POSEIDON SEAWATER DESALINATION PLANT
Transcription
POSEIDON SEAWATER DESALINATION PLANT
Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) STANDARD URBAN STORM WATER MITIGATION PROGRAM (SUSMP) WATER QUALITY TECHNICAL REPORT POSEIDON SEAWATER DESALINATION PLANT 4590 CARLSBAD BOULEVARD CARLSBAD, CALIFORNIA 92008 Prepared for: Poseidon Resources (Channelside) LLC 501 West Broadway, Suite 840 San Diego, California 92101 (760) 438-1440 Prepared by: TETRA TECH, INC. 16241 Laguna Canyon Road, Suite 200 Irvine, California 92618 (949) 727-7099 Date: September 25, 2009 OWNER’S CERTIFICATION STANDARD URBAN STORM WATER MITIGATION PROGRAM (SUSMP) WATER QUALITY TECHNICAL REPORT (WQTR) PERMIT/PLANNING APPLICATION NUMBER GRADING PERMIT NUMBER POSEIDON SEAWATER DESALINATION PLANT 4590 CARLSBAD BOULEVARD, CARLSBAD This Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) has been prepared for Poseidon Resources (Channelside) LLC by Tetra Tech, Inc. It is intended to comply with the requirements of the City of Carlsbad’s Standard Urban Storm Water Mitigation Program (SUSMP) requiring the preparation of a Standard Urban Storm Water Mitigation Program. The undersigned is aware that Best Management Practices (BMPs) are enforceable pursuant to the City’s Standard Urban Storm Water Mitigation Program (SUSMP) Ordinance. The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan consistent with the City of Carlsbad’s Local and the NPDES Permit for Waste Discharge Requirements for City of San Diego, the County of San Diego, the Port of San Diego and 17 other cities within the San Diego Regional Water Quality Control Board Stormwater Runoff Management Program. Once the undersigned transfers its interest in the property, its successors–in–interest shall bear the aforementioned responsibility to implement and amend this SUSMP. An appropriate number of approved–signed copies of this document shall be available on the subject site in perpetuity. I certify under penalty of law that this document and all attachments were prepared under my jurisdiction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete. I am aware that here are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Owner: Poseidon Resources (Channelside) LLC By: Peter MacLaggan Title: Senior Vice President – Project Development Address: 501 West Broadway, Suite 840 San Diego, California 92101 Telephone: (760) 438-1440 Date: Owner’s Certification Page ii Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) TABLE OF CONTENTS WQTR Background I. II. III. IV. V. VI. VII. VIII. IX. Discretionary Permit(s) and Water Quality Conditions Project Description Site Description Best Management Practices (BMPs) Low Impact Development Design Features Inspection/Maintenance Responsibilities for BMPs Vicinity Map and WQTR Plot Plan Educational Materials Appendices Appendix A Operations and Maintenance Plan Appendix B Drainage Report/Verification Calculations, Backup Documentation and Detail Drawings of the Treatment BMPs Appendix C 11x17 Grading Plans Table of Contents 5 6 8 9 15 16 17 19 20 Page iii Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) WQTR BACKGROUND Standard Urban Storm Water Mitigation Program (SUSMP)’s Water Quality Technical Report (WQTR) is prepared by the developer’s engineer. These documents are required per the Storm Water Standards Manual. It requires run-off, from all new development or significant re-development, to be managed during a project’s planning phase, implemented during construction and ultimately maintained for the life of the project. The SUSMP/WQTR deals with the long-term post-construction of a project and describes the commitment to installation and maintenance of appropriate structural and non-structural Best Management Practices (BMPs). BMPs are intended to provide measures that minimize or eliminate the introduction of pollutants into the storm water system. Non-Structural and Structural BMPs include education, clean up, and facility maintenance to prevent pollutants from entering the storm water system. Compliance is MANDATORY and severe penalties may be levied for any violations. It is the duty of the owner or his designated representative to ensure that all BMPs are followed. WQTR Background Page iv Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) I. DISCRETIONARY PERMIT AND WATER QUALITY CONDITION This Water Quality Technical Manual (WQTR) is intended to comply with the requirements of both the City of Carlsbad’s Standard Urban Storm Water Mitigation Program (SUSMP) and the California Coastal Commissions. Section I Page 5 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) II. PROJECT DESCRIPTION The name of the project is the Poseidon Seawater Desalination Plant. Poseidon Resources (Channelside) LLC has a long-term lease for this property. The perimeter streets and infrastructure are existing. The Poseidon Seawater Desalination Plant is a portion of the Encina Generating Station site. The proposed Poseidon Seawater Desalination Plant site comprises approximately 5.7 acres with 78% of the site being impervious. However, the tributary drainage area extends beyond the site limits and is approximately 6.3 acres. The property will be graded to accommodate the desalination facility, administration and electrical building and surface parking (see the Figure B - WQTR Plot Plan for the site layout). The square footage of the three story (including basement, ground level and upper lever 2) Administration and Electrical Building is approximately 7,200 square feet. The surface parking breakdown is as follows: 17 full spaces and 3 handicap spaces. Currently, runoff is collected in an onsite earthen bermed retention basin and into the existing drainage channel. The retention does not have an outlet and therefore the runoff that is collected either evaporates or percolates into the ground. The proposed grading design directs the runoff towards the proposed curb and gutters which then directs it to the proposed underground CUDO storage detention devices. Runoff generated in excess of the 10-year storm will be directed to the existing onsite bermed retention basin located along the westerly property line or to the existing drainage channel. Per the Coastal Commission requirements, the 10-year storm was selected to ensure that runoff from the developed site did not exceed that of the pre-developed condition. The runoff that enters the CUDO storage detention devices and the existing onsite bermed retention basin will be mitigated by the percolation of the runoff through the ground prior to recharging the ground water. Prior to entering the CUDO storage detention devices, the 85th percentile storm flows will be treated to remove particulates, other solids, and mitigate contaminants. Refer to Appendix B, Hydrology Report, for flows and sizing requirements of media filtration elements to be used for the treatment of these flows. The CUDO system will utilize media filtration to treat the incoming stormwater prior to it entering the infiltration portion of the system. Media filtration is an approved CASQA BMP (TC-40). The design philosophy is that the 85th percentile storm will be treated by the media filtration. After filtration, the clean water will then infiltrate into the ground. The estimated infiltration rates provided by the geotechnical study are 0 .10 in/hr for the south basin and potentially as low as 0.01 in/hr for the north basin (Refer to the Geotechnical Letter in Appendix B regarding infiltration rates). The two basins will be interconnected with a drain pipe so that if one basin has a low infiltration rate, then it will drain over to the other basin. In this way, the water level of both basins will decrease at the same rate and most of the water will percolate into the south basin. Based on the proposed basin configuration and the estimated infiltration rate, it will take a maximum of 90 days to percolate the 10-year storm. The groundwater at the site is approximately 12’ below the bottom of the infiltration system, this allows for additional filtration of the stormwater by the native soils before it reaches the water table. With the pre-treatment media filters and the infiltration of the water through sandy material, it is not anticipated that the lagoon or water table will be adversely affected. Since the project utilizes a front end media filtration system, the coastal lagoon water quality will not be detrimentally affected by the CUDO system Section II Page 6 Landscape berms, sidewalks and vehicle turn around areas will make up the remaining portion of the property. The type of landscaping used will be consistent with the established planting scheme in the area. Poseidon Resources (Channeside) LLC, the long-term lessee is responsible for all on-site maintenance activities. The Anticipated and Potential Pollutants Generated by a Land Use Type of Generating Station and parking may be: Sediments, Nutrients, Heavy Metals, Organic Compounds, Trash and Debris (litter), Oxygen-Demanding Substances, oil and grease, Bacteria/Virus and, Pesticides. There may be an employee kitchen’s/eating areas where breaks and lunch can be taken. There will not be any food service/preparation. The storage of outdoor materials is not a planned activity. No car washing, auto repair and/or vehicle fueling is a part of this facility either. The project pre and post peak stormwater discharge rates are: Site Generated Flow Site Runoff Pre 15.20 cfs 10.36 cfs Post 18.31 cfs 10.36 cfs The CUDO system will be designed to retain the difference between the pre and post developed 10 year storm volume and flows. The hydrology and site flows are included in Appendix B. The predevelopment 10 year storm peak flow and total storm volume are 15.20 cfs and 17,350cf, respectively. The post development 10 year storm peak flow and total storm volume are 18.31 cfs and 29,075 cf. The net difference between the peak flow rate and volume will be mitigated by the retention of a portion of the flows by the CUDO system. The site flows will be sent to one of two underground CUDO systems through the use of surface flow features, grated inlets and catch basins. The flows will then be routed through media filtration devices on the front end of the CUDO system to filter out contaminants, trash, and solids. The cleaned storm water will then flow to the infiltration portion of the CUDO system where the storm water will percolate into the ground. Media filtration is a proven method at removing contaminants from storm water and is a recognized management practice in the CASQA Handbook. The media filters will be inspected, cleaned and replaced on a regular basis to maintain performance. The CUDO system will be installed under proposed parking areas on the Project site. The CUDO system is installed surrounded by 12” of crushed rock and sand to promote infiltration into the surrounding native material. The native material, as identified in the Project Geotechnical Report, is comprised of sandy soils that will promote additional filtration and infiltration. The CUDO system volume was determined by the total net difference between pre and post development 10 year storm volumes, infiltration rate was not included in the calculation of this volume, even though infiltration will take place during and after a storm event. Materials, including treatment process materials, will not be stored in locations where they may be washed by rainwater into the receiving waters. However, there are two separate areas that will be constructed with berms and separate catch basins to collect and contain runoff in a separate containment tank. These areas are directly adjacent to the Chemical Storage and Solids Handling areas. In order to prevent any discharge of potential spills, these areas are drained into the containment tank, stored, and then tested before they are pumped to the infiltration units. Section III Page 7 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) III. SITE DESCRIPTION The project watershed area is approximately 6.3 acres. The Project site itself is approximately 5.9 acres. The Poseidon Seawater Desalination Plant site is part of the power plant property and is adjacent to the Encina Generating Station. The project is bordered to the south by Cannon Road and the east by North County Transit District (NCTD) Railroad right-of-way and Interstate Highway 5, on the west by the Carlsbad Boulevard and the Pacific Ocean and to the north by the Aqua Hedionda Lagoon. Currently, the site is comprised of a Fuel Tank #3 and concrete foundation, impervious paving, and piping structures (see Figure A – Vicinity Map). The perimeter streets and infrastructure are existing. The site will be graded to approximately 1% – 2% towards the existing bermed detention basin (see Figure B – WQTR Plot Plan). The Watershed Name is Agua Hedionda Lagoon Watershed. The Hydrologic Unit (HU) is the Carlsbad Hydrologic Unit 4.00 and the Hydrologic Area (HA) is the Agua Hedionda Lagoon 4.30. The Total Maximum Daily Loads (TMDLs) for have been established for the Agua Hedionda Lagoon Watershed. The 2006 CWA 303(d) List (USEPA Approval date of June 28, 2007) for the Agua Hedionda Lagoon Watershed lists the watershed as being impaired by Indicator Bacteria and Sedimentation/Siltation. The Project site is located within the immediate vicinity of the Agua Hedionda Lagoon a known Environmentally Sensitive Areas (ESAs). Runoff from Area A does not flow to nor enter the Agua Hedionda Lagoon nor the Pacific Ocean. While runoff in excess of the 10-year event from Area B enters the existing channel that flows into the Agua Hedionda Lagoon. Per the Geotechnical Report/Environmental Report for the Proposed Carlsbad Desalination Project Reconfigure Site Encina Generating Station, Carlsbad, California prepared by GeoLogic Associates, Project No. 2008-0075, dated September 22, 2008, the project soils types consist of the following: “Desalination Plant: Fill soils tested were found to have a very low expansion potential. The fills soils were described as dense fine to medium silty sand to very stiff clayey silt (in the northern 4 borings) and dense fine to coarse sandy gravel (in the southern three boring). Terrace Deposits were encountered at the existing ground surface in Boring B-11 extending 8 feet below the ground surface. These deposits were described as dense fine silty sand. Santiago Formation was encountered below the fill soils and the Terrace Deposits to the total depth… The Santiago Formation was described as very dense fine to medium silty to clayey sandstone and hard clayey siltstone with scattered silt lenses. Tank Relocation Area: The boring encountered pavement surfacing underlain by 2.5 feet of fill soils described as medium dense clayey silt. The fills soils were tested to have a very low expansion potential. Terrace Deposits were encountered below the fill soils to the total depth explored…The Terrance Deposits were described as medium dense silty sand to dense fine clayey sand. Cemented zone are known to exist within the Terrace Deposits. Intake Structure: The boring encountered pavement surfacing underlain by 2 to 3 feet of fill soils described as hard clayey silt with localized scattered sand lenses…Terrace Deposits were described as hard clayey silt to dense silty sand with localized gravel stringers… The Santiago Formation was described as very dense fine to medium sand with scattered silt lenses.” Section III Page 8 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) IV. BEST MANAGEMENT PRACTICES (BMPs) The following indicates the source control BMPs (routine non-structural and routine structural) included in this project and those that were not included. Routine Non-Structural BMPs Education for Property Owners, Tenants and Occupants and N12, Employee Training. Refer VIII Educational Materials for appropriate educational materials for preventing stormwater pollution. Additional Best Management Practices (BMP) Fact Sheets from the California Stormwater Best Management Practice Handbooks can be found at www.cabmphandbooks.com. Activity Restrictions. The list of restrictions and guidelines for implementation and maintenance of all Best Management Practices specified herein include, but will not be limited to: Section IV • CAR WASHING: No washing of motor vehicles will be allowed on the site. A sign should be posted stating such. • NO HOSING OF PAVED AREAS: Parking Areas will not be “Hosed Down for cleaning.” Rather, areas will be swept clean or dry vacuumed. All collected waste shall be disposed of in a covered container. Oil stains will be cleaned using rags or absorbents, then swept with granular absorbents and then mopped. No acid washing will be permitted. Final mop water shall be disposed into a sanitary sewer facility. Also, no hose bibs or washing areas will be allowed in any of the subterranean parking areas. • TRASH: No rubbish, trash or other material shall be kept on site or on any street abutting the properties, except in sanitary containers located in an appropriate trash containment area. • DRAINAGE: There shall be no interference or alteration of the established drainage pattern unless an alternative is approved by the City. • NO DISCHARGING: There shall be no discharging of fertilizers, pesticides and or wastes to the streets or adjacent storm drains. • DUMPSTER LIDS: Dumpster lids shall be closed at all times. • DEBRIS: No blowing or sweeping of debris (leaf litter, grass clippings, litter, etc.) into the streets or adjacent storm drains. Page 9 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) Common Area Landscape Management. Water conservation will be achieved through the use of water conserving plant material. Plantings are grouped based upon water requirements and solar exposure into hydro-zones. Irrigation valves are on an automatic irrigation system utilizing various types of irrigation heads designed to water areas based upon plant water requirements, sun/shade exposure, climatic factors, soil infiltration rate and seasons. A rain shut-off device is specified to maximize efficient water application and flow sensors are installed to identify broken irrigation mainlines and laterals. The Landscape Maintenance Contractors will continuously maintain the site to identify areas where significant amounts of irrigation overspray has developed. Landscape maintenance will occur weekly. The Landscape Maintenance Contractors will be contracted with the Owner’s Representative. Also, a designated representative of the owner will be responsible for continual maintenance of landscaped areas in a manner consistent with the local regulations. BMP Maintenance. Section VI indicates the person(s) responsible for the implementation and maintenance of the non-structural and structural BMPs. Title 22 CCR Compliance. Not applicable, per Title 22., Division 4.5., Chapter 11. of the California Code of Regulations definition of hazardous wastes. This is a self storage facility, no Hazardous Materials are anticipated to be onsite. Local Industrial Permit Compliance. Not applicable, there are no fuel dispensing areas and/or other areas of concern to the public proposed. Spill Contingency Plan. A spill contingency plan will be prepared by the owner/building operator. As a minimum the Spill Contingency Plan will “mandate the stockpiling of cleanup materials, notification of responsible agencies, disposal of cleanup materials and documentation.” Underground Storage Tank Compliance. Not applicable, since there are NO underground storage tanks proposed for this project. Hazardous Materials Disclosure Compliance. A designated representative of the owner shall provide information to the Fire Authority in accordance with requirements of the Health & Safety Code. Uniform Fire Code Implementation. A designated representative of the owner shall provide information to the Fire Authority in compliance with Article 80 of the UNIFORM FIRE CODE (UFC). Common Area Litter Control. Site litter shall be strictly controlled by an onsite maintenance person (not yet determined). Section IV Page 10 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) Employee Training. A representative of the owner will provide information available from the City/County on education regarding good housekeeping practices that contribute to the protection of storm water quality. Practical information material will be provided to all employees on general good housekeeping practices. These materials will describe, but are not limited to, spill prevention and control and the use of chemicals, petroleum products, pesticides and fertilizers that should be limited to the property, with no discharge of wastes directly or indirectly to gutters, catch basins or the storm drain system. Information will be distributed directly to the employees as well as being posted in public areas. Housekeeping of Loading Docks. Not applicable, no loading docks proposed. Street Sweeping Private Streets and Parking Lots. The Contractor (not yet determined) will have the private parking lot swept once a week and prior to the storm season, no later than October 1st each year. The rubbish/waste from the sweeping shall be disposed of in any of the on-site dumpsters. Section IV Page 11 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) Routine Structural BMPs Provide Storm Drain System Stenciling and Signage. The proposed catch basins shall have either concrete stamping, porcelain tile, inset permanent marking or equivalent as approved by the City of Carlsbad the words “NO DUMPING – I LIVE DOWNSTREAM” (satisfactory to the City Engineer) stenciled across the top of the catch basin inlet in 2 inch high letters using black epoxy paint. The stencil shall be legible and maintained at all times. Properly Design Trash Storage Areas. Site waste receptacles shall be emptied on a weekly basis or more often if containers are overflowing. Upon inspection any debris or rubbish will be picked up and the site cleaned. The trash area is NOT to be cleaned by hosing down. The type of materials used to clean the area and storage of said materials will be determined by the Contractor. Signage will be posted that lids shall be kept closed at all times. Use of Efficient Irrigation Systems and Landscape Design. Irrigation shall be implemented as indicated on the City of Carlsbad’s approved Landscape Plans and be consistent with the City of Carlsbad Landscape Manual, Water Conservation Resolution or City equivalent. Runoff from irrigation shall be kept to a minimum. Staged irrigation cycles start within a time frame that least interferes with the activities of the Community. “Low flow” heads shall be incorporated to limit excess flow. Rain shutoff devices shall be used to prevent irrigation during precipitation. Plants are grouped into hydrozones based upon their water needs in order to minimize the amounts of excess water flow. A designated representative of the owner will be responsible for continual maintenance of landscaped areas in a manner consistent with the local regulations. Section IV Page 12 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) Site Design BMPs The following table shows the site design BMPs that are included in this project. A description of each BMPs follows: Site Design BMPs Technique Included Yes Minimize Impervious Area/Maximize Permeability (C-Factor Reduction) Minimize Directly Connected Impervious Areas (DCIAs) (C-Factor Reduction) Create Reduced or “Zero Discharge” Areas (Runoff Volume Reduction) Conserve Natural Areas (C-Factor Reduction) Brief Description of Method No √ √ Urban curb/swale/v-ditch system √ √ The site design BMP that was used extensively in this design was to “Minimize Directly Connected Impervious Areas (DCIAs)” by draining impervious walkways, parking and open areas in to catch basins and the proposed onsite storm drain system and then into the existing onsite earthen bermed retention basin (see WQTR Plot Plan - Figure B) and the CUDO 2 underground storage detention units. Section IV Page 13 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) Treatment BMPs The following table shows the site design BMPs that are included in this project. A description of each BMPs follows: Treatment BMPs Name Included Yes Vegetated (Grass) Strips Vegetated (Grass) Swales Proprietary Control Measures Dry Detention Basin Wet Detention Basin Constructed Wetland Detention Basin/Sand Filter Porous Pavement Detention Porous Landscape Detention Infiltration Basin √ Infiltration Trench Media Filter √ Proprietary Control Measures No √ √ √ √ √ √ √ √ √ √ √ If not applicable, state brief reason Not proposed. Not proposed. Not proposed. Not proposed. Not proposed. Not proposed. Not proposed. Not proposed. Not proposed. CUDO Basin/Infiltration System Not proposed. Media Filtration at inlet of CUDO system to filter the 85th percentile storm event. Not proposed. This Project is considered a Priority Project. This section of the WQTR addresses Treatment Control BMPs. The primary control strategy for design Treatment Control BMPs is to treat the more frequent, lower-flow storm events. The selected treatment controls for this project is the existing onsite earthen bermed retention basin and the CUDO 2 underground storage detention units. Section IV Page 14 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) V. LOW IMPACT DEVELOPMENT DESIGN FEATURES Low Impact Development (LID) is a design strategy that is aimed at reducing the environmental impact of buildings on the surrounding environment. LID strategies can be classified into 4 separate strategies; optimize site layout, use pervious surfaces, disperse runoff, and integrated management practices. The project site inherently has unique challenges in meeting LID design philosophies as the project site is a densely developed industrial complex. The site does however have several advantages for development. The existing site contains fuel tanks and other industrial materials that may contain hazardous materials. As part of this project, the site will be remediated, the site cleaned, and new practical storm water elements constructed. The use of pervious pavements is not applicable to this site as the anticipated heavy truck traffic does not work well with open graded pavements. The use of permeable and pervious pavements is more applicable to sites with large amounts of parking and passenger vehicle traffic. The site will however utilize gravel and landscaped areas wherever possible to increase the amount of pervious areas associated with the project. Due to the tight site constraints, it is impractical to utilize bio retention cells and flow through planters. The size requirements of these items based on the project footprint will not be able to be obtained with the amount of open space that is available. The use of an underground infiltration basin will be part of the project. The underground infiltration basin will have media filtration devices at the inlet of the basin and will treat the low flow, 85th percentile storm event flows. Section V Page 15 VI. INSPECTION/MAINTENANCE RESPONSIBILITY FOR BMPs A schedule will be established for all maintenance and a log for all cleanups shall be recorded (see Appendix A – Operations and Maintenance Plan). All documents relating to site maintenance and Best Management Practices (BMP) will be kept on site for a minimum of 5 years and be made available to Federal, State, County, or City Inspectors upon request. The party responsible for all structural and non-structural BMPs and contact information is as follows: Poseidon Resources (Channelside) LLC 501 West Broadway, Suite 840 San Diego, California 92101 (760) 438-1440 Contact Person: Section VI Peter MacLaggan Page 16 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) VII. VICINITY MAP AND WQTR PLOT PLAN Section VII Page 17 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) VIII. EDUCATIONAL MATERIALS The following is a list of educational materials included in this WQTR. SC-11 – Spill Prevention, Control and Cleanup SC-34 – Waste Handling and Disposal SC-41 – Building and Grounds Maintenance SC-43 – Parking/Storage Area Maintenance SE-10 – Storm Drain Inlet Protection TC-40 – Media Filter Section VIII Page 19 Spill Prevention, Control & Cleanup SC-11 Objectives Cover Contain Educate Reduce/Minimize Product Substitution Photo Credit: Geoff Brosseau Description Targeted Constituents Many activities that occur at an industrial or commercial site have the potential to cause accidental or illegal spills. Preparation for accidental or illegal spills, with proper training and reporting systems implemented, can minimize the discharge of pollutants to the environment. Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics Spills and leaks are one of the largest contributors of stormwater pollutants. Spill prevention and control plans are applicable to any site at which hazardous materials are stored or used. An effective plan should have spill prevention and response procedures that identify potential spill areas, specify material handling procedures, describe spill response procedures, and provide spill clean-up equipment. The plan should take steps to identify and characterize potential spills, eliminate and reduce spill potential, respond to spills when they occur in an effort to prevent pollutants from entering the stormwater drainage system, and train personnel to prevent and control future spills. ; ; ; Approach Pollution Prevention Develop procedures to prevent/mitigate spills to storm drain systems. Develop and standardize reporting procedures, containment, storage, and disposal activities, documentation, and follow-up procedures. Develop a Spill Prevention Control and Countermeasure (SPCC) Plan. The plan should include: January 2003 Errata 4-06 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 1 of 9 SC-11 Spill Prevention, Control & Cleanup - Description of the facility, owner and address, activities and chemicals present - Facility map - Notification and evacuation procedures - Cleanup instructions - Identification of responsible departments - Identify key spill response personnel Recycle, reclaim, or reuse materials whenever possible. This will reduce the amount of process materials that are brought into the facility. Suggested Protocols (including equipment needs) Spill Prevention Develop procedures to prevent/mitigate spills to storm drain systems. Develop and standardize reporting procedures, containment, storage, and disposal activities, documentation, and follow-up procedures. If consistent illegal dumping is observed at the facility: - Post “No Dumping” signs with a phone number for reporting illegal dumping and disposal. Signs should also indicate fines and penalties applicable for illegal dumping. - Landscaping and beautification efforts may also discourage illegal dumping. - Bright lighting and/or entrance barriers may also be needed to discourage illegal dumping. Store and contain liquid materials in such a manner that if the tank is ruptured, the contents will not discharge, flow, or be washed into the storm drainage system, surface waters, or groundwater. If the liquid is oil, gas, or other material that separates from and floats on water, install a spill control device (such as a tee section) in the catch basins that collects runoff from the storage tank area. Routine maintenance: - Place drip pans or absorbent materials beneath all mounted taps, and at all potential drip and spill locations during filling and unloading of tanks. Any collected liquids or soiled absorbent materials must be reused/recycled or properly disposed. - Store and maintain appropriate spill cleanup materials in a location known to all near the tank storage area; and ensure that employees are familiar with the site’s spill control plan and/or proper spill cleanup procedures. - Sweep and clean the storage area monthly if it is paved, do not hose down the area to a storm drain. 