Brochure
Transcription
Brochure
A stunning office refurbishment of approximately 63,000 sq ft in the City of London. ARCHITECTURAL Excellence The Helicon was built in 1996 and designed by renowned architects Sheppard Robson. In total the building provides 119,000 sq ft of offices over first to eighth floors, with retail units to the ground and first floors currently occupied by Marks and Spencer and HSBC. Floors one to four and eight have been refurbished to provide modern, open plan office space. Headquarters Reception The newly refurbished double height reception is finished to an extremely high standard. AN AREA THAT KEEPS ON SURPRISING The Helicon sits on the corner of Finsbury Pavement and South Place, in a perfect location for access to the best the City has to offer. LOCATION 1 The major occupiers of the City sit within a short walk of The Helicon. Transport connections are excellent. Amenities are here in abundance. 16 TRAVEL TIMEs FROM MOORGATE STATION minutes Bank 02 London Bridge 04 King’s Cross / Eurostar 07 Euston 09 Paddington 20 Oxford Circus 16 Canary Wharf 16 City Airport 29 Stansted Airport 60 21 5 18 13 4 2 22 24 13 10 16 12 11 14 14 6 5 2 9 19 3 2 8 1 4 17 6 8 5 15 23 20 10 2 3 1 1 4 2 9 Walking TIMEs FROM THE Helicon STATIONMINUTES Moorgate 03 Liverpool Street 05 Bank 08 1 12 7 15 3 6 5 11 6 Travel times calculated from moorgate station, quickest route available based on transport for london’s journey planner 4 3 7 Heathrow Airport King’s Cross & St. Pancras 27 MINUTES FROM PADDINGTON MAINLINE SERVICES eurostar Stansted Airport 52 MINUTES FROM LIVERPOOL STREET Old Street MAINLINE SERVICES Farringdon Stratford MAINLINE SERVICES Crossrail Liverpool Street Moorgate Oxford Circus MAINLINE SERVICES STANSTED EXPRESS crossrail Bank Holborn DLR Canary Wharf Cannon Street 1 Lloyds Banking Group 1 Corney & Barrow 1 Virgin Active 2 Bloomberg 2 POD 2 Great Eastern Hotel 3 Commerzbank 3 ESCA 3 The City Point Club 4 Davis Polk & Wardwell 4 Gaucho 4 The Brewery 5 EBRD 5 The Cellar Wine Bar 5 The Montcalm City Suites 6 PRA 6 Hawksmoor 6 South Place Hotel 7 Legal & General 7 Anthologist 8 RBS 8 South Place Hotel 9 UBS 9 Piccolino RETAILERS 10 La Tasca 1 Hugo Boss 11 Deutsche Bank 11 Wasabi 2 TM Lewin DLR SERVICES 12 Prupim 12 All Bar One 3 Molton Brown 4 Charles Tyrwhitt London Bridge 53 MINUTES FROM PADDINGTON HOTELS/HEALTH CLUBS 10 Henderson Global Investors Victoria Gatwick Airport Eating & drinking Monument MAINLINE SERVICES Embankment Occupiers MAINLINE SERVICES 13 Macquarie Corporation 13 ITSU 14 Merrill Corporation 14 Starbucks 5 Marks & Spencer City Airport 15 ING 15 Hotel Chocolat 6 Gap 26 MINUTES FROM MOORGATE 16 Herbert Smith 16 Master Gunner 17 ICAP 18 Close Brothers 11 19 Western Asset 20 Cisco 21 Robson Rhodes 22 Markit 23 Stephenson Harwood LLP 24 Bank of Tokyo Mitsubishi CITY LIFE The immediate location provides ample entertainment opportunities – even a spot of ‘wiff waff’ with colleagues! HIGH SPEC The floors and the reception have undergone a major upgrade to provide an exceptional level of finishes and specification. The specification includes: •S tunning new reception •4 pipe fan coil air conditioning •6 x glazed lifts •F ully accessible raised floor – typical floor void 250mm • Metal tile suspended ceiling • LG7 compliant lighting • 1 50 KVA Standby Generator for tenants use •T ypical floor to ceiling height 2.75m •E xternal terraces on levels 4 and 8 • Target BREEAM Very Good • 3 x fire fighting lifts • New cycle facility incorporating 5 showers, 67 cycle spaces, drying room and changing facilities N PLANS NOT TO SCALE FLOOR areaS Floor plans Second floor 8th Floor 7th Floor 6th Floor 5th Floor 4th Floor 3rd Floor 2nd Floor 1st Floor Ground Floor Total SQ M 925.1 ORACLE ORACLE ORACLE 2,090.2 2,168.9 594.3 99.6 M&S/HSBC 5,878.10 SQ FT 9,958 – – – 22,499 23,346 6,397 1,072 – 63,272 6,397 sq ft 594.3 sq m Floor plans Third floor Reception 23,346 sq ft 2,168.9 sq m 2,150 sq ft 200 sq m 16.5m 45.7m ACCESS 9m ACCESS N PLANS NOT TO SCALE Space Plans Floor plans 3rd Floor – UK Legal Space Plan Fourth floor 22,499 sq ft 2,090.2 sq m ACCESS ACCESS NIA 23,346 sq. ft 2,168.9 sq. m 170 workstations – 1 person to 12.85 sq m 4 x 1 person offices 51 x 2 person offices Support spaces: 29.6m 43.9m ACCESS ACCESS Reception: – 3 staff, Library Meeting rooms: 3 x 16 persons 3 x 10 persons 4 x 8 persons 2 x 6 persons 3 x 4 persons – informal meetings in open plan areas Breakout areas: 2 x 15 persons Lockers: 216 in 6 bays Copy centres: 4 No. Comm. rooms: 2 No. 3rd Floor – Open Plan (Corporate) Layout Eighth floor 9,958 sq ft 925.1 