Curriculum Vitae - RP-jobs

Transcription

Curriculum Vitae - RP-jobs
CURRICULUM VITAE
Personal Information:
Name
:
Samy Fawzy Mahmoud AL-Aaser
Date/ Place of birth
:
23 July, 1975 / Egypt
Nationality
:
Egyptian
Languages
:
Arabic (mother tongue) –English (v. good)-French (little)
Current Position
:
Construction Manager – Project Management Co. – Egypt.
Contact Number
:
+201092877669Egypt
Addresses
:
6th October City – Egypt
E-Mail
:
[email protected]
Driving license
:
Valid driving license in both Egypt and Saudi Arabia
Marital status
:
Married+2 child
Military Service
:
Completed
Education and personal qualifications:
B.Sc.of Civil Engineering, from faculty of Engineering -Banha University- Graduation Year 2000
Project grade “very good” & Total Grade “Fair”
 Member of Syndicate of Engineering (EES), Cairo, Egypt. 2001
 Member of Project Management Institute (PMI) , USA, 2008
 Member of Project Management Institute Gulf Chapter (PMI-AGC) , 2008
Key Experience:
- More than 12 years experience in the field of Project Management, Executing, Supervision and Technical
Office for Construction Projects in Egypt, Saudi Arabia
- Projects which I had successfully completed include Hotels, Residential Buildings, Shopping Complexes, and
Educational Building etc. I have experience in all aspects of Project & Construction Management, Planning,
Scheduling, and Site Coordination.
-Have a good knowledge of International Codes, British Standards, ASTM Standards and familiar with ACI
Computer skills:
- Programs
: Windows (XP. Professionals, Windows Vista& Windows 7)
- Engineering programs : AutoCAD-ms office-primavera
- Internet skills
: Very good user for internet
Surveying instruments skills:
- Perfect in using (level-total station) equipments
Objective:
- Seeking a challenging position in the field of construction project management where by my technical
background and interpersonal skills can be applied and fully developed
Certified Courses:
- Project Management Professional (PMP) Certification Preparation Course ,2008
Pre-Graduation Work Experience :
- Jan 1999 to Dec 2000 Site Engineer at Banha United Contractor Company
Project: constructing Banha girl's secondary school.
Samy Fawzy M. EL-Aaser
02/08/17
Page 1 of 5
Professional History
 Feb.2012 up to Date
Egyptian Canadian Project Managers (EGYCAN)
(Grand Heights Compound – Green Built -6th of October –Egypt )
(Phase I – Infrastructure Work )
Scope of work:

Assisting the Project Manager in Managing the project crew (designers, consultant and
contractor) ,

Coordinating with designers for any missing information needed ,

Follow up the work progress on site.

Monitor day to day work according to project time schedule ,

Preparing and Checking the monthly invoice and submitting to Employer with a follow
up for paying to contractor ,

Randomly inspection for work executed & material delivered to insure the quality and

Attending and issuing Minuets of all project meetings (Progress, Quality, Safety
,Planning and any other needed meetings)
Project Description :
Construction of infrastructure work of around 3,800,000 m2 (900Feddans)in the green
built in 6th October city the work contains Irrigation, Sewage, Storm Water Networks
including Tanks ,valve champers, manholes……etc.
Project Directory :

Employer :KUWADICO

Project Manager :Egyptian –Canadian Project Managers (EGYCAN)

Engineer :Engineering Consulting Group (ECG)

Infrastructure Design Consultant : AAW Consulting Engineers

Master Planning Lead Consultant :EHAF Consultant Office

Contractor :ORASCOM CONSTRUCTION
General :
Phase I Amount : 247,000,000 EGP
All Project Estimated Amount :1,000,000,000 EGP
Project Period :22 months
Job Title: Construction Manager / Project Coordinator.
Samy Fawzy M. EL-Aaser
02/08/17
Page 2 of 5
 Dec.2009 toFeb.2012
: Makro Cash& Carry Egypt
(Salam Store& Qalioob Store )
Scope of work:
Managing the project crew (consultant & contractors) and follow up all the construction
stages& Handing over the stores to the operation department. Reporting to MCCI Head Of
Engineering about any deviation in the project track to be sure that project will be handed
over As per contract condition
Project Description :
Unique mega store Consists of 10000m2 steel structural building(the store) + 25000m2 as
parking area & service area
Essential Duties and Responsibilities include the following:

Prepare design brief for all new stores according to standards

Coordinate with the designers and provide them with the required information needed
for the store design ( Mall Manual, as built drawings and shop requirements)

Coordinate with the mall management as well as the designers until the concept
drawings approved.