2 of 9 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Errata 4-06 Spill Prevention, Control & Cleanup SC-11 - Check tanks (and any containment sumps) daily for leaks and spills. Replace tanks that are leaking, corroded, or otherwise deteriorating with tanks in good condition. Collect all spilled liquids and properly dispose of them. Label all containers according to their contents (e.g., solvent, gasoline). Label hazardous substances regarding the potential hazard (corrosive, radioactive, flammable, explosive, poisonous). Prominently display required labels on transported hazardous and toxic materials (per US DOT regulations). Identify key spill response personnel. Spill Control and Cleanup Activities Follow the Spill Prevention Control and Countermeasure Plan. Clean up leaks and spills immediately. Place a stockpile of spill cleanup materials where it will be readily accessible (e.g., near storage and maintenance areas). On paved surfaces, clean up spills with as little water as possible. Use a rag for small spills, a damp mop for general cleanup, and absorbent material for larger spills. If the spilled material is hazardous, then the used cleanup materials are also hazardous and must be sent to a certified laundry (rags) or disposed of as hazardous waste. Physical methods for the cleanup of dry chemicals include the use of brooms, shovels, sweepers, or plows. Never hose down or bury dry material spills. Sweep up the material and dispose of properly. Chemical cleanups of material can be achieved with the use of adsorbents, gels, and foams. Use adsorbent materials on small spills rather than hosing down the spill. Remove the adsorbent materials promptly and dispose of properly. For larger spills, a private spill cleanup company or Hazmat team may be necessary. Reporting Report spills that pose an immediate threat to human health or the environment to the Regional Water Quality Control Board. Federal regulations require that any oil spill into a water body or onto an adjoining shoreline be reported to the National Response Center (NRC) at 800-424-8802 (24 hour). Report spills to local agencies, such as the fire department; they can assist in cleanup. Establish a system for tracking incidents. The system should be designed to identify the following: - Types and quantities (in some cases) of wastes - Patterns in time of occurrence (time of day/night, month, or year) January 2003 Errata 4-06 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 3 of 9 SC-11 Spill Prevention, Control & Cleanup - Mode of dumping (abandoned containers, “midnight dumping” from moving vehicles, direct dumping of materials, accidents/spills) - Responsible parties Training Educate employees about spill prevention and cleanup. Well-trained employees can reduce human errors that lead to accidental releases or spills: - The employee should have the tools and knowledge to immediately begin cleaning up a spill should one occur. - Employees should be familiar with the Spill Prevention Control and Countermeasure Plan. Employees should be educated about aboveground storage tank requirements. Employees responsible for aboveground storage tanks and liquid transfers should be thoroughly familiar with the Spill Prevention Control and Countermeasure Plan and the plan should be readily available. Train employees to recognize and report illegal dumping incidents. Other Considerations (Limitations and Regulations) A Spill Prevention Control and Countermeasure Plan (SPCC) is required for facilities that are subject to the oil pollution regulations specified in Part 112 of Title 40 of the Code of Federal Regulations or if they have a storage capacity of 10,000 gallons or more of petroleum. (Health and Safety Code 6.67) State regulations also exist for storage of hazardous materials (Health & Safety Code Chapter 6.95), including the preparation of area and business plans for emergency response to the releases or threatened releases. Consider requiring smaller secondary containment areas (less than 200 sq. ft.) to be connected to the sanitary sewer, prohibiting any hard connections to the storm drain. Requirements Costs (including capital and operation & maintenance) Will vary depending on the size of the facility and the necessary controls. Prevention of leaks and spills is inexpensive. Treatment and/or disposal of contaminated soil or water can be quite expensive. Maintenance (including administrative and staffing) This BMP has no major administrative or staffing requirements. However, extra time is needed to properly handle and dispose of spills, which results in increased labor costs. 4 of 9 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Errata 4-06 Spill Prevention, Control & Cleanup SC-11 Supplemental Information Further Detail of the BMP Reporting Record keeping and internal reporting represent good operating practices because they can increase the efficiency of the facility and the effectiveness of BMPs. A good record keeping system helps the facility minimize incident recurrence, correctly respond with appropriate cleanup activities, and comply with legal requirements. A record keeping and reporting system should be set up for documenting spills, leaks, and other discharges, including discharges of hazardous substances in reportable quantities. Incident records describe the quality and quantity of non-stormwater discharges to the storm sewer. These records should contain the following information: Date and time of the incident Weather conditions Duration of the spill/leak/discharge Cause of the spill/leak/discharge Response procedures implemented Persons notified Environmental problems associated with the spill/leak/discharge Separate record keeping systems should be established to document housekeeping and preventive maintenance inspections, and training activities. All housekeeping and preventive maintenance inspections should be documented. Inspection documentation should contain the following information: The date and time the inspection was performed Name of the inspector Items inspected Problems noted Corrective action required Date corrective action was taken Other means to document and record inspection results are field notes, timed and dated photographs, videotapes, and drawings and maps. Aboveground Tank Leak and Spill Control Accidental releases of materials from aboveground liquid storage tanks present the potential for contaminating stormwater with many different pollutants. Materials spilled, leaked, or lost from January 2003 Errata 4-06 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 5 of 9 SC-11 Spill Prevention, Control & Cleanup tanks may accumulate in soils or on impervious surfaces and be carried away by stormwater runoff. The most common causes of unintentional releases are: Installation problems Failure of piping systems (pipes, pumps, flanges, couplings, hoses, and valves) External corrosion and structural failure Spills and overfills due to operator error Leaks during pumping of liquids or gases from truck or rail car to a storage tank or vice versa Storage of reactive, ignitable, or flammable liquids should comply with the Uniform Fire Code and the National Electric Code. Practices listed below should be employed to enhance the code requirements: Tanks should be placed in a designated area. Tanks located in areas where firearms are discharged should be encapsulated in concrete or the equivalent. Designated areas should be impervious and paved with Portland cement concrete, free of cracks and gaps, in order to contain leaks and spills. Liquid materials should be stored in UL approved double walled tanks or surrounded by a curb or dike to provide the volume to contain 10 percent of the volume of all of the containers or 110 percent of the volume of the largest container, whichever is greater. The area inside the curb should slope to a drain. For used oil or dangerous waste, a dead-end sump should be installed in the drain. All other liquids should be drained to the sanitary sewer if available. The drain must have a positive control such as a lock, valve, or plug to prevent release of contaminated liquids. Accumulated stormwater in petroleum storage areas should be passed through an oil/water separator. Maintenance is critical to preventing leaks and spills. Conduct routine inspections and: Check for external corrosion and structural failure. Check for spills and overfills due to operator error. Check for failure of piping system (pipes, pumps, flanger, coupling, hoses, and valves). Check for leaks or spills during pumping of liquids or gases from truck or rail car to a storage facility or vice versa. 6 of 9 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Errata 4-06 Spill Prevention, Control & Cleanup SC-11 Visually inspect new tank or container installation for loose fittings, poor welding, and improper or poorly fitted gaskets. Inspect tank foundations, connections, coatings, and tank walls and piping system. Look for corrosion, leaks, cracks, scratches, and other physical damage that may weaken the tank or container system. Frequently relocate accumulated stormwater during the wet season. Periodically conduct integrity testing by a qualified professional. Vehicle Leak and Spill Control Major spills on roadways and other public areas are generally handled by highly trained Hazmat teams from local fire departments or environmental health departments. The measures listed below pertain to leaks and smaller spills at vehicle maintenance shops. In addition to implementing the spill prevention, control, and clean up practices above, use the following measures related to specific activities: Vehicle and Equipment Maintenance Perform all vehicle fluid removal or changing inside or under cover to prevent the run-on of stormwater and the runoff of spills. Regularly inspect vehicles and equipment for leaks, and repair immediately. Check incoming vehicles and equipment (including delivery trucks, and employee and subcontractor vehicles) for leaking oil and fluids. Do not allow leaking vehicles or equipment onsite. Always use secondary containment, such as a drain pan or drop cloth, to catch spills or leaks when removing or changing fluids. Immediately drain all fluids from wrecked vehicles. Store wrecked vehicles or damaged equipment under cover. Place drip pans or absorbent materials under heavy equipment when not in use. Use adsorbent materials on small spills rather than hosing down the spill. Remove the adsorbent materials promptly and dispose of properly. Promptly transfer used fluids to the proper waste or recycling drums. Don’t leave full drip pans or other open containers lying around. Oil filters disposed of in trashcans or dumpsters can leak oil and contaminate stormwater. Place the oil filter in a funnel over a waste oil recycling drum to drain excess oil before disposal. Oil filters can also be recycled. Ask your oil supplier or recycler about recycling oil filters. January 2003 Errata 4-06 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 7 of 9 SC-11 Spill Prevention, Control & Cleanup Store cracked batteries in a non-leaking secondary container. Do this with all cracked batteries, even if you think all the acid has drained out. If you drop a battery, treat it as if it is cracked. Put it into the containment area until you are sure it is not leaking. Vehicle and Equipment Fueling Design the fueling area to prevent the run-on of stormwater and the runoff of spills: - Cover fueling area if possible. - Use a perimeter drain or slope pavement inward with drainage to a sump. - Pave fueling area with concrete rather than asphalt. If dead-end sump is not used to collect spills, install an oil/water separator. Install vapor recovery nozzles to help control drips as well as air pollution. Discourage “topping-off’ of fuel tanks. Use secondary containment when transferring fuel from the tank truck to the fuel tank. Use adsorbent materials on small spills and general cleaning rather than hosing down the area. Remove the adsorbent materials promptly. Carry out all Federal and State requirements regarding underground storage tanks, or install above ground tanks. Do not use mobile fueling of mobile industrial equipment around the facility; rather, transport the equipment to designated fueling areas. Keep your Spill Prevention Control and Countermeasure (SPCC) Plan up-to-date. Train employees in proper fueling and cleanup procedures. Industrial Spill Prevention Response For the purposes of developing a spill prevention and response program to meet the stormwater regulations, facility managers should use information provided in this fact sheet and the spill prevention/response portions of the fact sheets in this handbook, for specific activities. The program should: Integrate with existing emergency response/hazardous materials programs (e.g., Fire Department) Develop procedures to prevent/mitigate spills to storm drain systems Identify responsible departments Develop and standardize reporting procedures, containment, storage, and disposal activities, documentation, and follow-up procedures Address spills at municipal facilities, as well as public areas 8 of 9 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Errata 4-06 Spill Prevention, Control & Cleanup SC-11 Provide training concerning spill prevention, response and cleanup to all appropriate personnel References and Resources California’s Nonpoint Source Program Plan http://www.swrcb.ca.gov/nps/index.html Clark County Storm Water Pollution Control Manual http://www.co.clark.wa.us/pubworks/bmpman.pdf King County Storm Water Pollution Control Manual http://dnr.metrokc.gov/wlr/dss/spcm.htm Santa Clara Valley Urban Runoff Pollution Prevention Program http://www.scvurppp.org The Stormwater Managers Resource Center http://www.stormwatercenter.net/ January 2003 Errata 4-06 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 9 of 9 Waste Handling & Disposal SC-34 Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended solids, and other pollutants to enter stormwater runoff. The discharge of pollutants to stormwater from waste handling and disposal can be prevented and reduced by tracking waste generation, storage, and disposal; reducing waste generation and disposal through source reduction, reuse, and recycling; and preventing run-on and runoff. Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics Approach Pollution Prevention Accomplish reduction in the amount of waste generated using the following source controls: - Production planning and sequencing - Process or equipment modification - Raw material substitution or elimination - Loss prevention and housekeeping - Waste segregation and separation - Close loop recycling Establish a material tracking system to increase awareness about material usage. This may reduce spills and minimize contamination, thus reducing the amount of waste produced. Recycle materials whenever possible. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 1 of 5 SC-34 Waste Handling & Disposal Suggested Protocols General Cover storage containers with leak proof lids or some other means. If waste is not in containers, cover all waste piles (plastic tarps are acceptable coverage) and prevent stormwater run-on and runoff with a berm. The waste containers or piles must be covered except when in use. Use drip pans or absorbent materials whenever grease containers are emptied by vacuum trucks or other means. Grease cannot be left on the ground. Collected grease must be properly disposed of as garbage. Check storage containers weekly for leaks and to ensure that lids are on tightly. Replace any that are leaking, corroded, or otherwise deteriorating. Sweep and clean the storage area regularly. If it is paved, do not hose down the area to a storm drain. Dispose of rinse and wash water from cleaning waste containers into a sanitary sewer if allowed by the local sewer authority. Do not discharge wash water to the street or storm drain. Transfer waste from damaged containers into safe containers. Take special care when loading or unloading wastes to minimize losses. Loading systems can be used to minimize spills and fugitive emission losses such as dust or mist. Vacuum transfer systems can minimize waste loss. Controlling Litter Post “No Littering” signs and enforce anti-litter laws. Provide a sufficient number of litter receptacles for the facility. Clean out and cover litter receptacles frequently to prevent spillage. Waste Collection Keep waste collection areas clean. Inspect solid waste containers for structural damage regularly. Repair or replace damaged containers as necessary. Secure solid waste containers; containers must be closed tightly when not in use. Do not fill waste containers with washout water or any other liquid. Ensure that only appropriate solid wastes are added to the solid waste container. Certain wastes such as hazardous wastes, appliances, fluorescent lamps, pesticides, etc., may not be disposed of in solid waste containers (see chemical/ hazardous waste collection section below). 2 of 5 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Waste Handling & Disposal SC-34 Do not mix wastes; this can cause chemical reactions, make recycling impossible, and complicate disposal. Good Housekeeping Use all of the product before disposing of the container. Keep the waste management area clean at all times by sweeping and cleaning up spills immediately. Use dry methods when possible (e.g., sweeping, use of absorbents) when cleaning around restaurant/food handling dumpster areas. If water must be used after sweeping/using absorbents, collect water and discharge through grease interceptor to the sewer. Chemical/Hazardous Wastes Select designated hazardous waste collection areas on-site. Store hazardous materials and wastes in covered containers and protect them from vandalism. Place hazardous waste containers in secondary containment. Make sure that hazardous waste is collected, removed, and disposed of only at authorized disposal areas. Stencil or demarcate storm drains on the facility’s property with prohibitive message regarding waste disposal. Run-on/Runoff Prevention Prevent stormwater run-on from entering the waste management area by enclosing the area or building a berm around the area. Prevent waste materials from directly contacting rain. Cover waste piles with temporary covering material such as reinforced tarpaulin, polyethylene, polyurethane, polypropyleneor hypalon. Cover the area with a permanent roof if feasible. Cover dumpsters to prevent rain from washing waste out of holes or cracks in the bottom of the dumpster. Move the activity indoor after ensuring all safety concerns such as fire hazard and ventilation are addressed. Inspection Inspect and replace faulty pumps or hoses regularly to minimize the potential of releases and spills. Check waste management areas for leaking containers or spills. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 3 of 5 SC-34 Waste Handling & Disposal Repair leaking equipment including valves, lines, seals, or pumps promptly. Training Train staff in pollution prevention measures and proper disposal methods. Train employees and contractors in proper spill containment and cleanup. The employee should have the tools and knowledge to immediately begin cleaning up a spill should one occur. Train employees and subcontractors in proper hazardous waste management. Spill Response and Prevention Keep your Spill Prevention Control and Countermeasure (SPCC) Plan up-to-date. Have an emergency plan, equipment and trained personnel ready at all times to deal immediately with major spills Collect all spilled liquids and properly dispose of them. Store and maintain appropriate spill cleanup materials in a location known to all near the designated wash area. Ensure that vehicles transporting waste have spill prevention equipment that can prevent spills during transport. Spill prevention equipment includes: - Vehicles equipped with baffles for liquid waste - Trucks with sealed gates and spill guards for solid waste Other Considerations (Limitations and Regulations) Hazardous waste cannot be reused or recycled; it must be disposed of by a licensed hazardous waste hauler. Requirements Costs Capital and O&M costs for these programs will vary substantially depending on the size of the facility and the types of waste handled. Costs should be low if there is an inventory program in place. Maintenance None except for maintaining equipment for material tracking program. Supplemental Information Further Detail of the BMP Land Treatment System Minimize runoff of polluted stormwater from land application by: Choosing a site where slopes are under 6%, the soil is permeable, there is a low water table, it is located away from wetlands or marshes, and there is a closed drainage system 4 of 5 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Waste Handling & Disposal SC-34 Avoiding application of waste to the site when it is raining or when the ground is saturated with water Growing vegetation on land disposal areas to stabilize soils and reduce the volume of surface water runoff from the site Maintaining adequate barriers between the land application site and the receiving waters (planted strips are particularly good) Using erosion control techniques such as mulching and matting, filter fences, straw bales, diversion terracing, and sediment basins Performing routine maintenance to ensure the erosion control or site stabilization measures are working Examples The port of Long Beach has a state-of-the-art database for identifying potential pollutant sources, documenting facility management practices, and tracking pollutants. References and Resources California’s Nonpoint Source Program Plan http://www.swrcb.ca.gov/nps/index.html Clark County Storm Water Pollution Control Manual http://www.co.clark.wa.us/pubworks/bmpman.pdf Solid Waste Container Best Management Practices – Fact Sheet On-Line Resources – Environmental Health and Safety. Harvard University. 2002. King County Storm Water Pollution Control Manual http://dnr.metrokc.gov/wlr/dss/spcm.htm Pollution from Surface Cleaning Folder. 1996. Bay Area Stormwater Management Agencies Association (BASMAA). http://www.basmaa.org Santa Clara Valley Urban Runoff Pollution Prevention Program http://www.scvurppp.org The Storm Water Managers Resource Center http://www.stormwatercenter.net/ January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 5 of 5 Building & Grounds Maintenance SC-41 Objectives Cover Contain Educate Reduce/Minimize Product Substitution Targeted Constituents Description Stormwater runoff from building and grounds maintenance activities can be contaminated with toxic hydrocarbons in solvents, fertilizers and pesticides, suspended solids, heavy metals, abnormal pH, and oils and greases. Utilizing the protocols in this fact sheet will prevent or reduce the discharge of pollutants to stormwater from building and grounds maintenance activities by washing and cleaning up with as little water as possible, following good landscape management practices, preventing and cleaning up spills immediately, keeping debris from entering the storm drains, and maintaining the stormwater collection system. Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics Approach Reduce potential for pollutant discharge through source control pollution prevention and BMP implementation. Successful implementation depends on effective training of employees on applicable BMPs and general pollution prevention strategies and objectives. Pollution Prevention Switch to non-toxic chemicals for maintenance when possible. Choose cleaning agents that can be recycled. Encourage proper lawn management and landscaping, including use of native vegetation. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 1 of 5 SC-41 Building & Grounds Maintenance Encourage use of Integrated Pest Management techniques for pest control. Encourage proper onsite recycling of yard trimmings. Recycle residual paints, solvents, lumber, and other material as much as possible. Suggested Protocols Pressure Washing of Buildings, Rooftops, and Other Large Objects In situations where soaps or detergents are used and the surrounding area is paved, pressure washers must use a water collection device that enables collection of wash water and associated solids. A sump pump, wet vacuum or similarly effective device must be used to collect the runoff and loose materials. The collected runoff and solids must be disposed of properly. If soaps or detergents are not used, and the surrounding area is paved, wash runoff does not have to be collected but must be screened. Pressure washers must use filter fabric or some other type of screen on the ground and/or in the catch basin to trap the particles in wash water runoff. If you are pressure washing on a grassed area (with or without soap), runoff must be dispersed as sheet flow as much as possible, rather than as a concentrated stream. The wash runoff must remain on the grass and not drain to pavement. Landscaping Activities Dispose of grass clippings, leaves, sticks, or other collected vegetation as garbage, or by composting. Do not dispose of collected vegetation into waterways or storm drainage systems. Use mulch or other erosion control measures on exposed soils. Building Repair, Remodeling, and Construction Do not dump any toxic substance or liquid waste on the pavement, the ground, or toward a storm drain. Use ground or drop cloths underneath outdoor painting, scraping, and sandblasting work, and properly dispose of collected material daily. Use a ground cloth or oversized tub for activities such as paint mixing and tool cleaning. Clean paintbrushes and tools covered with water-based paints in sinks connected to sanitary sewers or in portable containers that can be dumped into a sanitary sewer drain. Brushes and tools covered with non-water-based paints, finishes, or other materials must be cleaned in a manner that enables collection of used solvents (e.g., paint thinner, turpentine, etc.) for recycling or proper disposal. Use a storm drain cover, filter fabric, or similarly effective runoff control mechanism if dust, grit, wash water, or other pollutants may escape the work area and enter a catch basin. This is particularly necessary on rainy days. The containment device(s) must be in place at the beginning of the work day, and accumulated dirty runoff and solids must be collected and disposed of before removing the containment device(s) at the end of the work day. 2 of 5 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Building & Grounds Maintenance SC-41 If you need to de-water an excavation site, you may need to filter the water before discharging to a catch basin or off-site. If directed off-site, you should direct the water through hay bales and filter fabric or use other sediment filters or traps. Store toxic material under cover during precipitation events and when not in use. A cover would include tarps or other temporary cover material. Mowing, Trimming, and Planting Dispose of leaves, sticks, or other collected vegetation as garbage, by composting or at a permitted landfill. Do not dispose of collected vegetation into waterways or storm drainage systems. Use mulch or other erosion control measures when soils are exposed. Place temporarily stockpiled material away from watercourses and drain inlets, and berm or cover stockpiles to prevent material releases to the storm drain system. Consider an alternative approach when bailing out muddy water: do not put it in the storm drain; pour over landscaped areas. Use hand weeding where practical. Fertilizer and Pesticide Management Follow all federal, state, and local laws and regulations governing the use, storage, and disposal of fertilizers and pesticides and training of applicators and pest control advisors. Use less toxic pesticides that will do the job when applicable. Avoid use of copper-based pesticides if possible. Do not use pesticides if rain is expected. Do not mix or prepare pesticides for application near storm drains. Use the minimum amount needed for the job. Calibrate fertilizer distributors to avoid excessive application. Employ techniques to minimize off-target application (e.g., spray drift) of pesticides, including consideration of alternative application techniques. Apply pesticides only when wind speeds are low. Fertilizers should be worked into the soil rather than dumped or broadcast onto the surface. Irrigate slowly to prevent runoff and then only as much as is needed. Clean pavement and sidewalk if fertilizer is spilled on these surfaces before applying irrigation water. Dispose of empty pesticide containers according to the instructions on the container label. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 3 of 5 SC-41 Building & Grounds Maintenance Use up the pesticides. Rinse containers, and use rinse water as product. Dispose of unused pesticide as hazardous waste. Implement storage requirements for pesticide products with guidance from the local fire department and County Agricultural Commissioner. Provide secondary containment for pesticides. Inspection Inspect irrigation system periodically to ensure that the right amount of water is being applied and that excessive runoff is not occurring. Minimize excess watering and repair leaks in the irrigation system as soon as they are observed. Training Educate and train employees on pesticide use and in pesticide application techniques to prevent pollution. Train employees and contractors in proper techniques for spill containment and cleanup. Be sure the frequency of training takes into account the complexity of the operations and the nature of the staff. Spill Response and Prevention Keep your Spill Prevention Control and Countermeasure (SPCC) Plan up-to-date. Place a stockpile of spill cleanup materials, such as brooms, dustpans, and vacuum sweepers (if desired) near the storage area where it will be readily accessible. Have employees trained in spill containment and cleanup present during the loading/unloading of dangerous wastes, liquid chemicals, or other materials. Familiarize employees with the Spill Prevention Control and Countermeasure Plan. Clean up spills immediately. Other Considerations Alternative pest/weed controls may not be available, suitable, or effective in many cases. Requirements Costs Cost will vary depending on the type and size of facility. Overall costs should be low in comparison to other BMPs. Maintenance Sweep paved areas regularly to collect loose particles. Wipe up spills with rags and other absorbent material immediately, do not hose down the area to a storm drain. 