Highbanker/ Dredge Combo - The Honcoop Highbanker Company
Transcription
Highbanker/ Dredge Combo - The Honcoop Highbanker Company
P.O. Box 1139-615 Cass St. Owosso, MI 48867 www.honcoophighbanker.com Toll Free Phone: 1-888-988-2122 Phone: 1-989-723-3404 Email: [email protected] Highbanker/ Dredge Combo/ Shovel Platform Assembly Instructions P.O. Box 1139 615 Cass St. Owosso, MI 48867 www.honcoophighbanker.com 1-888-988-2122 HONCOOP HIGHBANKER Shovel Platform Assembly Leg Assembly Rear legs are longer and heavier than the front legs. Push on white caps. Page 2 Page 23 1-888-988-2122 HONCOOP HIGHBANKER Shovel Platform Assembly 3/4 x 1/4 x 20 SS Machine Screws The Header Box Side Walls attach under the Spray Bar top screw clamp and the Dredge Flume holes. Rest the Shovel Platform on the Spray Bar and screw in place. Page 22 3/4 x 1/4 x 20 SS Machine Screws Side Panel Assembly Page 3 1-888-988-2122 HONCOOP HIGHBANKER Shovel Platform Assembly 3/4 x 1/4 x 20 SS Machine Screws Rear Panel Assembly Slide panel down on the inside of the two side panel lips. Page 4 3/4 x 1/4 x 20 SS Machine Screws Twist the Shovel Platform Spray Bar onto the Highbanker Valve Assembly and mount. Page 21 1-888-988-2122 HONCOOP HIGHBANKER Shovel Platform Assembly 3/4 x 1/4 x 20 SS Machine Screws Remove the Dredge Flume, Hoses and Valve Assembly. Page 20 Header Box Assembly Page 5 1-888-988-2122 HONCOOP HIGHBANKER 2” Dredge Assembly Lay Flat Hose to Pump Bucket Holder Assembly Page 6 Stand the Highbanker/Combo in the stream of water that you will be working. Raise the Highbanker/ Dredge to a minimum height above the water. Remember the less height difference from the Nozzle tip to the top of the Header Box, the better the Nozzle suction. Page 19 HONCOOP HIGHBANKER 1-888-988-2122 2” Dredge Assembly 1 1/4” Pressure Hose Screw the 1 1/4” Pressure Hose onto the P.V.C. Valve Assembly. Twist the Valve Assembly onto the Lay Flat Hose to the pump. Now attach to the Top Tray Spray Bar. Then attach to Flume and Nozzle. Page 18 Splash Screen Placement Place the Moss on the Black Ribbed Mat. Place the Punch Hole Screen on the Moss. Wedge it down tight with the two Wood Blocks placed under the plastic pegs. Page 7 1-888-988-2122 HONCOOP HIGHBANKER 2” Dredge Assembly 3/4 x 1/4 x 20 SS Machine Screws Dredge “3rd Tray” Hangers Garden Hose Valve & Garden Hose Header Box Spray Bar Assembly Thread the Spray Bar with the small holes onto the Valve Assembly with the longest piece of Blue Lay Flat Hose. Mount to the Header Box with the plastic clamps found in the tool tray. Screw on Garden Hose Valve and Garden Hose. Page 8 Slide the Dredge 3rd Tray between the Top Tray and Bottom Tray. Lift and hang on the cross bars of the Bottom Tray. Page 17 1-888-988-2122 HONCOOP HIGHBANKER 2” Dredge Assembly 3/4 x 1/4 x 20 SS Machine Screws 3/4 x 1/4 x 20 SS Machine Screws Top Tray Spray Bar Assembly Screw down the Dredge Header Box Flume Page 16 Thread the Spray Bar with the large holes onto the Valve Assembly with the short Blue Lay Flat Hose. Mount to the Side Panels with the plastic clamps found in the tool tray. The P.V.C. “Y”-Coupler can then be threaded to the Spray Bars. Page 9 HONCOOP HIGHBANKER 1-888-988-2122 2” Dredge Assembly 3/4 x 1/4 x 20 SS Machine Screws 3/4 x 1/4 x 20 SS Machine Screws Tool Tray Assembly Open end of Tool Tray faces the side with the Spray Bar Valves. Page 10 Screw in place under the Header Box Grizzly. Rotate to touch the Tines and tighten. Page 15 1-888-988-2122 HONCOOP HIGHBANKER 2” Dredge Assembly Loosen Screws Loosen (DO NOT REMOVE) the 4 screws that hold down the Header Box Grizzly. Lift the Grizzly Tines and place the 3/4” aluminum angle between the Tines and the Back Panel. The end tabs on the angle will hook on the welds in the corner. Retighten the Grizzly screws. The pressure from the Tines will hold the angle in place. Page 14 Top Tray Classifying Screen Assembly Place the Classifying Screen under the Spray Bar and rest it on the two Plastic Pegs located on the Side Panels.. Push it all the way back so it will hang on it’s own while you reach for the Top Tray. Page 11 1-888-988-2122 HONCOOP HIGHBANKER 2” Dredge Assembly Dredge Kit “3rd Tray Flume” #2 #1 Wi Nu ng ts Top Tray Assembly The Moss of the Top Tray slips under the rubber flap of the Classifying Screen assembly. The flap is then pinched down when the Riffle Tray is latched tight.. Note: The Velcro on the cross bar of the Bottom Tray mates with the Velcro on the bottom of the Top Tray and holds the assembly in place. Page 12 Remove Header Box Spray Bar Valve Assembly & “Y”-coupler. Center “3rd Tray Flume” under Top Tray Classifying Screen and insert #1 screw through the first row of punch holes. Then insert #2 screw through the screen and wing nut the screws in place. Replace the Classifying Screen in the Highbanker with the Top Tray. Page 13