Main-Building-Ground-Floor-South-and-North

Transcription

Main-Building-Ground-Floor-South-and-North
FLAT ROOF TO BASEMENT
ACCESSIBILITY LEGEND
EMERG.
EXIT
DN
(280 drop)
UP
housing
(plant)
TOILET
(FEMALE)
light well
DUCT
0.14
DUCT
DUCT
D
DUCT
bottle
store
RAMP DN
VOID
DUCT
DUCT
cycle stands
LARGE `SHANDON'
LECTURE THEATRE
-1.64
0.13
UP
TO B/MENT
(25 rise)
ENTRANCE
WING
LIFT
LIGHT WELL
DUCT
RAMP UP
BULKHEAD
DUCT
TO
(UN
DUCT
FLAT ROOF TO BASEMENT
gradient . 1:17 (6°)
(Rise 240)
ENTRANCE
LADDER UP
ROOFLIGHT
cycle stands
DN
ROOFLIGHT
0.28
cycle stands
ROLLER SHUTTER
TOILET
(MALE)
RAMP UP
dient . 1:6 (9°)
(Rise 370)
LIFT
5 No. cycle stands
ANCE
NORTH
WING
CENTRAL AREA
RAMP UP
gradient . 1:19 (5°)
(Rise 170)
ENTRANCE
5 No. cycle stands
PLAN OUTLINE OF MAIN BUILDING (NTS)
GREENHOUSE
SHED
NORTH WING
LIGHT WELL
LIGHT WELL
0.33
TOILET
(FEMALE)
GREENHOUSES
TOILET (MALE)
SHED
0.93
ESTATES DIVISION
TITLE
0.34
TOILET
(MALE)
SOUTH
WING
MAIN BUILDING.
PART GROUND FLOOR PLAN.
TOILET
(DIS.)
0.35
RAMP UP
gradient . 1:8 (8°)
(Rise 340)
handrail
LIGHT WELL
NORTH WING
ENTRANCE
SCALE
1:250\A3 SHEET
SOUTH WING
LAST REVISED:
DRAWN/DATE
REC. DWG. No.
ORIGINAL LAYOUT DRAWN:
GPI
RLF - 23/09/2008
AK\AK01\FP\00
RECORD DRAWING

Similar documents