4 of 5 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Building & Grounds Maintenance SC-41 Supplemental Information Further Detail of the BMP Fire Sprinkler Line Flushing Building fire sprinkler line flushing may be a source of non-stormwater runoff pollution. The water entering the system is usually potable water, though in some areas it may be non-potable reclaimed wastewater. There are subsequent factors that may drastically reduce the quality of the water in such systems. Black iron pipe is usually used since it is cheaper than potable piping, but it is subject to rusting and results in lower quality water. Initially, the black iron pipe has an oil coating to protect it from rusting between manufacture and installation; this will contaminate the water from the first flush but not from subsequent flushes. Nitrates, polyphosphates and other corrosion inhibitors, as well as fire suppressants and antifreeze may be added to the sprinkler water system. Water generally remains in the sprinkler system a long time (typically a year) and between flushes may accumulate iron, manganese, lead, copper, nickel, and zinc. The water generally becomes anoxic and contains living and dead bacteria and breakdown products from chlorination. This may result in a significant BOD problem and the water often smells. Consequently dispose fire sprinkler line flush water into the sanitary sewer. Do not allow discharge to storm drain or infiltration due to potential high levels of pollutants in fire sprinkler line water. References and Resources California’s Nonpoint Source Program Plan http://www.swrcb.ca.gov/nps/index.html Clark County Storm Water Pollution Control Manual http://www.co.clark.wa.us/pubworks/bmpman.pdf King County Storm Water Pollution Control Manual http://dnr.metrokc.gov/wlr/dss/spcm.htm Mobile Cleaners Pilot Program: Final Report. 1997. Bay Area Stormwater Management Agencies Association (BASMAA). http://www.basmaa.org/ Pollution from Surface Cleaning Folder. 1996. Bay Area Stormwater Management Agencies Association (BASMAA). http://www.basmaa.org/ Santa Clara Valley Urban Runoff Pollution Prevention Program http://www.scvurppp.org The Storm Water Managers Resource Center http://www.stormwatercenter.net/ January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 5 of 5 Parking/Storage Area Maintenance SC-43 Objectives Cover Contain Educate Reduce/Minimize Product Substitution Targeted Constituents Description Parking lots and storage areas can contribute a number of substances, such as trash, suspended solids, hydrocarbons, oil and grease, and heavy metals that can enter receiving waters through stormwater runoff or non-stormwater discharges. The protocols in this fact sheet are intended to prevent or reduce the discharge of pollutants from parking/storage areas and include using good housekeeping practices, following appropriate cleaning BMPs, and training employees. Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics Approach The goal of this program is to ensure stormwater pollution prevention practices are considered when conducting activities on or around parking areas and storage areas to reduce potential for pollutant discharge to receiving waters. Successful implementation depends on effective training of employees on applicable BMPs and general pollution prevention strategies and objectives. Pollution Prevention Encourage alternative designs and maintenance strategies for impervious parking lots. (See New Development and Redevelopment BMP Handbook) Keep accurate maintenance logs to evaluate BMP implementation. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 1 of 4 SC-43 Parking/Storage Area Maintenance Suggested Protocols General Keep the parking and storage areas clean and orderly. Remove debris in a timely fashion. Allow sheet runoff to flow into biofilters (vegetated strip and swale) and/or infiltration devices. Utilize sand filters or oleophilic collectors for oily waste in low quantities. Arrange rooftop drains to prevent drainage directly onto paved surfaces. Design lot to include semi-permeable hardscape. Discharge soapy water remaining in mop or wash buckets to the sanitary sewer through a sink, toilet, clean-out, or wash area with drain. Controlling Litter Post “No Littering” signs and enforce anti-litter laws. Provide an adequate number of litter receptacles. Clean out and cover litter receptacles frequently to prevent spillage. Provide trash receptacles in parking lots to discourage litter. Routinely sweep, shovel, and dispose of litter in the trash. Surface Cleaning Use dry cleaning methods (e.g., sweeping, vacuuming) to prevent the discharge of pollutants into the stormwater conveyance system if possible. Establish frequency of public parking lot sweeping based on usage and field observations of waste accumulation. Sweep all parking lots at least once before the onset of the wet season. Follow the procedures below if water is used to clean surfaces: - Block the storm drain or contain runoff. - Collect and pump wash water to the sanitary sewer or discharge to a pervious surface. Do not allow wash water to enter storm drains. - Dispose of parking lot sweeping debris and dirt at a landfill. Follow the procedures below when cleaning heavy oily deposits: - Clean oily spots with absorbent materials. - Use a screen or filter fabric over inlet, then wash surfaces. 2 of 4 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Parking/Storage Area Maintenance SC-43 - Do not allow discharges to the storm drain. - Vacuum/pump discharges to a tank or discharge to sanitary sewer. - Appropriately dispose of spilled materials and absorbents. Surface Repair Preheat, transfer or load hot bituminous material away from storm drain inlets. Apply concrete, asphalt, and seal coat during dry weather to prevent contamination from contacting stormwater runoff. Cover and seal nearby storm drain inlets where applicable (with waterproof material or mesh) and manholes before applying seal coat, slurry seal, etc. Leave covers in place until job is complete and all water from emulsified oil sealants has drained or evaporated. Clean any debris from these covered manholes and drains for proper disposal. Use only as much water as necessary for dust control, to avoid runoff. Catch drips from paving equipment that is not in use with pans or absorbent material placed under the machines. Dispose of collected material and absorbents properly. Inspection Have designated personnel conduct inspections of parking facilities and stormwater conveyance systems associated with parking facilities on a regular basis. Inspect cleaning equipment/sweepers for leaks on a regular basis. Training Provide regular training to field employees and/or contractors regarding cleaning of paved areas and proper operation of equipment. Train employees and contractors in proper techniques for spill containment and cleanup. Spill Response and Prevention Keep your Spill Prevention Control and Countermeasure (SPCC) Plan up-to-date. Place a stockpile of spill cleanup materials where it will be readily accessible or at a central location. Clean up fluid spills immediately with absorbent rags or material. Dispose of spilled material and absorbents properly. Other Considerations Limitations related to sweeping activities at large parking facilities may include high equipment costs, the need for sweeper operator training, and the inability of current sweeper technology to remove oil and grease. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 3 of 4 SC-43 Parking/Storage Area Maintenance Requirements Costs Cleaning/sweeping costs can be quite large. Construction and maintenance of stormwater structural controls can be quite expensive as well. Maintenance Sweep parking lot regularly to minimize cleaning with water. Clean out oil/water/sand separators regularly, especially after heavy storms. Clean parking facilities regularly to prevent accumulated wastes and pollutants from being discharged into conveyance systems during rainy conditions. Supplemental Information Further Detail of the BMP Surface Repair Apply concrete, asphalt, and seal coat during dry weather to prevent contamination from contacting stormwater runoff. Where applicable, cover and seal nearby storm drain inlets (with waterproof material or mesh) and manholes before applying seal coat, slurry seal, etc. Leave covers in place until job is complete and all water from emulsified oil sealants has drained or evaporated. Clean any debris from these covered manholes and drains for proper disposal. Only use only as much water as is necessary for dust control to avoid runoff. References and Resources California’s Nonpoint Source Program Plan http://www.swrcb.ca.gov/nps/index.html Clark County Storm Water Pollution Control Manual http://www.co.clark.wa.us/pubworks/bmpman.pdf King County Storm Water Pollution Control Manual http://dnr.metrokc.gov/wlr/dss/spcm.htm Pollution from Surface Cleaning Folder. 1996. Bay Area Stormwater Management Agencies Association (BASMAA). http://www.basmaa.org/ Oregon Association of Clean Water Agencies. Oregon Municipal Stormwater Toolbox for Maintenance Practices. June 1998. Santa Clara Valley Urban Runoff Pollution Prevention Program http://www.scvurppp.org The Storm Water Managers Resource Center http://www.stormwatercenter.net/ 4 of 4 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Storm Drain Inlet Protection SE-10 Objectives EC SE TR WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control ; Legend: ; : Primary Objective Secondary Objective Targeted Constituents Description and Purpose Storm drain inlet protection consists of a sediment filter or an impounding area around or upstream of a storm drain, drop inlet, or curb inlet. Storm drain inlet protection measures temporarily pond runoff before it enters the storm drain, allowing sediment to settle. Some filter configurations also remove sediment by filtering, but usually the ponding action results in the greatest sediment reduction. Suitable Applications Every storm drain inlet receiving sediment-laden runoff should be protected. Limitations Drainage area should not exceed 1 acre. Straw bales, while potentially effective, have not produced in practice satisfactory results, primarily due to improper installation. Requires an adequate area for water to pond without encroaching into portions of the roadway subject to traffic. Inlet protection usually requires other methods of temporary protection to prevent sediment-laden stormwater and non-stormwater discharges from entering the storm drain system. Sediment removal may be difficult in high flow conditions or if runoff is heavily sediment laden. If high flow conditions are January 2003 California Stormwater BMP Handbook Construction www.cabmphandbooks.com ; Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics ; Potential Alternatives SE-1 Silt Fence SE-5 Fiber Rolls SE-6 Gravel Bag Berm SE-8 Sandbag Barrier SE-9 Straw Bale Barrier 1 of 9 SE-10 Storm Drain Inlet Protection expected, use other onsite sediment trapping techniques in conjunction with inlet protection. Frequent maintenance is required. For drainage areas larger than 1 acre, runoff should be routed to a sediment-trapping device designed for larger flows. See BMPs SE-2, Sediment Basin, and SE-3, Sediment Traps. Excavated drop inlet sediment traps are appropriate where relatively heavy flows are expected, and overflow capability is needed. Implementation General Large amounts of sediment may enter the storm drain system when storm drains are installed before the upslope drainage area is stabilized, or where construction is adjacent to an existing storm drain. In cases of extreme sediment loading, the storm drain itself may clog and lose a major portion of its capacity. To avoid these problems, it is necessary to prevent sediment from entering the system at the inlets. Inlet control measures presented in this handbook should not be used for inlets draining more than one acre. Runoff from larger disturbed areas should be first routed through SE-2, Sediment Basin or SE-3, Sediment Trap. Different types of inlet protection are appropriate for different applications depending on site conditions and the type of inlet. Inlet protection methods not presented in this handbook should be approved by the local stormwater management agency. Design and Layout Identify existing and planned storm drain inlets that have the potential to receive sedimentladen surface runoff. Determine if storm drain inlet protection is needed and which method to use. Limit upstream drainage area to 1 acre maximum. For larger drainage areas, use SE-2, Sediment Basin, or SE-3, Sediment Trap, upstream of the inlet protection device. The key to successful and safe use of storm drain inlet protection devices is to know where runoff will pond or be diverted. - Determine the acceptable location and extent of ponding in the vicinity of the drain inlet. The acceptable location and extent of ponding will influence the type and design of the storm drain inlet protection device. - Determine the extent of potential runoff diversion caused by the storm drain inlet protection device. Runoff ponded by inlet protection devices may flow around the device and towards the next downstream inlet. In some cases, this is acceptable; in other cases, serious erosion or downstream property damage can be caused by these diversions. The possibility of runoff diversions will influence whether or not storm drain inlet protection is suitable; and, if suitable, the type and design of the device. The location and extent of ponding, and the extent of diversion, can usually be controlled through appropriate placement of the inlet protection device. In some cases, moving the 2 of 9 California Stormwater BMP Handbook Construction www.cabmphandbooks.com January 2003 Storm Drain Inlet Protection SE-10 inlet protection device a short distance upstream of the actual inlet can provide more efficient sediment control, limit ponding to desired areas, and prevent or control diversions. Four types of inlet protection are presented below. However, it is recognized that other effective methods and proprietary devices exist and may be selected. - Filter Fabric Fence: Appropriate for drainage basins with less than a 5% slope, sheet flows, and flows under 0.5 cfs. - Excavated Drop Inlet Sediment Trap: An excavated area around the inlet to trap sediment (SE-3). - Gravel bag barrier: Used to create a small sediment trap upstream of inlets on sloped, paved streets. Appropriate for sheet flow or when concentrated flow may exceed 0.5 cfs, and where overtopping is required to prevent flooding. - Block and Gravel Filter: Appropriate for flows greater than 0.5 cfs. Select the appropriate type of inlet protection and design as referred to or as described in this fact sheet. Provide area around the inlet for water to pond without flooding structures and property. Grates and spaces around all inlets should be sealed to prevent seepage of sediment-laden water. Excavate sediment sumps (where needed) 1 to 2 ft with 2:1 side slopes around the inlet. Installation DI Protection Type 1 - Filter Fabric Fence - The filter fabric fence (Type 1) protection is shown in the attached figure. Similar to constructing a silt fence; see BMP SE-1, Silt Fence. Do not place filter fabric underneath the inlet grate since the collected sediment may fall into the drain inlet when the fabric is removed or replaced. 1. Excavate a trench approximately 6 in. wide and 6 in. deep along the line of the silt fence inlet protection device. 2. Place 2 in. by 2 in. wooden stakes around the perimeter of the inlet a maximum of 3 ft apart and drive them at least 18 in. into the ground or 12 in. below the bottom of the trench. The stakes must be at least 48 in. 3. Lay fabric along bottom of trench, up side of trench, and then up stakes. See SE-1, Silt Fence, for details. The maximum silt fence height around the inlet is 24 in. 4. Staple the filter fabric (for materials and specifications, see SE-1, Silt Fence) to wooden stakes. Use heavy-duty wire staples at least 1 in. in length. 5. Backfill the trench with gravel or compacted earth all the way around. DI Protection Type 2 - Excavated Drop Inlet Sediment Trap - The excavated drop inlet sediment trap (Type 2) is shown in the attached figures. Install filter fabric fence in January 2003 California Stormwater BMP Handbook Construction www.cabmphandbooks.com 3 of 9 SE-10 Storm Drain Inlet Protection accordance with DI Protection Type 1. Size excavated trap to provide a minimum storage capacity calculated at the rate 67 yd3/acre of drainage area. DI Protection Type 3 - Gravel bag - The gravel bag barrier (Type 3) is shown in the figures. Flow from a severe storm should not overtop the curb. In areas of high clay and silts, use filter fabric and gravel as additional filter media. Construct gravel bags in accordance with SE-6, Gravel Bag Berm. Gravel bags should be used due to their high permeability. 1. Use sand bag made of geotextile fabric (not burlap) and fill with 0.75 in. rock or 0.25 in. pea gravel. 2. Construct on gently sloping street. 3. Leave room upstream of barrier for water to pond and sediment to settle. 4. Place several layers of sand bags – overlapping the bags and packing them tightly together. 5. Leave gap of one bag on the top row to serve as a spillway. Flow from a severe storm (e.g., 10 year storm) should not overtop the curb. DI Protection Type 4 – Block and Gravel Filter - The block and gravel filter (Type 4) is shown in the figures. Block and gravel filters are suitable for curb inlets commonly used in residential, commercial, and industrial construction. 1. Place hardware cloth or comparable wire mesh with 0.5 in. openings over the drop inlet so that the wire extends a minimum of 1 ft beyond each side of the inlet structure. If more than one strip is necessary, overlap the strips. Place filter fabric over the wire mesh. 2. Place concrete blocks lengthwise on their sides in a single row around the perimeter of the inlet, so that the open ends face outward, not upward. The ends of adjacent blocks should abut. The height of the barrier can be varied, depending on design needs, by stacking combinations of blocks that are 4 in., 8 in., and 12 in. wide. The row of blocks should be at least 12 in. but no greater than 24 in. high. 3. Place wire mesh over the outside vertical face (open end) of the concrete blocks to prevent stone from being washed through the blocks. Use hardware cloth or comparable wire mesh with 0.5 in. opening. 4. Pile washed stone against the wire mesh to the top of the blocks. Use 0.75 to 3 in. Costs Average annual cost for installation and maintenance (one year useful life) is $200 per inlet. Inspection and Maintenance Inspect BMPs prior to forecast rain, daily during extended rain events, after rain events, weekly during the rainy season, and at two-week intervals during the non-rainy season. 4 of 9 California Stormwater BMP Handbook Construction www.cabmphandbooks.com January 2003 Storm Drain Inlet Protection SE-10 Filter Fabric Fences. If the fabric becomes clogged, torn, or degrades, it should be replaced. Make sure the stakes are securely driven in the ground and are in good shape (i.e., not bent, cracked, or splintered, and are reasonably perpendicular to the ground). Replace damaged stakes. Gravel Filters. If the gravel becomes clogged with sediment, it must be carefully removed from the inlet and either cleaned or replaced. Since cleaning gravel at a construction site may be difficult, consider using the sediment-laden stone as fill material and put fresh stone around the inlet. Inspect bags for holes, gashes, and snags, and replace bags as needed. Check gravel bags for proper arrangement and displacement. Sediment that accumulates in the BMP must be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height. Sediment removed during maintenance may be incorporated into earthwork on the site ore disposed at an appropriate location. Remove storm drain inlet protection once the drainage area is stabilized. - Clean and regrade area around the inlet and clean the inside of the storm drain inlet as it must be free of sediment and debris at the time of final inspection. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management Manual for The Puget Sound Basin, Washington State Department of Ecology, Public Review Draft, 1991. January 2003 California Stormwater BMP Handbook Construction www.cabmphandbooks.com 5 of 9 SE-10 6 of 9 Storm Drain Inlet Protection California Stormwater BMP Handbook Construction www.cabmphandbooks.com January 2003 Storm Drain Inlet Protection January 2003 California Stormwater BMP Handbook Construction www.cabmphandbooks.com SE-10 7 of 9 SE-10 8 of 9 Storm Drain Inlet Protection California Stormwater BMP Handbook Construction www.cabmphandbooks.com January 2003 Storm Drain Inlet Protection January 2003 California Stormwater BMP Handbook Construction www.cabmphandbooks.com SE-10 9 of 9 IX. IX Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) APPENDIX A Operations and Maintenance Plan Appendix A Implementation, Maintenance and Inspection Frequency and Schedule New onsite employees to be educated within 2 weeks of hire. Each onsite employee shall receive an annual review. If a user is observed engaging activity that may adverse impacts on stormwater, the authorized representative shall take corrective action as necessary. Ongoing basis. The Landscape Maintenance Common Area Landscape Management Contractors will continuously Water conservation will be achieved through the use of water conserving plant material. Plantings are grouped into hydro-zones maintain the site. Landscape maintenance/management will based upon water requirements and solar exposure. Irrigation valves are on an automatic irrigation system utilizing various types of occur weekly. Also, a designated representative of the irrigation heads designed to water areas based upon plant water requirements, sun/shade exposure, climatic factors, soil infiltration rate owner will be responsible for continual maintenance of and seasons. An ET based irrigation controller, which utilizes daily evapotranspiration rates, will be used to adjust the irrigation schedule landscaped areas in a manner consistent with the local with multiple cycles. A rain shut-off device is specified to maximize efficient water application, and flow sensors are installed to identify regulations. broken irrigation mainlines and laterals. The Landscape Maintenance Contractors will continuously maintain the site to identify areas where significant amounts of irrigation overspray has developed. Landscape maintenance will occur regularly as specified by the project Owner. Education for Property Owners, Tenants and Occupants Poseidon Resources (Channelside) LLC, the Owner, will educate all onsite employees. Education shall be given using the project SUSMP/WQTR and the educational materials contained within as reference. Activity Restrictions Ensure all users are adhering to activity restrictions as outlined in the project SUSMP/WQTR and the City of Carlsbad’s zoning ordinance and standards. Non-Structural Source Control BMPs BMP Name and BMP Implementation, Maintenance and Inspection Procedures OPERATIONS AND MAINTENANCE PLAN Appendix A The Landscape Maintenance Contractors will be contracted with The Owner. The Owner is responsible for educating the authorized tenant representative(s), who in turn, will educate all onsite employees. The Owner is responsible for educating the authorized tenant representative(s), who in turn, will educate all onsite employees. Person or Entity with Operation & Maintenance Responsibility Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) Implementation, Maintenance and Inspection Frequency and Schedule Through a maintenance firm that will be contracted with The Owner. Through a maintenance firm that will be contracted with The Owner. The Owner is responsible for educating the authorized tenant representative(s), who in turn, will educate all onsite employees. The Owner through a maintenance firm. Weekly New onsite employees to be educated within 2 weeks of hire. Each onsite employee shall receive an annual review. Person or Entity with Operation & Maintenance Responsibility When spills occur. Weekly Street Sweeping Private Streets and Parking Lots. The private parking lot swept once a week and prior to the storm season, no later than September 30th each year. The rubbish/waste from the sweeping shall be disposed of in the on-site dumpster. Spill Contingency Plan A Spill Contingency Plan is not available. As a minimum the Spill Contingency Plan will “mandate the stockpiling of cleanup materials, notification of responsible agencies, disposal of cleanup materials and documentation.” Common Area Litter Control. Perform parking lot/common area maintenance that will include the removal of litter from around the trash storage receptacles, drive aisles, parking lot and outdoor areas. All litter shall be placed in appropriate trash receptacles. Employee Training. Poseidon Resources will educate all onsite employees. Education shall be given using the project SUSMP/WQTR and the educational materials contained within as reference. Non-Structural Source Control BMPs BMP Name and BMP Implementation, Maintenance and Inspection Procedures OPERATIONS AND MAINTENANCE PLAN Implementation, Maintenance and Inspection Frequency and Schedule Provide storm drain system stenciling and signage The proposed catch basins shall have either concrete stamping, porcelain tile, inset permanent marking or equivalent as approved by the City of Carlsbad the words “NO DUMPING – I LIVE DOWNSTREAM” (satisfactory to the City Engineer) stenciled across the top of the catch basin inlet in 2 inch high letters using black epoxy paint. The stencil shall be legible and maintained at all times. Design and construct trash and waste storage areas to reduce pollution introduction Site waste receptacles shall be emptied on a weekly basis or more often if overflowing. Signage will be posted that lids shall be kept closed at all times. Inspect the waste receptacle area for any loose trash on the ground. Inspect for damage to the structural elements of the waste receptacles. Use efficient irrigation systems & landscape design, water conservation, smart controllers, and source control Irrigation shall be implemented as indicated on the City of Carlsbad’s approved Landscape Plans and be consistent with the City of Carlsbad Landscape Manual, Water Conservation Resolution or City equivalent. Runoff from irrigation shall be kept to a minimum. Staged irrigation cycles start within a time frame that least interferes with the activities of the Community. “Low flow” heads shall be incorporated to limit excess flow. Rain shutoff devices shall be used to prevent irrigation during precipitation. Plants are grouped into hydrozones based upon their water needs in order to minimize the amounts of excess water flow. A designated representative of the owner will be responsible for continual maintenance of landscaped areas in a manner consistent with the local regulations. The Owner through a maintenance firm. Person or Entity with Operation & Maintenance Responsibility The Landscape Maintenance Contractors will continuously maintain the site. Landscape maintenance/management will occur weekly. The Landscape Maintenance Contractors will be contracted with The Owner. Daily and weekly basis. The Owner through a Replace/repair structural elements maintenance firm. when needed. Annually. Repair when needed. Structural Source Control BMPs BMP Name and BMP Implementation, Maintenance and Inspection Procedures OPERATIONS AND MAINTENANCE PLAN The vendor/manufacturer for a minimum period of one year, shall maintain the system. After said first year, the Owner through a maintenance firm. The vendor/manufacturer for a minimum period of one year, shall maintain the system. After said first year, the Owner through a maintenance firm. Minimum of three times a year; prior to the storm season, no later than September 30th each year and after each storm event. Clean, replace and repair media filtration elements as needed. Minor maintenance which involves inspection of the media filtration units and removal of trash and debris should be performed once per year and after major storm events. Major maintenance which involves replacement of the media filters shall occur once per year or in the event of a chemical spill. Media Filtration- FloGuard Perk Filter System or equal, installed by construction contractor in conjunction with the CUDO 2 stromwater storage system as a pretreatment system prior to entering the infiltration portion of the CUDO 2 system. Person or Entity with Operation & Maintenance Responsibility Minimum of three times a year; prior to the storm season, no later than September 30th each year and after each storm event. Clean/Repair structural elements when needed. Minor maintenance which involves inspection of the CUDO units and removal of trash and debris should be performed once per year and after major storm events. Major maintenance which involves replacement and sediment removal should be performed once per year or in the event of a chemical spill. Once an understanding of site characteristics have been established, major maintenance frequency may be decreased to once every two years. Treatment BMPs Implementation, Maintenance and Inspection Frequency and Schedule CUDO 2 Stormwater Storage Detention Units Installed by construction contractor during construction and as indicated on the precise grading plan and per CUDO specifications. BMP Name and BMP Implementation, Maintenance and Inspection Procedures OPERATIONS AND MAINTENANCE PLAN Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) REQUIRED PERMITS No permits are required for the implementation, operation and maintenance of the BMPs. RECORD KEEPING All records must be maintained for at least five (5) years and must be available for review upon request. Appendix A RECORD OF BMP IMPLEMENTATION, MAINTENANCE AND INSPECTION Today’s Date: __________________________________________________________________________Name of Person Performing Activity:________________________________________________________ Signature:______________________________________________________________________________ BMP Name Brief Description of Implementation, Maintenance and Inspection Activity Performed Corrective actions needed: ________________None _______________________ As Noted Below. 