sq m ACCESS NIA 23,346 sq. ft 2,168.9 sq. m 268 workstations – 1 person to 8.15 sq m 8 x 1 person offices Support spaces: ACCESS ACCESS Reception: – 3 staff Meeting rooms: 3 x 16 persons 3 x 10 persons 7 x 8 persons 3 x 6 persons 3 x 4 persons – informal meetings in open plan areas Breakout areas: 2 x 15 persons Lockers: 216 in 6 bays Copy centres: 4 No. Comm. rooms: 1 No. Specification S pe c ifi c atio n Domestic Water and Drainage LIFTS TEAM The building domestic water and drainage systems have been extended to new toilet facilities on the refurbished office floors and provision is provided for future extension to tenants’ facilities. New domestic water and drainage services have also been provided to the new basement showers. Passenger Lifts – 6no. 16 person passenger lifts. 1250 KGS Project Manager Jones Lang LaSalle Architect John Robertson Architects Fire fighting lifts – 3no. fire fighting 8 person passenger lifts. 630 KGS Services Engineers Hoare Lea Consulting Engineers Cost Manager Jones Lang LaSalle CDM Coordinator Lighthouse Surveyors TOILETS AND WCS Lighting and Emergency Lighting Scope This Cat A specification refers to Part L1, Part L2, L3, L4, and L8 office floors. The works include the refurbishment of the ground floor reception and car park level CP1 comprising the provision of cycle facilities. Lift Lobby – Cove lighting with new linear fittings and existing retained glass lifts. Reception Desk – Monolithic Grey Corian with leather inlay top. Stainless steel skirting. OFFICE AREA (CAtegory a) Design criteria Fan coil units manufacture has been selected using EC/DC low energy motors which reduce energy consumption to average 4 watts /m2 or 0.8 watts/ litre/second of supply air to achieve the BREEAM rating ‘Very Good.’ An energy efficient lighting installation has been provided complete with a fully addressable DALI lighting control system and daylight sensing. PIR detection has also been provided. FCU’s control on air temperature in each zone. Each Fan coil unit is connected to a Trend 963 Building Management System. Non maintained Emergency Lighting has been provided to illuminate all notional exit routes via standard light fittings with 3 hours back up batteries with remote LED indicators. Battery re-charge period from full discharge is 16 hours max. Floors – metal tiled raised access floor with 600mm x 600mm tiles. Design Parameters Open Plan Offices 22 Centigrade +/- 2 centigrade Category A – 1 person per 10 sq m with the ability to be enhanced to support 1 person per 8 sq m on all office floor plates. Means of escape is 1 person per 6 sq m. Typical raised access floor void of 250mm to top of tile. Circulation Areas 18 Centigrade minimum Dimensions Walls – Emulsion paint dry lined walls and fair faced concrete columns. Occupancy Ratio Floor to ceiling heights are noted as below: Eighth – 2.5m Fourth – 2.78m Third – 3.05m Second – 3.18m EXTERNAL Main Entrance Existing frameless glass screen with frameless glass revolving doors and pass doors finished with anodised aluminium surround to reveals and soffits. Glass canopy over the entrance with anodised aluminium surround and fret cut aluminium lettering as building signage. New external paving to demise of building – Limestone. Access is dda compliant. No call point. Assisted entry for wheelchair users by reception staff who have direct line of sight and there is full time security guard assistance. Video entrance system. Façade Existing double glazed windows. RECEPTION AREA Reception has been fully refurbished in accordance with the following: Floors – 1360mm x 500mm Balzac Limestone (honed) and inset entrance matting. Walls – white onyx backlit feature wall and GRG textured feature wall. Ceilings – painted plasterboard with ceiling troughs. Lighting – Ceiling void of 450mm. Ceilings – SAS 330 with plasterboard margins. Noise CriteriaNC 38 Humidity Control Not provided Casual Heat Gains assessed as follows Lighting 12 W/m2 Occupancy 1 person / 10m2 Doors and joinery – glazed double doors from lift lobby onto office floors, doors into WCs and end cores white paint finish with 20% gloss, riser doors white finish with 20% gloss. Small Power 25 W/m2 Supply Air Provision 2.5 l/s/m2 Fresh Air 15 l/s/person Signage – New statutory signage. floor voids served directly from the landlords existing Primary Fresh air is provided to the spaces via the central ventilation plant, a lake of tempered, filtered Skirtings and architraves – Egg shell paint finish. COMFORT AND VENTILATION Fresh air is introduced to the office areas via the floor void, via floor mounted swirl