THE BAY BRIDGE WILL BE CLOSED
LABOR DAY WEEKEND 2013
West Approach
West Span
Yerba Buena Island
Transition
SAS
Skyway
Oakland
Touchdown
8 p.m. Wednesday, Aug. 28 to 5 a.m. Tuesday, Sept. 3
FULL BRIDGE CLOSURE DURING HOLIDAY WEEKEND
Novato
37
Vallejo
BAY
B
AY BRI
BRIDGE
CLOSED
LABOR
ABOR D
DAY
AY WEEKEN
WEEKEND
D
DGE C
LOSED L
USE
ALTERNATE
BRIDGES
US
EA
LTERNATE BRIDGE
S
80
He
ercules
Hercules
This closure marks the final step before the new bridge opens to traffic.
Since 1936, the original East Span has facilitated the movement of people
and goods throughout the Bay Area. The 7.1-magnitude Loma Prieta earthquake in 1989 significantly damaged the region’s transportation structures,
and exposed the vulnerability of the existing East Span. Since that day, the
Toll Bridge Program Oversight Committee has worked diligently to replace
the original bridge and move everyone onto a safer structure. Following
the safe rerouting of traffic to the new East Span, the original East Span
will be demolished, a process that will take approximately three years.
Fairfax
Fa
Ric
h
ill
Mill
Valley
ey
Valley
n
San
b
Pablo
mo
nd/San Rafael
d
Richmond
as
Pleasant
Hill
580
Tibu
bu
uron
Tiburon
da
Orinda
80
1
Sausalito
S
Golden
G
H[L°)YPKNL
.H[L°)YPKNL
.
24
24
680
Moraga
1133
Danville
OAKL
OAKLAND
LAND
80
SAN
CO
FRANCISCO
)[email protected]°
)[email protected]°
)
90+., Alameda
)90+.,
d
da
San
Ramon
580
880
S an M
San
Mateo
ateo
Bridge
idge D
etour
Detour
280
Dublin
101
ly City
Daly
580
OAAKLAND
K NDD
OAKLAND
INTERNATIONAL
ATIONAL
T ONAL
INTERNATIONAL
AIRPO
RT
AIRPORT
ou
uth
South
San
an
n Franciso
1
Pacifica
P
Walnut
Wa
alnut
lnut
k
Creek
tte
Lafayette
ey
Berkeley
123
1
680
Richmond-San
R
ichmond
hm
mond-San Rafael
mond
Rafael
Ra
fael
ae 2244
Bridge
ge
e Detour
Detour
ur
P
Pleasanton
380
SAN FRANCISCO
INTERN
INTERNATIONAL
ATIONAL
AIRPO
AIRPORT
RT
280
Ma
San
San
San
Mateo
101
e
ridg
t eo B
880
680
Dumbarton
Dumbarton
Bridge Detour
Detourr
9922
238
9922
GETTING AROUND
Union
U
City
Hayward
s er City
ster
Foster
Hillsborough
H
gh
Residents and visitors will have numerous alternatives for getting around the
Bay Area while the entire Bay Bridge is closed during Labor Day weekend.
Pittsburg
Concord
Bridge
Larkspur
La
101
4
680
242
San
n
fa l
Rafael
Corte
te
Ma era
Madera
Martinez
4
Belmont
101
San
Carlos
Redwood
dwood
w d
ity
ty
City
rto
n
While the Bay Bridge was closed during Labor Day weekends in 2006,
2007 and 2009, essential construction work was successfully completed
on schedule. Taking advantage of historically light traffic on the bridge during the holiday weekend helps minimize disruptions to motorists, residents
and businesses. Experience gained from previous closures will help us perform this construction safely again this year.
Benicia
780
ge
Brid
8844
ont
Fremont
Newark
Du
mb
a
This Labor Day weekend, the Bay Bridge will be closed to take the original
East Span out of service and to open the new East Span to traffic. Work
will be done at the Oakland Touchdown and the Yerba Buena Island Transition Structure to connect the new bridge to the existing Toll Plaza and
Yerba Buena Island, respectively. Crews will also perform essential construction activities, including paving, striping and erecting barrier rail.