1. 2. 3. Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) APPENDIX B Drainage Report/Verification Calculations, Backup Documentation and Detail Drawings of the Treatment BMPs Appendix B HYDROLOGY REPORT CARLSBAD DESALINATION PLANT Hydrology Report for Poseidon Resources Corporation 501 West Broadway, Suite 840 San Diego, CA 92101 September 2009 Prepared by: Infrastructure Services Group 16241 Laguna Canyon Road, Suite 200 Irvine, CA 92618 (949) 727-7099 DISCUSSION Purpose for Project This hydrology report is for the Carlsbad 50-MGD Desalination Plant. The project site is located in San Diego County, City of Carlsbad. The site is located on the grounds of the Encina Power Station. The power station is bounded by the Pacific Ocean and Carlsbad Boulevard to the west, the Carlsbad State Beach and Agua Hedionda Lagoon to the north, the I-5 Freeway to the east, and Cannon Road, an SDG&E maintenance yard, and adjacent residential areas to the south. Refer to Figure 1 and Figure 2 for the site and vicinity maps, respectively. The existing runoff is typically surface flow through the site or falls within containment berms for percolation and evaporation. The desalination facility will have a capacity to deliver approximately 50 million gallons of drinking (potable) water per day. This report will present hydrology for the existing, interim and proposed conditions. The proposed condition accounts for a 50-MGD Desalination Plant placed on the project site along with associated improvements. The interim condition evaluates rough grading of the site. The evaluated storm is the 10-year storm event, although the 100-year storm event will also be analyzed for overflow design purposes. The report will evaluate the following: 1. Determine the existing flowrate and volume of water for the site for a 10-year storm event. 2. Determine the interim condition flowrate and volume of water for a 10-year storm event. 3. Determine the proposed condition flowrate and volume of water for a 10-year storm event. 4. Storage volume required to hold the 10-year storm event. 5. Calculate 100-year storm event overflow rates. Hydrology Report Carlsbad Desalination Plant Page 1 9/11/2009 Tetra Tech, Inc. Figure 1 – Site Map Hydrology Report Carlsbad Desalination Plant Page 2 9/11/2009 Tetra Tech, Inc. Figure 2 – Vicinity Map Description of Watershed Existing Condition The existing site consists of tanks, pipes, containment berms, paving, vegetation and other improvements related to the Encina Power Station. The site generally slopes from the northeast to the southwest. The existing drainage is collected within containment berms or drains into a local storm drain system that flows to the Agua Hedionda Lagoon. An exhibit (Figure 3) showing the existing conditions may be found at the end of this report. Interim Condition The interim condition consists of an excavation for a proposed underground tank and a gently graded pad. Runoff from the gently sloping pad will be stored in an adjacent bermed containment basin, similar to the existing condition. Water entering the excavation for the underground tank will be either allowed to Hydrology Report Carlsbad Desalination Plant Page 3 9/11/2009 Tetra Tech, Inc. percolate into the ground or pumped into the above mentioned basin. An exhibit (Figure 4) showing the interim conditions may be found at the end of this report. Proposed Condition The proposed site consists of a 50-MGD desalinization plant, paving, water tanks, retaining walls and landscaping. The improvements will increase the amount of impervious surfaces. An exhibit (Figure 5) showing the proposed conditions may be found at the end of this report. Methodology The site hydrology was analyzed utilizing the Rational Method found in the San Diego County Hydrology Manual, June 2003. The watershed for this project is less than 1 square mile so the Rational Method is acceptable for peak discharge calculations. The volume of water capable of being stored in the adjacent bermed containment basin was obtained utilizing AutoCAD Civil 3D 2008. A freeboard value was assumed to be 2 feet, giving a maximum water surface elevation of 39 feet. The various drainage areas and other pertinent hydrology data were determined utilizing existing and proposed site data. All three development stage watershed geometric information maps (Figures 3, 4, and 5) may be found later in this report. The proposed condition was split into two subdrainage areas, Area A to the north and Area B to the south, as indicated on the watershed geometric information map for the proposed condition. The development of the site results in an increase in the impervious area which will increase runoff volumes and peak discharges. The excess peak storm volume from the 10-year, 6-hour duration storm will be contained on site through the use of underground storage detention devices. Once in the detention devices, the water will infiltrate into the ground. For storm events larger than 10 years, storm water from Area A and a portion of Area B will exit the site and flow into the existing abandoned oil containment basin where the water will percolate into the ground, similar to the existing condition. Excess water leaving from Area B, not collected, will discharge into the existing drainage Hydrology Report Carlsbad Desalination Plant Page 4 9/11/2009 Tetra Tech, Inc. channel which flows into the Agua Hedionda Lagoon to the north, similar to the existing condition. A Microsoft Excel workbook was used in conjunction with the San Diego County Hydrology Manual to model the watershed. The point rainfall depths used for the analysis were obtained from the NOAA Atlas 2. The isopluvials maps used may be found in the San Diego County Hydrology Manual and are also attached at the end of this report as Figures 6 through 10. Intensity for the 6hour storm can be found using the equation I = 7.44 P6 D −0.645 where P6 is the 6-hour storm rainfall amount and D is the duration in minutes. This equation only applies to the 6-hour storm. P6 should be between 45% and 65% of P24. If not, P6 can be adjusted before applying to the equation. The rainfall distribution used for this analysis is the 24-hour hypothetical distribution as described in the Hydrology Manual. Descriptions of the soils present on the watershed are contained in the Hydrology Manual. Based on those soil surveys, there is one type of soil in the watershed, Group “B”. Permanent vegetated areas have been classified as Open Brush, a “c” value of 0.25, and paved areas, buildings, equipment and other similar objects have been considered as impermeable, a “c” value of 0.90. A “c” value of 0.25 was used for the interim development due to erosion control measures that will be used. These “c” values are from the Hydrology Manual. The adjusted “c” values for the various watershed areas were calculated using the method described in the Hydrology Manual. Summary Rational Method peak flows along with storm volumes are developed for three conditions, as follows: 1. Pre-Development Condition 2. Interim Development Condition 3. Post-Development Condition Hydrology Report Carlsbad Desalination Plant Page 5 9/11/2009 Tetra Tech, Inc. All of the above models are prepared for the 10-year, 6-hour storm event. Pre-development conditions are defined as those that existed at the time of commencement of the study (July 2009). The post-development condition is based on the assumptions that 1) the off-site watershed is assumed to match the pre-development condition land-use; and 2) the on-site area is fully developed. The results of the models are summarized in Table 1 below: Table 1 – Rational Method Peak Flows and Peak Volumes Model Pre-Development Area A Area B Area C Total Interim Development Area A Area B Total Post-Development Area A Area B Total 10 – Year Storm Event Peak Discharge Volume 100 – Year Storm Event Peak Discharge Volume 4.84 cfs 5.89 cfs 4.47 cfs 15.20 cfs 5,663 cf 6,703 cf 4,985 cf 17,351 cf 6.73 cfs 8.18 cfs 6.21 cfs 21.12 cfs 7,865 cf 9,310 cf 6,923 cf 24,098 cf 4.09 cfs 4.24 cfs 8.33 cfs 6,994 cf 3,395 cf 10,389 cf 5.67 cfs 5.89 cfs 11.56 cfs 9,714 cf 4,715 cf 14,429 cf 12.03 cfs 6.28 cfs 18.31 cfs 18,445 cf 10,630 cf 29,075 cf 16.71 cfs 8.72 cfs 25.43 cf 25,618 cf 14,764 cf 40,382 cf The volume of water storage available for the interim development is 161,480 cf, in the existing offsite bermed containment basin, which is adequate to store the 10-year and 100-year events without any overtopping of the basin. A desilting trap is implemented to convey the runoff from the site into the existing basin. The desilting trap size has been calculated per the recommendations contained in the Caltrans Construction Site Best Management Practices Manual, Sediment Trap SC-3. For the post-development condition it is proposed to use an underground storage and percolation system such as CUDO 4 Units manufactured by Cudo Stormwater Products, Inc. (or equal). The proposed site is required to store approximately 11,725 cf (the storage required to maintain the same runoff flows of the 10-year storm event for the preand post-development conditions). Each unit is capable of storing 30.8 cubic feet of water and is 2 feet x 2 feet x 8 feet tall. A total of 11,725 cf of storage is provided through the Hydrology Report Carlsbad Desalination Plant Page 6 9/11/2009 Tetra Tech, Inc. units. This onsite underground storm water storage system is fully capable of collecting and treating all flows produced by the 85th percentile storm (Calculations are provided in Appendix 1). Inlet structures and pipes were sized using FlowMaster to convey the resulting runoff of the 10-year storm event. The results can be found in Appendix 1. Outlet structures and pipes are incorporated into the design to release the storm water to the existing underground storm drain located in the access road. The outlet structure, which has a crest height of six feet, was sized using FlowMaster (see Appendix 1). The location and storage capacity of the units are indicated on the watershed geometric information map (Figure 5) for the proposed condition. In the event of a 100-year storm, the overflow will bypass the Cudo units. Excess water from Area A will flow into the adjacent bermed containment basin. Excess water from Area B will flow offsite. REFERENCES 1. County of San Diego, Department of Public Works, Flood Control Section, San Diego County Hydrology Manual, June 2003. 2. Lindeburg, M. R., Civil Engineering Reference Manual for the PE Exam, Eighth Edition, 2001. 3. U.S. Army Corps of Engineers and Dodson & Associates, ProHEC1 Program Documentation, April, 1991. 4. U.S. Army Corps of Engineers, HEC-HMS Version 2.2.2 Hydrology Report Carlsbad Desalination Plant Page 7 9/11/2009 Tetra Tech, Inc. DECLARATION OF RESPONSIBLE CHARGE I, HEREBY DECLARE THAT I AM THE CIVIL ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXCERISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE CITY OF CARLSBAD IS CONFINED TO A REVIEW ONLY AND DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN. ENGINEER OF WORK TETRA TECH, INC. 16241 LAGUNA CANYON ROAD, SUITE 200 IRVINE, CA 92618 PHONE: (949) 727-7099 PROJECT NO. 134-10905-09004 CHRISTOPHER D. FUGITT, R.C.E. 66591 EXP. 6/30/10 DATE Table 2 - Watershed Information using the Rational Method Pre-Development Area (sf), A Adjusted Runoff Coefficient, cADJ Watercourse Length (ft), L Change in Elevation (ft), h Duration (min), tc 6-hr Precipitation (in), P6 24-hr Precipitation (in), P24 Intensity (in/hr), i Flow Rate (cfs), Q Flow Volume (cf), Vol 6-hr Precipitation (in), P6 24-hr Precipitation (in), P24 Intensity (in/hr), i Flow Rate (cfs), Q Flow Volume (cf), Vol A B C 96,350 65,401 95,748 0.39 0.46 0.51 480 570 436 10 11 20.5 3.60 3.88 3.72 10 - Year Storm Event 1.8 3.0 5.86 5.59 5.74 4.84 5.89 4.47 5,663 6,703 4,985 100 - Year Storm Event 2.5 4.5 7.76 7.97 8.14 6.73 8.18 6.21 7,865 9,310 6,923 InterimDevelopment A 186,504 0.25 672 6.5 7.00 B 90,521 0.25 455 43 2.16 Post-Development A 152,752 0.80 634 8.5 5.90 1.8 3.0 1.8 3.0 3.82 4.09 6,994 8.16 4.24 3,395 4.26 12.03 18,445 2.5 4.5 5.30 5.67 9,714 B 105,792 0.67 695 7.5 6.89 3.86 6.28 10,630 2.5 4.5 11.33 5.89 4,715 5.92 16.71 25,618 5.36 8.72 14,764 APPENDIX 1 RATIONAL METHOD ANALYSIS CALCULATIONS CLIENT PROJECT DETAIL Carlsbad Desalter Pre-Dev. Hydrology - 10 Yr Event Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) P6 = 6-Hour Precipitation (in) P6 1.80 = 1.80 = = P24 = 24-Hour Precipitation (in) = 3.00 P24 3.00 Drainage Area A B C Total Area Permeable Impervious (SF) Area (SF) Area (SF) 95,748 74,186 21,341 96,350 64,661 31,692 65,401 38,834 26,135 257,499 c = 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ( ) E JOB NO. Poseidon 60% DATE CHECKED CHECKED BY 8/3/2009 JED Duration (tc) (Min) 3.88 3.72 3.60 Intensity 5.59 5.74 5.86 Isopluvial (Inches) Isopluvial (Inches) = = 3.0 1.8 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Adjusted c value: Impervious Area 0.90 x + 0.25 x c = Total Area Peak Discharge Q= c i A COMPUTED BY 1 7/31/2009 CDF Peak Discharge, Runoff Volume, Q (cfs) VOL (acre-inch) 4.84 1.56 5.89 1.85 4.47 1.37 Drainage Area A B C Total: I = 7.44P6D-0.645 Storm Volume VOL = c P6 A DATE OF c = 0.90 0.385 10 Year Rainfall Event - 24 Hours 10 Year Rainfall Event - 6 Hours 1 P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. Watercourse Change in Elev., Length,L (FT) E (FT) 480 11 570 20.5 436 10 Adjusted c 0.39 0.46 0.51 PAGE Pervious Area 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual Runoff Volume, VOL (cf) 5,663 6,703 4,985 17,351 CLIENT JOB NO. Poseidon PROJECT Carlsbad Desalter DETAIL Interim-Dev. Hydrology 10-Yr Event Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) P6 = 6-Hour Precipitation (in) P6 1.80 = 1.80 = = 60% P24 = 24-Hour Precipitation (in) = 3.00 3.00 P24 Drainage Area A B Total Area (SF) Adjusted c 186,504 0.25 90,521 0.25 277,025 c = 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ( ) E Watercourse Length,L (FT) 672 455 Change in Elev., E (FT) 6.5 43 DATE CHECKED CHECKED BY 8/3/2009 JED Isopluvial (Inches) Isopluvial (Inches) = = Storm Volume VOL = c P6 A Peak Discharge Q= c i A 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual COMPUTED BY Peak Discharge, Runoff Volume, Q (cfs) VOL (acre-inch) 4.09 1.93 4.24 0.94 Drainage Area A B Runoff Volume, VOL (cf) 6,994 3,395 3.0 1.8 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Pervious Area DATE Intensity 3.82 8.16 I = 7.44P6D-0.645 Adjusted c value: Impervious 0.90 x + 0.25 x Area c = Total Area 1 P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. c = 0.90 0.385 10 Year Rainfall Event - 24 Hours 10 Year Rainfall Event - 6 Hours Duration (tc) (Min) 7.00 2.16 PAGE OF 1 7/31/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter DATE CHECKED CHECKED BY Interim-Dev. Hydrology 10-Yr Event (Drainage Area A) Rational Method Hydrograph Calculations Q10 = 4.09 cfs TC = 7.00 min P6 = C= A= 1.8 0.25 186,504 in sf -0.645 I = 7.44 x P6 x D IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.51 I (incr) (in/hr) 3.03 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 3.03 1.94 1.49 1.24 1.07 0.95 0.86 0.79 0.74 0.69 0.65 0.61 0.58 0.55 0.53 0.51 0.49 0.47 0.45 0.44 0.43 0.41 0.40 0.39 0.38 0.37 0.36 0.35 0.35 0.34 0.33 0.32 0.32 0.31 0.31 0.30 0.51 0.65 0.75 0.83 0.90 0.95 1.01 1.06 1.10 1.14 1.18 1.22 1.26 1.29 1.32 1.35 1.38 1.41 1.44 1.46 1.49 1.51 1.54 1.56 1.58 1.61 1.63 1.65 1.67 1.69 1.71 1.73 1.75 1.77 1.79 1.80 0.14 0.10 0.08 0.07 0.06 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.85 0.60 0.48 0.41 0.36 0.32 0.29 0.27 0.25 0.24 0.22 0.21 0.20 0.19 0.18 0.18 0.17 0.16 0.16 0.15 0.15 0.14 0.14 0.14 0.13 0.13 0.13 0.12 0.12 0.12 0.12 0.11 0.11 0.11 0.11 0.00 Q (cfs) 3.27 Vol (cf) 1964 0.91 0.65 0.52 0.44 0.39 0.35 0.32 0.29 0.27 0.26 0.24 0.23 0.22 0.21 0.20 0.19 0.18 0.18 0.17 0.17 0.16 0.16 0.15 0.15 0.14 0.14 0.14 0.13 0.13 0.13 0.13 0.12 0.12 0.12 0.12 0.00 SUM = 548 389 312 265 233 209 190 175 163 153 144 137 130 124 119 114 110 106 103 99 96 94 91 89 86 84 82 80 79 77 75 74 72 71 70 0 7009 0.16 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.16 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon DATE CHECKED Carlsbad Desalter CHECKED BY Interim-Dev. Hydrology 10-Yr Event (Drainage Area B) Rational Method Hydrograph Calculations Q10 = 4.24 cfs TC = 2.16 min P6 = C= A= 1.8 0.25 90,521 in sf I = 7.44 x P6 x D-0.645 IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.51 I (incr) (in/hr) 3.03 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 3.03 1.94 1.49 1.24 1.07 0.95 0.86 0.79 0.74 0.69 0.65 0.61 0.58 0.55 0.53 0.51 0.49 0.47 0.45 0.44 0.43 0.41 0.40 0.39 0.38 0.37 0.36 0.35 0.35 0.34 0.33 0.32 0.32 0.31 0.31 0.30 0.51 0.65 0.75 0.83 0.90 0.95 1.01 1.06 1.10 1.14 1.18 1.22 1.26 1.29 1.32 1.35 1.38 1.41 1.44 1.46 1.49 1.51 1.54 1.56 1.58 1.61 1.63 1.65 1.67 1.69 1.71 1.73 1.75 1.77 1.79 1.80 0.14 0.10 0.08 0.07 0.06 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.85 0.60 0.48 0.41 0.36 0.32 0.29 0.27 0.25 0.24 0.22 0.21 0.20 0.19 0.18 0.18 0.17 0.16 0.16 0.15 0.15 0.14 0.14 0.14 0.13 0.13 0.13 0.12 0.12 0.12 0.12 0.11 0.11 0.11 0.11 0.00 Q (cfs) 1.59 Vol (cf) 953 0.44 0.31 0.25 0.21 0.19 0.17 0.15 0.14 0.13 0.12 0.12 0.11 0.11 0.10 0.10 0.09 0.09 0.09 0.08 0.08 0.08 0.08 0.07 0.07 0.07 0.07 0.07 0.07 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.00 SUM = 266 189 151 129 113 101 92 85 79 74 70 66 63 60 58 55 53 52 50 48 47 45 44 43 42 41 40 39 38 37 37 36 35 34 34 0 3402 0.08 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.08 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon PAGE DATE CHECKED Carlsbad Desalter Interim-Dev. Hydrology 10-Yr Event 9/8/2009 CHECKED BY 1 DATE OF 9/8/2009 COMPUTED BY JED 1 CDF Rational Method Hydrograph from San Diego County RATHYDRO Program Area A Area B D (min) 0 7 14 Q (cfs) 0 0.1 0.1 D (min) 0 5 10 Q (cfs) 0 0.1 0.1 D (min) 330 335 340 Q (cfs) 0.1 0.1 0.1 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 182 189 196 203 210 217 224 231 238 245 252 259 266 273 280 287 294 301 308 315 322 329 336 343 350 357 364 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.6 0.8 1.1 4.09 0.6 0.4 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.5 1.1 4.24 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 345 350 355 360 365 0.1 0.1 0.1 0.1 0 Area A 4.5 4 Flow Rate (cfs) 3.5 3 2.5 2 1.5 1 0.5 0 0 50 100 150 200 250 300 350 400 250 300 350 400 Time (min) Area B 4.5 4 Flow Rate (cfs) 3.5 3 2.5 2 1.5 1 0.5 0 0 50 100 150 200 Time (min) CLIENT PROJECT DETAIL Drainage Area A B Post-Dev. Hydrology - 10 Yr Event Total Area Permeable Impervious Area (SF) (SF) Area (SF) 21,221 130,733 152,752 38,467 105,792 68,054 258,544 c = 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ) ( E 60% CHECKED BY 8/3/2009 JED DATE OF 1 7/31/2009 COMPUTED BY CDF Duration (tc) (Min) 5.90 6.89 Intensity 4.26 3.86 Peak Discharge, Runoff Volume, VOL (acre-inch) Q (cfs) 5.08 12.03 2.93 6.28 c = 0.90 Drainage Area A B Runoff Volume, VOL (cf) 18,445 10,630 CUDO 2 Units, EA 317 130 CUDO Units Volume, CF 9,764 4,004 CUDO Units Area, SF 1,268 520 13,768 Check-OK 29,075 Isopluvial (Inches) Isopluvial (Inches) = = I = 7.44P6D-0.645 3.0 1.8 Required Runoff Volume: Post Dev. 29,075 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Adjusted c value: Impervious 0.90 x Area + 0.25 x c = Total Area Storm Volume VOL = c P6 A 1 P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. Watercourse Change in Elev., Length,L (FT) E (FT) 8.5 634 7.5 695 Adjusted c 0.80 0.67 0.385 10 Year Rainfall Event - 24 Hours 10 Year Rainfall Event - 6 Hours DATE CHECKED Carlsbad Desalter Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) P6 = 6-Hour Precipitation (in) = 1.80 P6 1.80 = = P24 = 24-Hour Precipitation (in) = 3.00 3.00 P24 PAGE JOB NO. Poseidon Pervious Area 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual Peak Discharge Q= c i A CUDO 2 Units are manufactured by Cudo Stormwater Products, Inc. and are capable of storing 30.8 CF of water per unit. CUDO 2 Dimensions are 2 ft. x 2 ft. x 8 ft tall. - Pre Dev. 17,351 = 11,724 CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter DATE CHECKED CHECKED BY Post-Dev. Hydrology 10-Yr Event (Drainage Area A) Rational Method Hydrograph Calculations Q10 = 12.03 cfs TC = 5.90 min P6 = C= A= 1.8 0.8 152,752 in sf I = 7.44 x P6 x D-0.645 IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.51 I (incr) (in/hr) 3.03 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 3.03 1.94 1.49 1.24 1.07 0.95 0.86 0.79 0.74 0.69 0.65 0.61 0.58 0.55 0.53 0.51 0.49 0.47 0.45 0.44 0.43 0.41 0.40 0.39 0.38 0.37 0.36 0.35 0.35 0.34 0.33 0.32 0.32 0.31 0.31 0.30 0.51 0.65 0.75 0.83 0.90 0.95 1.01 1.06 1.10 1.14 1.18 1.22 1.26 1.29 1.32 1.35 1.38 1.41 1.44 1.46 1.49 1.51 1.54 1.56 1.58 1.61 1.63 1.65 1.67 1.69 1.71 1.73 1.75 1.77 1.79 1.80 0.14 0.10 0.08 0.07 0.06 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.85 0.60 0.48 0.41 0.36 0.32 0.29 0.27 0.25 0.24 0.22 0.21 0.20 0.19 0.18 0.18 0.17 0.16 0.16 0.15 0.15 0.14 0.14 0.14 0.13 0.13 0.13 0.12 0.12 0.12 0.12 0.11 0.11 0.11 0.11 0.00 Q (cfs) 8.58 Vol (cf) 5147 2.39 1.70 1.36 1.16 1.02 0.91 0.83 0.77 0.71 0.67 0.63 0.60 0.57 0.54 0.52 0.50 0.48 0.46 0.45 0.43 0.42 0.41 0.40 0.39 0.38 0.37 0.36 0.35 0.34 0.34 0.33 0.32 0.32 0.31 0.30 0.00 SUM = 1436 1019 817 694 609 547 499 460 428 401 378 358 341 326 312 300 288 278 269 260 253 245 239 232 226 221 216 211 206 202 197 193 190 186 183 0 18369 0.42 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.42 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter DATE CHECKED CHECKED BY Post-Dev. Hydrology 10-Yr Event (Drainage Area B) Rational Method Hydrograph Calculations Q10 = 6.28 cfs TC = 6.89 min P6 = C= A= 1.8 0.67 105,792 in sf I = 7.44 x P6 x D-0.645 IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.51 I (incr) (in/hr) 3.03 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 3.03 1.94 1.49 1.24 1.07 0.95 0.86 0.79 0.74 0.69 0.65 0.61 0.58 0.55 0.53 0.51 0.49 0.47 0.45 0.44 0.43 0.41 0.40 0.39 0.38 0.37 0.36 0.35 0.35 0.34 0.33 0.32 0.32 0.31 0.31 0.30 0.51 0.65 0.75 0.83 0.90 0.95 1.01 1.06 1.10 1.14 1.18 1.22 1.26 1.29 1.32 1.35 1.38 1.41 1.44 1.46 1.49 1.51 1.54 1.56 1.58 1.61 1.63 1.65 1.67 1.69 1.71 1.73 1.75 1.77 1.79 1.80 0.14 0.10 0.08 0.07 0.06 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.85 0.60 0.48 0.41 0.36 0.32 0.29 0.27 0.25 0.24 0.22 0.21 0.20 0.19 0.18 0.18 0.17 0.16 0.16 0.15 0.15 0.14 0.14 0.14 0.13 0.13 0.13 0.12 0.12 0.12 0.12 0.11 0.11 0.11 0.11 0.00 Q (cfs) 4.98 Vol (cf) 2986 1.39 0.99 0.79 0.67 0.59 0.53 0.48 0.44 0.41 0.39 0.37 0.35 0.33 0.31 0.30 0.29 0.28 0.27 0.26 0.25 0.24 0.24 0.23 0.22 0.22 0.21 0.21 0.20 0.20 0.19 0.19 0.19 0.18 0.18 0.18 0.00 SUM = 833 591 474 403 353 317 289 267 248 233 219 208 198 189 181 174 167 161 156 151 147 142 138 135 131 128 125 122 119 117 115 112 110 108 106 0 10654 0.25 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.24 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter Post-Dev. Hydrology 10-Yr Event Rational Method Hydrograph from San Diego County RATHYDRO Program Area A PAGE DATE CHECKED CHECKED BY 9/8/2009 1 OF DATE 9/8/2009 COMPUTED BY JED Unit Hydrograph from Eq. 4-10 of the SD County Hydrology Manual Area B D Q D Q (min) 0 6 12 (cfs) 0 0.3 0.3 (min) 0 7 14 (cfs) 0 0.2 0.2 18 24 30 0.3 0.3 0.3 21 28 35 0.2 0.2 0.2 Area A Tr = 411 Tr = 1.67Tp 36 0.3 42 0.2 qp = 7.81 42 48 54 60 66 72 78 84 90 96 102 108 114 120 126 132 138 144 150 156 162 168 174 180 186 192 198 204 210 216 222 228 234 240 246 252 258 264 270 276 282 288 294 300 306 312 318 324 330 336 342 348 354 360 366 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.7 0.7 0.7 0.7 0.8 0.9 0.9 1.1 1.1 1.4 1.6 2.3 3.1 12.03 1.9 1.3 1.0 0.8 0.7 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 182 189 196 203 210 217 224 231 238 245 252 259 266 273 280 287 294 301 308 315 322 329 336 343 350 357 364 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.6 0.6 0.7 0.8 1.2 1.7 6.28 1.0 0.7 0.5 0.4 0.4 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0 qp = KAQa/Tp K = 484 A in square miles Tp in hours min cfs Area B Tr = 409 qp = 2.83 min cfs Flow Rate (cfs) Area A 9 8 7 6 5 4 3 2 1 0 0 411 822 Time (min) Area B 3 Flow Rate (cf) 2.5 2 1.5 1 0.5 0 0 409 Time (min) 1 818 CDF CLIENT Poseidon PROJECT DETAIL Peak Reservoir Storage: Inflow (cfs) 0.00 0.02 0.04 0.06 0.08 0.10 0.11 0.13 0.15 0.17 0.19 0.21 0.23 0.25 0.27 0.29 0.30 0.32 0.34 0.36 0.38 0.40 0.42 0.44 0.46 0.48 0.49 0.51 0.53 0.55 0.57 0.59 0.61 0.63 0.65 0.67 0.68 0.70 0.72 0.74 0.76 0.78 0.80 0.82 0.84 0.86 0.87 0.89 0.91 0.93 0.95 0.97 0.99 1.01 1.03 1.05 1.06 1.08 1.10 1.12 1.14 1.16 1.18 Post-Dev. Hydrology 10-Yr Event 8,636 cf Reservoir Area: Area A Duration (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 Carlsbad Desalter JOB NO. PAGE DATE CHECKED CHECKED BY Peak Reservoir Storage: 1,268 SF Reservoir Reservoir Storage (cf) Elevation (ft) 0.00 0.00 1.14 0.00 3.42 0.00 6.84 0.01 11.40 0.01 17.10 0.01 23.94 0.02 31.92 0.03 41.05 0.03 51.31 0.04 62.71 0.05 75.25 0.06 88.93 0.07 103.75 0.09 119.72 0.10 136.82 0.11 155.06 0.13 174.44 0.14 194.96 0.16 216.63 0.18 239.43 0.20 263.37 0.22 288.46 0.24 314.68 0.26 342.04 0.28 370.55 0.31 400.19 0.33 430.98 0.36 462.90 0.38 495.96 0.41 530.17 0.44 565.51 0.47 602.00 0.50 639.62 0.53 678.39 0.56 718.29 0.60 759.34 0.63 801.52 0.67 844.85 0.70 889.31 0.74 934.92 0.78 981.67 0.81 1029.55 0.85 1078.58 0.90 1128.74 0.94 1180.05 0.98 1232.50 1.02 1286.08 1.07 1340.81 1.11 1396.68 1.16 1453.69 1.21 1511.83 1.26 1571.12 1.30 1631.55 1.35 1693.12 1.41 1755.82 1.46 1819.67 1.51 1884.66 1.56 1950.79 1.62 2018.06 1.68 2086.47 1.73 2156.02 1.79 2226.71 1.85 9/8/2009 JED Inflow (cfs) 0.00 0.01 0.01 0.02 0.03 0.03 0.04 0.05 0.06 0.06 0.07 0.08 0.08 0.09 0.10 0.10 0.11 0.12 0.12 0.13 0.14 0.15 0.15 0.16 0.17 0.17 0.18 0.19 0.19 0.20 0.21 0.21 0.22 0.23 0.24 0.24 0.25 0.26 0.26 0.27 0.28 0.28 0.29 0.30 0.30 0.31 0.32 0.33 0.33 0.34 0.35 0.35 0.36 0.37 0.37 0.38 0.39 0.39 0.40 0.41 0.42 0.42 0.43 DATE OF 11 9/8/2009 COMPUTED BY Required Storage: Total Storage: 3,258 cf Reservoir Area: Area B Outflow Duration (cfs) (min) 0.00 0 0.00 1 0.00 2 0.00 3 0.00 4 0.00 5 6 0.00 7 0.00 8 0.00 9 0.00 0.00 10 11 0.00 12 0.00 13 0.00 0.00 14 0.00 15 0.00 16 0.00 17 0.00 18 0.00 19 20 0.00 21 0.00 22 0.00 23 0.00 24 0.00 25 0.00 26 0.00 27 0.00 28 0.00 29 0.00 30 0.00 31 0.00 32 0.00 33 0.00 34 0.00 35 0.00 36 0.00 37 0.00 38 0.00 39 0.00 40 0.00 41 0.00 42 0.00 43 0.00 44 0.00 45 0.00 46 0.00 47 0.00 48 0.00 49 0.00 50 0.00 51 0.00 52 0.00 53 0.00 54 0.00 55 0.00 56 0.00 57 0.00 58 0.00 59 0.00 60 0.00 61 0.00 62 0.00 Page 1 of 11 1 CDF 11,724 11,894 Check: OK 520 SF Reservoir Reservoir Storage (cf) Elevation (ft) 0.00 0.00 0.42 0.00 1.25 0.00 2.49 0.01 4.15 0.01 6.23 0.01 8.72 0.02 11.62 0.02 14.95 0.03 18.68 0.04 22.83 0.05 27.40 0.06 32.38 0.07 37.78 0.08 43.59 0.09 49.82 0.10 56.46 0.11 63.52 0.13 70.99 0.14 78.88 0.16 87.18 0.18 95.90 0.19 105.04 0.21 114.58 0.23 124.55 0.25 134.93 0.27 145.72 0.29 156.93 0.32 168.55 0.34 180.59 0.37 193.05 0.39 205.92 0.42 219.20 0.44 232.90 0.47 247.02 0.50 261.55 0.53 276.50 0.56 291.86 0.59 307.63 0.62 323.82 0.66 340.43 0.69 357.45 0.72 374.89 0.76 392.74 0.80 411.01 0.83 429.69 0.87 448.79 0.91 468.30 0.95 488.23 0.99 508.57 1.03 529.33 1.07 550.50 1.11 572.09 1.16 594.09 1.20 616.51 1.25 639.34 1.29 662.59 1.34 686.26 1.39 710.34 1.44 734.83 1.49 759.74 1.54 785.07 1.59 810.81 1.64 Outflow (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Area A Duration (min) 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 Inflow (cfs) 1.20 1.22 1.24 1.25 1.27 1.29 1.31 1.33 1.35 1.37 1.39 1.41 1.43 1.44 1.46 1.48 1.50 1.52 1.54 1.56 1.58 1.60 1.62 1.63 1.65 1.67 1.69 1.71 1.73 1.75 1.77 1.79 1.81 1.82 1.84 1.86 1.88 1.90 1.92 1.94 1.96 1.98 2.00 2.01 2.03 2.05 2.07 2.09 2.11 2.13 2.15 2.17 2.19 2.20 2.22 2.24 2.26 2.28 2.30 2.32 2.34 2.36 2.38 2.39 2.41 2.43 2.45 2.47 2.49 2.51 2.53 2.55 2.57 2.58 2.60 2.62 Reservoir Reservoir Storage (cf) Elevation (ft) 2298.53 1.91 2371.50 1.97 2445.61 2.03 2520.86 2.09 2597.25 2.16 2674.78 2.22 2753.45 2.29 2833.26 2.35 2914.21 2.42 2996.30 2.49 3079.53 2.56 3163.91 2.63 3249.42 2.70 3336.07 2.77 3423.86 2.84 3512.79 2.92 3602.86 2.99 3694.07 3.07 3786.42 3.14 3879.92 3.22 3974.55 3.30 4070.32 3.38 4167.23 3.46 4265.29 3.54 4364.48 3.62 4464.81 3.71 4566.28 3.79 4668.90 3.88 4772.65 3.96 4877.54 4.05 4983.58 4.14 5090.75 4.23 5199.07 4.32 5308.52 4.41 5419.11 4.50 5530.85 4.59 5643.72 4.69 5757.74 4.78 5872.89 4.88 5989.19 4.97 6106.62 5.07 6225.20 5.17 6344.91 5.27 6465.77 5.37 6587.76 5.47 6710.90 5.57 6835.18 5.67 6960.59 5.78 7087.15 5.88 7214.84 5.99 7343.68 6.10 7467.66 6.20 7569.97 6.28 7646.43 6.35 7704.23 6.40 7746.36 6.43 7777.64 6.46 7800.46 6.48 7817.22 6.49 7829.72 6.50 7839.75 6.51 7847.33 6.51 7853.65 6.52 7858.71 6.52 7863.71 6.53 7867.45 6.53 7871.12 6.53 7875.34 6.54 7878.90 6.54 7882.40 6.54 7885.84 6.55 7889.22 6.55 7892.54 6.55 7895.80 6.55 7899.60 6.56 7902.74 6.56 Area B Outflow Duration (cfs) (min) 0.00 63 0.00 64 0.00 65 0.00 66 0.00 67 0.00 68 0.00 69 0.00 70 0.00 71 0.00 72 0.00 73 0.00 74 0.00 75 0.00 76 0.00 77 0.00 78 0.00 79 0.00 80 0.00 81 0.00 82 0.00 83 0.00 84 0.00 85 0.00 86 0.00 87 0.00 88 0.00 89 0.00 90 0.00 91 0.00 92 0.00 93 0.00 94 0.00 95 0.00 96 0.00 97 0.00 98 0.00 99 0.00 100 0.00 101 0.00 102 0.00 103 0.00 104 0.00 105 0.00 106 0.00 107 0.00 108 0.00 109 0.00 110 0.00 111 0.00 112 0.10 113 0.48 114 0.93 115 1.26 116 1.54 117 1.74 118 1.90 119 2.02 120 2.11 121 2.17 122 2.23 123 2.27 124 2.31 125 2.33 126 2.37 127 2.39 128 2.40 129 2.43 130 2.45 131 2.47 132 2.49 133 2.51 134 2.53 135 136 2.54 2.57 137 2.58 138 Page 2 of 11 Inflow (cfs) 0.44 0.44 0.45 0.46 0.46 0.47 0.48 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.53 0.54 0.55 0.55 0.56 0.57 0.57 0.58 0.59 0.60 0.60 0.61 0.62 0.62 0.63 0.64 0.64 0.65 0.66 0.66 0.67 0.68 0.69 0.69 0.70 0.71 0.71 0.72 0.73 0.73 0.74 0.75 0.75 0.76 0.77 0.77 0.78 0.79 0.80 0.80 0.81 0.82 0.82 0.83 0.84 0.84 0.85 0.86 0.86 0.87 0.88 0.89 0.89 0.90 0.91 0.91 0.92 0.93 0.93 0.94 0.95 0.95 Reservoir Reservoir Storage (cf) Elevation (ft) 836.96 1.69 863.53 1.75 890.52 1.80 917.92 1.86 945.73 1.91 973.96 1.97 1002.61 2.03 1031.67 2.09 1061.15 2.15 1091.04 2.21 1121.34 2.27 1152.07 2.33 1183.20 2.40 1214.76 2.46 1246.72 2.52 1279.10 2.59 1311.90 2.66 1345.11 2.72 1378.74 2.79 1412.79 2.86 1447.24 2.93 1482.12 3.00 1517.41 3.07 1553.11 3.14 1589.23 3.22 1625.76 3.29 1662.71 3.37 1700.08 3.44 1737.86 3.52 1776.05 3.60 1814.66 3.67 