Appoint contractors (construction, furniture and flooring) for the new projects.

Work on the quotations of the contractor according to the budget, and get the approval
of the MCCI Head of Engineering.

Follow up the work progress on site and assure the projects to be completed on time.

Managing the fit out work &Take over the store from the contractors and prepare
signage.

Hand over the store to the operation and coordinate with the other departments for the
store opening.

Auditing, controlling Contractors invoices and follow up Contractors’ payments with
our accounting department.

Auditing and controlling the contractors work quality.

Working on the municipalities' approvals to start work on sites.

REPORTS: submit the following reports to the MCCI Head Of Engineering, Work
progress reports for each project (weekly), Work flow reports for all the projects
under construction (weekly) and Other Reports as requested.
Project Directory :

Employer :MAKRO CASH AND CARRY EGYPT

Engineer :MA Consultant

Civil Contractor :DETAC

Electromechanical Contractor : SIEMENS , ECO, Experts and delta
General :
Samy Fawzy M. EL-Aaser

Location Salam City& Cairo Alex agriculture road - Cairo- Egypt

Estimated Budget for each store 150,000,000 EGP

Project Period : 8 months for each store

The job title: (Project Manager-Owner representative)
02/08/17
Page 3 of 5
 Nov.2008 to Dec.2009
: Engineering Construction office for construction (ENCO) - Cairo – Egypt
(City Stars Hotel / Resort phase 2&3)
Scope of work:
Monitoring &Controlling The Project (Quality, Time& Budget) during the
construction stages up to handing-over according to the project specifications.
-Location Sharm AL-Sheikh - Egypt
-Consists of (9 buildings /450 Rooms +Lagoon ) with all facilities
( swimming pools , recreation center ,Gym, Spa, landscape & roads)
-Owner Golden Coast Holding Co.
- Estimated budget 450,000,000 EGP
-The job title: (Project Control Manager)
 June 2007 to Nov.2008
: International Projects Management Co. (IPMC) – AL-Khober- Saudi
Arabia
1.
(EL-Morgan Residential Village )
Managing all the construction stages up to handing-over&Owner representative for
controlling the project (Quality, Time &Budget) to assure that the project will meet the
owner satisfaction
- Location AL-Jubil industrial city beach - KSA
- Consists of (10 five floors buildings +14 luxuries villas) with all facilities (
swimming pools , recreation center , landscape , roads)
- Owner Zamil Group(Real estate Division)
Estimated budget 100,000,000 SR
- The job title: (Project Coordinator – Project Manager)
2.
(Zamil Tower)
Managing all the construction stages up to handing-over&Owner representative for
controlling the project (Quality, Time &Budget) to assure that the project will meet the
owner satisfaction
- Location AL-Khober - KSA
- Consists of (5concrete floors +12 steel structure floors)
- Owner Zamil Group(Real estate Division)
Estimated budget 150,000,000 SR
- The job title: (Project Coordinator – Assistant Project Manager)
Samy Fawzy M. EL-Aaser
02/08/17
Page 4 of 5
 Sept. 2004 to May 2007
: Saudi Pan Kingdom for Const. (S.A.P.A.C) - Riyadh - Saudi Arabia
1.
Constructing EL-jouf technical collage
- Location Skaka-EL-jouf – KSA
- Consists of (13 unite of three floors building with all facilities like roads,
landscape ,basket ball courts, etc)
- Owner Ministry Of Technical Education
- (Estimated value 70,000,000 SR)..
- The job name: (Site Engineer - Site manager)
2.
Constructing Skaka Big Mosque
Location Skaka-EL-jouf – KSA
(Estimated value 25,000,000 SR).
Owner Ministry of Islamic Affairs
Consists of a three floors mosque with total area 500 sq meter
The job name: (Project manager)
3. Constructing Administration Building of Nursing collage
- Location Riyadh –KSA
- Consists of five floor building with total area 800 sq meter
- Owner National Guard -Saudi Arabia
- (Estimated value 25,000,000 SR)..
- The job title: (Project manager)
-
 May 2003 to Jul 2004
EL Farag Construction Co. – EL-Qaseem – Saudi Arabia
Constructing El Aseah municipality (estimated value 7,000,000 SR)
Constructing & Maintenance of roads ( estimated value 18,000,000 SR)
 Jan 2002 to Mar 2003
Military Forces in Egypt
-
 Jan 2001 to Dec 2001
Maintenance and concrete works
Egyptian Structure engineering office (middle delta- Egypt)
-
Constructing schools in Mahala El kobra
All official paper and references available upon request
Samy Fawzy M. EL-Aaser
02/08/17
Page 5 of 5

Similar documents