Table of contents
Transcription
Table of contents
Table of contents No 1 Contents MD message Page 3 2 Summary of the company’s business 2.1 Location Map 2.2 Company Profile 2.3 Company Layout 5 6 7 3 Environmental Policy 9 4 Status of Environmental Management System 4.1 Company’s achievements 4.2 Environmental Organization Chart 5 Environmental Objective and Achievement 6 Information and indicators that describe the status of activities for environmental impacts and reduction measures 6.1 Environmental Load 6.2 Measures to reduce environmental impacts 17 18 ~ 20 7 Environmental Awareness Programs 22 ~ 24 8 Contact Information 11 ~ 12 13 15 2 Katsutoshi Teraoka Managing Director Sharp Manufacturing Corporation (M) Sdn. Bhd. is a site manufacturing of Liquid Crystal Display television of different models for export to many countries throughout the world. In the business world today, a company’s role in the preservation and protection of the environment in the course of its business activities can determine it’s success or failure. Sharp Manufacturing Corporation (M) Sdn. Bhd. carries out its operations in line with compliance to international, Malaysian and corporate environmental directives, regulations and laws. The company has attained the ISO14001 certification since 1998 and continuously carried out environmental activities in the company to instill an awareness and strong commitment among its employees and vendors towards protection of the environment. Environmental activities outside the company were also promoted to create a better relationship between the company, society and the environmental. This report describes the main environmental activities carried out in the year of 2014 by the company for your better understanding. 3 4 Location PLANT 3 PLANT 2 PLANT 1 SHARP MANUFACTURING CORP. (M) SDN. BHD. PLO-225 KAWASAN PERINDUSTRIAN SRI GADING 83009 BATU PAHAT, JOHOR 5 Company Profile COMPANY NAME CO. REG. NO. ADDRESS : SHARP MANUFACTURING CORPORATION (M) SDN.BHD. (ABB. SMM) : (188562-V) : PLO-225 KAWASAN PERINDUSTRIAN SRI GADING, 83009 BATU PAHAT, JOHOR DARUL TAKZIM DIRECTORS: MANAGING DIRECTOR FINANCE & ADMIN DIR DATE FOUNDED PROD. STARTED PAID-UP CAPITAL SHARE HOLDERS FISCAL YEAR LINE OF BUSINESS: PRODUCTION OF : MR. K TERAOKA : MR. K KAMIYA : : : : : OCTOBER 1989 JUNE 1990 RM 162 MILLION SHARP CORPORATION [100%] MARCH : Liquid Crystal Display (LCD) Module & Television and their kits thereof EXPORT MARKET : JAPAN, ASIA, EUROPE, AMERICA LAND AREA BUILD-UP AREA : 142,387M² : 74,612M² EMPLOYEES : 1,559 (1st June 2015) ACHIEVED : ISO 9001 BY SIRIM IN NOVEMBER 1994 ISO 14001 BY SIRIM IN OCTOBER 1998 6 Factory Layout Plant 2 LCD TV (19”~90”) Final Assembly process, Purchasing, Engineering, Administration office, Shipping and Warehouse. (15,720 m2) Plant 3 Hiraki Panel Front process, Module Assembly and Warehouse. (46,517 m2) PLANT 3 PLANT 2 PLANT 1 Plant 1 SMT Auto process, Production Checker And Training Center. (12,375 m2) 7 8 Environmental Policy This environmental policy indicates our commitment to protect the environment. We will explore and apply the best practical means to reduce adverse significant impact from our activities, products & services in our continuous quest to manufacture the product with the best quality and environmental friendly. The following pro-active efforts shall be taken in order to fulfill our commitment: Identify existing and potential pollution. Recommended actions, objectives & targets will be established in the environmental programs to ensure a progressive and systematic means in pollution prevention, waste reduction & minimization of energy consumption l Ensure compliance with applicable legal requirements & with other requirements which relate to its environmental aspects. l Promote environmental protection in line with Sharp environmental policy. l Annually review this environmental policy together with the environmental objectives & targets. l Publicize and communicate this environmental policy to all persons who work for or on behalf & make it readily available to the public. We will achieve continual improvement and prevention of pollution through our systematic Environmental Management System. 