1853.68 3.75 1893.12 3.83 1932.98 3.91 1973.25 3.99 2013.94 4.08 2055.04 4.16 2096.55 4.24 2138.48 4.33 2180.83 4.41 2223.59 4.50 2266.77 4.59 2310.36 4.68 2354.37 4.77 2398.79 4.86 2443.63 4.95 2488.88 5.04 2534.55 5.13 2580.63 5.22 2627.13 5.32 2674.04 5.41 2721.37 5.51 2769.11 5.61 2817.27 5.70 2865.84 5.80 2914.83 5.90 2964.23 6.00 3014.05 6.10 3058.29 6.19 3080.14 6.24 3091.60 6.26 3094.48 6.26 3097.78 6.27 3101.49 6.28 3105.61 6.29 3102.95 6.28 3107.91 6.29 3106.08 6.29 3104.66 6.28 3103.67 6.28 3110.28 6.30 3108.31 6.29 3108.56 6.29 3109.22 6.29 3110.30 6.30 3109.99 6.30 Outflow (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.48 0.66 0.81 0.81 0.81 0.81 0.93 0.81 0.93 0.93 0.93 0.81 0.96 0.93 0.93 0.93 0.96 0.96 Area A Duration (min) 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 Inflow (cfs) 2.64 2.66 2.68 2.70 2.72 2.74 2.76 2.77 2.79 2.81 2.83 2.85 2.87 2.89 2.91 2.93 2.95 2.96 2.98 3.00 3.02 3.04 3.06 3.08 3.10 3.12 3.14 3.15 3.17 3.19 3.21 3.23 3.25 3.27 3.29 3.31 3.33 3.34 3.36 3.38 3.40 3.42 3.44 3.46 3.48 3.50 3.52 3.53 3.55 3.57 3.59 3.61 3.63 3.65 3.67 3.69 3.71 3.72 3.74 3.76 3.78 3.80 3.82 3.84 3.86 3.88 3.90 3.91 3.93 3.95 3.97 3.99 4.01 4.03 4.05 4.07 Reservoir Reservoir Storage (cf) Elevation (ft) 7906.42 6.56 7909.44 6.57 7913.00 6.57 7915.90 6.57 7919.34 6.57 7922.72 6.58 7925.45 6.58 7928.71 6.58 7931.91 6.58 7935.05 6.59 7938.73 6.59 7941.75 6.59 7945.32 6.60 7949.42 6.60 7954.66 6.60 7961.04 6.61 7966.16 6.61 7968.83 6.62 7971.43 6.62 7972.77 6.62 7974.66 6.62 7977.68 6.62 7981.24 6.63 7983.55 6.63 7986.99 6.63 7989.78 6.63 7993.70 6.64 7996.36 6.64 7998.97 6.64 8002.71 6.64 8005.80 6.65 8008.22 6.65 8011.79 6.65 8015.89 6.65 8018.74 6.66 8021.52 6.66 8024.25 6.66 8026.91 6.66 8030.72 6.67 8033.27 6.67 8035.75 6.67 8039.38 6.67 8041.74 6.68 8045.25 6.68 8048.10 6.68 8052.08 6.68 8054.81 6.69 8057.48 6.69 8060.09 6.69 8063.83 6.69 8066.32 6.70 8069.35 6.70 8071.72 6.70 8075.22 6.70 8079.27 6.71 8081.46 6.71 8084.19 6.71 8086.86 6.71 8089.47 6.72 8093.22 6.72 8095.71 6.72 8098.13 6.72 8101.70 6.73 8104.61 6.73 8106.86 6.73 8110.25 6.73 8114.18 6.74 8116.85 6.74 8119.46 6.74 8122.01 6.74 8124.50 6.74 8128.13 6.75 8130.51 6.75 8132.82 6.75 8136.27 6.75 8139.06 6.76 Area B Outflow Duration (cfs) (min) 2.61 139 2.62 140 2.65 141 2.66 142 2.68 143 2.71 144 2.72 145 2.74 146 2.76 147 2.77 148 2.80 149 2.81 150 2.82 151 2.82 152 2.82 153 2.86 154 2.92 155 2.94 156 2.98 157 2.99 158 2.99 159 3.00 160 3.04 161 3.04 162 3.07 163 3.07 164 3.11 165 3.13 166 3.13 167 3.16 168 3.19 169 3.19 170 3.20 171 3.24 172 3.26 173 3.28 174 3.30 175 3.30 176 3.34 177 3.36 178 3.36 179 3.40 180 3.40 181 3.43 182 3.43 183 3.47 184 3.49 185 3.51 186 3.51 187 3.55 188 3.56 189 3.59 190 3.59 191 3.60 192 3.65 193 3.66 194 3.68 195 3.70 196 3.70 197 3.74 198 3.76 199 3.76 200 3.79 201 3.82 202 3.82 203 3.83 204 3.87 205 3.89 206 3.91 207 3.93 208 3.93 209 3.97 210 3.99 211 3.99 212 4.02 213 4.02 214 Page 3 of 11 Inflow (cfs) 0.96 0.97 0.98 0.98 0.99 1.00 1.00 1.01 1.02 1.02 1.03 1.04 1.04 1.05 1.06 1.07 1.07 1.08 1.09 1.09 1.10 1.11 1.11 1.12 1.13 1.13 1.14 1.15 1.16 1.16 1.17 1.18 1.18 1.19 1.20 1.20 1.21 1.22 1.22 1.23 1.24 1.25 1.25 1.26 1.27 1.27 1.28 1.29 1.29 1.30 1.31 1.31 1.32 1.33 1.34 1.34 1.35 1.36 1.36 1.37 1.38 1.38 1.39 1.40 1.40 1.41 1.42 1.43 1.43 1.44 1.45 1.45 1.46 1.47 1.47 1.48 Reservoir Reservoir Storage (cf) Elevation (ft) 3110.10 6.30 3110.62 6.30 3111.56 6.30 3112.91 6.30 3114.68 6.31 3113.26 6.30 3112.26 6.30 3115.27 6.31 3115.10 6.31 3115.34 6.31 3116.00 6.31 3117.07 6.31 3118.56 6.31 3120.47 6.32 3117.99 6.31 3120.72 6.32 3119.07 6.31 3122.64 6.32 3121.82 6.32 3121.41 6.32 3121.42 6.32 3121.85 6.32 3122.69 6.32 3123.94 6.32 3125.61 6.33 3124.70 6.33 3127.20 6.33 3127.12 6.33 3127.45 6.33 3128.20 6.33 3129.36 6.33 3128.53 6.33 3130.53 6.34 3130.53 6.34 3130.96 6.34 3131.79 6.34 3131.25 6.34 3132.92 6.34 3133.20 6.34 3133.90 6.34 3133.21 6.34 3134.74 6.35 3134.88 6.35 3135.44 6.35 3136.42 6.35 3137.20 6.35 3137.21 6.35 3137.63 6.35 3138.46 6.35 3139.11 6.35 3140.18 6.36 3140.46 6.36 3141.15 6.36 3141.66 6.36 3142.59 6.36 3142.73 6.36 3143.29 6.36 3143.66 6.36 3144.44 6.37 3145.05 6.37 3145.46 6.37 3146.29 6.37 3146.94 6.37 3147.40 6.37 3148.28 6.37 3148.97 6.37 3149.48 6.38 3149.80 6.38 3150.54 6.38 3151.09 6.38 3152.06 6.38 3152.25 6.38 3152.84 6.38 3153.26 6.38 3154.09 6.38 3154.73 6.39 Outflow (cfs) 0.96 0.96 0.96 0.96 1.02 1.02 0.96 1.02 1.02 1.02 1.02 1.02 1.02 1.10 1.02 1.10 1.02 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.15 1.10 1.15 1.15 1.15 1.15 1.19 1.15 1.19 1.19 1.19 1.22 1.19 1.22 1.22 1.25 1.22 1.25 1.25 1.25 1.26 1.28 1.28 1.28 1.29 1.29 1.31 1.31 1.32 1.32 1.34 1.34 1.35 1.35 1.36 1.37 1.37 1.38 1.39 1.39 1.40 1.41 1.42 1.42 1.43 1.43 1.45 1.45 1.46 1.46 1.47 1.48 Area A Duration (min) 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 Inflow (cfs) 4.09 4.10 4.12 4.14 4.16 4.18 4.20 4.22 4.24 4.26 4.28 4.29 4.31 4.33 4.35 4.37 4.39 4.41 4.43 4.45 4.47 4.48 4.50 4.52 4.54 4.56 4.58 4.60 4.62 4.64 4.66 4.67 4.69 4.71 4.73 4.75 4.77 4.79 4.81 4.83 4.85 4.86 4.88 4.90 4.92 4.94 4.96 4.98 5.00 5.02 5.04 5.05 5.07 5.09 5.11 5.13 5.15 5.17 5.19 5.21 5.23 5.24 5.26 5.28 5.30 5.32 5.34 5.36 5.38 5.40 5.42 5.43 5.45 5.47 5.49 5.51 Reservoir Reservoir Storage (cf) Elevation (ft) 8142.99 6.76 8145.66 6.76 8148.27 6.76 8150.82 6.77 8153.32 6.77 8156.95 6.77 8159.32 6.77 8161.63 6.78 8163.89 6.78 8167.28 6.78 8171.21 6.78 8173.88 6.79 8176.50 6.79 8179.05 6.79 8181.54 6.79 8185.18 6.79 8187.55 6.80 8189.87 6.80 8192.12 6.80 8194.31 6.80 8196.45 6.80 8199.72 6.81 8203.54 6.81 8207.89 6.81 8210.39 6.82 8211.62 6.82 8214.00 6.82 8216.31 6.82 8219.77 6.82 8220.76 6.82 8222.90 6.83 8225.58 6.83 8228.79 6.83 8231.95 6.83 8236.24 6.84 8238.08 6.84 8239.86 6.84 8242.17 6.84 8244.43 6.84 8247.83 6.85 8251.16 6.85 8253.84 6.85 8255.86 6.85 8258.42 6.86 8262.12 6.86 8264.55 6.86 8266.93 6.86 8269.25 6.86 8271.51 6.87 8273.71 6.87 8276.45 6.87 8280.32 6.87 8284.14 6.88 8286.70 6.88 8289.20 6.88 8291.04 6.88 8293.42 6.88 8295.74 6.89 8299.20 6.89 8301.40 6.89 8303.54 6.89 8306.22 6.90 8310.04 6.90 8312.60 6.90 8315.10 6.90 8317.54 6.90 8319.92 6.91 8322.25 6.91 8324.51 6.91 8326.71 6.91 8330.05 6.92 8332.13 6.92 8334.75 6.92 8338.52 6.92 8340.42 6.92 8342.86 6.93 Area B Outflow Duration (cfs) (min) 4.06 215 4.08 216 4.10 217 4.12 218 4.12 219 4.16 220 4.18 221 4.20 222 4.20 223 4.21 224 4.25 225 4.27 226 4.29 227 4.31 228 4.31 229 4.35 230 4.37 231 4.39 232 4.41 233 4.43 234 4.43 235 4.44 236 4.45 237 4.50 238 4.54 239 4.54 240 4.56 241 4.56 242 4.62 243 4.62 244 4.63 245 4.64 246 4.66 247 4.66 248 4.72 249 4.74 250 4.75 251 4.77 252 4.77 253 4.79 254 4.82 255 4.85 256 4.86 257 4.86 258 4.90 259 4.92 260 4.94 261 4.96 262 4.98 263 4.99 264 4.99 265 5.01 266 5.05 267 5.07 268 5.10 269 5.11 270 5.13 271 5.13 272 5.17 273 5.19 274 5.20 275 5.20 276 5.24 277 5.26 278 5.28 279 5.30 280 5.32 281 5.34 282 5.36 283 5.36 284 5.40 285 286 5.41 287 5.41 288 5.46 5.47 289 5.49 290 Page 4 of 11 Inflow (cfs) 1.49 1.49 1.50 1.51 1.52 1.52 1.53 1.54 1.54 1.55 1.56 1.56 1.57 1.58 1.58 1.59 1.60 1.61 1.61 1.62 1.63 1.63 1.64 1.65 1.65 1.66 1.67 1.67 1.68 1.69 1.70 1.70 1.71 1.72 1.72 1.73 1.74 1.74 1.75 1.76 1.76 1.77 1.78 1.79 1.79 1.80 1.81 1.81 1.82 1.83 1.83 1.84 1.85 1.85 1.86 1.87 1.88 1.88 1.89 1.90 1.90 1.91 1.92 1.92 1.93 1.94 1.94 1.95 1.96 1.97 1.97 1.98 1.99 1.99 2.00 2.01 Reservoir Reservoir Storage (cf) Elevation (ft) 3155.19 6.39 3155.46 6.39 3156.15 6.39 3157.26 6.39 3157.58 6.39 3158.31 6.39 3158.86 6.39 3159.23 6.40 3160.01 6.40 3160.60 6.40 3161.02 6.40 3161.84 6.40 3162.48 6.40 3162.94 6.40 3163.21 6.40 3163.90 6.40 3165.00 6.41 3165.32 6.41 3166.05 6.41 3166.59 6.41 3166.96 6.41 3167.73 6.41 3168.33 6.41 3168.73 6.41 3169.56 6.42 3170.20 6.42 3170.65 6.42 3170.92 6.42 3171.60 6.42 3172.70 6.42 3173.01 6.42 3173.14 6.42 3173.69 6.42 3174.65 6.43 3174.82 6.43 3175.41 6.43 3176.42 6.43 3176.64 6.43 3177.27 6.43 3177.72 6.43 3178.59 6.43 3179.27 6.44 3179.76 6.44 3180.07 6.44 3180.80 6.44 3181.34 6.44 3181.70 6.44 3182.47 6.44 3183.06 6.44 3183.46 6.44 3184.28 6.45 3184.91 6.45 3185.36 6.45 3185.62 6.45 3186.30 6.45 3186.79 6.45 3187.10 6.45 3187.82 6.45 3188.36 6.45 3188.71 6.45 3189.48 6.46 3190.07 6.46 3190.46 6.46 3191.28 6.46 3191.91 6.46 3192.35 6.46 3192.61 6.46 3193.29 6.46 3193.78 6.47 3194.08 6.47 3194.80 6.47 3195.34 6.47 3196.29 6.47 3196.45 6.47 3197.03 6.47 3197.43 6.47 Outflow (cfs) 1.49 1.49 1.49 1.51 1.51 1.52 1.53 1.53 1.54 1.55 1.55 1.56 1.57 1.58 1.58 1.58 1.60 1.60 1.61 1.62 1.62 1.63 1.64 1.64 1.65 1.66 1.67 1.67 1.67 1.69 1.70 1.70 1.70 1.72 1.72 1.72 1.74 1.74 1.75 1.75 1.76 1.77 1.78 1.78 1.79 1.80 1.80 1.81 1.82 1.82 1.83 1.84 1.85 1.85 1.86 1.87 1.87 1.88 1.89 1.89 1.90 1.91 1.91 1.92 1.93 1.94 1.94 1.95 1.96 1.96 1.97 1.97 1.99 1.99 2.00 2.00 Area A Duration (min) 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 Inflow (cfs) 5.53 5.55 5.57 5.59 5.61 5.62 5.64 5.66 5.68 5.70 5.72 5.74 5.76 5.78 5.80 5.81 5.83 5.85 5.87 5.89 5.91 5.93 5.95 5.97 5.99 6.00 6.02 6.04 6.06 6.08 6.10 6.12 6.14 6.16 6.18 6.19 6.21 6.23 6.25 6.27 6.29 6.31 6.33 6.35 6.37 6.38 6.40 6.42 6.44 6.46 6.48 6.50 6.52 6.54 6.56 6.57 6.59 6.61 6.63 6.65 6.67 6.69 6.71 6.73 6.75 6.76 6.78 6.80 6.82 6.84 6.86 6.88 6.90 6.92 6.94 6.95 Reservoir Reservoir Storage (cf) Elevation (ft) 8345.24 6.93 8347.56 6.93 8351.03 6.93 8353.23 6.93 8355.37 6.94 8357.46 6.94 8360.08 6.94 8363.84 6.94 8367.55 6.95 8368.79 6.95 8370.58 6.95 8373.50 6.95 8375.76 6.95 8377.97 6.95 8381.31 6.96 8383.40 6.96 8386.62 6.96 8388.59 6.96 8391.09 6.97 8394.74 6.97 8396.52 6.97 8398.85 6.97 8401.11 6.97 8403.32 6.98 8406.67 6.98 8408.75 6.98 8411.38 6.98 8413.34 6.98 8415.85 6.99 8419.50 6.99 8421.28 6.99 8423.61 6.99 8425.88 6.99 8429.29 7.00 8431.43 7.00 8433.52 7.00 8436.75 7.00 8439.32 7.01 8441.82 7.01 8443.67 7.01 8446.06 7.01 8448.39 7.01 8450.66 7.02 8452.87 7.02 8455.02 7.02 8458.31 7.02 8460.33 7.02 8463.50 7.03 8466.01 7.03 8468.46 7.03 8470.25 7.03 8472.58 7.03 8476.05 7.04 8478.26 7.04 8480.41 7.04 8482.50 7.04 8484.53 7.04 8486.51 7.05 8489.62 7.05 8491.47 7.05 8493.86 7.05 8497.39 7.05 8499.66 7.06 8501.87 7.06 8505.22 7.06 8507.32 7.06 8509.35 7.06 8511.32 7.07 8514.43 7.07 8516.89 7.07 8519.28 7.07 8522.81 7.08 8525.08 7.08 8527.30 7.08 8529.45 7.08 8531.54 7.08 Area B Outflow Duration (cfs) (min) 5.51 291 5.51 292 5.55 293 5.57 294 5.59 295 5.60 296 5.60 297 5.62 298 5.68 299 5.69 300 5.69 301 5.72 302 5.74 303 5.74 304 5.78 305 5.78 306 5.82 307 5.83 308 5.83 309 5.88 310 5.89 311 5.91 312 5.93 313 5.93 314 5.97 315 5.98 316 6.01 317 6.02 318 6.02 319 6.07 320 6.08 321 6.10 322 6.10 323 6.14 324 6.16 325 6.16 326 6.19 327 6.21 328 6.24 329 6.25 330 6.27 331 6.29 332 6.31 333 6.33 334 6.33 335 6.37 336 6.37 337 6.40 338 6.42 339 6.45 340 6.46 341 6.46 342 6.50 343 6.52 344 6.54 345 6.56 346 6.58 347 6.58 348 6.62 349 6.63 350 6.63 351 6.67 352 6.69 353 6.69 354 6.73 355 6.75 356 6.77 357 6.77 358 6.80 359 6.82 360 6.82 361 362 6.86 363 6.88 364 6.90 365 6.92 366 6.94 Page 5 of 11 Inflow (cfs) 2.01 2.02 2.03 2.03 2.04 2.05 2.06 2.06 2.07 2.08 2.08 2.09 2.10 2.10 2.11 2.12 2.12 2.13 2.14 2.14 2.15 2.16 2.17 2.17 2.18 2.19 2.19 2.20 2.21 2.21 2.22 2.23 2.23 2.24 2.25 2.26 2.26 2.27 2.28 2.28 2.29 2.30 2.30 2.31 2.32 2.32 2.33 2.34 2.35 2.35 2.36 2.37 2.37 2.38 2.39 2.39 2.40 2.41 2.41 2.42 2.43 2.44 2.44 2.45 2.46 2.46 2.47 2.48 2.48 2.49 2.50 2.50 2.51 2.52 2.53 2.53 Reservoir Reservoir Storage (cf) Elevation (ft) 3198.24 6.47 3198.87 6.48 3199.31 6.48 3199.57 6.48 3200.24 6.48 3200.73 6.48 3201.63 6.48 3201.75 6.48 3202.28 6.48 3203.23 6.48 3203.39 6.48 3203.97 6.49 3204.96 6.49 3205.17 6.49 3205.79 6.49 3206.23 6.49 3207.08 6.49 3207.15 6.49 3207.64 6.49 3208.54 6.50 3208.65 6.50 3209.18 6.50 3210.12 6.50 3210.28 6.50 3210.86 6.50 3211.85 6.50 3212.06 6.50 3212.68 6.50 3213.11 6.50 3213.36 6.50 3214.03 6.51 3214.51 6.51 3215.41 6.51 3215.52 6.51 3216.04 6.51 3216.99 6.51 3217.14 6.51 3217.71 6.51 3218.70 6.52 3218.90 6.52 3218.92 6.52 3219.36 6.52 3220.20 6.52 3220.87 6.52 3221.34 6.52 3221.64 6.52 3221.75 6.52 3222.27 6.52 3223.21 6.52 3223.36 6.53 3223.93 6.53 3224.92 6.53 3225.12 6.53 3225.73 6.53 3226.16 6.53 3227.01 6.53 3227.07 6.53 3227.54 6.53 3228.43 6.54 3229.14 6.54 3229.66 6.54 3229.99 6.54 3230.74 6.54 3230.71 6.54 3231.09 6.54 3231.89 6.54 3232.50 6.54 3233.53 6.55 3233.77 6.55 3233.83 6.55 3234.30 6.55 3234.59 6.55 3235.29 6.55 3235.81 6.55 3236.74 6.55 3236.89 6.55 Outflow (cfs) 2.01 2.02 2.03 2.03 2.04 2.04 2.06 2.06 2.06 2.08 2.08 2.08 2.10 2.10 2.11 2.11 2.13 2.13 2.13 2.15 2.15 2.15 2.17 2.17 2.17 2.19 2.19 2.20 2.21 2.21 2.22 2.22 2.24 2.24 2.24 2.26 2.26 2.26 2.28 2.29 2.29 2.29 2.30 2.31 2.32 2.33 2.33 2.33 2.35 2.35 2.35 2.37 2.37 2.38 2.38 2.40 2.40 2.40 2.41 2.42 2.43 2.43 2.45 2.45 2.45 2.46 2.46 2.48 2.49 2.49 2.50 2.50 2.51 2.51 2.53 2.53 Area A Duration (min) 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 Inflow (cfs) 6.97 6.99 7.01 7.03 7.05 7.07 7.09 7.11 7.13 7.14 7.16 7.18 7.20 7.22 7.24 7.26 7.28 7.30 7.32 7.33 7.35 7.37 7.39 7.41 7.43 7.45 7.47 7.49 7.51 7.52 7.54 7.56 7.58 7.60 7.62 7.64 7.66 7.68 7.70 7.71 7.73 7.75 7.77 7.79 7.81 7.79 7.77 7.75 7.73 7.71 7.70 7.68 7.66 7.64 7.62 7.60 7.58 7.56 7.54 7.52 7.51 7.49 7.47 7.45 7.43 7.41 7.39 7.37 7.35 7.33 7.32 7.30 7.28 7.26 7.24 7.22 Reservoir Reservoir Storage (cf) Elevation (ft) 8533.58 7.08 8535.55 7.09 8537.47 7.09 8539.92 7.09 8542.31 7.09 8544.05 7.09 8546.92 7.10 8550.34 7.10 8552.49 7.10 8554.59 7.10 8556.62 7.10 8558.60 7.10 8560.51 7.11 8563.57 7.11 8565.96 7.11 8568.30 7.11 8571.78 7.12 8573.99 7.12 8576.15 7.12 8578.24 7.12 8580.28 7.12 8582.26 7.12 8585.37 7.13 8587.23 7.13 8589.63 7.13 8591.96 7.13 8595.44 7.14 8598.86 7.14 8599.22 7.14 8600.72 7.14 8603.35 7.14 8605.33 7.14 8607.25 7.15 8609.11 7.15 8612.11 7.15 8615.65 7.15 8617.92 7.15 8620.14 7.16 8622.30 7.16 8624.40 7.16 8626.44 7.16 8628.42 7.16 8631.54 7.17 8633.40 7.17 8635.80 7.17 8635.86 7.17 8634.78 7.17 8633.76 7.17 8631.60 7.17 8628.90 7.16 8626.26 7.16 8623.68 7.16 8622.35 7.16 8619.89 7.16 8617.49 7.15 8615.15 7.15 8612.87 7.15 8610.65 7.15 8608.48 7.15 8605.78 7.14 8603.14 7.14 8600.56 7.14 8598.64 7.14 8595.57 7.14 8595.57 7.14 8594.43 7.13 8592.14 7.13 8588.72 7.13 8586.56 7.13 8583.25 7.13 8580.61 7.12 8578.02 7.12 8575.50 7.12 8573.04 7.12 8571.83 7.12 8569.49 7.11 Area B Outflow Duration (cfs) (min) 6.96 367 6.98 368 6.99 369 7.01 370 7.04 371 7.04 372 7.05 373 7.09 374 7.11 375 7.13 376 7.15 377 7.17 378 7.17 379 7.20 380 7.22 381 7.22 382 7.26 383 7.28 384 7.30 385 7.32 386 7.34 387 7.34 388 7.38 389 7.39 390 7.41 391 7.41 392 7.43 393 7.50 394 7.50 395 7.50 396 7.53 397 7.55 398 7.57 399 7.57 400 7.58 401 7.62 402 7.64 403 7.66 404 7.68 405 7.70 406 7.72 407 7.72 408 7.76 409 7.77 410 7.79 411 7.79 412 7.77 413 7.77 414 7.76 415 7.74 416 7.72 417 7.68 418 7.68 419 7.66 420 7.64 421 7.62 422 7.60 423 7.58 424 7.57 425 7.55 426 7.53 427 7.50 428 7.50 429 7.43 430 7.43 431 7.43 432 7.43 433 7.39 434 7.39 435 7.36 436 7.34 437 7.32 438 7.30 439 7.26 440 7.26 441 7.24 442 Page 6 of 11 Inflow (cfs) 2.54 2.55 2.55 2.56 2.57 2.57 2.58 2.59 2.59 2.60 2.61 2.62 2.62 2.63 2.64 2.64 2.65 2.66 2.66 2.67 2.68 2.68 2.69 2.70 2.71 2.71 2.72 2.73 2.73 2.74 2.75 2.75 2.76 2.77 2.77 2.78 2.79 2.80 2.80 2.81 2.82 2.82 2.83 2.82 2.82 2.81 2.80 2.80 2.79 2.78 2.77 2.77 2.76 2.75 2.75 2.74 2.73 2.73 2.72 2.71 2.71 2.70 2.69 2.68 2.68 2.67 2.66 2.66 2.65 2.64 2.64 2.63 2.62 2.62 2.61 2.60 Reservoir Reservoir Storage (cf) Elevation (ft) 3237.45 6.55 3238.43 6.56 3238.02 6.55 3239.23 6.56 3239.66 6.56 3239.90 6.56 3240.55 6.56 3241.02 6.56 3241.30 6.56 3242.00 6.56 3241.92 6.56 3242.25 6.56 3242.99 6.56 3243.55 6.57 3244.53 6.57 3244.72 6.57 3245.33 6.57 3245.75 6.57 3246.58 6.57 3246.64 6.57 3247.10 6.57 3247.98 6.57 3248.08 6.58 3248.59 6.58 3249.52 6.58 3249.66 6.58 3250.22 6.58 3250.59 6.58 3251.38 6.58 3251.38 6.58 3251.80 6.58 3252.63 6.58 3253.28 6.59 3253.15 6.59 3254.02 6.59 3254.72 6.59 3254.63 6.59 3254.95 6.59 3255.69 6.59 3256.25 6.59 3256.62 6.59 3257.40 6.59 3258.00 6.60 3258.18 6.60 3257.95 6.60 3257.31 6.59 3256.25 6.59 3255.37 6.59 3255.28 6.59 3254.78 6.59 3253.85 6.59 3253.72 6.59 3253.17 6.59 3252.80 6.58 3252.02 6.58 3252.02 6.58 3251.61 6.58 3250.78 6.58 3250.14 6.58 3249.68 6.58 3249.41 6.58 3248.72 6.58 3248.82 6.58 3248.50 6.58 3247.76 6.57 3246.62 6.57 3246.25 6.57 3246.07 6.57 3245.48 6.57 3245.07 6.57 3244.25 6.57 3244.21 6.57 3243.75 6.57 3242.88 6.56 3242.20 6.56 3241.70 6.56 Outflow (cfs) 2.53 2.56 2.54 2.56 2.57 2.57 2.58 2.59 2.59 2.61 2.61 2.61 2.62 2.62 2.64 2.64 2.65 2.65 2.67 2.67 2.67 2.69 2.69 2.69 2.71 2.71 2.72 2.72 2.74 2.74 2.74 2.75 2.77 2.76 2.77 2.79 2.79 2.79 2.80 2.81 2.81 2.82 2.82 2.82 2.82 2.82 2.81 2.79 2.79 2.79 2.77 2.77 2.76 2.76 2.74 2.74 2.74 2.73 2.72 2.71 2.71 2.69 2.69 2.69 2.69 2.67 2.66 2.66 2.65 2.65 2.63 2.63 2.63 2.62 2.61 2.60 Area A Duration (min) 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 Inflow (cfs) 7.20 7.18 7.16 7.14 7.13 7.11 7.09 7.07 7.05 7.03 7.01 6.99 6.97 6.95 6.94 6.92 6.90 6.88 6.86 6.84 6.82 6.80 6.78 6.76 6.75 6.73 6.71 6.69 6.67 6.65 6.63 6.61 6.59 6.57 6.56 6.54 6.52 6.50 6.48 6.46 6.44 6.42 6.40 6.38 6.37 6.35 6.33 6.31 6.29 6.27 6.25 6.23 6.21 6.19 6.18 6.16 6.14 6.12 6.10 6.08 6.06 6.04 6.02 6.00 5.99 5.97 5.95 5.93 5.91 5.89 5.87 5.85 5.83 5.81 5.80 5.78 Reservoir Reservoir Storage (cf) Elevation (ft) 8567.20 7.11 8564.98 7.11 8562.81 7.11 8559.51 7.11 8556.86 7.10 8554.28 7.10 8551.75 7.10 8550.49 7.10 8548.08 7.10 8545.73 7.09 8543.45 7.09 8540.62 7.09 8538.46 7.09 8536.35 7.09 8533.70 7.08 8531.12 7.08 8528.59 7.08 8526.12 7.08 8523.71 7.08 8521.37 7.07 8519.08 7.07 8518.05 7.07 8515.88 7.07 8512.58 7.07 8509.93 7.06 8507.34 7.06 8504.81 7.06 8502.34 7.06 8501.13 7.06 8498.78 7.06 8496.49 7.05 8494.27 7.05 8492.10 7.05 8488.79 7.05 8486.74 7.05 8484.15 7.04 8481.62 7.04 8479.15 7.04 8476.74 7.04 8474.39 7.04 8472.10 7.03 8469.87 7.03 8466.49 7.03 8464.38 7.03 8462.33 7.03 8459.74 7.02 8457.21 7.02 8454.74 7.02 8452.33 7.02 8449.98 7.01 8447.68 7.01 8444.25 7.01 8442.08 7.01 8439.37 7.01 8437.31 7.00 8435.32 7.00 8432.19 7.00 8429.72 7.00 8427.30 7.00 8424.95 6.99 8422.66 6.99 8420.42 6.99 8417.65 6.99 8415.53 6.99 8413.48 6.98 8410.29 6.98 8408.35 6.98 8405.28 6.98 8402.86 6.98 8400.51 6.97 8398.21 6.97 8395.98 6.97 8392.60 6.97 8390.49 6.97 8388.43 6.96 8385.24 6.96 Area B Outflow Duration (cfs) (min) 7.22 443 7.20 444 7.20 445 7.17 446 7.15 447 7.13 448 7.09 449 7.09 450 7.07 451 7.05 452 7.04 453 7.01 454 6.99 455 6.98 456 6.96 457 6.94 458 6.92 459 6.90 460 6.88 461 6.86 462 6.82 463 6.82 464 6.82 465 6.79 466 6.77 467 6.75 468 6.73 469 6.69 470 6.69 471 6.67 472 6.65 473 6.63 474 6.63 475 6.59 476 6.58 477 6.56 478 6.54 479 6.52 480 6.50 481 6.48 482 6.46 483 6.46 484 6.42 485 6.40 486 6.39 487 6.37 488 6.35 489 6.33 490 6.31 491 6.29 492 6.29 493 6.25 494 6.24 495 6.21 496 6.19 497 6.19 498 6.16 499 6.14 500 6.12 501 6.10 502 6.08 503 6.07 504 6.04 505 6.02 506 6.02 507 5.98 508 5.98 509 5.95 510 5.93 511 5.91 512 5.89 513 514 5.89 515 5.85 516 5.83 5.83 517 5.79 518 Page 7 of 11 Inflow (cfs) 2.59 2.59 2.58 2.57 2.57 2.56 2.55 2.55 2.54 2.53 2.53 2.52 2.51 2.50 2.50 2.49 2.48 2.48 2.47 2.46 2.46 2.45 2.44 2.44 2.43 2.42 2.41 2.41 2.40 2.39 2.39 2.38 2.37 2.37 2.36 2.35 2.35 2.34 2.33 2.32 2.32 2.31 2.30 2.30 2.29 2.28 2.28 2.27 2.26 2.26 2.25 2.24 2.23 2.23 2.22 2.21 2.21 2.20 2.19 2.19 2.18 2.17 2.17 2.16 2.15 2.14 2.14 2.13 2.12 2.12 2.11 2.10 2.10 2.09 2.08 2.08 Reservoir Reservoir Storage (cf) Elevation (ft) 3241.38 6.56 3241.25 6.56 3240.70 6.56 3240.34 6.56 3239.57 6.56 3238.98 6.56 3238.57 6.56 3237.75 6.55 3237.71 6.55 3237.26 6.55 3236.99 6.55 3236.31 6.55 3235.81 6.55 3235.50 6.55 3234.77 6.55 3234.23 6.55 3233.27 6.55 3233.10 6.54 3232.51 6.54 3232.71 6.54 3231.89 6.54 3231.26 6.54 3230.81 6.54 3229.94 6.54 3229.86 6.54 3229.37 6.54 3229.06 6.54 3228.33 6.54 3227.79 6.53 3227.44 6.53 3226.67 6.53 3226.08 6.53 3225.68 6.53 3224.87 6.53 3224.24 6.53 3223.79 6.53 3223.53 6.53 3222.85 6.52 3222.36 6.52 3222.06 6.52 3221.33 6.52 3220.80 6.52 3220.44 6.52 3219.68 6.52 3219.70 6.52 3219.30 6.52 3218.49 6.52 3217.86 6.51 3217.41 6.51 3217.16 6.51 3216.48 6.51 3215.99 6.51 3215.69 6.51 3214.97 6.51 3214.44 6.51 3214.09 6.51 3213.32 6.50 3212.74 6.50 3212.35 6.50 3211.54 6.50 3211.52 6.50 3211.08 6.50 3210.22 6.50 3209.55 6.50 3209.06 6.50 3208.76 6.50 3208.05 6.49 3207.52 6.49 3207.17 6.49 3206.41 6.49 3205.83 6.49 3205.44 6.49 3205.23 6.49 3204.61 6.49 3203.57 6.48 3203.32 6.48 Outflow (cfs) 2.59 2.59 2.58 2.58 2.57 2.56 2.56 2.54 2.54 2.53 2.53 2.52 2.51 2.51 2.50 2.50 2.48 2.48 2.46 2.47 2.46 2.45 2.45 2.43 2.43 2.42 2.42 2.41 2.40 2.40 2.39 2.38 2.38 2.37 2.36 2.35 2.35 2.34 2.33 2.33 2.32 2.31 2.31 2.29 2.29 2.29 2.28 2.27 2.26 2.26 2.25 2.24 2.24 2.23 2.22 2.22 2.21 2.20 2.20 2.18 2.18 2.18 2.17 2.16 2.15 2.15 2.14 2.13 2.13 2.12 2.11 2.10 2.10 2.10 2.08 2.08 Area A Duration (min) 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 Inflow (cfs) 5.76 5.74 5.72 5.70 5.68 5.66 5.64 5.62 5.61 5.59 5.57 5.55 5.53 5.51 5.49 5.47 5.45 5.43 5.42 5.40 5.38 5.36 5.34 5.32 5.30 5.28 5.26 5.24 5.23 5.21 5.19 5.17 5.15 5.13 5.11 5.09 5.07 5.05 5.04 5.02 5.00 4.98 4.96 4.94 4.92 4.90 4.88 4.86 4.85 4.83 4.81 4.79 4.77 4.75 4.73 4.71 4.69 4.67 4.66 4.64 4.62 4.60 4.58 4.56 4.54 4.52 4.50 4.48 4.47 4.45 4.43 4.41 4.39 4.37 4.35 4.33 Reservoir Reservoir Storage (cf) Elevation (ft) 8383.30 6.96 8380.82 6.96 8378.41 6.96 8376.05 6.95 8372.56 6.95 8370.32 6.95 8367.54 6.95 8364.23 6.94 8363.37 6.94 8361.37 6.94 8358.24 6.94 8355.16 6.94 8351.54 6.93 8349.18 6.93 8346.88 6.93 8344.65 6.93 8341.27 6.92 8339.15 6.92 8336.49 6.92 8334.49 6.92 8332.55 6.92 8329.48 6.91 8327.06 6.91 8323.50 6.91 8321.20 6.91 8318.96 6.91 8316.78 6.90 8313.46 6.90 8311.40 6.90 8309.40 6.90 8306.26 6.90 8304.38 6.89 8301.36 6.89 8297.80 6.89 8295.50 6.89 8293.26 6.88 8289.88 6.88 8287.15 6.88 8285.09 6.88 8283.09 6.88 8279.95 6.87 8278.07 6.87 8275.05 6.87 8272.08 6.87 8268.58 6.86 8266.34 6.86 8264.16 6.86 8260.84 6.86 8257.57 6.86 8255.57 6.85 8252.43 6.85 8250.54 6.85 8247.52 6.85 8245.16 6.84 8242.85 6.84 8239.41 6.84 8236.62 6.84 8233.90 6.84 8232.44 6.83 8231.03 6.83 8228.49 6.83 8226.00 6.83 8222.38 6.83 8218.21 6.82 8215.91 6.82 8213.66 6.82 8210.28 6.82 8206.95 6.81 8204.89 6.81 8202.88 6.81 8201.53 6.81 8199.05 6.81 8196.02 6.80 8192.46 6.80 8188.95 6.80 8186.70 6.80 Area B Outflow Duration (cfs) (min) 5.78 519 5.76 520 5.74 521 5.74 522 5.70 523 5.69 524 5.68 525 5.62 526 5.62 527 5.62 528 5.60 529 5.59 530 5.55 531 5.53 532 5.51 533 5.51 534 5.47 535 5.46 536 5.43 537 5.41 538 5.41 539 5.38 540 5.38 541 5.34 542 5.32 543 5.30 544 5.30 545 5.26 546 5.24 547 5.24 548 5.20 549 5.20 550 5.19 551 5.15 552 5.13 553 5.13 554 5.10 555 5.07 556 5.05 557 5.05 558 5.01 559 5.01 560 4.99 561 4.98 562 4.94 563 4.92 564 4.92 565 4.90 566 4.86 567 4.86 568 4.82 569 4.82 570 4.79 571 4.77 572 4.77 573 4.74 574 4.72 575 4.68 576 4.66 577 4.66 578 4.64 579 4.64 580 4.63 581 4.58 582 4.56 583 4.56 584 4.54 585 4.50 586 4.48 587 4.45 588 4.45 589 590 4.44 591 4.43 592 4.41 593 4.37 594 4.35 Page 8 of 11 Inflow (cfs) 2.07 2.06 2.06 2.05 2.04 2.03 2.03 2.02 2.01 2.01 2.00 1.99 1.99 1.98 1.97 1.97 1.96 1.95 1.94 1.94 1.93 1.92 1.92 1.91 1.90 1.90 1.89 1.88 1.88 1.87 1.86 1.85 1.85 1.84 1.83 1.83 1.82 1.81 1.81 1.80 1.79 1.79 1.78 1.77 1.76 1.76 1.75 1.74 1.74 1.73 1.72 1.72 1.71 1.70 1.70 1.69 1.68 1.67 1.67 1.66 1.65 1.65 1.64 1.63 1.63 1.62 1.61 1.61 1.60 1.59 1.58 1.58 1.57 1.56 1.56 1.55 Reservoir Reservoir Storage (cf) Elevation (ft) 3202.65 6.48 3202.17 6.48 3201.87 6.48 3201.16 6.48 3200.63 6.48 3200.29 6.48 3199.53 6.48 3198.96 6.48 3198.57 6.47 3198.37 6.47 3197.75 6.47 3196.71 6.47 3196.46 6.47 3195.80 6.47 3195.32 6.47 3195.02 6.47 3194.31 6.47 3193.19 6.46 3192.85 6.46 3192.09 6.46 3192.12 6.46 3191.74 6.46 3190.93 6.46 3190.32 6.46 3189.89 6.46 3189.64 6.46 3188.98 6.46 3187.90 6.45 3187.61 6.45 3186.90 6.45 3186.38 6.45 3186.04 6.45 3185.29 6.45 3184.72 6.45 3184.34 6.45 3184.14 6.45 3183.53 6.44 3182.50 6.44 3182.26 6.44 3181.60 6.44 3181.13 6.44 3180.84 6.44 3180.13 6.44 3179.61 6.44 3179.28 6.44 3178.53 6.43 3177.96 6.43 3176.98 6.43 3176.79 6.43 3176.18 6.43 3175.15 6.43 3174.91 6.43 3174.26 6.43 3173.79 6.42 3173.50 6.42 3172.80 6.42 3172.28 6.42 3171.95 6.42 3171.20 6.42 3170.64 6.42 3169.67 6.42 3169.47 6.42 3168.87 6.41 3167.84 6.41 3167.61 6.41 3166.95 6.41 3166.48 6.41 3166.20 6.41 3165.50 6.41 3164.99 6.41 3164.06 6.40 3163.32 6.40 3162.76 6.40 3162.38 6.40 3161.60 6.40 3160.99 6.40 Outflow (cfs) 2.07 2.06 2.06 2.05 2.04 2.04 2.03 2.02 2.01 2.01 2.01 1.99 1.99 1.98 1.97 1.97 1.97 1.95 1.95 1.93 1.93 1.93 1.92 1.91 1.90 1.90 1.90 1.88 1.88 1.87 1.86 1.86 1.85 1.84 1.83 1.83 1.83 1.81 1.81 1.80 1.79 1.79 1.78 1.77 1.77 1.76 1.76 1.74 1.74 1.74 1.72 1.72 1.71 1.70 1.70 1.69 1.68 1.68 1.67 1.67 1.65 1.65 1.65 1.63 1.63 1.62 1.61 1.61 1.60 1.60 1.59 1.58 1.57 1.57 1.56 1.55 Area A Duration (min) 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 Inflow (cfs) 4.31 4.29 4.28 4.26 4.24 4.22 4.20 4.18 4.16 4.14 4.12 4.10 4.09 4.07 4.05 4.03 4.01 3.99 3.97 3.95 3.93 3.91 3.90 3.88 3.86 3.84 3.82 3.80 3.78 3.76 3.74 3.72 3.71 3.69 3.67 3.65 3.63 3.61 3.59 3.57 3.55 3.53 3.52 3.50 3.48 3.46 3.44 3.42 3.40 3.38 3.36 3.34 3.33 3.31 3.29 3.27 3.25 3.23 3.21 3.19 3.17 3.15 3.14 3.12 3.10 3.08 3.06 3.04 3.02 3.00 2.98 2.96 2.95 2.93 2.91 2.89 Reservoir Reservoir Storage (cf) Elevation (ft) 8184.52 6.79 8181.19 6.79 8179.12 6.79 8175.91 6.79 8173.97 6.79 8170.88 6.78 8167.85 6.78 8164.88 6.78 8161.98 6.78 8158.53 6.77 8156.34 6.77 8153.01 6.77 8150.94 6.77 8147.73 6.76 8145.78 6.76 8142.69 6.76 8139.67 6.76 8136.70 6.75 8133.79 6.75 8130.94 6.75 8127.55 6.75 8124.22 6.74 8122.15 6.74 8118.94 6.74 8116.99 6.74 8113.90 6.74 8110.87 6.73 8107.89 6.73 8104.98 6.73 8101.53 6.73 8099.94 6.72 8097.21 6.72 8093.94 6.72 8090.73 6.72 8087.58 6.71 8084.48 6.71 8081.45 6.71 8078.48 6.71 8074.97 6.70 8073.31 6.70 8070.52 6.70 8067.19 6.70 8064.52 6.69 8061.30 6.69 8058.15 6.69 8055.06 6.69 8052.02 6.68 8049.05 6.68 8046.13 6.68 8043.28 6.68 8040.49 6.67 8037.15 6.67 8034.48 6.67 8031.26 6.67 8028.11 6.66 8025.01 6.66 8021.98 6.66 8019.00 6.66 8016.09 6.65 8013.23 6.65 8010.44 6.65 8007.70 6.65 8004.42 6.64 8001.81 6.64 7999.25 6.64 7995.56 6.64 7992.52 6.63 7989.54 6.63 7986.63 6.63 7983.77 6.63 7979.77 6.62 7976.44 6.62 7973.16 6.62 7969.34 6.62 7966.18 6.61 7964.28 6.61 Area B Outflow Duration (cfs) (min) 4.35 595 4.31 596 4.31 597 4.27 598 4.27 599 4.25 600 4.23 601 4.21 602 4.20 603 4.16 604 4.16 605 4.12 606 4.12 607 4.08 608 4.08 609 4.06 610 4.04 611 4.02 612 4.00 613 3.99 614 3.97 615 3.93 616 3.93 617 3.89 618 3.89 619 3.87 620 3.85 621 3.83 622 3.82 623 3.77 624 3.77 625 3.76 626 3.74 627 3.72 628 3.70 629 3.68 630 3.66 631 3.65 632 3.60 633 3.60 634 3.59 635 3.56 636 3.55 637 3.53 638 3.51 639 3.49 640 3.47 641 3.45 642 3.43 643 3.41 644 3.40 645 3.37 646 3.36 647 3.34 648 3.32 649 3.30 650 3.28 651 3.26 652 3.24 653 3.22 654 3.20 655 3.19 656 3.16 657 3.14 658 3.14 659 3.11 660 3.09 661 3.07 662 3.05 663 3.05 664 3.02 665 3.00 666 2.99 667 2.96 668 2.92 669 2.90 670 Page 9 of 11 Inflow (cfs) 1.54 1.54 1.53 1.52 1.52 1.51 1.50 1.49 1.49 1.48 1.47 1.47 1.46 1.45 1.45 1.44 1.43 1.43 1.42 1.41 1.40 1.40 1.39 1.38 1.38 1.37 1.36 1.36 1.35 1.34 1.34 1.33 1.32 1.31 1.31 1.30 1.29 1.29 1.28 1.27 1.27 1.26 1.25 1.25 1.24 1.23 1.22 1.22 1.21 1.20 1.20 1.19 1.18 1.18 1.17 1.16 1.16 1.15 1.14 1.13 1.13 1.12 1.11 1.11 1.10 1.09 1.09 1.08 1.07 1.07 1.06 1.05 1.04 1.04 1.03 1.02 Reservoir Reservoir Storage (cf) Elevation (ft) 3160.57 6.40 3159.74 6.40 3159.09 6.39 3158.62 6.39 3158.34 6.39 3157.65 6.39 3157.14 6.39 3156.21 6.39 3156.07 6.39 3155.51 6.39 3154.54 6.39 3154.36 6.39 3153.75 6.38 3152.74 6.38 3152.51 6.38 3151.86 6.38 3150.80 6.38 3150.52 6.38 3150.43 6.38 3149.92 6.38 3149.00 6.37 3148.26 6.37 3147.71 6.37 3146.74 6.37 3146.55 6.37 3145.96 6.37 3145.54 6.37 3144.71 6.37 3144.07 6.36 3143.01 6.36 3142.74 6.36 3142.05 6.36 3141.54 6.36 3141.22 6.36 3140.49 6.36 3139.94 6.36 3139.57 6.36 3138.79 6.35 3138.20 6.35 3137.18 6.35 3136.36 6.35 3136.32 6.35 3135.86 6.35 3134.99 6.35 3134.30 6.34 3133.20 6.34 3133.48 6.34 3133.35 6.34 3132.81 6.34 3131.84 6.34 3130.47 6.34 3130.47 6.34 3130.07 6.34 3129.24 6.33 3128.00 6.33 3128.75 6.33 3129.08 6.33 3126.60 6.33 3126.10 6.33 3125.19 6.33 3123.86 6.32 3125.11 6.33 3122.95 6.32 3123.38 6.32 3123.39 6.32 3122.98 6.32 3122.16 6.32 3120.93 6.32 3119.28 6.31 3122.01 6.32 3119.53 6.31 3121.44 6.32 3118.13 6.31 3119.20 6.31 3119.86 6.32 3120.10 6.32 Outflow (cfs) 1.55 1.54 1.53 1.52 1.52 1.51 1.51 1.49 1.49 1.49 1.47 1.47 1.47 1.45 1.45 1.45 1.43 1.42 1.42 1.42 1.41 1.40 1.40 1.38 1.38 1.37 1.37 1.36 1.36 1.34 1.34 1.33 1.32 1.32 1.31 1.30 1.30 1.29 1.29 1.28 1.26 1.26 1.26 1.25 1.25 1.22 1.22 1.22 1.22 1.22 1.19 1.19 1.19 1.19 1.15 1.15 1.19 1.15 1.15 1.15 1.10 1.15 1.10 1.10 1.10 1.10 1.10 1.10 1.02 1.10 1.02 1.10 1.02 1.02 1.02 1.10 Area A Duration (min) 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 Inflow (cfs) 2.87 2.85 2.83 2.81 2.79 2.77 2.76 2.74 2.72 2.70 2.68 2.66 2.64 2.62 2.60 2.58 2.57 2.55 2.53 2.51 2.49 2.47 2.45 2.43 2.41 2.39 2.38 2.36 2.34 2.32 2.30 2.28 2.26 2.24 2.22 2.20 2.19 2.17 2.15 2.13 2.11 2.09 2.07 2.05 2.03 2.01 2.00 1.98 1.96 1.94 1.92 1.90 1.88 1.86 1.84 1.82 1.81 1.79 1.77 1.75 1.73 1.71 1.69 1.67 1.65 1.63 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 1.46 1.44 Reservoir Reservoir Storage (cf) Elevation (ft) 7962.45 6.61 7960.67 6.61 7958.95 6.61 7956.69 6.61 7955.09 6.60 7952.35 6.60 7948.48 6.60 7943.46 6.59 7937.30 6.59 7931.80 6.58 7926.96 6.58 7922.78 6.58 7918.66 6.57 7915.20 6.57 7911.80 6.57 7908.46 6.57 7905.18 6.56 7901.96 6.56 7898.80 6.56 7895.70 6.55 7892.66 6.55 7889.08 6.55 7885.55 6.55 7882.09 6.54 7879.29 6.54 7875.95 6.54 7872.67 6.54 7868.85 6.53 7865.08 6.53 7861.38 6.53 7858.34 6.52 7855.36 6.52 7851.84 6.52 7848.37 6.52 7844.97 6.51 7841.63 6.51 7838.34 6.51 7835.12 6.50 7831.36 6.50 7827.65 6.50 7824.01 6.50 7820.42 6.49 7816.90 6.49 7814.04 6.49 7810.63 6.48 7806.69 6.48 7802.80 6.48 7798.98 6.47 7795.81 6.47 7792.11 6.47 7788.46 6.47 7784.88 6.46 7781.35 6.46 7777.89 6.46 7774.48 6.45 7771.13 6.45 7767.25 6.45 7763.42 6.44 7759.66 6.44 7755.95 6.44 7752.30 6.44 7748.72 6.43 7745.19 6.43 7741.12 6.43 7737.11 6.42 7733.17 6.42 7729.88 6.42 7726.05 6.41 7722.28 6.41 7718.58 6.41 7714.93 6.40 7711.34 6.40 7707.21 6.40 7703.14 6.39 7699.13 6.39 7695.18 6.39 Area B Outflow Duration (cfs) (min) 2.88 671 2.86 672 2.85 673 2.82 674 2.82 675 2.82 676 2.82 677 2.82 678 2.79 679 2.76 680 2.73 681 2.71 682 2.68 683 2.66 684 2.64 685 2.62 686 2.60 687 2.58 688 2.56 689 2.54 690 2.53 691 2.51 692 2.49 693 2.46 694 2.45 695 2.43 696 2.42 697 2.40 698 2.38 699 2.35 700 2.33 701 2.32 702 2.30 703 2.28 704 2.26 705 2.24 706 2.22 707 