Rooms Al Fahares 250 Jordan Dubai Properties 220 Rooms Al-Bahara Eco Resort 255 Rooms Municipality of Moscow Unknown Rooms Mujib Chalets 15 Rooms Private and Committed Land Private and Committed Land Ecological Buffers Private and Committed Land Wadi Buffers (9,090 DU within Phase One Study Area) Steep Slope Areas and Inaccessible Areas Private and Committed Land Greater than 30% Slopes 20 - 30% Slopes 10% - 20% Slopes Steep Slope / Inaccessible Land (6,569 DU within Phase One Study Area) Un-Buildable Lands Private and Committed Land Steep Slope / Inaccessible Areas Wadi Buffers Land Below -408 Elevation Net Usable Land Analysis Net Usable Land Area: 10,713 Du (Steep Slope and Inaccessible Areas Suitable For Eco-Tourism: additional 2,177 Du) Uncommitted Buildable Land Not Included in Net Usable Land Area: Land Below -408 Elevation Private and Committed Land Steep Slope Areas Eco-Tourism Areas Wadi Buffers Net Usable Land Inventory Net Usable Land Area for Development: 10,713 Du Uncommitted Buildable Land Population Projection (includes Public Lands, Committed Lands and Sweimeh Private Lands) Projected Resident Population: 71,112 people Master Plan Framework– Districts and Nodes Master Plan- Overall Concept Limited Strategic Development beyond Porto – emphasis on preserving Natural assets and the Mujib Reserve Hot Springs Mukawir Panorama Complex Mt. Nebo Public Park to Madaba to Amman Wadi Mujib Lookout Point Petra Ghassul Mujib Reserve to Baptism Site Aqaba Resorts Tamarisk EcoReserve Amman Beach Herod’s Villa Health and Wellness Wadis Convention Center Development Concentrated between the Jordan River Valley and Porto Gateway Activity Node Public Space Archaeological Site Master Plan Framework: Proposed Districts and Activity Nodes Activity Node Precedents Jumeirah Madinat (Dubai, UAE) Melrose Place (Johannesburg, South Africa) Santana Row (San Jose, California) Santana Row (San Jose, California) The Raval (Barcelona, Spain) The Raval (Barcelona, Spain) Each activity node contains a mix of uses including hotels, residential, retail, F&B, and special uses (for example, a spa). Master Plan Framework: Proposed Districts and Activity Nodes Sweimeh Panorama Complex Porto Mujib Reserve Amman Beach Proposed Activity Nodes The development program centers around the concept of districts. Building from the existing pattern of developments strung along the Dead Sea Highway, the district concept breaks the Phase One Study Area down into a series of smaller areas. Each district has its own qualities and unique characteristics, yet all are related and compose the overall identity of the Area. Master Plan Framework: Proposed Districts and Activity Nodes Sweimeh Panorama Complex Porto Mujib Reserve Amman Beach Proposed Activity Nodes Sweimeh Urban District The Hotel District The Convention Center District Porto District The Mujib Reserve District The Northern Resort and Recreation District The Northern Hills District The Corniche and Holiday Inn District Amman Beach District The Panorama District North Zara District South Zara District Northern Resort, Sweimeh and Corniche District Concept Bypass Road Sweimeh Expansion Rt. 40 Sweimeh Town Center Eco-Tourism Sites Ghassul Entry Gateway Souk Farmlands The Dead Sea Highway Neighborhd Retail To Baptism Site Amwaj Entry Gateway Holiday Inn Proposed WWTP Waterfront Center The Corniche - Mixed Use Development Desal Facility Agricultural University Boulevard Public Beach Public Park (845 Du) Existing Tamarisks Tamarisks expanded to create a substantial habitat Development Parcels Waterfront Center Sustainable Golf Biblical Village Development Parcel Private / Committed Kh. Sweimeh Recreation Park Golf Club House Steep / Unbuildable Wadi Buffer Activity Node Activity Node Amenity - 423 Jordan River Valley - 408 Beach Master Plan Framework– Land Use Detailed Land Use Land Use categories and their distribution throughout the Area reflect the district concept and the organizing principle of activity nodes within most districts. Activity nodes contain a mix of commercial, residential, hotel, and specialty uses. Moving outward from these activity nodes, parcels become larger, accommodating resort hotels, integrated developments, large residential developments, and institutional uses. Hotel - A Resort - D Residential - D Retail - A Public Space - B Medical - A Logistics - A Hotel - B Resort - E Residential - E Retail – B Beach - A Medical - B Logistics - B Hotel - C Resort - F Mixed Use - A Park - A Beach - B Medical - C Utility - A Resort - A Residential - A Mixed Use - B Amenity - A Educational - A Utility - B Resort - B Residential - B Mixed Use - C Golf - A Amenity - B Educational - B Eco-Tourism Resort - C Residential - C Mixed Use - D Public Space - A Amenity - C Educational - C Park - B Detailed Land Use Hotel - A Resort - D Residential - D Retail - A Public Space - B Medical - A Logistics - A Hotel - B Resort - E Residential - E Retail – B Beach - A Medical - B Logistics - B Hotel - C Resort - F Mixed Use - A Park - A Beach - B Medical - C Utility - A Resort - A Residential - A Mixed Use - B Amenity - A Educational - A Utility - B Resort - B Residential - B Mixed Use - C Golf - A Amenity - B Educational - B Eco-Tourism Resort - C Residential - C Mixed Use - D Public Space - A Amenity - C Educational - C Park - B Phasing Strategy Phasing Strategy Early Disposition Sites to Include: 1- Part 1 of the Corniche Development (the eastern pier and part of the developments aligning the Corniche) in addition to the Corniche Road 2- The western side of the Convention District, 3- Public Areas: - The eastern public beach - Phase 1 of the public park (eastern side of the adjacent road) - The Tamarisk area Phase 1 to include: 1- All current commitments, whether operating, under construction or in the process. These are included in terms of infrastructure services demand and operation. 