9 10 11 12 Production Final Department Head Managing Director Cost Control Department Head SMT/Prod. Checker Department Head Shipping Department Head EMR Finance & Admin Dir General Affairs Department Head Prod. Engineering Department Head Deputy EMR GA Manager EMS Coordinator PQA Sr. Manager EMS Secretariat PQA Executive PQA Department Head TQC Department Head Accounting Department Head Purchasing Department Head Production Control Department Head Human Resource Department Head Internal Auditors Engineering Department Head Hiraki / DDR Department Head 13 14 Objectives 1. To control CO2 emission. Targets CO2 emission < 5.5 tCO2 per Prod. Unit Results 3000 FY2014 CO2 Emission Mwh t-CO2 / Prod unit 5.8 5.7 5.6 5.5 5.4 5.3 5.2 5.1 5.0 4.9 4.8 4.7 4.6 4.5 4.4 4.3 SMM CO2 PERMISSIBLE EMISSION LIMIT 2500 2000 1500 1000 500 0 Apr 2. To control wastes emission Wastes emission < 0.6 kg per Prod. unit Ton 180 160 140 120 100 80 60 40 20 0 May Jun Jul Aug Sep Oct 2014 Electricity (Mwh) Nov Dec Jan Feb Mar 2014 t-CO2/prod. unit Waste per unit production for FY2014 kg/prod. unit 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 SMM WASTES PERMISSIBLE EMISSION LIMIT Apr'14 May Jun Jul Aug Sep Hazardous waste Landfill Wastes (General) Oct Nov Dec Jan'15 Feb Mar Valuable Wastes Waste per prod. Unit 3. Reduce ICT fabrication cost by in-house assemble REUSE the unused jig component. In-house assemble 6 units jig by end of March 2015. Production Engineering managed to assembled in-house 6 units of jig by REUSED the old and unused jigs components. 4. Reduce the city water consumption by using rain water and Hiraki RO wastewater Reduce city water consumption by 2% compare previous usage. By using the rainwater and Hiraki RO wastewater for air-conditioner cooling tower system for Plant 1, Plant 2, Plant 3. City water consumption in 14L was 61,448 m3 . Whereby in 13L was 88,318 m3. There was 30% of city water reduction consumed. 5. Hold an Environmental Awareness Program Once in sixmonth On 31st March 2015, a total of 300 SMM staffs were participated in the “Clean and Beauty” campaign. Activities that been carried out in this campaign were cleaning up area at SMM surroundings and painting bus stop, cooling towers, rest shelters, road side curb and etc. 15 16 Electricity 19,228.18 MWh LPG 45.58 ton City Water 134,595 m3 Raw materials, electronic Components and Packing materials Production Products ADVERSE IMPACTS BENIFICIAL IMPACTS CO2 Hazardous Wastes 8.76 ton 12,741 t-CO2 Valuable Wastes 1,112.16 ton Rain harvesting 2,172 m3 Reuse Hiraki RO wastewater 8,336 m3 Wastewater 134,595 m3 Landfill Waste 83.47 ton 17 Input Environmental Impact Electricity CO2 emission Measure to reduce environmental impact 1. Use Solar Power Forklift Battery Charger to recharge forklift . 24 units of Sharp solar panel ND-R240A5. Control panel for Solar battery charger. Forklift will ready for use after 4 hour charging. With using the Solar Power Forklift Battery charger, we manage to reduce CO2 emission during Forklift battery charging approximately 8,790.1 kg-CO2 per year. 18 Consume Environmental Impact City water Depleting natural resources Measure to reduce environmental impact 1. Increase the capacity of rain water harvesting system for aircondition cooling tower. Saved city water approximately 4,928 m3 per year. 2. Reuse the Hiraki RO wastewater for air-condition cooling tower and wash room. Saved city water approximately 3,851 m3 per year. Raw materials, electronics components, packing materials etc. Depleting natural resources 1. Sale used packing materials such as carton box, plastics, polyfoam etc. to recycler contractor. 19 Environmental burden Environmental Impact Measure to reduce Hazardous wastes Land or water pollution 1. Dispose through Department of Environmental licensed contractor for fully recovery or partial recovery or secured landfill or incineration. Landfill wastes Land or water pollution 1. Dispose at Local authority gazetted sanitary landfill. 20 21 Date Venue 20th Sep.’14 Taman Sri Panchur, Batu Pahat Participants 75 SMM staffs 200 Residents 1. PA system donation. 2. Triathlon suit sponsorship to Mr. Rafik. 3. Sport equipment donation. 4. Cleaning up area 5. Futsal, netball and tag of war friendship match. 300 SMM staff 1. Painting : cooling tower, canteen, rest shed, road side curb, bus stop and motorcycle parking area. 2. Cleaning up factory surrounding area. Theme: “Clean and healthy” 31st Mar. ’15 SMM premises Theme: “Clean and Beauty” Activities 22 23 24 Publisher EMS Secretariat SHARP MANUFACTURING CORPORATION (M) SDN. BHD (188562 – V) PLO. NO. 225, KAWASAN PERINDUSTRIAN SRI GADING, 83009 BATU PAHAT, JOHOR, MALAYSIA. P.O BOX 513 TEL: +06-07-4302604 FAX: +06-07-4558972