2.21 708 2.19 709 2.17 710 2.15 711 2.13 712 2.10 713 2.09 714 2.08 715 2.06 716 2.04 717 2.01 718 2.00 719 1.98 720 1.96 721 1.94 722 1.92 723 1.90 724 1.88 725 1.87 726 1.85 727 1.83 728 1.81 729 1.79 730 1.77 731 1.75 732 1.74 733 1.72 734 1.70 735 1.67 736 1.66 737 1.64 738 1.62 739 1.60 740 1.58 741 742 1.57 743 1.55 744 1.53 1.51 745 1.49 746 Page 10 of 11 Inflow (cfs) 1.02 1.01 1.00 1.00 0.99 0.98 0.98 0.97 0.96 0.95 0.95 0.94 0.93 0.93 0.92 0.91 0.91 0.90 0.89 0.89 0.88 0.87 0.86 0.86 0.85 0.84 0.84 0.83 0.82 0.82 0.81 0.80 0.80 0.79 0.78 0.77 0.77 0.76 0.75 0.75 0.74 0.73 0.73 0.72 0.71 0.71 0.70 0.69 0.69 0.68 0.67 0.66 0.66 0.65 0.64 0.64 0.63 0.62 0.62 0.61 0.60 0.60 0.59 0.58 0.57 0.57 0.56 0.55 0.55 0.54 0.53 0.53 0.52 0.51 0.51 0.50 Reservoir Reservoir Storage (cf) Elevation (ft) 3115.13 6.31 3114.54 6.30 3113.54 6.30 3112.12 6.30 3113.89 6.30 3111.64 6.30 3112.58 6.30 3113.10 6.30 3113.21 6.30 3109.30 6.29 3110.38 6.30 3109.24 6.29 3109.49 6.29 3107.52 6.29 3106.93 6.29 3105.94 6.29 3104.52 6.28 3102.69 6.28 3107.65 6.29 3104.99 6.29 3101.91 6.28 3105.62 6.29 3101.72 6.28 3104.60 6.28 3099.86 6.28 3101.91 6.28 3103.55 6.28 3104.77 6.28 3098.37 6.27 3098.76 6.27 3098.73 6.27 3098.29 6.27 3097.43 6.27 3096.16 6.27 3094.47 6.26 3092.37 6.26 3089.85 6.25 3095.92 6.27 3092.57 6.26 3088.81 6.25 3093.63 6.26 3089.04 6.25 3093.03 6.26 3087.61 6.25 3090.77 6.26 3093.52 6.26 3086.85 6.25 3088.76 6.25 3090.26 6.26 3091.35 6.26 3092.02 6.26 3083.28 6.24 3083.12 6.24 3082.54 6.24 3081.55 6.24 3080.14 6.24 3078.32 6.23 3076.09 6.23 3073.44 6.22 3073.37 6.22 3072.89 6.22 3071.99 6.22 3070.68 6.22 3068.96 6.21 3074.61 6.22 3072.06 6.22 3069.09 6.21 3073.50 6.22 3069.70 6.21 3065.48 6.21 3068.64 6.21 3071.40 6.22 3065.93 6.21 3067.86 6.21 3069.36 6.21 3062.65 6.20 Outflow (cfs) 1.02 1.02 1.02 0.96 1.02 0.96 0.96 0.96 1.02 0.93 0.96 0.93 0.96 0.93 0.93 0.93 0.93 0.81 0.93 0.93 0.81 0.93 0.81 0.93 0.81 0.81 0.81 0.93 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.66 0.81 0.81 0.66 0.81 0.66 0.81 0.66 0.66 0.81 0.66 0.66 0.66 0.66 0.81 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.61 0.61 0.61 0.61 0.61 0.48 0.61 0.61 0.48 0.61 0.61 0.48 0.48 0.61 0.48 0.48 0.61 0.48 Area A Duration (min) 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 Inflow (cfs) 1.43 1.41 1.39 1.37 1.35 1.33 1.31 1.29 1.27 1.25 1.24 1.22 1.20 1.18 1.16 1.14 1.12 1.10 1.08 1.06 1.05 1.03 1.01 0.99 0.97 0.95 0.93 0.91 0.89 0.87 0.86 0.84 0.82 0.80 0.78 0.76 0.74 0.72 0.70 0.68 0.67 0.65 0.63 0.61 0.59 0.57 0.55 0.53 0.51 0.49 0.48 0.46 0.44 0.42 0.40 0.38 0.36 0.34 0.32 0.30 0.29 0.27 0.25 0.23 0.21 0.19 0.17 0.15 0.13 0.11 0.10 0.08 0.06 0.04 0.02 0.00 Reservoir Reservoir Storage (cf) Elevation (ft) 7691.29 6.38 7687.47 6.38 7683.70 6.38 7679.99 6.38 7675.74 6.37 7671.55 6.37 7668.02 6.37 7663.95 6.36 7659.94 6.36 7655.99 6.36 7652.10 6.35 7648.27 6.35 7644.49 6.35 7640.18 6.34 7636.53 6.34 7631.74 6.34 7627.61 6.33 7624.74 6.33 7620.73 6.33 7615.58 6.32 7612.28 6.32 7607.85 6.32 7607.08 6.32 7605.17 6.31 7602.11 6.31 7597.92 6.31 7592.59 6.30 7586.12 6.30 7582.10 6.29 7578.75 6.29 7574.26 6.29 7568.62 6.28 7569.05 6.28 7561.13 6.28 7559.28 6.28 7556.29 6.27 7552.15 6.27 7546.88 6.27 7540.46 6.26 7532.91 6.25 7533.21 6.25 7532.38 6.25 7530.40 6.25 7527.29 6.25 7523.03 6.25 7517.64 6.24 7511.10 6.24 7503.42 6.23 7494.61 6.22 7487.65 6.22 7479.56 6.21 7478.12 6.21 7475.54 6.21 7471.83 6.20 7466.97 6.20 7460.97 6.19 7453.84 6.19 7445.56 6.18 7447.54 6.18 7436.98 6.17 7436.68 6.17 7435.25 6.17 7432.67 6.17 7428.95 6.17 7424.09 6.16 7418.09 6.16 7410.95 6.15 7402.68 6.15 7393.26 6.14 7382.70 6.13 7375.20 6.12 7366.56 6.12 7356.78 6.11 7353.06 6.10 7348.20 6.10 7342.20 6.10 Area B Outflow Duration (cfs) (min) 1.47 747 1.45 748 1.43 749 1.42 750 1.40 751 1.37 752 1.36 753 1.34 754 1.32 755 1.30 756 1.28 757 1.26 758 1.25 759 1.22 760 1.22 761 1.19 762 1.15 763 1.15 764 1.15 765 1.10 766 1.10 767 1.02 768 1.02 769 1.02 770 1.02 771 1.02 772 1.02 773 0.96 774 0.93 775 0.93 776 0.93 777 0.81 778 0.93 779 0.81 780 781 0.81 0.81 782 0.81 783 0.81 784 0.81 785 0.66 786 0.66 787 0.66 788 0.66 789 0.66 790 0.66 791 0.66 792 0.66 793 0.66 794 0.61 795 0.61 796 0.48 797 0.48 798 0.48 799 0.48 800 0.48 801 0.48 802 0.48 803 0.29 804 0.48 805 0.29 806 0.29 807 0.29 808 0.29 809 0.29 810 0.29 811 0.29 812 0.29 813 0.29 814 0.29 815 816 0.22 817 0.22 818 0.22 0.10 0.10 0.10 0.10 Page 11 of 11 Inflow (cfs) 0.49 0.48 0.48 0.47 0.46 0.46 0.45 0.44 0.44 0.43 0.42 0.42 0.41 0.40 0.39 0.39 0.38 0.37 0.37 0.36 0.35 0.35 0.34 0.33 0.33 0.32 0.31 0.30 0.30 0.29 0.28 0.28 0.27 0.26 0.26 0.25 0.24 0.24 0.23 0.22 0.21 0.21 0.20 0.19 0.19 0.18 0.17 0.17 0.16 0.15 0.15 0.14 0.13 0.12 0.12 0.11 0.10 0.10 0.09 0.08 0.08 0.07 0.06 0.06 0.05 0.04 0.03 0.03 0.02 0.01 0.01 0.00 Reservoir Reservoir Storage (cf) Elevation (ft) 3063.33 6.20 3063.59 6.20 3063.44 6.20 3062.87 6.20 3061.88 6.20 3060.48 6.20 3058.67 6.19 3056.44 6.19 3053.79 6.18 3062.13 6.20 3058.66 6.19 3054.77 6.18 3050.46 6.18 3057.14 6.19 3052.01 6.18 3057.86 6.19 3051.89 6.18 3056.91 6.19 3050.11 6.17 3054.30 6.18 3046.67 6.17 3050.03 6.17 3052.97 6.18 3055.50 6.19 3046.21 6.17 3047.91 6.17 3049.19 6.17 3050.06 6.17 3050.51 6.18 3050.55 6.18 3050.17 6.17 3049.38 6.17 3048.17 6.17 3046.54 6.17 3044.50 6.16 3042.05 6.16 3039.18 6.15 3035.90 6.15 3032.20 6.14 3028.08 6.13 3027.75 6.13 3027.01 6.13 3025.85 6.13 3024.27 6.12 3022.28 6.12 3019.87 6.11 3017.05 6.11 3021.02 6.12 3017.36 6.11 3020.50 6.11 3016.02 6.11 3018.32 6.11 3020.21 6.11 3014.48 6.10 3015.54 6.10 3016.18 6.11 3016.41 6.11 3016.22 6.11 3015.62 6.10 3014.60 6.10 3013.17 6.10 3011.32 6.10 3009.05 6.09 3006.38 6.09 3003.28 6.08 2999.77 6.07 2995.85 6.06 2997.51 6.07 2992.75 6.06 2993.58 6.06 2994.00 6.06 2994.00 6.06 Outflow (cfs) 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.29 0.48 0.48 0.48 0.29 0.48 0.29 0.48 0.29 0.48 0.29 0.48 0.29 0.29 0.29 0.48 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.10 0.22 0.10 0.22 0.10 0.10 0.22 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.00 0.10 0.00 0.00 0.00 0.00 CLIENT PROJECT DETAIL Carlsbad Desalter Pre-Dev. Hydrology - 100 Yr Event Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) P6 = 6-Hour Precipitation (in) P6 2.50 = 2.50 = = P24 = 24-Hour Precipitation (in) = 4.50 P24 4.50 Drainage Area A B C Total Area Permeable Impervious (SF) Area (SF) Area (SF) 95,748 74,186 21,341 96,350 64,661 31,692 65,401 38,834 26,135 257,499 c = 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ( ) E JOB NO. Poseidon 56% DATE CHECKED CHECKED BY 8/3/2009 JED Duration (tc) (Min) 3.88 3.72 3.60 Intensity 7.76 7.97 8.14 Isopluvial (Inches) Isopluvial (Inches) = = 4.5 2.5 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Adjusted c value: Impervious Area 0.90 x + 0.25 x c = Total Area Peak Discharge Q= c i A COMPUTED BY 1 7/31/2009 CDF Peak Discharge, Runoff Volume, Q (cfs) VOL (acre-inch) 6.73 2.17 8.18 2.56 6.21 1.91 Drainage Area A B C I = 7.44P6D-0.645 Storm Volume VOL = c P6 A DATE OF c = 0.90 0.385 100 Year Rainfall Event - 24 Hours 100 Year Rainfall Event - 6 Hours 1 P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. Watercourse Change in Elev., Length,L (FT) E (FT) 480 11 570 20.5 436 10 Adjusted c 0.39 0.46 0.51 PAGE Pervious Area 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual Runoff Volume, VOL (cf) 7,865 9,310 6,923 CLIENT JOB NO. Poseidon PROJECT Carlsbad Desalter DETAIL Interim-Dev. Hydrology 100-Yr Event Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) P6 = 6-Hour Precipitation (in) P6 2.50 = 2.50 = = 56% P24 = 24-Hour Precipitation (in) = 4.50 4.50 P24 Drainage Area A B Total Area (SF) Adjusted c 186,504 0.25 90,521 0.25 277,025 Watercourse Length,L (FT) 672 455 c = 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ( ) E Change in Elev., E (FT) 6.5 43 DATE CHECKED CHECKED BY 8/3/2009 JED Isopluvial (Inches) Isopluvial (Inches) = = Storm Volume VOL = c P6 A Peak Discharge Q= c i A 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual COMPUTED BY Peak Discharge, Runoff Volume, Q (cfs) VOL (acre-inch) 5.67 2.68 5.89 1.30 Drainage Area A B Runoff Volume, VOL (cf) 9,714 4,715 4.5 2.5 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Pervious Area DATE Intensity 5.30 11.33 I = 7.44P6D-0.645 Adjusted c value: Impervious 0.90 x + 0.25 x Area c = Total Area 1 P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. c = 0.90 0.385 100 Year Rainfall Event - 24 Hours 100 Year Rainfall Event - 6 Hours Duration (tc) (Min) 7.00 2.16 PAGE OF 1 7/31/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter DATE CHECKED CHECKED BY Interim-Dev. Hydrology 100-Yr Event (Drainage Area A) Rational Method Hydrograph Calculations Q10 = 4.09 cfs TC = 7.00 min P6 = C= A= 2.5 0.25 186,504 in sf -0.645 I = 7.44 x P6 x D IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.70 I (incr) (in/hr) 4.21 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 4.21 2.69 2.07 1.72 1.49 1.33 1.20 1.10 1.02 0.95 0.90 0.85 0.81 0.77 0.73 0.70 0.68 0.65 0.63 0.61 0.59 0.57 0.56 0.54 0.53 0.52 0.50 0.49 0.48 0.47 0.46 0.45 0.44 0.43 0.43 0.42 0.70 0.90 1.04 1.15 1.24 1.33 1.40 1.47 1.53 1.59 1.64 1.70 1.75 1.79 1.84 1.88 1.92 1.96 2.00 2.03 2.07 2.10 2.14 2.17 2.20 2.23 2.26 2.29 2.32 2.35 2.38 2.40 2.43 2.45 2.48 2.51 0.20 0.14 0.11 0.09 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.00 1.18 0.83 0.67 0.57 0.50 0.45 0.41 0.38 0.35 0.33 0.31 0.29 0.28 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.21 0.20 0.20 0.19 0.19 0.18 0.18 0.17 0.17 0.16 0.16 0.16 0.16 0.15 0.15 0.00 Q (cfs) 4.55 Vol (cf) 2728 1.27 0.90 0.72 0.61 0.54 0.48 0.44 0.41 0.38 0.35 0.33 0.32 0.30 0.29 0.28 0.26 0.25 0.25 0.24 0.23 0.22 0.22 0.21 0.21 0.20 0.19 0.19 0.19 0.18 0.18 0.17 0.17 0.17 0.16 0.16 0.00 SUM = 761 540 433 368 323 290 264 244 227 213 200 190 181 173 165 159 153 147 143 138 134 130 126 123 120 117 114 112 109 107 105 103 101 99 97 0 9734 0.22 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.22 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter DATE CHECKED CHECKED BY Interim-Dev. Hydrology 100-Yr Event (Drainage Area B) Rational Method Hydrograph Calculations Q10 = 4.24 cfs TC = 2.16 min P6 = C= A= 2.5 0.25 90,521 in sf I = 7.44 x P6 x D-0.645 IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.70 I (incr) (in/hr) 4.21 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 4.21 2.69 2.07 1.72 1.49 1.33 1.20 1.10 1.02 0.95 0.90 0.85 0.81 0.77 0.73 0.70 0.68 0.65 0.63 0.61 0.59 0.57 0.56 0.54 0.53 0.52 0.50 0.49 0.48 0.47 0.46 0.45 0.44 0.43 0.43 0.42 0.70 0.90 1.04 1.15 1.24 1.33 1.40 1.47 1.53 1.59 1.64 1.70 1.75 1.79 1.84 1.88 1.92 1.96 2.00 2.03 2.07 2.10 2.14 2.17 2.20 2.23 2.26 2.29 2.32 2.35 2.38 2.40 2.43 2.45 2.48 2.51 0.20 0.14 0.11 0.09 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.00 1.18 0.83 0.67 0.57 0.50 0.45 0.41 0.38 0.35 0.33 0.31 0.29 0.28 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.21 0.20 0.20 0.19 0.19 0.18 0.18 0.17 0.17 0.16 0.16 0.16 0.16 0.15 0.15 0.00 Q (cfs) 2.21 Vol (cf) 1324 0.62 0.44 0.35 0.30 0.26 0.23 0.21 0.20 0.18 0.17 0.16 0.15 0.15 0.14 0.13 0.13 0.12 0.12 0.12 0.11 0.11 0.11 0.10 0.10 0.10 0.09 0.09 0.09 0.09 0.09 0.08 0.08 0.08 0.08 0.08 0.00 SUM = 369 262 210 179 157 141 128 118 110 103 97 92 88 84 80 77 74 72 69 67 65 63 61 60 58 57 55 54 53 52 51 50 49 48 47 0 4725 0.11 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.11 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon PAGE DATE CHECKED Carlsbad Desalter Interim-Dev. Hydrology 100-Yr Event 9/8/2009 CHECKED BY 1 DATE OF 9/8/2009 COMPUTED BY JED 1 CDF Rational Method Hydrograph from San Diego County Rational Method Hydrograph Program Area A Area B D (min) 0 7 14 Q (cfs) 0 0.2 0.2 D (min) 0 5 10 Q (cfs) 0 0.1 0.1 D (min) 330 335 340 Q (cfs) 0.1 0.1 0.1 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 182 189 196 203 210 217 224 231 238 245 252 259 266 273 280 287 294 301 308 315 322 329 336 343 350 357 364 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.5 0.7 0.8 1.1 3.2 4.09 0.9 0.6 0.5 0.4 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.4 0.5 0.7 1.1 4.24 0.5 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 345 350 355 360 365 0.1 0.1 0.1 0.1 0 Area A 4.5 4 Flow Rate (cfs) 3.5 3 2.5 2 1.5 1 0.5 0 0 50 100 150 200 250 300 350 400 250 300 350 400 Time (min) Area B 4.5 4 Flow Rate (cfs) 3.5 3 2.5 2 1.5 1 0.5 0 0 50 100 150 200 Time (min) CLIENT PROJECT DETAIL Carlsbad Desalter Post-Dev. Hydrology - 100 Yr Event Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) P6 = 6-Hour Precipitation (in) = 2.50 2.50 P6 = = P24 = 24-Hour Precipitation (in) = 4.50 4.50 P24 Drainage Area A B Total Area Permeable Impervious (SF) Area (SF) Area (SF) 21,221 130,733 152,752 38,467 105,792 68,054 258,544 c = 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ) ( E 56% PAGE DATE CHECKED CHECKED BY 8/3/2009 DATE OF 1 7/31/2009 COMPUTED BY JED Duration (tc) (Min) 5.90 6.89 Intensity 5.92 5.36 CDF Peak Discharge, Runoff Volume, VOL (acre-inch) Q (cfs) 7.06 16.71 4.07 8.72 c = 0.90 Drainage Area A B Isopluvial (Inches) Isopluvial (Inches) = = Runoff Volume, VOL (cf) 25,618 14,764 40,382 CUDO 2 Units, EA 1,664 959 4.5 2.5 I = 7.44P6D-0.645 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Adjusted c value: Impervious 0.90 x + 0.25 x Area c = Total Area Storm Volume VOL = c P6 A 1 P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. Watercourse Change in Elev., Length,L (FT) E (FT) 8.5 634 7.5 695 Adjusted c 0.80 0.67 0.385 100 Year Rainfall Event - 24 Hours 100 Year Rainfall Event - 6 Hours JOB NO. Poseidon Pervious Area 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual Peak Discharge Q= c i A CUDO 2 Units are manufactured by Cudo Stormwater Products, Inc. and are capable of storing 30.8 CF of water per unit. CUDO 2 Dimensions are 2 ft. x 2 ft. x 8 ft tall. CUDO Units Area, SF 6,656 3,836 CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter DATE CHECKED CHECKED BY Post-Dev. Hydrology 100-Yr Event (Drainage Area A) Rational Method Hydrograph Calculations Q10 = 12.03 cfs TC = 5.90 min P6 = C= A= 2.5 0.8 152,752 in sf I = 7.44 x P6 x D-0.645 IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.70 I (incr) (in/hr) 4.21 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 4.21 2.69 2.07 1.72 1.49 1.33 1.20 1.10 1.02 0.95 0.90 0.85 0.81 0.77 0.73 0.70 0.68 0.65 0.63 0.61 0.59 0.57 0.56 0.54 0.53 0.52 0.50 0.49 0.48 0.47 0.46 0.45 0.44 0.43 0.43 0.42 0.70 0.90 1.04 1.15 1.24 1.33 1.40 1.47 1.53 1.59 1.64 1.70 1.75 1.79 1.84 1.88 1.92 1.96 2.00 2.03 2.07 2.10 2.14 2.17 2.20 2.23 2.26 2.29 2.32 2.35 2.38 2.40 2.43 2.45 2.48 2.51 0.20 0.14 0.11 0.09 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.00 1.18 0.83 0.67 0.57 0.50 0.45 0.41 0.38 0.35 0.33 0.31 0.29 0.28 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.21 0.20 0.20 0.19 0.19 0.18 0.18 0.17 0.17 0.16 0.16 0.16 0.16 0.15 0.15 0.00 Q (cfs) 11.92 Vol (cf) 7149 3.32 2.36 1.89 1.61 1.41 1.27 1.15 1.06 0.99 0.93 0.88 0.83 0.79 0.75 0.72 0.69 0.67 0.64 0.62 0.60 0.58 0.57 0.55 0.54 0.52 0.51 0.50 0.49 0.48 0.47 0.46 0.45 0.44 0.43 0.42 0.00 SUM = 1995 1416 1135 964 846 760 692 639 594 557 525 498 474 452 433 416 401 387 374 362 351 341 331 322 314 307 299 293 286 280 274 269 264 259 254 0 25512 0.59 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.58 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon Carlsbad Desalter DATE CHECKED CHECKED BY Post-Dev. Hydrology 100-Yr Event (Drainage Area B) Rational Method Hydrograph Calculations Q10 = 6.28 cfs TC = 6.89 min P6 = C= A= 2.5 0.67 105,792 in sf I = 7.44 x P6 x D-0.645 IxD Vol = 60 Vol = V1 - V0 I (incr) = V/ t Q = ciA D (min) 0 I (in/hr) 0.00 Vol (in) 0.00 Vol (in) 0.70 I (incr) (in/hr) 4.21 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 4.21 2.69 2.07 1.72 1.49 1.33 1.20 1.10 1.02 0.95 0.90 0.85 0.81 0.77 0.73 0.70 0.68 0.65 0.63 0.61 0.59 0.57 0.56 0.54 0.53 0.52 0.50 0.49 0.48 0.47 0.46 0.45 0.44 0.43 0.43 0.42 0.70 0.90 1.04 1.15 1.24 1.33 1.40 1.47 1.53 1.59 1.64 1.70 1.75 1.79 1.84 1.88 1.92 1.96 2.00 2.03 2.07 2.10 2.14 2.17 2.20 2.23 2.26 2.29 2.32 2.35 2.38 2.40 2.43 2.45 2.48 2.51 0.20 0.14 0.11 0.09 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.00 1.18 0.83 0.67 0.57 0.50 0.45 0.41 0.38 0.35 0.33 0.31 0.29 0.28 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.21 0.20 0.20 0.19 0.19 0.18 0.18 0.17 0.17 0.16 0.16 0.16 0.16 0.15 0.15 0.00 Q (cfs) 6.91 Vol (cf) 4147 1.93 1.37 1.10 0.93 0.82 0.73 0.67 0.62 0.57 0.54 0.51 0.48 0.46 0.44 0.42 0.40 0.39 0.37 0.36 0.35 0.34 0.33 0.32 0.31 0.30 0.30 0.29 0.28 0.28 0.27 0.27 0.26 0.25 0.25 0.25 0.00 SUM = 1157 821 659 559 491 441 402 370 345 323 305 289 275 262 251 241 232 224 217 210 203 198 192 187 182 178 174 170 166 162 159 156 153 150 147 0 14798 0.34 Check: OK cubic feet acre-feet V = c x A x P6 V = 0.34 acre-feet PAGE 9/8/2009 JED 1 DATE COMPUTED BY OF 1 9/8/2009 CDF CLIENT PROJECT DETAIL JOB NO. Poseidon DATE CHECKED Carlsbad Desalter CHECKED BY Post-Dev. Hydrology 100-Yr Event Rational Method Hydrograph from San Diego County Rational Method Hydrograph Program Area A PAGE 9/8/2009 1 OF DATE 9/8/2009 COMPUTED BY JED CDF Unit Hydrograph from Eq. 4-10 of the SD County Hydrology Manual Area B D Q D Q (min) 0 6 12 (cfs) 0 0.4 0.4 (min) 0 7 14 (cfs) 0 0.2 0.2 18 24 30 0.4 0.4 0.4 21 28 35 0.3 0.3 0.3 Area A Tr = 411 Tr = 1.67Tp 36 0.5 42 0.3 qp = 7.1 42 48 54 60 66 72 78 84 90 96 102 108 114 120 126 132 138 144 150 156 162 168 174 180 186 192 198 204 210 216 222 228 234 240 246 252 258 264 270 276 282 288 294 300 306 312 318 324 330 336 342 348 354 360 366 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.9 0.9 1.0 1.0 1.1 1.2 1.3 1.5 1.6 1.9 2.2 3.3 9.0 12.03 2.6 1.7 1.4 1.1 1.0 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.4 0.4 0 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 182 189 196 203 210 217 224 231 238 245 252 259 266 273 280 287 294 301 308 315 322 329 336 343 350 357 364 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.6 0.6 0.7 0.8 0.8 1.0 1.2 1.7 4.8 6.28 1.4 0.9 0.7 0.6 0.5 0.5 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0 qp = KAQa/Tp K = 484 A in square miles Tp in hours min cfs Area B Tr = 4.09 qp = 2.83 min cfs Flow Rate (cfs) Area A 8 7 6 5 4 3 2 1 0 0 411 822 Time (min) Area B 3 Flow Rate (cf) 2.5 2 1.5 1 0.5 0 0 409 Time (min) 1 818 CLIENT PROJECT DETAIL Area A Duration (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 Inflow (cfs) 0.00 0.02 0.03 0.05 0.07 0.09 0.10 0.12 0.14 0.16 0.17 0.19 0.21 0.22 0.24 0.26 0.28 0.29 0.31 0.33 0.35 0.36 0.38 0.40 0.41 0.43 0.45 0.47 0.48 0.50 0.52 0.54 0.55 0.57 0.59 0.60 0.62 0.64 0.66 0.67 0.69 0.71 0.73 0.74 0.76 0.78 0.79 0.81 0.83 0.85 0.86 0.88 0.90 0.92 0.93 0.95 0.97 0.98 1.00 1.02 1.04 1.05 1.07 1.09 1.11 1.12 1.14 Poseidon Carlsbad Desalter Post-Dev. Hydrology 100-Yr Event Reservoir Reservoir Storage (cf) Elevation (ft) 0.00 0.00 1.04 0.00 3.11 0.00 6.22 0.01 10.36 0.01 15.55 0.01 21.77 0.02 29.02 0.02 37.31 0.03 46.64 0.04 57.01 0.05 68.41 0.06 80.85 0.07 94.32 0.08 108.83 0.09 124.38 0.10 140.96 0.12 158.58 0.13 177.24 0.15 196.93 0.16 217.66 0.18 239.43 0.20 262.23 0.22 286.07 0.24 310.95 0.26 336.86 0.28 363.81 0.30 391.80 0.33 420.82 0.35 450.88 0.37 481.97 0.40 514.10 0.43 547.27 0.45 581.47 0.48 616.72 0.51 652.99 0.54 690.31 0.57 728.66 0.60 768.04 0.64 808.47 0.67 849.93 0.71 892.42 0.74 935.96 0.78 980.53 0.81 1026.13 0.85 1072.77 0.89 1120.45 0.93 1169.17 0.97 1218.92 1.01 1269.71 1.05 1321.53 1.10 1374.39 1.14 1428.29 1.19 1483.23 1.23 1539.20 1.28 1596.20 1.33 1654.25 1.37 1713.33 1.42 1773.45 1.47 1834.60 1.52 1896.79 1.57 1960.01 1.63 2024.28 1.68 2089.58 1.73 2155.91 1.79 2223.28 1.85 2291.69 1.90 JOB NO. PAGE DATE CHECKED CHECKED BY Area B Outflow Duration (cfs) (min) 0.00 0 0.00 1 0.00 2 0.00 3 0.00 4 0.00 5 0.00 6 0.00 7 0.00 8 0.00 9 0.00 10 0.00 11 0.00 12 0.00 13 0.00 14 0.00 15 0.00 16 0.00 17 0.00 18 0.00 19 0.00 20 0.00 21 0.00 22 0.00 23 0.00 24 0.00 25 0.00 26 0.00 27 0.00 28 0.00 29 0.00 30 0.00 31 0.00 32 0.00 33 0.00 34 0.00 35 0.00 36 0.00 37 0.00 38 0.00 39 0.00 40 0.00 41 0.00 42 0.00 43 0.00 44 0.00 45 0.00 46 0.00 47 0.00 48 0.00 49 0.00 50 0.00 51 0.00 52 0.00 53 0.00 54 0.00 55 0.00 56 0.00 57 0.00 58 0.00 59 0.00 60 0.00 61 0.00 62 0.00 63 0.00 64 0.00 65 0.00 66 Page 1 of 11 Inflow (cfs) 0.00 0.01 0.01 0.02 0.03 0.03 0.04 0.05 0.06 0.06 0.07 0.08 0.08 0.09 0.10 0.10 0.11 0.12 0.12 0.13 0.14 0.15 0.15 0.16 0.17 0.17 0.18 0.19 0.19 0.20 0.21 0.21 0.22 0.23 0.24 0.24 0.25 0.26 0.26 0.27 0.28 0.28 0.29 0.30 0.30 0.31 0.32 0.33 0.33 0.34 0.35 0.35 0.36 0.37 0.37 0.38 0.39 0.39 0.40 0.41 0.42 0.42 0.43 0.44 0.44 0.45 0.46 9/8/2009 JED 1 DATE OF 11 9/8/2009 COMPUTED BY Reservoir Reservoir Storage (cf) Elevation (ft) 0.00 0.00 0.42 0.00 1.25 0.00 2.49 0.01 4.15 0.01 6.23 0.01 8.72 0.02 11.62 0.02 14.95 0.03 18.68 0.04 22.83 0.05 27.40 0.06 32.38 0.07 37.78 0.08 43.59 0.09 49.82 0.10 56.46 0.11 63.52 0.13 70.99 0.14 78.88 0.16 87.18 0.18 95.90 0.19 105.04 0.21 114.58 0.23 124.55 0.25 134.93 0.27 145.72 0.29 156.93 0.32 168.55 0.34 180.59 0.37 193.05 0.39 205.92 0.42 219.20 0.44 232.90 0.47 247.02 0.50 261.55 0.53 276.50 0.56 291.86 0.59 307.63 0.62 323.82 0.66 340.43 0.69 357.45 0.72 374.89 0.76 392.74 0.80 411.01 0.83 429.69 0.87 448.79 0.91 468.30 0.95 488.23 0.99 508.57 1.03 529.33 1.07 550.50 1.11 572.09 1.16 594.09 1.20 616.51 1.25 639.34 1.29 662.59 1.34 686.26 1.39 710.34 1.44 734.83 1.49 759.74 1.54 785.07 1.59 810.81 1.64 836.96 1.69 863.53 1.75 890.52 1.80 917.92 1.86 CDF Outflow (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Area A Duration (min) 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 Inflow (cfs) 1.16 1.17 1.19 1.21 1.23 1.24 1.26 1.28 1.30 1.31 1.33 1.35 1.36 1.38 1.40 1.42 1.43 1.45 1.47 1.49 1.50 1.52 1.54 1.55 1.57 1.59 1.61 1.62 1.64 1.66 1.68 1.69 1.71 1.73 1.74 1.76 1.78 1.80 1.81 1.83 1.85 1.87 1.88 1.90 1.92 1.93 1.95 1.97 1.99 2.00 2.02 2.04 2.06 2.07 2.09 2.11 2.12 2.14 2.16 2.18 2.19 2.21 2.23 2.25 2.26 2.28 2.30 2.31 2.33 2.35 2.37 2.38 2.40 2.42 2.44 2.45 Reservoir Reservoir Storage (cf) Elevation (ft) 2361.14 1.96 2431.62 2.02 2503.14 2.08 2575.69 2.14 2649.28 2.20 2723.91 2.26 2799.58 2.32 2876.28 2.39 2954.01 2.45 3032.79 2.52 3112.60 2.58 3193.45 2.65 3275.33 2.72 3358.25 2.79 3442.20 2.86 3527.20 2.93 3613.23 3.00 3700.29 3.07 3788.39 3.14 3877.53 3.22 3967.71 3.29 4058.92 3.37 4151.17 3.45 4244.45 3.52 4338.77 3.60 4434.13 3.68 4530.53 3.76 4627.96 3.84 4726.42 3.92 4825.93 4.01 4926.47 4.09 5028.04 4.17 5130.66 4.26 5234.31 4.35 5338.99 4.43 5444.72 4.52 5551.47 4.61 5659.27 4.70 5768.10 4.79 5877.97 4.88 5988.88 4.97 6100.82 5.06 6213.80 5.16 6327.81 5.25 6442.86 5.35 6558.95 5.44 6676.07 5.54 6794.23 5.64 6913.43 5.74 7033.66 5.84 7154.93 5.94 7277.24 6.04 7400.58 6.14 7507.56 6.23 7593.38 6.30 7658.63 6.36 7706.92 6.40 7742.45 6.43 7768.81 6.45 7787.81 6.47 7802.44 6.48 7813.31 6.49 7821.62 6.49 7828.57 6.50 7834.15 6.50 7838.96 6.51 7843.02 6.51 7846.91 6.51 7850.64 6.52 7854.20 6.52 7857.60 6.52 7860.84 6.53 7863.91 6.53 7866.82 6.53 7870.16 6.53 7873.35 6.54 Area B Outflow Duration (cfs) (min) 0.00 67 0.00 68 0.00 69 0.00 70 0.00 71 0.00 72 0.00 73 0.00 74 0.00 75 0.00 76 0.00 77 0.00 78 0.00 79 0.00 80 0.00 81 0.00 82 0.00 83 0.00 84 0.00 85 0.00 86 0.00 87 0.00 88 0.00 89 0.00 90 0.00 91 0.00 92 0.00 93 0.00 94 0.00 95 0.00 96 0.00 97 0.00 98 0.00 99 0.00 100 0.00 101 0.00 102 0.00 103 0.00 104 0.00 105 0.00 106 0.00 107 0.00 108 0.00 109 0.00 110 0.00 111 0.00 112 0.00 113 0.00 114 0.00 115 0.00 116 0.00 117 0.00 118 0.29 119 0.66 120 1.02 121 1.32 122 1.55 123 1.72 124 1.86 125 1.95 126 2.03 127 2.09 128 2.13 129 2.17 130 2.20 131 2.23 132 2.25 133 2.27 134 2.29 135 2.31 136 2.33 137 2.35 138 2.37 139 2.38 140 2.40 141 2.42 142 Page 2 of 11 Inflow (cfs) 0.46 0.47 0.48 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.53 0.54 0.55 0.55 0.56 0.57 0.57 0.58 0.59 0.60 0.60 0.61 0.62 0.62 0.63 0.64 0.64 0.65 0.66 0.66 0.67 0.68 0.69 0.69 0.70 0.71 0.71 0.72 0.73 0.73 0.74 0.75 0.75 0.76 0.77 0.77 0.78 0.79 0.80 0.80 0.81 0.82 0.82 0.83 0.84 0.84 0.85 0.86 0.86 0.87 0.88 0.89 0.89 0.90 0.91 0.91 0.92 0.93 0.93 0.94 0.95 0.95 0.96 0.97 0.98 0.98 Reservoir Reservoir Storage (cf) Elevation (ft) 945.73 1.91 973.96 1.97 1002.61 2.03 1031.67 2.09 1061.15 2.15 1091.04 2.21 1121.34 2.27 1152.07 2.33 1183.20 2.40 1214.76 2.46 1246.72 2.52 1279.10 2.59 1311.90 2.66 1345.11 2.72 1378.74 2.79 1412.79 2.86 1447.24 2.93 1482.12 3.00 1517.41 3.07 1553.11 3.14 1589.23 3.22 1625.76 3.29 1662.71 3.37 1700.08 3.44 1737.86 3.52 1776.05 3.60 1814.66 3.67 1853.68 3.75 1893.12 3.83 1932.98 3.91 1973.25 3.99 2013.94 4.08 2055.04 4.16 2096.55 4.24 2138.48 4.33 2180.83 4.41 2223.59 4.50 2266.77 4.59 2310.36 4.68 2354.37 4.77 2398.79 4.86 2443.63 4.95 2488.88 5.04 2534.55 5.13 2580.63 5.22 2627.13 5.32 2674.04 5.41 2721.37 5.51 2769.11 5.61 2817.27 5.70 2865.84 5.80 2914.83 5.90 2964.23 6.00 3014.05 6.10 3058.29 6.19 3080.14 6.24 3091.60 6.26 3094.48 6.26 3097.78 6.27 3101.49 6.28 3105.61 6.29 3102.95 6.28 3107.91 6.29 3106.08 6.29 3104.66 6.28 3103.67 6.28 3110.28 6.30 3108.31 6.29 3108.56 6.29 3109.22 6.29 3110.30 6.30 3109.99 6.30 3110.10 6.30 3110.62 6.30 3111.56 6.30 3112.91 6.30 Outflow (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.48 0.66 0.81 0.81 0.81 0.81 0.93 0.81 0.93 0.93 0.93 0.81 0.96 0.93 0.93 0.93 0.96 0.96 0.96 0.96 0.96 0.96 Area A Duration (min) 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 Inflow (cfs) 2.47 2.49 2.50 2.52 2.54 2.56 2.57 2.59 2.61 2.63 2.64 2.66 2.68 2.69 2.71 2.73 2.75 2.76 2.78 2.80 2.82 2.83 2.85 2.87 2.88 2.90 2.92 2.94 2.95 2.97 2.99 3.01 3.02 3.04 3.06 3.07 3.09 3.11 3.13 3.14 3.16 3.18 3.20 3.21 3.23 3.25 3.26 3.28 3.30 3.32 3.33 3.35 3.37 3.39 3.40 3.42 3.44 3.45 3.47 3.49 3.51 3.52 3.54 3.56 3.58 3.59 3.61 3.63 3.65 3.66 3.68 3.70 3.71 3.73 3.75 3.77 Reservoir Reservoir Storage (cf) Elevation (ft) 7876.37 6.54 7879.22 6.54 7882.51 6.54 7885.64 6.55 7888.61 6.55 7891.41 6.55 7894.65 6.55 7897.72 6.56 7900.63 6.56 7903.38 6.56 7906.56 6.56 7909.58 6.57 7913.04 6.57 7915.73 6.57 7918.86 6.57 7921.83 6.58 7925.23 6.58 7927.87 6.58 7930.95 6.58 7933.86 6.59 7936.61 6.59 7939.20 6.59 7942.22 6.59 7945.08 6.60 7948.97 6.60 7953.90 6.60 7959.87 6.61 7965.07 6.61 7968.32 6.61 7970.19 6.62 7971.91 6.62 7973.46 6.62 7975.44 6.62 7977.87 6.62 7981.33 6.63 7983.42 6.63 7986.56 6.63 7990.13 6.63 7992.33 6.63 7995.57 6.64 7998.65 6.64 8001.57 6.64 8004.92 6.65 8008.11 6.65 8010.53 6.65 8013.39 6.65 8016.09 6.65 8018.63 6.66 8021.00 6.66 8024.40 6.66 8026.45 6.66 8029.53 6.67 8032.45 6.67 8035.20 6.67 8037.79 6.67 8040.81 6.68 8043.08 6.68 8045.78 6.68 8048.31 6.68 8051.88 6.68 8054.09 6.69 8057.34 6.69 8059.22 6.69 8062.14 6.69 8064.89 6.70 8067.48 6.70 8070.51 6.70 8072.78 6.70 8075.48 6.70 8078.01 6.71 8079.79 6.71 8082.60 6.71 8085.85 6.71 8088.93 6.72 8091.85 6.72 8094.60 6.72 Area B Outflow Duration (cfs) (min) 2.44 143 2.45 144 2.47 145 2.49 146 2.51 147 2.52 148 2.54 149 2.56 150 2.58 151 2.59 152 2.61 153 2.62 154 2.65 155 2.66 156 2.68 157 2.69 158 2.72 159 2.73 160 2.75 161 2.77 162 2.79 163 2.80 164 2.82 165 2.82 166 2.82 167 2.82 168 2.85 169 2.90 170 2.94 171 2.96 172 2.98 173 2.99 174 3.00 175 3.00 176 3.04 177 3.04 178 3.05 179 3.09 180 3.09 181 3.11 182 3.13 183 3.14 184 3.16 185 3.19 186 3.20 187 3.22 188 3.24 189 3.26 190 3.26 191 3.30 192 3.30 193 3.32 194 3.34 195 3.36 196 3.37 197 3.40 198 3.41 199 3.43 200 3.43 201 3.47 202 3.47 203 3.51 204 3.51 205 3.53 206 3.55 207 3.56 208 3.59 209 3.60 210 3.62 211 3.65 212 3.65 213 3.66 214 3.68 215 3.70 216 3.72 217 3.74 218 Page 3 of 11 Inflow (cfs) 0.99 1.00 1.00 1.01 1.02 1.02 1.03 1.04 1.04 1.05 1.06 1.07 1.07 1.08 1.09 1.09 1.10 1.11 1.11 1.12 1.13 1.13 1.14 1.15 1.16 1.16 1.17 1.18 1.18 1.19 1.20 1.20 1.21 1.22 1.22 1.23 1.24 1.25 1.25 1.26 1.27 1.27 1.28 1.29 1.29 1.30 1.31 1.31 1.32 1.33 1.34 1.34 1.35 1.36 1.36 1.37 1.38 1.38 1.39 1.40 1.40 1.41 1.42 1.43 1.43 1.44 1.45 1.45 1.46 1.47 1.47 1.48 1.49 1.49 1.50 1.51 Reservoir Reservoir Storage (cf) Elevation (ft) 3114.68 6.31 3113.26 6.30 3112.26 6.30 3115.27 6.31 3115.10 6.31 3115.34 6.31 3116.00 6.31 3117.07 6.31 3118.56 6.31 3120.47 6.32 3117.99 6.31 3120.72 6.32 3119.07 6.31 3122.64 6.32 3121.82 6.32 3121.41 6.32 3121.42 6.32 3121.85 6.32 3122.69 6.32 3123.94 6.32 3125.61 6.33 3124.70 6.33 3127.20 6.33 3127.12 6.33 3127.45 6.33 3128.20 6.33 3129.36 6.33 3128.53 6.33 3130.53 6.34 3130.53 6.34 3130.96 6.34 3131.79 6.34 3131.25 6.34 3132.92 6.34 3133.20 6.34 3133.90 6.34 3133.21 6.34 3134.74 6.35 3134.88 6.35 3135.44 6.35 3136.42 6.35 3137.20 6.35 3137.21 6.35 3137.63 6.35 3138.46 6.35 3139.11 6.35 3140.18 6.36 3140.46 6.36 3141.15 6.36 3141.66 6.36 3142.59 6.36 3142.73 6.36 3143.29 6.36 3143.66 6.36 3144.44 6.37 3145.05 6.37 3145.46 6.37 3146.29 6.37 3146.94 6.37 3147.40 6.37 3148.28 6.37 3148.97 6.37 3149.48 6.38 3149.80 6.38 3150.54 6.38 3151.09 6.38 3152.06 6.38 3152.25 6.38 3152.84 6.38 3153.26 6.38 3154.09 6.38 3154.73 6.39 3155.19 6.39 3155.46 6.39 3156.15 6.39 3157.26 6.39 Outflow (cfs) 1.02 1.02 0.96 1.02 1.02 1.02 1.02 1.02 1.02 1.10 1.02 1.10 1.02 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.15 1.10 1.15 1.15 1.15 1.15 1.19 1.15 1.19 1.19 1.19 1.22 1.19 1.22 1.22 1.25 1.22 1.25 1.25 1.25 1.26 1.28 1.28 1.28 1.29 1.29 1.31 1.31 1.32 1.32 1.34 1.34 1.35 1.35 1.36 1.37 1.37 1.38 1.39 1.39 1.40 1.41 1.42 1.42 1.43 1.43 1.45 1.45 1.46 1.46 1.47 1.48 1.49 1.49 1.49 1.51 Area A Duration (min) 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 Inflow (cfs) 3.78 3.80 3.82 3.84 3.85 3.87 3.89 3.90 3.92 3.94 3.96 3.97 3.99 4.01 4.03 4.04 4.06 4.08 4.09 4.11 4.13 4.15 4.16 4.18 4.20 4.22 4.23 4.25 4.27 4.28 4.30 4.32 4.34 4.35 4.37 4.39 4.41 4.42 4.44 4.46 4.47 4.49 4.51 4.53 4.54 4.56 4.58 4.60 4.61 4.63 4.65 4.66 4.68 4.70 4.72 4.73 4.75 4.77 4.79 4.80 4.82 4.84 4.85 4.87 4.89 4.91 4.92 4.94 4.96 4.98 4.99 5.01 5.03 5.04 5.06 5.08 Reservoir Reservoir Storage (cf) Elevation (ft) 8097.20 6.72 8099.63 6.72 8102.49 6.73 8105.19 6.73 8107.13 6.73 8110.11 6.73 8113.52 6.74 8115.57 6.74 8118.65 6.74 8121.57 6.74 8124.33 6.74 8126.93 6.75 8129.36 6.75 8131.62 6.75 8133.73 6.75 8136.27 6.75 8138.64 6.76 8142.06 6.76 8145.31 6.76 8147.19 6.76 8150.12 6.77 8152.87 6.77 8155.47 6.77 8157.90 6.77 8160.17 6.77 8162.28 6.78 8164.22 6.78 8167.20 6.78 8170.61 6.78 8172.66 6.78 8175.75 6.79 8178.67 6.79 8181.43 6.79 8184.03 6.79 8186.46 6.80 8188.73 6.80 8190.84 6.80 8192.78 6.80 8194.56 6.80 8196.18 6.80 8198.83 6.81 8201.92 6.81 8205.45 6.81 8208.21 6.81 8209.61 6.82 8210.84 6.82 8213.11 6.82 8215.22 6.82 8218.37 6.82 8221.35 6.82 8222.96 6.83 8225.02 6.83 8227.51 6.83 8231.04 6.83 8234.40 6.84 8237.60 6.84 8239.44 6.84 8241.11 6.84 8243.22 6.84 8245.16 6.84 8248.15 6.85 8250.97 6.85 8253.02 6.85 8254.31 6.85 8256.64 6.85 8259.41 6.86 8262.01 6.86 8264.45 6.86 8266.72 6.86 8268.83 6.86 8271.98 6.87 8273.76 6.87 8275.98 6.87 8279.24 6.87 8282.33 6.88 8285.26 6.88 Area B Outflow