Main-Building-Ground-Floor-South-and-North
Transcription
Main-Building-Ground-Floor-South-and-North
FLAT ROOF TO BASEMENT ACCESSIBILITY LEGEND EMERG. EXIT DN (280 drop) UP housing (plant) TOILET (FEMALE) light well DUCT 0.14 DUCT DUCT D DUCT bottle store RAMP DN VOID DUCT DUCT cycle stands LARGE `SHANDON' LECTURE THEATRE -1.64 0.13 UP TO B/MENT (25 rise) ENTRANCE WING LIFT LIGHT WELL DUCT RAMP UP BULKHEAD DUCT TO (UN DUCT FLAT ROOF TO BASEMENT gradient . 1:17 (6°) (Rise 240) ENTRANCE LADDER UP ROOFLIGHT cycle stands DN ROOFLIGHT 0.28 cycle stands ROLLER SHUTTER TOILET (MALE) RAMP UP dient . 1:6 (9°) (Rise 370) LIFT 5 No. cycle stands ANCE NORTH WING CENTRAL AREA RAMP UP gradient . 1:19 (5°) (Rise 170) ENTRANCE 5 No. cycle stands PLAN OUTLINE OF MAIN BUILDING (NTS) GREENHOUSE SHED NORTH WING LIGHT WELL LIGHT WELL 0.33 TOILET (FEMALE) GREENHOUSES TOILET (MALE) SHED 0.93 ESTATES DIVISION TITLE 0.34 TOILET (MALE) SOUTH WING MAIN BUILDING. PART GROUND FLOOR PLAN. TOILET (DIS.) 0.35 RAMP UP gradient . 1:8 (8°) (Rise 340) handrail LIGHT WELL NORTH WING ENTRANCE SCALE 1:250\A3 SHEET SOUTH WING LAST REVISED: DRAWN/DATE REC. DWG. No. ORIGINAL LAYOUT DRAWN: GPI RLF - 23/09/2008 AK\AK01\FP\00 RECORD DRAWING