2- All parcels directly located on both sides of the Highway, 3- Agriculture University 4- The Hospitality School 5- Infrastructure projects (needed as enablers for the master plan phased developments), this includes part of the Water D-sal Plant to serve the exiting developments and Phase 1 developments Master Plan Framework The Dead Sea Scenic Highway Dead Sea Scenic Highway: A Scenic Spine Transformation of the Dead Sea Highway – into a Scenic Road A series of “character zones” are proposed that tie into unique districts (both existing and proposed). From the “farmlands” area, through Sweimeh, the hotels, and to Zara, the Dead Sea “Scenic” Highway is the spine that ties the entire destination together. Master Plan Framework - The Dead Sea Districts Convention Center District Convention Center District – Overall Layout The Corniche District The Corniche District – General Layout The Corniche District - The Corniche Parcels The DistrictInvestment Opportunities TheCorniche Corniche District – Southern Cap Northern Hills District General Land Use Potential Campsites Rally Parking High Voltage Power Line Hospital Skin Treatment and Product Research and Certification Center Emaar Hospitality School Emaar Residential Boutique Hotel Mixed Use Community Facility Activity Node Wadi Buffers Resort Like Hotel Steep Slope Areas Private / Committed Land Entry Gateway Section through the Hotel District Activity Node Road Residential Courtyard Access Road Dead Sea Highway HOTEL HOTEL RESIDENTIAL RESIDENTIAL RETAIL RESIDENTIAL SERVICE Road RESIDENTIAL PARKING RESIDENTIAL Residential Courtyard RESIDENTIAL PARKING Access Road Hotel District Node - Conceptual Image Northern Resort and Recreation District North District- General Land Use Existing Desalination Facility Public Park (840 Du) Agricultural Education Sustainable Golf (1000 Du) Kh. Sweimeh Recreational Park (668 Du) Biblical Village 200 m River Buffer 100 m Security Buffer Jordan River - 408 - 423 Residential Boutique Hotel Sustainable Golf Mixed Use Resort with Residential River Buffer Activity Node Public Park Utilities Resort Recreational Park Sweimeh Urban District Integrated Framework Plan Entry Gateway P P P Mosque P P Youth Center Multi-Purpose Recreation Area P P Community Center School Laundry Gathering / Recreation Area P Bus Terminal Plaza P Health Clinic P P P P Office / Mixed Use P P P P P Sweimeh Urban District Sustainability Strategies Existing Summer Solstice Winter Solstice Courtyards facilitate cross ventilation and maximize daylight within units, as well as provide shaded communal areas Buildings oriented to face NorthSouth to minimize sun exposure and reduce heat gain Canopies reduce heat gain and allow for passive cooling Buildings oriented to face NorthSouth to minimize sun exposure and reduce heat gain Solar panels help reduce energy demand and provide hot water to units below Proposed Canopies and louvers on southern façade provide additional shading Mixed use development and proximity to public transit create walkable communities Cool winds from the Dead Sea Bikepath Solar panels power lighting of public realm Natural Ventilation Landscape irrigation Pump Energy efficient public transit Underground parking reduces urban heat island and allows for improved urban design Use of low water consumptive and drought tolerant shade trees Feedback Loop Central Waste Water Treatment Plant Pump 100m = 2min walk Proximity to Public Transit Typical Section through the Corniche and the Tamarisk Eco-Reserve Tamrarisk Eco Reserve : Preservation of ecological systems Master Plan Framework – Outcomes in Numbers A B C A A 1 B 1 C 1 D A B C D E F 1 A B CD E A B C A B C A B A B A North Resort District 3 1 134333 1 8 531 6 Corniche Early Disposition Sweimeh Urban District 4 Northern Hills District 1 Hotel District 2 Convention Center District 1 Early Disposition 3 Amman Beach District Porto District Panorama District South Zara District Total Parcels 21 1 6 6 1 1 1 16 3 1 1 1 B 1 1 2 27 2 48 14 1 21 1 1 2 1 1 1 1 1 1 3 1 Total Logistics 1 1 13 1 Educational A B A B AB C A B C A B 11 32 1 1 13 Amenity Retail Utility Public Space Golf Park Beach Medical Hotel Residential District Resort Mixed Use Master Plan Parcels 34 9 10 2 4 5 2 3 1 159 Master Plan Infrastructure Cost The Dead Sea in the Near Future Convention District Convention Center District Node Convention Center District Node Hotel District Node Corniche District Corniche District – South Cap Corniche District – Promenade Corniche District – Promenade Corniche District – Promenade Corniche District – Side Road Corniche District – Promenade Corniche District – South Cap Thank You…