Duration (cfs) (min) 3.76 219 3.77 220 3.79 221 3.82 222 3.82 223 3.83 224 3.87 225 3.87 226 3.89 227 3.91 228 3.93 229 3.95 230 3.97 231 3.99 232 4.00 233 4.02 234 4.02 235 4.04 236 4.08 237 4.08 238 4.10 239 4.12 240 4.14 241 4.16 242 4.18 243 4.20 244 4.20 245 4.21 246 4.25 247 4.25 248 4.27 249 4.29 250 4.31 251 4.33 252 4.35 253 4.37 254 4.39 255 4.41 256 4.43 257 4.43 258 4.44 259 4.45 260 4.48 261 4.52 262 4.54 263 4.54 264 4.56 265 4.56 266 4.58 267 4.62 268 4.63 269 4.64 270 4.64 271 4.66 272 4.68 273 4.72 274 4.74 275 4.75 276 4.77 277 4.77 278 4.79 279 4.82 280 4.85 281 4.85 282 4.86 283 4.88 284 4.90 285 4.92 286 4.94 287 4.94 288 4.98 289 4.99 290 4.99 291 5.01 292 5.03 293 5.05 294 Page 4 of 11 Inflow (cfs) 1.52 1.52 1.53 1.54 1.54 1.55 1.56 1.56 1.57 1.58 1.58 1.59 1.60 1.61 1.61 1.62 1.63 1.63 1.64 1.65 1.65 1.66 1.67 1.67 1.68 1.69 1.70 1.70 1.71 1.72 1.72 1.73 1.74 1.74 1.75 1.76 1.76 1.77 1.78 1.79 1.79 1.80 1.81 1.81 1.82 1.83 1.83 1.84 1.85 1.85 1.86 1.87 1.88 1.88 1.89 1.90 1.90 1.91 1.92 1.92 1.93 1.94 1.94 1.95 1.96 1.97 1.97 1.98 1.99 1.99 2.00 2.01 2.01 2.02 2.03 2.03 Reservoir Reservoir Storage (cf) Elevation (ft) 3157.58 6.39 3158.31 6.39 3158.86 6.39 3159.23 6.40 3160.01 6.40 3160.60 6.40 3161.02 6.40 3161.84 6.40 3162.48 6.40 3162.94 6.40 3163.21 6.40 3163.90 6.40 3165.00 6.41 3165.32 6.41 3166.05 6.41 3166.59 6.41 3166.96 6.41 3167.73 6.41 3168.33 6.41 3168.73 6.41 3169.56 6.42 3170.20 6.42 3170.65 6.42 3170.92 6.42 3171.60 6.42 3172.70 6.42 3173.01 6.42 3173.14 6.42 3173.69 6.42 3174.65 6.43 3174.82 6.43 3175.41 6.43 3176.42 6.43 3176.64 6.43 3177.27 6.43 3177.72 6.43 3178.59 6.43 3179.27 6.44 3179.76 6.44 3180.07 6.44 3180.80 6.44 3181.34 6.44 3181.70 6.44 3182.47 6.44 3183.06 6.44 3183.46 6.44 3184.28 6.45 3184.91 6.45 3185.36 6.45 3185.62 6.45 3186.30 6.45 3186.79 6.45 3187.10 6.45 3187.82 6.45 3188.36 6.45 3188.71 6.45 3189.48 6.46 3190.07 6.46 3190.46 6.46 3191.28 6.46 3191.91 6.46 3192.35 6.46 3192.61 6.46 3193.29 6.46 3193.78 6.47 3194.08 6.47 3194.80 6.47 3195.34 6.47 3196.29 6.47 3196.45 6.47 3197.03 6.47 3197.43 6.47 3198.24 6.47 3198.87 6.48 3199.31 6.48 3199.57 6.48 Outflow (cfs) 1.51 1.52 1.53 1.53 1.54 1.55 1.55 1.56 1.57 1.58 1.58 1.58 1.60 1.60 1.61 1.62 1.62 1.63 1.64 1.64 1.65 1.66 1.67 1.67 1.67 1.69 1.70 1.70 1.70 1.72 1.72 1.72 1.74 1.74 1.75 1.75 1.76 1.77 1.78 1.78 1.79 1.80 1.80 1.81 1.82 1.82 1.83 1.84 1.85 1.85 1.86 1.87 1.87 1.88 1.89 1.89 1.90 1.91 1.91 1.92 1.93 1.94 1.94 1.95 1.96 1.96 1.97 1.97 1.99 1.99 2.00 2.00 2.01 2.02 2.03 2.03 Area A Duration (min) 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 Inflow (cfs) 5.10 5.11 5.13 5.15 5.17 5.18 5.20 5.22 5.23 5.25 5.27 5.29 5.30 5.32 5.34 5.36 5.37 5.39 5.41 5.42 5.44 5.46 5.48 5.49 5.51 5.53 5.55 5.56 5.58 5.60 5.61 5.63 5.65 5.67 5.68 5.70 5.72 5.74 5.75 5.77 5.79 5.80 5.82 5.84 5.86 5.87 5.89 5.91 5.93 5.94 5.96 5.98 5.99 6.01 6.03 6.05 6.06 6.08 6.10 6.12 6.13 6.15 6.17 6.18 6.20 6.22 6.24 6.25 6.27 6.29 6.31 6.32 6.34 6.36 6.37 6.39 Reservoir Reservoir Storage (cf) Elevation (ft) 8288.03 6.88 8290.63 6.88 8292.47 6.88 8294.75 6.89 8296.86 6.89 8298.81 6.89 8300.60 6.89 8303.42 6.89 8305.48 6.89 8308.57 6.90 8310.90 6.90 8313.67 6.90 8315.07 6.90 8317.52 6.90 8319.79 6.91 8321.91 6.91 8323.86 6.91 8326.84 6.91 8329.67 6.91 8331.13 6.92 8333.62 6.92 8336.56 6.92 8339.33 6.92 8341.33 6.92 8343.77 6.93 8346.05 6.93 8348.17 6.93 8350.12 6.93 8353.11 6.93 8354.73 6.94 8357.39 6.94 8359.29 6.94 8362.23 6.94 8365.00 6.94 8368.80 6.95 8369.45 6.95 8371.13 6.95 8373.25 6.95 8376.40 6.95 8378.19 6.96 8381.01 6.96 8383.68 6.96 8385.58 6.96 8386.71 6.96 8388.88 6.96 8391.49 6.97 8393.94 6.97 8395.62 6.97 8397.74 6.97 8400.89 6.97 8403.88 6.98 8405.51 6.98 8408.18 6.98 8410.08 6.98 8413.01 6.98 8414.59 6.99 8417.20 6.99 8419.65 6.99 8421.33 6.99 8423.45 6.99 8425.40 6.99 8428.40 7.00 8430.03 7.00 8432.69 7.00 8435.19 7.00 8436.93 7.00 8439.71 7.01 8442.32 7.01 8444.17 7.01 8446.45 7.01 8448.57 7.01 8450.53 7.02 8453.53 7.02 8455.16 7.02 8457.82 7.02 8460.33 7.02 Area B Outflow Duration (cfs) (min) 5.07 295 5.10 296 5.11 297 5.13 298 5.15 299 5.17 300 5.17 301 5.20 302 5.20 303 5.23 304 5.24 305 5.28 306 5.28 307 5.30 308 5.32 309 5.34 310 5.34 311 5.36 312 5.40 313 5.40 314 5.41 315 5.43 316 5.46 317 5.47 318 5.49 319 5.51 320 5.53 321 5.53 322 5.57 323 5.57 324 5.60 325 5.60 326 5.62 327 5.62 328 5.69 329 5.69 330 5.70 331 5.70 332 5.74 333 5.74 334 5.76 335 5.79 336 5.82 337 5.82 338 5.83 339 5.85 340 5.88 341 5.89 342 5.89 343 5.91 344 5.95 345 5.95 346 5.98 347 5.98 348 6.02 349 6.02 350 6.04 351 6.07 352 6.08 353 6.10 354 6.10 355 6.14 356 6.14 357 6.16 358 6.19 359 6.19 360 6.21 361 6.24 362 6.25 363 6.27 364 6.29 365 6.29 366 6.33 367 6.33 368 6.35 369 6.37 370 Page 5 of 11 Inflow (cfs) 2.04 2.05 2.06 2.06 2.07 2.08 2.08 2.09 2.10 2.10 2.11 2.12 2.12 2.13 2.14 2.14 2.15 2.16 2.17 2.17 2.18 2.19 2.19 2.20 2.21 2.21 2.22 2.23 2.23 2.24 2.25 2.26 2.26 2.27 2.28 2.28 2.29 2.30 2.30 2.31 2.32 2.32 2.33 2.34 2.35 2.35 2.36 2.37 2.37 2.38 2.39 2.39 2.40 2.41 2.41 2.42 2.43 2.44 2.44 2.45 2.46 2.46 2.47 2.48 2.48 2.49 2.50 2.50 2.51 2.52 2.53 2.53 2.54 2.55 2.55 2.56 Reservoir Reservoir Storage (cf) Elevation (ft) 3200.24 6.48 3200.73 6.48 3201.63 6.48 3201.75 6.48 3202.28 6.48 3203.23 6.48 3203.39 6.48 3203.97 6.49 3204.96 6.49 3205.17 6.49 3205.79 6.49 3206.23 6.49 3207.08 6.49 3207.15 6.49 3207.64 6.49 3208.54 6.50 3208.65 6.50 3209.18 6.50 3210.12 6.50 3210.28 6.50 3210.86 6.50 3211.85 6.50 3212.06 6.50 3212.68 6.50 3213.11 6.50 3213.36 6.50 3214.03 6.51 3214.51 6.51 3215.41 6.51 3215.52 6.51 3216.04 6.51 3216.99 6.51 3217.14 6.51 3217.71 6.51 3218.70 6.52 3218.90 6.52 3218.92 6.52 3219.36 6.52 3220.20 6.52 3220.87 6.52 3221.34 6.52 3221.64 6.52 3221.75 6.52 3222.27 6.52 3223.21 6.52 3223.36 6.53 3223.93 6.53 3224.92 6.53 3225.12 6.53 3225.73 6.53 3226.16 6.53 3227.01 6.53 3227.07 6.53 3227.54 6.53 3228.43 6.54 3229.14 6.54 3229.66 6.54 3229.99 6.54 3230.74 6.54 3230.71 6.54 3231.09 6.54 3231.89 6.54 3232.50 6.54 3233.53 6.55 3233.77 6.55 3233.83 6.55 3234.30 6.55 3234.59 6.55 3235.29 6.55 3235.81 6.55 3236.74 6.55 3236.89 6.55 3237.45 6.55 3238.43 6.56 3238.02 6.55 3239.23 6.56 Outflow (cfs) 2.04 2.04 2.06 2.06 2.06 2.08 2.08 2.08 2.10 2.10 2.11 2.11 2.13 2.13 2.13 2.15 2.15 2.15 2.17 2.17 2.17 2.19 2.19 2.20 2.21 2.21 2.22 2.22 2.24 2.24 2.24 2.26 2.26 2.26 2.28 2.29 2.29 2.29 2.30 2.31 2.32 2.33 2.33 2.33 2.35 2.35 2.35 2.37 2.37 2.38 2.38 2.40 2.40 2.40 2.41 2.42 2.43 2.43 2.45 2.45 2.45 2.46 2.46 2.48 2.49 2.49 2.50 2.50 2.51 2.51 2.53 2.53 2.53 2.56 2.54 2.56 Area A Duration (min) 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 Inflow (cfs) 6.41 6.43 6.44 6.46 6.48 6.50 6.51 6.53 6.55 6.56 6.58 6.60 6.62 6.63 6.65 6.67 6.69 6.70 6.72 6.74 6.75 6.77 6.79 6.81 6.82 6.84 6.86 6.88 6.89 6.91 6.93 6.94 6.96 6.98 7.00 7.01 7.03 7.05 7.07 7.08 7.10 7.08 7.07 7.05 7.03 7.01 7.00 6.98 6.96 6.94 6.93 6.91 6.89 6.88 6.86 6.84 6.82 6.81 6.79 6.77 6.75 6.74 6.72 6.70 6.69 6.67 6.65 6.63 6.62 6.60 6.58 6.56 6.55 6.53 6.51 6.50 Reservoir Reservoir Storage (cf) Elevation (ft) 8462.67 7.03 8464.24 7.03 8466.86 7.03 8469.31 7.03 8470.99 7.03 8473.12 7.03 8475.07 7.04 8478.07 7.04 8479.70 7.04 8482.37 7.04 8483.68 7.04 8486.02 7.04 8488.20 7.05 8490.81 7.05 8492.66 7.05 8494.95 7.05 8497.07 7.05 8499.03 7.06 8502.03 7.06 8504.86 7.06 8506.33 7.06 8508.84 7.06 8511.18 7.07 8513.36 7.07 8514.78 7.07 8517.23 7.07 8519.52 7.07 8521.05 7.07 8523.01 7.08 8526.01 7.08 8527.64 7.08 8530.31 7.08 8532.82 7.08 8533.97 7.08 8536.15 7.09 8538.16 7.09 8540.62 7.09 8542.91 7.09 8544.44 7.09 8546.40 7.09 8549.40 7.10 8550.16 7.10 8548.69 7.10 8547.38 7.10 8545.04 7.09 8542.85 7.09 8540.23 7.09 8538.38 7.09 8536.69 7.09 8534.56 7.08 8532.59 7.08 8530.79 7.08 8527.95 7.08 8526.48 7.08 8523.97 7.08 8521.62 7.07 8519.44 7.07 8516.82 7.07 8514.96 7.07 8513.27 7.07 8510.54 7.07 8508.57 7.06 8506.77 7.06 8503.93 7.06 8502.45 7.06 8501.14 7.06 8498.79 7.06 8496.60 7.05 8494.58 7.05 8491.52 7.05 8488.63 7.05 8487.10 7.05 8484.53 7.04 8481.53 7.04 8479.88 7.04 8477.21 7.04 Area B Outflow Duration (cfs) (min) 6.40 371 6.40 372 6.42 373 6.45 374 6.46 375 6.48 376 6.48 377 6.52 378 6.52 379 6.56 380 6.56 381 6.58 382 6.59 383 6.62 384 6.63 385 6.65 386 6.67 387 6.67 388 6.69 389 6.73 390 6.73 391 6.75 392 6.77 393 6.80 394 6.80 395 6.82 396 6.85 397 6.86 398 6.86 399 6.90 400 6.90 401 6.92 402 6.96 403 6.96 404 6.98 405 6.99 406 7.01 407 7.04 408 7.05 409 7.05 410 7.07 411 7.09 412 7.07 413 7.07 414 7.05 415 7.04 416 7.01 417 6.99 418 6.98 419 6.96 420 6.94 421 6.94 422 6.90 423 6.90 424 6.88 425 6.86 426 6.85 427 6.82 428 6.80 429 6.80 430 6.77 431 6.75 432 6.75 433 6.71 434 6.69 435 6.69 436 6.67 437 6.65 438 6.65 439 6.63 440 6.59 441 6.59 442 6.58 443 6.54 444 6.54 445 6.50 446 Page 6 of 11 Inflow (cfs) 2.57 2.57 2.58 2.59 2.59 2.60 2.61 2.62 2.62 2.63 2.64 2.64 2.65 2.66 2.66 2.67 2.68 2.68 2.69 2.70 2.71 2.71 2.72 2.73 2.73 2.74 2.75 2.75 2.76 2.77 2.77 2.78 2.79 2.80 2.80 2.81 2.82 2.82 2.83 2.82 2.82 2.81 2.80 2.80 2.79 2.78 2.77 2.77 2.76 2.75 2.75 2.74 2.73 2.73 2.72 2.71 2.71 2.70 2.69 2.68 2.68 2.67 2.66 2.66 2.65 2.64 2.64 2.63 2.62 2.62 2.61 2.60 2.59 2.59 2.58 2.57 Reservoir Reservoir Storage (cf) Elevation (ft) 3239.66 6.56 3239.90 6.56 3240.55 6.56 3241.02 6.56 3241.30 6.56 3242.00 6.56 3241.92 6.56 3242.25 6.56 3242.99 6.56 3243.55 6.57 3244.53 6.57 3244.72 6.57 3245.33 6.57 3245.75 6.57 3246.58 6.57 3246.64 6.57 3247.10 6.57 3247.98 6.57 3248.08 6.58 3248.59 6.58 3249.52 6.58 3249.66 6.58 3250.22 6.58 3250.59 6.58 3251.38 6.58 3251.38 6.58 3251.80 6.58 3252.63 6.58 3253.28 6.59 3253.15 6.59 3254.02 6.59 3254.72 6.59 3254.63 6.59 3254.95 6.59 3255.69 6.59 3256.25 6.59 3256.62 6.59 3257.40 6.59 3258.00 6.60 3258.18 6.60 3257.95 6.60 3257.31 6.59 3256.25 6.59 3255.37 6.59 3255.28 6.59 3254.78 6.59 3253.85 6.59 3253.72 6.59 3253.17 6.59 3252.80 6.58 3252.02 6.58 3252.02 6.58 3251.61 6.58 3250.78 6.58 3250.14 6.58 3249.68 6.58 3249.41 6.58 3248.72 6.58 3248.82 6.58 3248.50 6.58 3247.76 6.57 3246.62 6.57 3246.25 6.57 3246.07 6.57 3245.48 6.57 3245.07 6.57 3244.25 6.57 3244.21 6.57 3243.75 6.57 3242.88 6.56 3242.20 6.56 3241.70 6.56 3241.38 6.56 3241.25 6.56 3240.70 6.56 3240.34 6.56 Outflow (cfs) 2.57 2.57 2.58 2.59 2.59 2.61 2.61 2.61 2.62 2.62 2.64 2.64 2.65 2.65 2.67 2.67 2.67 2.69 2.69 2.69 2.71 2.71 2.72 2.72 2.74 2.74 2.74 2.75 2.77 2.76 2.77 2.79 2.79 2.79 2.80 2.81 2.81 2.82 2.82 2.82 2.82 2.82 2.81 2.79 2.79 2.79 2.77 2.77 2.76 2.76 2.74 2.74 2.74 2.73 2.72 2.71 2.71 2.69 2.69 2.69 2.69 2.67 2.66 2.66 2.65 2.65 2.63 2.63 2.63 2.62 2.61 2.60 2.59 2.59 2.58 2.58 Area A Duration (min) 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 Inflow (cfs) 6.48 6.46 6.44 6.43 6.41 6.39 6.37 6.36 6.34 6.32 6.31 6.29 6.27 6.25 6.24 6.22 6.20 6.18 6.17 6.15 6.13 6.12 6.10 6.08 6.06 6.05 6.03 6.01 5.99 5.98 5.96 5.94 5.93 5.91 5.89 5.87 5.86 5.84 5.82 5.80 5.79 5.77 5.75 5.74 5.72 5.70 5.68 5.67 5.65 5.63 5.61 5.60 5.58 5.56 5.55 5.53 5.51 5.49 5.48 5.46 5.44 5.42 5.41 5.39 5.37 5.36 5.34 5.32 5.30 5.29 5.27 5.25 5.23 5.22 5.20 5.18 Reservoir Reservoir Storage (cf) Elevation (ft) 8475.89 7.04 8473.54 7.03 8471.36 7.03 8469.33 7.03 8466.87 7.03 8465.18 7.03 8462.44 7.03 8460.47 7.02 8457.47 7.02 8455.83 7.02 8453.15 7.02 8450.63 7.02 8448.28 7.01 8446.09 7.01 8444.07 7.01 8442.21 7.01 8439.91 7.01 8438.37 7.01 8435.80 7.00 8433.40 7.00 8431.75 7.00 8429.07 7.00 8426.55 7.00 8424.20 6.99 8422.01 6.99 8419.99 6.99 8417.52 6.99 8415.82 6.99 8414.29 6.99 8411.72 6.98 8408.71 6.98 8406.46 6.98 8403.78 6.98 8401.26 6.97 8398.91 6.97 8396.72 6.97 8394.69 6.97 8392.22 6.97 8390.52 6.97 8388.99 6.96 8386.41 6.96 8383.40 6.96 8381.75 6.96 8379.07 6.96 8376.55 6.95 8374.20 6.95 8372.00 6.95 8369.97 6.95 8367.51 6.95 8364.61 6.94 8364.27 6.94 8362.89 6.94 8360.48 6.94 8358.23 6.94 8354.95 6.94 8351.23 6.93 8348.87 6.93 8346.67 6.93 8344.64 6.93 8341.58 6.92 8339.87 6.92 8337.73 6.92 8334.56 6.92 8333.34 6.92 8331.09 6.92 8328.41 6.91 8325.88 6.91 8323.53 6.91 8321.33 6.91 8319.30 6.91 8316.23 6.90 8314.52 6.90 8311.78 6.90 8309.20 6.90 8306.79 6.90 8303.94 6.89 Area B Outflow Duration (cfs) (min) 6.50 447 6.48 448 6.46 449 6.45 450 6.42 451 6.42 452 6.39 453 6.39 454 6.35 455 6.35 456 6.33 457 6.31 458 6.29 459 6.27 460 6.25 461 6.24 462 6.21 463 6.21 464 6.19 465 6.16 466 6.16 467 6.14 468 6.12 469 6.10 470 6.08 471 6.07 472 6.04 473 6.02 474 6.02 475 6.01 476 5.98 477 5.97 478 5.95 479 5.93 480 5.91 481 5.89 482 5.88 483 5.85 484 5.83 485 5.83 486 5.82 487 5.78 488 5.78 489 5.76 490 5.74 491 5.72 492 5.70 493 5.69 494 5.68 495 5.62 496 5.62 497 5.62 498 5.60 499 5.60 500 5.59 501 5.55 502 5.53 503 5.51 504 5.51 505 5.47 506 5.46 507 5.46 508 5.41 509 5.41 510 5.40 511 5.38 512 5.36 513 5.34 514 5.32 515 5.32 516 5.28 517 5.28 518 5.26 519 5.24 520 5.23 521 5.20 522 Page 7 of 11 Inflow (cfs) 2.57 2.56 2.55 2.55 2.54 2.53 2.53 2.52 2.51 2.50 2.50 2.49 2.48 2.48 2.47 2.46 2.46 2.45 2.44 2.44 2.43 2.42 2.41 2.41 2.40 2.39 2.39 2.38 2.37 2.37 2.36 2.35 2.35 2.34 2.33 2.32 2.32 2.31 2.30 2.30 2.29 2.28 2.28 2.27 2.26 2.26 2.25 2.24 2.23 2.23 2.22 2.21 2.21 2.20 2.19 2.19 2.18 2.17 2.17 2.16 2.15 2.14 2.14 2.13 2.12 2.12 2.11 2.10 2.10 2.09 2.08 2.08 2.07 2.06 2.06 2.05 Reservoir Reservoir Storage (cf) Elevation (ft) 3239.57 6.56 3238.98 6.56 3238.57 6.56 3237.75 6.55 3237.71 6.55 3237.26 6.55 3236.99 6.55 3236.31 6.55 3235.81 6.55 3235.50 6.55 3234.77 6.55 3234.23 6.55 3233.27 6.55 3233.10 6.54 3232.51 6.54 3232.71 6.54 3231.89 6.54 3231.26 6.54 3230.81 6.54 3229.94 6.54 3229.86 6.54 3229.37 6.54 3229.06 6.54 3228.33 6.54 3227.79 6.53 3227.44 6.53 3226.67 6.53 3226.08 6.53 3225.68 6.53 3224.87 6.53 3224.24 6.53 3223.79 6.53 3223.53 6.53 3222.85 6.52 3222.36 6.52 3222.06 6.52 3221.33 6.52 3220.80 6.52 3220.44 6.52 3219.68 6.52 3219.70 6.52 3219.30 6.52 3218.49 6.52 3217.86 6.51 3217.41 6.51 3217.16 6.51 3216.48 6.51 3215.99 6.51 3215.69 6.51 3214.97 6.51 3214.44 6.51 3214.09 6.51 3213.32 6.50 3212.74 6.50 3212.35 6.50 3211.54 6.50 3211.52 6.50 3211.08 6.50 3210.22 6.50 3209.55 6.50 3209.06 6.50 3208.76 6.50 3208.05 6.49 3207.52 6.49 3207.17 6.49 3206.41 6.49 3205.83 6.49 3205.44 6.49 3205.23 6.49 3204.61 6.49 3203.57 6.48 3203.32 6.48 3202.65 6.48 3202.17 6.48 3201.87 6.48 3201.16 6.48 Outflow (cfs) 2.57 2.56 2.56 2.54 2.54 2.53 2.53 2.52 2.51 2.51 2.50 2.50 2.48 2.48 2.46 2.47 2.46 2.45 2.45 2.43 2.43 2.42 2.42 2.41 2.40 2.40 2.39 2.38 2.38 2.37 2.36 2.35 2.35 2.34 2.33 2.33 2.32 2.31 2.31 2.29 2.29 2.29 2.28 2.27 2.26 2.26 2.25 2.24 2.24 2.23 2.22 2.22 2.21 2.20 2.20 2.18 2.18 2.18 2.17 2.16 2.15 2.15 2.14 2.13 2.13 2.12 2.11 2.10 2.10 2.10 2.08 2.08 2.07 2.06 2.06 2.05 Area A Duration (min) 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 Inflow (cfs) 5.17 5.15 5.13 5.11 5.10 5.08 5.06 5.04 5.03 5.01 4.99 4.98 4.96 4.94 4.92 4.91 4.89 4.87 4.85 4.84 4.82 4.80 4.79 4.77 4.75 4.73 4.72 4.70 4.68 4.66 4.65 4.63 4.61 4.60 4.58 4.56 4.54 4.53 4.51 4.49 4.47 4.46 4.44 4.42 4.41 4.39 4.37 4.35 4.34 4.32 4.30 4.28 4.27 4.25 4.23 4.22 4.20 4.18 4.16 4.15 4.13 4.11 4.09 4.08 4.06 4.04 4.03 4.01 3.99 3.97 3.96 3.94 3.92 3.90 3.89 3.87 Reservoir Reservoir Storage (cf) Elevation (ft) 8301.85 6.89 8299.33 6.89 8296.97 6.89 8294.77 6.89 8292.74 6.88 8290.87 6.88 8287.96 6.88 8286.42 6.88 8283.84 6.88 8281.42 6.87 8279.17 6.87 8277.08 6.87 8273.95 6.87 8270.99 6.87 8267.59 6.86 8265.56 6.86 8263.69 6.86 8261.98 6.86 8259.23 6.86 8256.65 6.85 8254.24 6.85 8251.38 6.85 8249.29 6.85 8246.76 6.85 8244.40 6.84 8242.20 6.84 8238.96 6.84 8236.49 6.84 8234.18 6.84 8233.24 6.83 8231.25 6.83 8229.43 6.83 8226.58 6.83 8223.89 6.83 8220.76 6.82 8217.19 6.82 8214.99 6.82 8212.95 6.82 8209.88 6.82 8206.97 6.81 8205.42 6.81 8204.04 6.81 8201.62 6.81 8199.96 6.81 8197.87 6.81 8194.74 6.80 8191.17 6.80 8188.97 6.80 8186.93 6.80 8183.85 6.79 8182.14 6.79 8179.39 6.79 8176.80 6.79 8174.38 6.79 8172.12 6.78 8170.03 6.78 8168.10 6.78 8165.13 6.78 8162.33 6.78 8159.08 6.77 8156.01 6.77 8154.29 6.77 8151.54 6.77 8148.96 6.76 8146.53 6.76 8144.27 6.76 8142.18 6.76 8140.24 6.76 8137.27 6.76 8134.47 6.75 8131.83 6.75 8128.75 6.75 8125.83 6.75 8123.08 6.74 8120.49 6.74 8118.07 6.74 Area B Outflow Duration (cfs) (min) 5.19 523 5.17 524 5.15 525 5.13 526 5.11 527 5.11 528 5.07 529 5.07 530 5.05 531 5.03 532 5.01 533 5.01 534 4.99 535 4.98 536 4.94 537 4.92 538 4.90 539 4.90 540 4.88 541 4.86 542 4.85 543 4.82 544 4.81 545 4.79 546 4.77 547 4.77 548 4.74 549 4.72 550 4.68 551 4.68 552 4.66 553 4.66 554 4.64 555 4.63 556 4.62 557 4.58 558 4.56 559 4.56 560 4.54 561 4.50 562 4.48 563 4.48 564 4.45 565 4.44 566 4.44 567 4.43 568 4.39 569 4.37 570 4.37 571 4.33 572 4.33 573 4.31 574 4.29 575 4.27 576 4.25 577 4.23 578 4.23 579 4.21 580 4.20 581 4.18 582 4.14 583 4.14 584 4.12 585 4.10 586 4.08 587 4.06 588 4.04 589 4.04 590 4.02 591 4.00 592 3.99 593 3.97 594 3.95 595 3.93 596 3.91 597 3.89 598 Page 8 of 11 Inflow (cfs) 2.04 2.03 2.03 2.02 2.01 2.01 2.00 1.99 1.99 1.98 1.97 1.97 1.96 1.95 1.94 1.94 1.93 1.92 1.92 1.91 1.90 1.90 1.89 1.88 1.88 1.87 1.86 1.85 1.85 1.84 1.83 1.83 1.82 1.81 1.81 1.80 1.79 1.79 1.78 1.77 1.76 1.76 1.75 1.74 1.74 1.73 1.72 1.72 1.71 1.70 1.70 1.69 1.68 1.67 1.67 1.66 1.65 1.65 1.64 1.63 1.63 1.62 1.61 1.61 1.60 1.59 1.58 1.58 1.57 1.56 1.56 1.55 1.54 1.54 1.53 1.52 Reservoir Reservoir Storage (cf) Elevation (ft) 3200.63 6.48 3200.29 6.48 3199.53 6.48 3198.96 6.48 3198.57 6.47 3198.37 6.47 3197.75 6.47 3196.71 6.47 3196.46 6.47 3195.80 6.47 3195.32 6.47 3195.02 6.47 3194.31 6.47 3193.19 6.46 3192.85 6.46 3192.09 6.46 3192.12 6.46 3191.74 6.46 3190.93 6.46 3190.32 6.46 3189.89 6.46 3189.64 6.46 3188.98 6.46 3187.90 6.45 3187.61 6.45 3186.90 6.45 3186.38 6.45 3186.04 6.45 3185.29 6.45 3184.72 6.45 3184.34 6.45 3184.14 6.45 3183.53 6.44 3182.50 6.44 3182.26 6.44 3181.60 6.44 3181.13 6.44 3180.84 6.44 3180.13 6.44 3179.61 6.44 3179.28 6.44 3178.53 6.43 3177.96 6.43 3176.98 6.43 3176.79 6.43 3176.18 6.43 3175.15 6.43 3174.91 6.43 3174.26 6.43 3173.79 6.42 3173.50 6.42 3172.80 6.42 3172.28 6.42 3171.95 6.42 3171.20 6.42 3170.64 6.42 3169.67 6.42 3169.47 6.42 3168.87 6.41 3167.84 6.41 3167.61 6.41 3166.95 6.41 3166.48 6.41 3166.20 6.41 3165.50 6.41 3164.99 6.41 3164.06 6.40 3163.32 6.40 3162.76 6.40 3162.38 6.40 3161.60 6.40 3160.99 6.40 3160.57 6.40 3159.74 6.40 3159.09 6.39 3158.62 6.39 Outflow (cfs) 2.04 2.04 2.03 2.02 2.01 2.01 2.01 1.99 1.99 1.98 1.97 1.97 1.97 1.95 1.95 1.93 1.93 1.93 1.92 1.91 1.90 1.90 1.90 1.88 1.88 1.87 1.86 1.86 1.85 1.84 1.83 1.83 1.83 1.81 1.81 1.80 1.79 1.79 1.78 1.77 1.77 1.76 1.76 1.74 1.74 1.74 1.72 1.72 1.71 1.70 1.70 1.69 1.68 1.68 1.67 1.67 1.65 1.65 1.65 1.63 1.63 1.62 1.61 1.61 1.60 1.60 1.59 1.58 1.57 1.57 1.56 1.55 1.55 1.54 1.53 1.52 Area A Duration (min) 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 Inflow (cfs) 3.85 3.84 3.82 3.80 3.78 3.77 3.75 3.73 3.71 3.70 3.68 3.66 3.65 3.63 3.61 3.59 3.58 3.56 3.54 3.52 3.51 3.49 3.47 3.45 3.44 3.42 3.40 3.39 3.37 3.35 3.33 3.32 3.30 3.28 3.26 3.25 3.23 3.21 3.20 3.18 3.16 3.14 3.13 3.11 3.09 3.07 3.06 3.04 3.02 3.01 2.99 2.97 2.95 2.94 2.92 2.90 2.88 2.87 2.85 2.83 2.82 2.80 2.78 2.76 2.75 2.73 2.71 2.69 2.68 2.66 2.64 2.63 2.61 2.59 2.57 2.56 Reservoir Reservoir Storage (cf) Elevation (ft) 8115.81 6.74 8113.71 6.74 8110.57 6.73 8107.60 6.73 8104.80 6.73 8101.55 6.73 8100.27 6.72 8097.95 6.72 8095.20 6.72 8091.41 6.72 8088.99 6.72 8086.72 6.71 8084.62 6.71 8081.49 6.71 8078.52 6.71 8075.11 6.70 8073.66 6.70 8071.18 6.70 8068.26 6.70 8066.11 6.70 8063.52 6.69 8059.89 6.69 8057.62 6.69 8054.32 6.69 8052.39 6.68 8049.41 6.68 8046.60 6.68 8043.95 6.68 8041.47 6.68 8038.55 6.67 8036.40 6.67 8033.20 6.67 8029.57 6.67 8027.31 6.66 8024.01 6.66 8022.07 6.66 8019.09 6.66 8016.28 6.65 8013.63 6.65 8011.15 6.65 8008.83 6.65 8005.47 6.65 8001.67 6.64 7999.84 6.64 7996.98 6.64 7993.67 6.64 7990.53 6.63 7987.56 6.63 7984.74 6.63 7982.09 6.63 7979.01 6.62 7976.08 6.62 7973.33 6.62 7970.13 6.62 7967.70 6.61 7965.43 6.61 7964.52 6.61 7962.58 6.61 7960.80 6.61 7959.19 6.61 7957.14 6.61 7955.85 6.60 7953.53 6.60 7950.17 6.60 7945.77 6.60 7940.34 6.59 7934.47 6.59 7929.96 6.58 7926.22 6.58 7922.64 6.58 7918.62 6.57 7915.37 6.57 7912.28 6.57 7909.35 6.57 7906.59 6.56 7903.39 6.56 Area B Outflow Duration (cfs) (min) 3.87 599 3.87 600 3.85 601 3.83 602 3.82 603 3.77 604 3.77 605 3.76 606 3.76 607 3.72 608 3.70 609 3.68 610 3.68 611 3.66 612 3.65 613 3.60 614 3.60 615 3.59 616 3.56 617 3.55 618 3.55 619 3.51 620 3.51 621 3.47 622 3.47 623 3.45 624 3.43 625 3.41 626 3.40 627 3.37 628 3.37 629 3.36 630 3.32 631 3.32 632 3.28 633 3.28 634 3.26 635 3.24 636 3.22 637 3.20 638 3.20 639 3.19 640 3.14 641 3.14 642 3.13 643 3.11 644 3.09 645 3.07 646 3.05 647 3.04 648 3.02 649 3.00 650 2.99 651 2.96 652 2.94 653 2.90 654 2.90 655 2.88 656 2.86 657 2.85 658 2.82 659 2.82 660 2.82 661 2.82 662 2.82 663 2.81 664 2.77 665 2.74 666 2.72 667 2.71 668 2.68 669 2.66 670 2.64 671 2.62 672 2.61 673 2.59 674 Page 9 of 11 Inflow (cfs) 1.52 1.51 1.50 1.49 1.49 1.48 1.47 1.47 1.46 1.45 1.45 1.44 1.43 1.43 1.42 1.41 1.40 1.40 1.39 1.38 1.38 1.37 1.36 1.36 1.35 1.34 1.34 1.33 1.32 1.31 1.31 1.30 1.29 1.29 1.28 1.27 1.27 1.26 1.25 1.25 1.24 1.23 1.22 1.22 1.21 1.20 1.20 1.19 1.18 1.18 1.17 1.16 1.16 1.15 1.14 1.13 1.13 1.12 1.11 1.11 1.10 1.09 1.09 1.08 1.07 1.07 1.06 1.05 1.04 1.04 1.03 1.02 1.02 1.01 1.00 1.00 Reservoir Reservoir Storage (cf) Elevation (ft) 3158.34 6.39 3157.65 6.39 3157.14 6.39 3156.21 6.39 3156.07 6.39 3155.51 6.39 3154.54 6.39 3154.36 6.39 3153.75 6.38 3152.74 6.38 3152.51 6.38 3151.86 6.38 3150.80 6.38 3150.52 6.38 3150.43 6.38 3149.92 6.38 3149.00 6.37 3148.26 6.37 3147.71 6.37 3146.74 6.37 3146.55 6.37 3145.96 6.37 3145.54 6.37 3144.71 6.37 3144.07 6.36 3143.01 6.36 3142.74 6.36 3142.05 6.36 3141.54 6.36 3141.22 6.36 3140.49 6.36 3139.94 6.36 3139.57 6.36 3138.79 6.35 3138.20 6.35 3137.18 6.35 3136.36 6.35 3136.32 6.35 3135.86 6.35 3134.99 6.35 3134.30 6.34 3133.20 6.34 3133.48 6.34 3133.35 6.34 3132.81 6.34 3131.84 6.34 3130.47 6.34 3130.47 6.34 3130.07 6.34 3129.24 6.33 3128.00 6.33 3128.75 6.33 3129.08 6.33 3126.60 6.33 3126.10 6.33 3125.19 6.33 3123.86 6.32 3125.11 6.33 3122.95 6.32 3123.38 6.32 3123.39 6.32 3122.98 6.32 3122.16 6.32 3120.93 6.32 3119.28 6.31 3122.01 6.32 3119.53 6.31 3121.44 6.32 3118.13 6.31 3119.20 6.31 3119.86 6.32 3120.10 6.32 3115.13 6.31 3114.54 6.30 3113.54 6.30 3112.12 6.30 Outflow (cfs) 1.52 1.51 1.51 1.49 1.49 1.49 1.47 1.47 1.47 1.45 1.45 1.45 1.43 1.42 1.42 1.42 1.41 1.40 1.40 1.38 1.38 1.37 1.37 1.36 1.36 1.34 1.34 1.33 1.32 1.32 1.31 1.30 1.30 1.29 1.29 1.28 1.26 1.26 1.26 1.25 1.25 1.22 1.22 1.22 1.22 1.22 1.19 1.19 1.19 1.19 1.15 1.15 1.19 1.15 1.15 1.15 1.10 1.15 1.10 1.10 1.10 1.10 1.10 1.10 1.02 1.10 1.02 1.10 1.02 1.02 1.02 1.10 1.02 1.02 1.02 0.96 Area A Duration (min) 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 Inflow (cfs) 2.54 2.52 2.50 2.49 2.47 2.45 2.44 2.42 2.40 2.38 2.37 2.35 2.33 2.31 2.30 2.28 2.26 2.25 2.23 2.21 2.19 2.18 2.16 2.14 2.12 2.11 2.09 2.07 2.06 2.04 2.02 2.00 1.99 1.97 1.95 1.93 1.92 1.90 1.88 1.87 1.85 1.83 1.81 1.80 1.78 1.76 1.74 1.73 1.71 1.69 1.68 1.66 1.64 1.62 1.61 1.59 1.57 1.55 1.54 1.52 1.50 1.49 1.47 1.45 1.43 1.42 1.40 1.38 1.36 1.35 1.33 1.31 1.30 1.28 1.26 1.24 Reservoir Reservoir Storage (cf) Elevation (ft) 7900.36 6.56 7897.49 6.56 7894.18 6.55 7891.63 6.55 7888.65 6.55 7885.24 6.55 7881.98 6.54 7879.49 6.54 7876.56 6.54 7873.20 6.54 7870.00 6.53 7866.96 6.53 7863.49 6.53 7860.18 6.53 7857.04 6.52 7854.05 6.52 7851.23 6.52 7847.98 6.52 7844.89 6.51 7841.96 6.51 7839.19 6.51 7835.99 6.51 7832.95 6.50 7829.48 6.50 7826.77 6.50 7823.62 6.49 7820.04 6.49 7816.62 6.49 7813.96 6.49 7810.87 6.48 7807.34 6.48 7803.97 6.48 7800.77 6.48 7797.73 6.47 7794.25 6.47 7790.94 6.47 7787.79 6.47 7784.80 6.46 7781.38 6.46 7778.12 6.46 7775.03 6.45 7771.50 6.45 7768.13 6.45 7764.93 6.45 7761.88 6.44 7758.41 6.44 7755.09 6.44 7751.34 6.43 7748.36 6.43 7744.93 6.43 7741.07 6.43 7737.38 6.42 7733.84 6.42 7731.07 6.42 7727.87 6.42 7724.23 6.41 7720.75 6.41 7717.43 6.41 7713.68 6.40 7710.09 6.40 7706.67 6.40 7703.41 6.39 7699.71 6.39 7696.17 6.39 7692.80 6.39 7689.00 6.38 7685.35 6.38 7681.87 6.38 7678.55 6.37 7674.80 6.37 7671.21 6.37 7667.79 6.37 7663.92 6.36 7660.22 6.36 7656.69 6.36 7653.32 6.35 Area B Outflow Duration (cfs) (min) 2.57 675 2.56 676 2.53 677 2.52 678 2.51 679 2.49 680 2.46 681 2.45 682 2.44 683 2.42 684 2.40 685 2.39 686 2.37 687 2.35 688 2.33 689 2.31 690 2.30 691 2.28 692 2.26 693 2.24 694 2.23 695 2.21 696 2.20 697 2.17 698 2.16 699 2.15 700 2.13 701 2.10 702 2.09 703 2.08 704 2.06 705 2.04 706 2.02 707 2.01 708 1.99 709 1.97 710 1.95 711 1.94 712 1.92 713 1.90 714 1.89 715 1.87 716 1.85 717 1.83 718 1.82 719 1.80 720 1.79 721 1.76 722 1.75 723 1.74 724 1.72 725 1.70 726 1.67 727 1.66 728 1.65 729 1.63 730 1.61 731 1.60 732 1.58 733 1.56 734 1.54 735 1.53 736 1.51 737 1.49 738 1.48 739 1.46 740 1.44 741 1.42 742 1.41 743 1.39 744 1.37 745 1.36 746 1.34 747 1.32 748 1.30 749 1.29 750 Page 10 of 11 Inflow (cfs) 0.99 0.98 0.98 0.97 0.96 0.95 0.95 0.94 0.93 0.93 0.92 0.91 0.91 0.90 0.89 0.89 0.88 0.87 0.86 0.86 0.85 0.84 0.84 0.83 0.82 0.82 0.81 0.80 0.80 0.79 0.78 0.77 0.77 0.76 0.75 0.75 0.74 0.73 0.73 0.72 0.71 0.71 0.70 0.69 0.69 0.68 0.67 0.66 0.66 0.65 0.64 0.64 0.63 0.62 0.62 0.61 0.60 0.60 0.59 0.58 0.57 0.57 0.56 0.55 0.55 0.54 0.53 0.53 0.52 0.51 0.51 0.50 0.49 0.48 0.48 0.47 Reservoir Reservoir Storage (cf) Elevation (ft) 3113.89 6.30 3111.64 6.30 3112.58 6.30 3113.10 6.30 3113.21 6.30 3109.30 6.29 3110.38 6.30 3109.24 6.29 3109.49 6.29 3107.52 6.29 3106.93 6.29 3105.94 6.29 3104.52 6.28 3102.69 6.28 3107.65 6.29 3104.99 6.29 3101.91 6.28 3105.62 6.29 3101.72 6.28 3104.60 6.28 3099.86 6.28 3101.91 6.28 3103.55 6.28 3104.77 6.28 3098.37 6.27 3098.76 6.27 3098.73 6.27 3098.29 6.27 3097.43 6.27 3096.16 6.27 3094.47 6.26 3092.37 6.26 3089.85 6.25 3095.92 6.27 3092.57 6.26 3088.81 6.25 3093.63 6.26 3089.04 6.25 3093.03 6.26 3087.61 6.25 3090.77 6.26 3093.52 6.26 3086.85 6.25 3088.76 6.25 3090.26 6.26 3091.35 6.26 3092.02 6.26 3083.28 6.24 3083.12 6.24 3082.54 6.24 3081.55 6.24 3080.14 6.24 3078.32 6.23 3076.09 6.23 3073.44 6.22 3073.37 6.22 3072.89 6.22 3071.99 6.22 3070.68 6.22 3068.96 6.21 3074.61 6.22 3072.06 6.22 3069.09 6.21 3073.50 6.22 3069.70 6.21 3065.48 6.21 3068.64 6.21 3071.40 6.22 3065.93 6.21 3067.86 6.21 3069.36 6.21 3062.65 6.20 3063.33 6.20 3063.59 6.20 3063.44 6.20 3062.87 6.20 Outflow (cfs) 1.02 0.96 0.96 0.96 1.02 0.93 0.96 0.93 0.96 0.93 0.93 0.93 0.93 0.81 0.93 0.93 0.81 0.93 0.81 0.93 0.81 0.81 0.81 0.93 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.66 0.81 0.81 0.66 0.81 0.66 0.81 0.66 0.66 0.81 0.66 0.66 0.66 0.66 0.81 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.61 0.61 0.61 0.61 0.61 0.48 0.61 0.61 0.48 0.61 0.61 0.48 0.48 0.61 0.48 0.48 0.61 0.48 0.48 0.48 0.48 0.48 Area A Duration (min) 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 Inflow (cfs) 1.23 1.21 1.19 1.17 1.16 1.14 1.12 1.11 1.09 1.07 1.05 1.04 1.02 1.00 0.98 0.97 0.95 0.93 0.92 0.90 0.88 0.86 0.85 0.83 0.81 0.79 0.78 0.76 0.74 0.73 0.71 0.69 0.67 0.66 0.64 0.62 0.60 0.59 0.57 0.55 0.54 0.52 0.50 0.48 0.47 0.45 0.43 0.41 0.40 0.38 0.36 0.35 0.33 0.31 0.29 0.28 0.26 0.24 0.22 0.21 0.19 0.17 0.16 0.14 0.12 0.10 0.09 0.07 0.05 0.03 0.02 0.00 Reservoir Reservoir Storage (cf) Elevation (ft) 7649.51 6.35 7645.26 6.35 7641.78 6.34 7639.06 6.34 7635.31 6.34 7632.32 6.34 7628.29 6.33 7625.62 6.33 7621.92 6.33 7617.19 6.32 7614.41 6.32 7610.60 6.32 7605.75 6.31 7604.67 6.31 7602.55 6.31 7599.40 6.31 7595.20 6.31 7589.97 6.30 7587.31 6.30 7583.61 6.30 7578.87 6.29 7574.89 6.29 7569.88 6.28 7563.83 6.28 7563.95 6.28 7563.03 6.28 7561.07 6.28 7558.07 6.27 7554.04 6.27 7548.98 6.27 7542.87 6.26 7535.73 6.26 7536.56 6.26 7536.34 6.26 7535.09 6.26 7532.81 6.25 7529.48 6.25 7525.13 6.25 7519.73 6.24 7513.30 6.24 7505.83 6.23 7497.32 6.22 7490.78 6.22 7483.20 6.21 7482.39 6.21 7480.54 6.21 7477.65 6.21 7473.73 6.20 7468.77 6.20 7462.77 6.20 7455.74 6.19 7447.67 6.18 7438.56 6.18 7439.82 6.18 7440.04 6.18 7439.22 6.18 7437.37 6.17 7434.48 6.17 7430.55 6.17 7425.59 6.16 7419.59 6.16 7412.56 6.15 7404.49 6.15 7395.38 6.14 7385.23 6.13 7374.05 6.12 7366.04 6.11 7356.98 6.11 7354.09 6.11 7350.16 6.10 7345.20 6.10 7339.20 6.09 Outflow (cfs) 1.28 1.25 1.22 1.22 1.19 1.19 1.15 1.15 1.15 1.10 1.10 1.10 1.02 1.02 1.02 1.02 1.02 0.96 0.96 0.96 0.93 0.93 0.93 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.61 0.61 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.22 0.22 0.10 0.10 0.10 0.10 0.10 Area B Duration (min) 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 Page 11 of 11 Inflow (cfs) 0.46 0.46 0.45 0.44 0.44 0.43 0.42 0.42 0.41 0.40 0.39 0.39 0.38 0.37 0.37 0.36 0.35 0.35 0.34 0.33 0.33 0.32 0.31 0.30 0.30 0.29 0.28 0.28 0.27 0.26 0.26 0.25 0.24 0.24 0.23 0.22 0.21 0.21 0.20 0.19 0.19 0.18 0.17 0.17 0.16 0.15 0.15 0.14 0.13 0.12 0.12 0.11 0.10 0.10 0.09 0.08 0.08 0.07 0.06 0.06 0.05 0.04 0.03 0.03 0.02 0.01 0.01 0.00 Reservoir Reservoir Storage (cf) Elevation (ft) 3061.88 6.20 3060.48 6.20 3058.67 6.19 3056.44 6.19 3053.79 6.18 3062.13 6.20 3058.66 6.19 3054.77 6.18 3050.46 6.18 3057.14 6.19 3052.01 6.18 3057.86 6.19 3051.89 6.18 3056.91 6.19 3050.11 6.17 3054.30 6.18 3046.67 6.17 3050.03 6.17 3052.97 6.18 3055.50 6.19 3046.21 6.17 3047.91 6.17 3049.19 6.17 3050.06 6.17 3050.51 6.18 3050.55 6.18 3050.17 6.17 3049.38 6.17 3048.17 6.17 3046.54 6.17 3044.50 6.16 3042.05 6.16 3039.18 6.15 3035.90 6.15 3032.20 6.14 3028.08 6.13 3027.75 6.13 3027.01 6.13 3025.85 6.13 3024.27 6.12 3022.28 6.12 3019.87 6.11 3017.05 6.11 3021.02 6.12 3017.36 6.11 3020.50 6.11 3016.02 6.11 3018.32 6.11 3020.21 6.11 3014.48 6.10 3015.54 6.10 3016.18 6.11 3016.41 6.11 3016.22 6.11 3015.62 6.10 3014.60 6.10 3013.17 6.10 3011.32 6.10 3009.05 6.09 3006.38 6.09 3003.28 6.08 2999.77 6.07 2995.85 6.06 2997.51 6.07 2992.75 6.06 2993.58 6.06 2994.00 6.06 2994.00 6.06 Outflow (cfs) 0.48 0.48 0.48 0.48 0.29 0.48 0.48 0.48 0.29 0.48 0.29 0.48 0.29 0.48 0.29 0.48 0.29 0.29 0.29 0.48 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.10 0.22 0.10 0.22 0.10 0.10 0.22 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.00 0.10 0.00 0.00 0.00 0.00 CLIENT Poseidon PROJECT Carlsbad Desalter DETAIL Interim-Dev. Hydrology 85th Percentile Storm Event Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) 85th Percentile Precipitation = 0.60 in (24-hour storm duration) P6 = 0.3 in Drainage Area A B Total Area (SF) Adjusted c 186,504 0.25 90,521 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ( ) E Change in Elev., Duration (tc) E (FT) (Min) 6.5 7.00 43 2.16 0.385 85th Percentile Event - 24 Hours I = Watercourse Length,L (FT) 672 455 Isopluvial (Inches) = JOB NO. PAGE DATE CHECKED CHECKED BY 9/10/2009 JED Storm Volume VOL = c P6 A Peak Discharge Q= c i A 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual COMPUTED BY Intensity 1.27 2.72 Peak Discharge, Runoff Volume, Q (cfs) VOL (acre-inch) 