Throughout the closure, maintenance will work on the West Span, replacing
lighting fixtures, cleaning and painting the cable, and repairing finger
joints. For more information about construction during the weekend, see
the reverse side of this factsheet.
880
Menlo
nlo
o
Park
Half
Moon
Bay
8844
680
Milpitas
Motorists should allow extra time for travel and use of other bridges,
including the Golden Gate Bridge, the Richmond-San Rafael Bridge, the
San Mateo-Hayward Bridge and the Dumbarton Bridge.
8844
Palo
A
Alto
ntain
a
Mountain
View
View
237
S
Sunnyvale
Santa
Clara
280
Vehicle access to Yerba Buena Island and Treasure Island for residents, employees and visitors will be maintained via special permit from San Francisco.
For updates on other transit options, including ferries, BART and MUNI,
be sure to visit 511.org or call 511 for real-time traffic conditions.
SAN
JOSE
OSE
101
o
Los
ltos
Altos
For
For more
more information,
i n fo rm a t io n , v
visit:
isit:
P
ara e
sta iinformación
nformación en
en
Para
esta
es
s p a ño l , p
or favor
favor visite:
visite:
español,
por
BayBridgeInfo.org
B
ayBridgeInfo.org
For real-time
and public transit
alternatives, visit
Saan Jose
San
International
In
ntternational
ational
A
Airport
8877
2013-SFOBB_Closure_fact-sheet_Layout 1 8/16/13 11:56 AM Page 2
THE BAY BRIDGE WILL BE CLOSED LABOR DAY WEEKEND 2013
8 p.m. Wednesday, Aug. 28 to 5 a.m. Tuesday, Sept. 3
YERBA BUENA ISLAND TRANSITION STRUCTURE
STAY INFORMED
Baybridgeinfo.org features information on on the opening of the new
East Span, including important closure details and construction simulations,
and drive-throughs of the new span.
For updates on other transit options, including ferries, BART and MUNI, be
sure to visit 511.org or call 511 for real-time traffic conditions, detour routes
and public transit alternatives. Check back often for the latest updates.
For more information, visit BayBridgeInfo.org, or contact:
BAY BRIDGE PUBLIC
INFORMATION OFFICE
BAY BRIDGE/TREASURE ISLAND
PUBLIC INFORMATION OFFICE
311 Burma Road
Oakland, CA 94607
(510) 286-7167
410 Avenue of the Palms
Building 1, Room 169
San Francisco, CA 94130
(415) 288-8802
OAKLAND TOUCHDOWN
EXIT TO YERBA
BUENA ISLAND
NEW EAST SPAN DEBUTS NEW DRIVING EXPERIENCE
When the bridge reopens to traffic on Tuesday, Sept. 3, motorists will
encounter a new driving experience, as traffic moves from the upper and
lower decks of the original bridge to the parallel, side-by-side decks of the
new East Span. The new side-by-side configuration will open up panoramic
views of the San Francisco bay and surrounding hills.
NEW WESTBOUND
PATH FROM TOLL
PLAZA
BIKE AND PEDESTRIAN PATH
For the first time pedestrians and cyclists will have the chance to travel
across the San Francisco-Oakland Bay Bridge’s East Span, on a 15.5foot-wide bike/pedestrian path that will extend the 2.2 miles to Yerba
Buena Island.
Before the pathway can fully connect to Yerba Buena Island, crews will
need to demolish a portion of the existing bridge that sits in the way of the
new bike and pedestrian path. Contractors must dismantle portions of the
original bridge, including the S-Curve detour that was put into place in
2009, in order to install the rest of the path and connect it to Yerba Buena
Island, as well as replace the temporary path at Oakland Touchdown. The
bike path is expected to be complete by summer 2015. Information about
pathway access will be available prior to bridge opening.
EASTBOUND
■ Permanent Bike Path
■ Temporary Bike Path
■ Temporary Bike Ramp

Similar documents