diffusers. Air is extracted from the space via return air bellmouths located within the ceiling void adjacent to each core. fresh air is introduced at low level from the floor void via floor mounted adjustable swirl diffusers, which rises collecting any contaminants and is exhausted at high level via the ceiling void by the building central extract plant. Light fittings are designed to have high frequency control gear with integral power factor correction to 0.95. Diffusers are fabricated from TpA material complying fully with building regulations. Design Parameters Offices Circulation Staircases Toilets Defined escape route lighting Open Plan Areas 300-500 lux 100-200 lux at floor level 150 lux at floor level 150 lux at floor level 1 lux 0.5 lux There is capacity within the existing electrical infrastructure to provide 65W/m2 small power to one floor only. General Power - LV power from the main LV switchpanel feeds tenant distribution boards in two risers of the building, on each standard floor-plate. Tenants Power provisions are as follows; 25 W/m2 small power SPRINKLEr PROTECTION 12 W/m2 office lighting 10 W/m2 spare capacity at the risers Comfort cooling and heating is provided to the space via 4 pipe heating (4 pipe at perimeter only, 2 pipe internal to zones) and cooling Variable Air Volume Fan Coil units each provided with individual temperature control via an on board controller and waterside control valves. Heating and Cooling media is provided via dedicated distribution systems from the existing building central heating and cooling plant. Each fan coil is responsible for maintaining comfort conditions within its control zone, which have been designed to current BCO guidelines to provide maximum flexibility for a future tenants fit out. Air is recirculated within the space utilising sheet metal ductwork from each FCU to ceiling mounted linear diffusers located within perimeter margins and ceiling tiles, return air is facilitated by static linear diffusers located within ceiling tiles. The building is protected by a sprinkler installation to BS5306 Part 2, Ordinary Hazard Part (OH3). Please note this building is not registered to LPS 1048 scheme and as such void protection has not been provided. Sprinkler heads are the concealed type providing maximum coverage of 12m2 with discharge density of 5.0 mm/min. FIRE ALARM The building is provided with a fully addressable fire alarm system to category L1 which provides full coverage. A pager system is also provided for persons with hearing difficulties. COMMUNICATIONS Provision within risers has been made for tenant’s incoming communications services from basement to individual floors. Refurbished self-contained WCs at each floor. Floor – 600mm x 1200mm Domus Stonetech Ceramic tiles. Skirting – Stainless steel throughout. Walls – Mixture of back painted glass and white emulsion. Ceiling – Painted plasterboard throughout. Lighting and grilles – New lighting and grilles. Cubicle doors – High gloss white laminate with an oak trim. Cubicle back panels – Back painted glass. Mirrors – New mirrors throughout. Vanity Units – New white Zodiac units throughout. Splash backs – Back painted glass. Wash Hand basins – New undercounter vitreous china. Taps – New sensor control taps. WCs & Urinals – New vitreous china throughout. Toilet roll holders – Stainless steel. DISABLED WC FACILITIES WCs – New vitreous china throughout. Handrails and grab bars – Stainless steel. Disabled toilet alarm is installed in each disabled WC/local audible and visual alarm/remote alarm facility back to the reception desk. WC LOBBIES Floor finish – 600mm x 1200mm Domus Stonetech Ceramic tiles. Wall finish – Painted plasterboard finish. Ceiling finish – Painted plasterboard. WC Entrance Doors – Egg shell painted finish. Lighting and grilles – New grilles throughout. Escape STAIRCASES Wall finish – Egg shell paint finish. Ceiling finish – Egg shell paint finish. CYCLIST FACILITIES 67 Cycle racks with repair area. Separate male and female changing facilities including lockers and showers and separate drying room. BREEAM BREEAM targeted rating – Very Good. UPPER FLOOR LIFT LOBBIES EPC Floors – Existing Moleanos Limestone. Walls – Existing glass walls to all sides. Ceiling – Existing pre-cast concrete. Doors – Existing framed in stainless steel with full glazing. Lighting– New linear fittings. An EPC rating of 67 has been achieved. CONTACTS Allsop Jones Lang LaSalle 020 7588 4433 020 7248 6040 James Neville [email protected] Jack Beeby [email protected] Peter Lance [email protected] Dan Burn [email protected] www.helicon-ec2.co.uk