1.36 0.32 1.41 0.16 Drainage Area A B Runoff Volume, VOL (cf) 1,166 566 0.6 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Pervious Area DATE P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. (7.44P6D-0.645) x 2 Adjusted c value: Impervious Area 0.90 x + 0.25 x c = Total Area 1 OF 1 9/10/2009 CDF CLIENT Poseidon PROJECT Carlsbad Desalter DETAIL Post-Dev. Hydrology 85th Percentile Storm Event Intensity is based on San Diego County Hydrology Manual, June 2003 I = 7.44 P6D-0.645 Link I = Intensity (in/hr) 85th Percentile Precipitation = 0.60 in (24-hour storm duration) P6 = 0.3 in Drainage Area A B Total Area Permeable Impervious (SF) Area (SF) Area (SF) 152,752 21,221 130,733 105,792 38,467 68,054 258,544 c = 0.25 L = Watercourse Length = Change in Elevation = 11.9L3 D = Duration (tc) = ( ) E I = PAGE DATE CHECKED CHECKED BY 9/10/2009 JED Duration (tc) (Min) 5.90 6.89 Intensity 1.42 1.29 c = 0.90 Drainage Area A B Isopluvial (Inches) = Runoff Volume, VOL (cf) 3,074 1,772 4,846 0.6 (7.44P6D-0.645) x 2 Permeable Areas c = 0.25 From Table 3-1 of the San Diego County Hydrology Manual, Group B Soils, Permanent Open Space Soils Data taken from Appendix A of the San Diego County Hydrology Manual Impervious Areas c = 0.90 From Section 3.1.2 of the San Diego County Hydrology Manual, Impervious Areas Adjusted c value: Impervious Area 0.90 x + 0.25 x c = Total Area Storm Volume VOL = c P6 A Peak Discharge Q= c i A Pervious Area 6-Hour Precipitation Eq. 6-1 San Diego Hydrology Manual 1 DATE COMPUTED BY OF 1 9/10/2009 CDF P6/P24 needs to be between 45% to 65% of the 24 hr precipitation. Watercourse Change in Elev., Length,L (FT) E (FT) 634 8.5 7.5 695 Adjusted c 0.80 0.67 0.385 85th Percentile Event - 24 Hours JOB NO. Peak Discharge, Runoff Volume, Q (cfs) VOL (acre-inch) 0.85 4.01 2.10 0.49 10yr Curb Inlet On Sag - A Project Description Solve For Spread Input Data 12.03 Discharge ft³/s Gutter Width 1.50 ft Gutter Cross Slope 0.08 ft/ft Road Cross Slope 0.02 ft/ft Curb Opening Length 7.00 ft Opening Height 0.67 ft 10.00 in 7.00 ft Curb Throat Type Local Depression Local Depression Width Throat Incline Angle Horizontal 90.00 degrees Results Spread 6.72 ft Depth 0.50 ft Gutter Depression 0.09 ft Total Depression 0.92 ft Bentley Systems, Inc. Haestad Methods Solution Center 9/10/2009 9:08:57 AM Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 10yr Circular Pipe - A Project Description Friction Method Manning Formula Solve For Normal Depth Input Data 0.013 Roughness Coefficient 0.02700 Channel Slope Diameter 1.50 Discharge 12.03 ft/ft ft ft³/s Results Normal Depth 0.92 ft Flow Area 1.14 ft² Wetted Perimeter 2.70 ft Top Width 1.46 ft Critical Depth 1.32 ft Percent Full 61.5 % Critical Slope Velocity 0.01185 ft/ft 10.56 ft/s Velocity Head 1.73 ft Specific Energy 2.65 ft Froude Number 2.11 Maximum Discharge 18.57 ft³/s Discharge Full 17.26 ft³/s 0.01312 ft/ft Slope Full Flow Type SuperCritical GVF Input Data Downstream Depth Length 2.50 ft 89.00 ft 1 Number Of Steps GVF Output Data Upstream Depth 1.32 ft 1.22 ft Composite S1 -> S2 Profile Description Profile Headloss 127.19 % 61.48 % Downstream Velocity 6.81 ft/s Upstream Velocity 7.32 ft/s Average End Depth Over Rise Normal Depth Over Rise Bentley Systems, Inc. Haestad Methods Solution Center 9/10/2009 9:09:35 AM Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 10yr Circular Pipe - A GVF Output Data Normal Depth 0.92 ft Critical Depth 1.32 ft Channel Slope 0.02700 ft/ft Critical Slope 0.01185 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center 9/10/2009 9:09:35 AM Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 10yr Curb Inlet On Grade - B Project Description Solve For Efficiency Input Data Discharge Slope 6.28 ft³/s 0.60000 ft/ft Gutter Width 1.50 ft Gutter Cross Slope 0.08 ft/ft Road Cross Slope 0.01 ft/ft Roughness Coefficient 0.016 Curb Opening Length 13.00 ft Local Depression 10.00 in 5.00 ft 44.65 % Local Depression Width Results Efficiency Intercepted Flow 2.80 ft³/s Bypass Flow 3.48 ft³/s Spread 8.73 ft Depth 0.19 ft Flow Area 0.46 ft² Gutter Depression 0.11 ft Total Depression Velocity Equivalent Cross Slope Length Factor Total Interception Length 0.94 ft 13.67 ft/s 0.12476 ft/ft 0.28 46.41 ft Bentley Systems, Inc. Haestad Methods Solution Center 9/10/2009 9:10:14 AM Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 10yr Circular Pipe - B Project Description Friction Method Manning Formula Solve For Normal Depth Input Data 0.013 Roughness Coefficient 0.07100 Channel Slope ft/ft Diameter 1.50 ft Discharge 6.28 ft³/s 0.48 ft Results Normal Depth Flow Area 0.49 ft² Wetted Perimeter 1.81 ft Top Width 1.40 ft Critical Depth 0.97 ft Percent Full 32.2 % Critical Slope Velocity 0.00636 ft/ft 12.77 ft/s Velocity Head 2.54 ft Specific Energy 3.02 ft Froude Number 3.80 Maximum Discharge 30.11 ft³/s Discharge Full 27.99 ft³/s 0.00357 ft/ft Slope Full Flow Type SuperCritical GVF Input Data Downstream Depth Length 3.60 ft 50.70 ft 1 Number Of Steps GVF Output Data Upstream Depth 0.97 ft 0.97 ft Composite S1 -> S2 Profile Description Profile Headloss 152.29 % 32.20 % Downstream Velocity 3.55 ft/s Upstream Velocity 5.20 ft/s Average End Depth Over Rise Normal Depth Over Rise Bentley Systems, Inc. Haestad Methods Solution Center 9/10/2009 9:10:43 AM Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 10yr Circular Pipe - B GVF Output Data Normal Depth 0.48 ft Critical Depth 0.97 ft Channel Slope 0.07100 ft/ft Critical Slope 0.00636 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center 9/10/2009 9:10:43 AM Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Broad Crested Weir Project Description Solve For Discharge Input Data Headwater Elevation 7.00 ft Crest Elevation 6.00 ft Tailwater Elevation 0.00 ft Crest Breadth 0.50 ft Crest Length 2.00 ft Discharge 6.17 ft³/s Headwater Height Above Crest 1.00 ft Paved Crest Surface Type Results Tailwater Height Above Crest -6.00 Weir Coefficient 3.09 Submergence Factor 1.00 ft US Adjusted Weir Coefficient 3.09 US Flow Area 2.00 ft² Velocity 3.09 ft/s Wetted Perimeter 4.00 ft Top Width 2.00 ft Bentley Systems, Inc. Haestad Methods Solution Center 9/10/2009 10:23:26 AM Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 S H A P I N G T H E F UTURE O F WATER Q UA L I TY ™ ® A new approach to underground stormwater storage, infiltration, treatment, rainwater harvesting, or other stormwater management needs. c u d o water storage system US PATENT PENDING MADE IN THE U.S.A. FROM RECYCLED MATERIAL The French Connection Derived from the French “Cube d’eau”, meaning “cube of water”, the CUDO is a modular plastic cube used to construct underground water storage systems. The unique cube incorporates an arched design that adds structural integrity, increased water storage and enhanced access for inspection and maintenance. CUDO sets the new standard for stormwater management by incorporating features that are not available with other systems currently on the market. CUDO is made in the U.S.A. using injection molded, recycled, polypropylene plastic. A single CUDO assembly requires just two modules and two end caps. The CUDO may be installed as a singlelevel system, or connected vertically, to form a CUDO stack, increasing storage capacity. Formed stacks can be easily moved about a construction site. Per application, either a filter fabric or plastic liner is placed beneath and around the CUDO modules, forming an envelope around the entire system. Geo-grid or other structural enhancement may be incorporated into the CUDO installation, depending on the loading requirements. Features and Benefits of the Standard CUDO. Other Applications for CUDO •large interior openings offer ease of access for inspection and maintenance •individual drain inlet sand filter device •high water storage capacity (95%) •CUDO size (24” x 24” x 24”) offers ease of handling and installation •unique shape offers superior strength •minimum number of components required for assembly Added Components, Features and Benefits •built-in gross pollutant filter (GPF) or media filter devices (RMF, VMF) eliminate the need for separate pre-treatment systems and reduce or eliminate related piping •integral “metered outlet” device eliminates the need for separate outlet and flow control structure •BLUE (color) CUDO identifies the location of filter devices, simplifying assembly, installation and system maintenance •CUDO flow-through bypass feature forms a virtual pipeline through the system, reducing or eliminating separate bypass piping. The use of BLUE CUDO offers ease of assembly and installation by identifying the location and direction of virtual flow channels. •potential LEED® NC credits for Sustainable Sites (6.1, 6.2) Materials & Reuse (4.1, 4.2, 5.1, 5.2 in CA, AZ, NV, UT) and Water Efficiency (1.1, 1.2, 3.1 ,3.2) 1 •downspout sand filter device •modular sand filter system CUDO Modular Bioretention System •CUDO may be integrated into bioretention systems (rain gardens) replacing drain pipe and aggregate with a highly porous matrix •additional storage volume enhances retention •more opportunity for on-site rain water reuse through passive or active irrigation •mitigates temperature increase typical of surface storage The Concrete CUDO CUDO water storage systems are also available in pre-cast concrete designs to address many problematic applications. Contact your local CUDO distributor for availability of concrete CUDO in your area. •severe loading conditions – shallow or deep burial depths, heavy loading areas •high water tables – anti-floatation features •enhanced maintenance access – the larger CUDO allows full access for equipment and personnel •plastic filter CUDO devices may be used in conjunction with concrete CUDO to offer integral pre-filter capabilites CUDO components snap together, forming a single or multiple CUDO stack. Assembled stacks are installed to form the desiired CUDO system size and shape, with a maximum amount of footprint flexibility. CUDO 1 CUDO 2 CUDO 3 CUDO 4 1 LEED ® for New Construction and Major Renovation, US Green Building Council, v2.2, October 2005 C U D O S Y S T E M S D E S I Maintenance Access Flow-Through Bypass Outlet Control Media Filtration Assemble CUDO to build water storage systems with virtualy unlimited sizes and shapes. CUDO dimensions (2 ft. x 2 ft.) offers ease of installation, while a high 95% void ratio allows for a reduced system footprint. Specialty CUDO components allow the construction of systems with features and benefits simply not possible with any other water management product. G N C U D O A S S E M B L Y I S A S N A P ! CUDO components snap together, making assembly easy, and assuring a precise fit with solid construction. TOP/BOTTOM GRATE (ACCESS OPENING OPTIONAL) CUDO (ASSEMBLED) LATERAL COUPLER STACKING COUPLER (OPEN OR CLOSED) CUDO HALF SIDE PLUG (OPEN OR CLOSED) TOP/BOTTOM GRATE US PATENT PENDING MADE IN THE U.S.A. WITH RECYCLED MATERIAL ALL DIMENSIONAL MEASUREMENTS ARE NOMINAL © 2008 CUDO STORMWATER PRODUCTS, INC. CUDO STORMWATER P.O. BOX 497 ® OCCIDENTAL CA 95465 PRODUCTS PHONE 877.876.3345 INC. WWW.CUDOCUBE.COM FAX 707.876.3346 c u d o water storage system S H A P I N G T H E F U T U R E O F WAT E R Q UA L I T Y ™ US PATENT PENDING MADE IN THE U.S.A. WITH RECYCLED MATERIAL MORE ® c u d o water storage system HOW CAPACITY WE PER STACK CUBIC UP FOOT M O R E C A PA C I T Y – E I G H T C U B I C F E E T AT A T I M E HOW WE STACK UP Each CUDO ® module measures a large eight cubic feet, with 95% storage capacity. Cubic foot vs. cubic foot, we beat other systems. 2 ft. x 2 ft. x 2 ft. 2 ft. x 2 ft. x 4 ft. 2 ft. x 2 ft. x 6 ft. M O R E C A P A C I T Y CUDO ASSEMBLY UNIT WEIGHT (LBS.) STORAGE (CUBIC FT.) CAPACITY (GALLONS – 95%) CUDO 1 21 7.7 57 CUDO 2 41 15.4 115 CUDO 3 62 23.0 172 CUDO 4 86 30.6 229 US PATENT PENDING MADE IN THE U.S.A. WITH RECYCLED MATERIAL ALL DIMENSIONAL MEASUREMENTS ARE NOMINAL © 2008 CUDO STORMWATER PRODUCTS, INC. CUDO STORMWATER P E R 2 ft. x 2 ft. x 8 ft. C U B I C F O O T P.O. BOX 497 ® OCCIDENTAL CA 95465 PRODUCTS PHONE 877.876.3345 INC. WWW.CUDOCUBE.COM FAX 707.876.3346 c u d o water storage system CUDOTM Stormwater Cube (Underground Retention / Detention / Infiltration / Water Reuse Systems) Operations and Maintenance Manual Version 1.00c – November 05, 2008 2 | P a g e ‐ CUDOTM O&M Manual CUDOTM Stormwater Cube – Modular Stormwater Systems Description / Basic Function CUDOTM is a modular stormwater system comprised of a grouping of modular polypropylene or concrete cubes that when constructed form an underground storage area for stormwater. This system can be used for infiltration, retention, detention or water reuse. CUDOTM can help achieve runoff detainment and storage to help attenuate the peak flow to pre‐construction levels and can help conform to current Low Impact Development requirements. Infiltration The purpose of a CUDOTM infiltration system is to capture stormwater runoff, store the runoff, and then allow it to percolate into the ground via the open space area of the cubes and perforations in the side wall. The system is backfilled with a Class I material defined by ASTM D2321 as a cleaned open graded rock or a Class II permeable sand. The rock or sand provide additional storage capacity but also allow for a percolation interface with the native material. The ground water is “recharged” with this type of system. Detention The purpose of a CUDOTM detention system is to capture stormwater runoff, store the runoff, and then allow it to be released at a controlled rate through an appropriately sized orifice control. A detention system helps attenuate the peak flow from the site assuring that pre‐development runoff flows are not exceeded as a result of the development. A CUDOTM detention requires the cubes to be encapsulated with an impermeable liner for the polypropylene system or the seams of the concrete system to be sealed with a water proof mastic. Retention A CUDOTM retention system is a hybrid system. It is a combination of a detention system and an infiltration system. A retention system is utilized to attenuate peak flow as well as promote groundwater re‐charge. A retention system is outfitted with an overflow pipe at the top of the system which allows the system to fill for infiltration but also outlet if the ground is saturated. Water Reuse The purpose of a water‐reuse CUDOTM system is to capture and store water for future use. The system is constructed in a similar fashion to a detention system but instead of a controlled outlet the system is constructed with an emergency overflow. A water reuse system is a LID device that helps attenuate peak flows as well as conserve water. Water may be reused through an active pump system or passive irrigation. Inspection/Cleanout Ports Inspection and cleanout ports are 18‐inch diameter vertical risers connected to the uppermost polypropylene CUDOTM cubes or up to 30‐inch manhole access connected to the concrete CUDOTM. They are used for entrance into the system, or for access to place vacuum truck hoses or water‐jetting devices or CCTV equipment. Ports are strategically located near inlet and outlet pipes and in other areas or probable deposition in the system. It is recommended to keep surface level access lids sealed and bolted at all times when the system is in service. Inlet Bay Some systems are configured so that pretreatment of the stormwater occurs within the CUDOTM system. In this case the CUDOTM system will house an inlet bay. The inlet bay is separated from the rest of the CUDOTM system by sidewall plugs and is intended to separate gross pollutants, trash and debris and floatables from the CUDOTM system and pre‐treatment device. The bay contains its own sump area and unique access ports. Cudo Stormwater Products, Inc. P.O. Box 497 Occidental, California 95465‐0497 Phone: (877) 876‐3345 www.cudocube.com 3 | P a g e ‐ CUDOTM O&M Manual Maintenance Overview for CUDO State and Local regulations require that stormwater storage systems be maintained and serviced on a recurring basis. The purpose of maintaining a clean and obstruction free CUDOTM system is to ensure the system performs the intended function of the primary design. Trash and debris, floatables, gross pollutants and sediment can build up in the CUDOTM leading to clogging of the native soil interface or blockage of the inlet or outlet pipes. This can cause the system to function improperly by limiting storage volume, limiting the design percolation rates or impeding flow in and out of the system. Downstream and upstream, areas could run the risk of flooding and deleterious environmental impact. Recommended Frequency of Service It is recommended that the CUDOTM stormwater systems be serviced on a regularly occurring basis. Ultimately the frequency depends on the amount of runoff, pollutant loading, and interference from trash, debris and gross pollutants as well as proper maintenance of upstream pretreatment devices. However, it is recommended that each installation be inspected at least two times per year to assess service needs. Recommended Timing of Service Guidelines for the timing of service are as follows: 1. For areas with a definite rainy season the system should be serviced prior to and following the rainy season. 2. For areas subject to year‐round rainfall service should occur on a regularly occurring basis. (A minimum of two times per year.) 3. For areas with winter snow and summer rain the system should be serviced prior to and after the snow season. 4. For installed devices that are subject to dry weather flows only (i.e. wash racks, parking garages, etc…) the unit should be serviced on a regularly occurring basis. (A minimum of two times per year.) Inspection An inspection should be performed when the system is new. This allows the owner to establish a baseline condition for comparison to future inspections. Sediment build up can typically be monitored without entering the system. (No confined space entry.) Initial and subsequent inspection data should be recorded and filed for reference. Some regulatory agencies require that the results of the inspections be documented and reported. Inspection reports should comply with regulatory requirements and be submitted as required. Inspection Procedures 1. Locate the inspection, cleanout and access ports. Inspection and cleanout ports are typically 18‐inch diameter. Access ports are typically 24‐inch or 30‐inch diameter. Pictures should be taken to document the location or a site map should be generated to detail the as‐built locations of the ports. 2. Unbolt and remove the access port lids. 3. Insert a measuring device into the opening making note of a point of reference to determine the quantity of sediment and other accumulated material. If access is required to measure, ensure only certified confined space entry personnel having appropriate equipment are allowed to enter the system. 4. In addition, for accessible concrete CUDOTM systems personnel should utilize appropriate confined space entry procedures to enter the system and photograph its condition. 5. Inspect inlet and outlet locations for obstructions. Obstructions should be removed at this time. 6. Fill in the CUDOTM Inspection/Maintenance Data Sheet and send a copy to the regulatory agency if necessary. Maintenance Cudo Stormwater Products, Inc. P.O. Box 497 Occidental, California 95465‐0497 Phone: (877) 876‐3345 www.cudocube.com 4 | P a g e ‐ CUDOTM O&M Manual Cleanout of the CUDOTM system should be considered if there is sediment buildup of four or more inches at over 50% of the inspection ports. In the event of a spill of a foreign substance, cleanout of the system should be considered. Maintenance Procedures 1. Locate the inspection, cleanout and access ports. Inspection and cleanout ports are typically 18‐inch diameter. Access ports are typically 24‐inch or 30‐inch diameter. Pictures should be taken to document the location or a site map should be generated to detail the as‐built locations of the ports. 2. Unbolt and remove the access port lids. 3. Measure the sediment buildup at each port. If access is required to measure ensure only certified confined space entry personnel having appropriate equipment are allowed to enter the system. 4. A thorough cleaning of the system (inlets, outlets, ports, and inlet bays) shall be performed by either a vacuum truck or by manual methods. 5. Inspect inlet and outlet locations for obstructions. Obstructions should be removed at this time. 6. Inspect the structural components of the system. 7. Fill in the CUDOTM Inspection/Maintenance Data Sheet and send a copy to the regulatory agency if necessary. Inspection / Maintenance Requirements Listed below are some recommendations for equipment and training for personnel to inspect and maintain a CUDOTM system. Personnel – OSHA Confined Space Entry Training is a prerequisite for entrance into a system. In the state of California personnel should be CalOSHA certified. Equipment – Record Taking (pen, paper, voice recorder) Proper Clothing (appropriate footwear, gloves, hardhat, safety glasses, etc.) Flashlight Tape Measure Measuring Stick Pry Bar Traffic Control (Flagging, barricades, signage, cones, etc.) First aid materials Debris and Contaminant collectors Debris and Contaminant containers Vacuum Truck Disposal of Gross Pollutants, Hydrocarbons, and Sediment The collected gross pollutants, hydrocarbons, and sediment shall be disposed of in accordance with local, state and/or federal agency requirements. Cudo Stormwater Products, Inc. P.O. Box 497 Occidental, California 95465‐0497 Phone: (877) 876‐3345 www.cudocube.com Media Options 6HGLPHQWV Perlite LVQDWXUDOO\RFFXUULQJSXIIHGYROFDQLFDVK(IIHFWLYHIRUUHPRYLQJ 766RLODQGJUHDVH 2LODQG *UHDVH 6ROXEOH Metals 2UJDQLFV 1XWULHQWV &6)®/HDI0HGLD and 0HWDO5[DUHFUHDWHGIURPGHFLGXRXVOHDYHV SURFHVVHGLQWRJUDQXODURUJDQLFPHGLD&6)LVPRVWHIIHFWLYHIRU UHPRYLQJVROXEOHPHWDOV766RLODQGJUHDVHDQGEXIIHULQJDFLGUDLQ 0HWDO5[DÀQHUJUDGDWLRQLVXVHGIRUKLJKHUOHYHOVRIPHWDOUHPRYDO &6) 3KRVSKR6RUELVDOLJKWZHLJKWPHGLDEXLOWIURPD3HUOLWHEDVHWKDW UHPRYHVWRWDOSKRVSKRUXV73E\DGVRUELQJGLVVROYHG3DQGÀOWHULQJ SDUWLFXODWH3VLPXOWDQHRXVO\ *$& =HROLWH 0HWDO5[ 3KRVSKR6RUE 2XUÀOWUDWLRQSURGXFWVFDQEHFXVWRPL]HGXVLQJGLIIHUHQWÀOWHUPHGLDWRWDUJHWVLWHVSHFLÀFSROOXWDQWV $FRPELQDWLRQRIPHGLDLVRIWHQUHFRPPHQGHGWRPD[LPL]HSROOXWDQWUHPRYDOHIIHFWLYHQHVV 3HUOLWH Media Choices ZeoliteLVDQDWXUDOO\RFFXUULQJPLQHUDOXVHGWRUHPRYHVROXEOHPHWDOV DPPRQLXPDQGVRPHRUJDQLFV 7RWDO Phosphorus *$&*UDQXODU$FWLYDWHG&DUERQVWUXFWXUHDOORZVKLJKOHYHOVRI DGVRUSWLRQ,WLVSULPDULO\XVHGWRUHPRYHRLODQGJUHDVHDQGRUJDQLFV VXFKDV3$+VDQGSKWKDODWHV 1RWH,QGLFDWHGPHGLDDUHPRVWHIIHFWLYHIRU DVVRFLDWHGSROOXWDQWW\SH2WKHUPHGLDPD\WUHDW SROOXWDQWVEXWWRDOHVVHUGHJUHH =3*PHGLDDSURSULHWDU\EOHQGRI]HROLWHSHUOLWH DQG*$&LVDOVRDYDLODEOHDQGSURYLGHVDQDOWHUQDWLYH ZKHUHOHDIPHGLDFDQQRWEHXVHG &DUWULGJH2SWLRQV :LWKPXOWLSOHFDUWULGJHKHLJKWVDYDLODEOH\RXQRZ KDYHDFKRLFHZKHQÀWWLQJD6WRUP)LOWHUV\VWHPRQWR \RXUVLWH 7KHµFDUWULGJHSURYLGHVPRUHWUHDWPHQWSHU VTXDUHIRRWRIV\VWHPWKDQWKHSUHYLRXVO\VWDQGDUG µFDUWULGJH6R\RXDUHPHHWLQJWKHVDPH WUHDWPHQWVWDQGDUGVZLWKIHZHUFDUWULGJHVZKLFK PHDQVDVPDOOHUV\VWHP 6HOHFWLQJ&DUWULGJH+HLJKW 6PDOO Footprint K\GUDXOLFGURS 3.05 ft /RZ'URS 2.3 ft 1.8 ft ,I\RXDUHOLPLWHGE\K\GUDXOLFFRQVWUDLQWVFKRRVHRXU ORZGURSFDUWULGJHZKLFKSURYLGHÀOWUDWLRQWUHDWPHQW ZLWKRQO\IHHWRIKHDGORVV &DUWULGJH)ORZ5DWHV &DUWULGJH 7\SH +\GUDXOLF 'URS IRRWSULQWV\VWHPVL]H 7UHDWPHQW &DSDFLW\JSP JSPIW JSPIW 6WRUP)LOWHUµ IHHW 6WRUP)LOWHUµ IHHW 6WRUP)LOWHU/RZ'URS IHHW 0)6µ IHHW 0)6µ IHHW FDUWULGJH 27” SDJH 18” 12” GENERAL SPECIFICATIONS FOR MAINTENANCE OF FloGard Perk Filter™ Systems SCOPE: Federal, State and Local Clean Water Act regulations and those of insurance carriers require that stormwater filtration systems be maintained on a recurring basis. The intent of the regulations is to ensure that the systems, on a continuing basis, efficiently remove pollutants from stormwater runoff thereby preventing pollution of the nation’s water resources. These specifications apply to FloGard Perk Filter™ Systems as manufactured by KriStar Enterprises, Inc. RECOMMENDED FREQUENCY OF SERVICE: Drainage Protection Systems (DPS) and KriStar Enterprises, Inc., the manufacturer of the FloGard Perk Filter System recommend that the devices be serviced every six months (two times annually) on a recurring basis. Regulations and/or codes of some regulatory agencies and municipalities may require more frequent service. RECOMMENDED TIMING OF SERVICE: Guidelines for the timing of service are as follows: Level 1 Inspection Service – Six (6) months after unit is placed into service, or six (6) months after a Level 2 or Level 3 inspection. Level 2 Inspection Service- Six (6) months after a Level 2 inspection or twelve (12) months after a Level 3 service. Level 3 Service – As determined by findings from Level 2 inspection service reports indicating a media filter change or system repairs are required to maintain the operating efficiency of the system. SERVICE PROCEDURES: INLET BAY 1. The inlet manhole cover(s) and or grate(s) shall be removed and placed to one side. 2. For systems with a FloGard Plus Catch Basin Insert, the insert will be cleaned in accordance with the general specifications for maintenance of those devices. After cleaning the filter shall be removed and set aside. 3. Any debris will be removed from the inlet bay(s) and disposed of in accordance with local regulations. 4. Check and clean the area behind and under the inlet weir/bypass assembly. Remove assembly as necessary to conduct inspection. 5. Check drain down assembly and clean if necessary. 6. Re-install catch basin insert filter. 7. Re-install grate or manhole access cover. CARTRIDGE BAY 1. Remove and place to one side the manhole access covers above the cartridge bay. 2. 3. 4. 5. 6. A Level 1 inspection service shall consist of a visual inspection from the surface level. Observe and note the condition of the cartridge bay and the cartridges, measure sediment level, if any, and note on maintenance record. Physical entry is not required unless the depth prevents the entire cartridge bay area from being observed. A Level 2 inspection service shall consist of a physical, confined-space entry into the cartridge bay. The filter cartridges and filter media shall be inspected for condition and filter media life, the sediment level, if any, measured, and any trash or debris removed and disposed of in accordance with local regulations. All information and recommendations shall be noted on the maintenance record. A Level 3 service shall consist of a physical, confined-space entry into the cartridge bay. The filter cartridges shall be removed and replaced with re-charged exchange filter cartridges. As an option, the filter media may be removed of on-site, the cartridges cleaned, and replacement media be installed into the cartridges. All spent filter media shall be disposed of in accordance with local regulations. Upon completion of inspection/service, re-install the manhole access cover(s). The manhole cover(s) and/or grate(s) shall be replaced. REPLACEMENT AND DISPOSAL OF FILTER MEDIA AND COLLECTED DEBRIS: The filter media will be exchanged once per year. Depending upon the type of filter media utilized, additional fees may be incurred for testing and disposal of this waste material. DPS also has the capability of servicing all manner of catch basin inserts and catch basins without inserts, underground oil/water separators and other such devices. All DPS personnel are highly qualified technicians and are confined space trained and certified. Call us at (888) 950-8826 for further information and assistance. Leighton Consulting, Inc. GEOTECHNICAL To: | GEOENVIRONMENTAL | MATERIALS Tetra Tech, Inc. 16241 Laguna Canyon Road, Suite 200 Irvine, CA 92618 TESTING Date: September 23, 2009 Project No. 602480-003 Attention: Mr. Joe Dietz From: Djan Chandra, PE, GE Subject: Estimated Percolation Rates for Proposed Carlsbad Desalination Plant at Encina Generating Station, Carlsbad, California Reference: Leighton Consulting, Inc., 2009, Geotechnical Recommendations and Review of Rough Grading Plan for Proposed Carlsbad Desalination Plant at Encina Generating Station, Carlsbad, California, Project No. 602480-003, dated September 9, 2009 We understand that stormwater retention basins are planned beneath each of the parking lots of the proposed Carlsbad Desalination Plant. The parking lots will be located at the northwest corner and southwest corner of the site. The retention basins will extend down to Elevation 30 feet. In accordance with your request, we have prepared this project memorandum to provide the estimated percolation rates of the subsurface soils at Elevation 30 feet at these locations. No percolation test was performed at the site. Based on the available borings, the parking lot at the northwest portion of the site is expected to be underlain by bedrock at Elevation 30 feet. The bedrock consists of silty to clayey sandstone and the percolation rate is estimated to be on the order of 0.01 inch per hour. The parking lot at the southwestern portion is expected to be underlain by fill consisting of silty sand and the percolation rate at Elevation 30 feet is estimated to be on the order of 0.1 inch per hour. If you have any questions regarding this project memorandum, please do not hesitate to contact this office. We appreciate this opportunity to be of service. P a g e 1 of 1 1 7 7 8 1 C o w a n , I r vi n e , C A 9 2 6 1 4 ( 9 4 9 ) 2 5 0 - 1 4 2 1 • F AX ( 9 4 9 ) 2 5 0 - 1 1 1 4 Standard Urban Storm Water Mitigation Program (SUSMP) Water Quality Technical Report (WQTR) Poseidon Seawater Desalination Plant, Carlsbad PDP: 00-02/SP 144(H) APPENDIX C 11x17 Grading Plans Appendix C POSEIDON CARLSBAD SEAWATER DESALINATION PLANT DEMOLITION AND ROUGH GRADING PLANS PROJECT LOCATION VICINITY MAP PROJECT MAP WITH HAUL ROUTE SHEET INDEX 1) TITLE SHEET AND LEGEND 2) NOTES 3) CONSTRUCTION SITE PLAN 4) DEMOLITION PLAN - PIPING 5) DEMOLITION PLAN - FACILITIES 6) ROUGH GRADING PLAN POSEIDON RESOURCES CARLSBAD SEAWATER DESALINATION PLANT TITLE SHEET AND LEGEND POSEIDON RESOURCES CARLSBAD SEAWATER DESALINATION PLANT NOTES POSEIDON RESOURCES CARLSBAD SEAWATER DESALINATION PLANT CONSTRUCTION PLAN POSEIDON RESOURCES CARLSBAD SEAWATER DESALINATION PLANT DEMOLITION PLAN - PIPING POSEIDON RESOURCES CARLSBAD SEAWATER DESALINATION PLANT DEMOLITION PLAN -FACILITIES POSEIDON RESOURCES CARLSBAD SEAWATER DESALINATION PLANT ROUGH GRADING PLAN
Similar documents
Roof Drains Technical Data
Designates a wide flange that can be added to certain Smith roof drains. This flange receives and serves as a bonding base for the membranes and coatings of waterproof roof deck covering systems. T...
More informationCooperative Sustainability Report
RXUORQJVWDQGLQJFRPPLWPHQWWRRXUSODQHWRXUSHRSOHDQGRXUFRZV 7KHVXVWDLQDELOLW\HIIRUWVDW8QLWHG'DLU\PHQRI $UL]RQD8'$DUH DOLJQHGZLWK86GDLU\LQGXVWU\HIIRUWVSUHVHQWHGLQWKH...
More information