Visualizza la nostra brochure aziendale

Transcription

Visualizza la nostra brochure aziendale
45
thh
1969 - 2014
4
gruppo
g
gr
NEL CUORE
DI OGNI GRANDE
OPERA
IN THE HEART OF
EVERY GREAT
WORK
CONTATTI - CONTACTS
Generale SICE - Info SICE
[email protected]
Presidente - President
Dott. Ing. Vito Villari
[email protected]
Amministratore Delegato - C.E.O.
Dott. Ing. Alberto Villari
[email protected]
Direttore amministrativo qualità ISO e SOA
C.F.O. Director Quality ISO e SOA
Dott. Arch. Emanuela Villari
[email protected]
[email protected]
Direttore Tecnico - Technical Director
Per. Ind. Andrea Noventa
[email protected]
Ufficio Commerciale - Commercial Director
Per. Ind. Igor Pallado
[email protected]
[email protected]
Ufficio Lavori, Sicurezza e RSPP - Work’s Office, H&S Manager
Dott. Ing. Pauline Consoli
[email protected]
Divisione Impianti Elettrici - Electrical Planning Coordinator
Per. Ind. Marco Varotto
[email protected]
[email protected]
Divisione Impianti Meccanici - Mechanical Planning Coordinator
Dott. Ing. Roberto Maggiolo
[email protected]
[email protected]
Ufficio Gare e Preventivi - Quotes/Estimates Office
[email protected]
Ufficio Acquisti - Purchase Office
[email protected]
Ufficio CAD - CAD Office
[email protected]
COMPANY PROFILE
Sice srl gruppo leader nella progettazione,
installazione e manutenzione di impianti elettrici,
meccanici e speciali in Italia e nel mondo.
Fondata nel 1969, Sice nasce dal desiderio di un
gruppo di imprenditori veneti di dare vita ad una
realtà nuova, che, sulla scorta del modello
produttivo del nordest, riuscisse ad imporsi prima
a livello regionale, e poi nazionale nell’ambito
della progettazione e della realizzazione
di impianti elettrici.
Sice srl is leader-group in engineering,
building and service of electrical,
mechanical and networking systems.
Founded in 1969, Sice was born from the
desire of a group of Venetian entrepreneurs to
realize a new reality, which, on the basis of the
production model of the Northeast, was able to
impose as leader of design and installation of
electrical equipment, first at the regional
level and then nationally.
Fondata nel 1969, Sice nasce dal desiderio di un gruppo
di imprenditori veneti di dare vita ad una realtà nuova
che, sulla scorta del modello produttivo del nordest,
riuscisse ad imporsi prima a livello regionale, e poi
nazionale nell’ambito della progettazione e della
realizzazione di impianti elettrici.
Riuscita nel giro di un ventennio a guadagnare una
posizione di rispetto in tale settore con realizzazioni
significative a livello nazionale e internazionale, sia nel
pubblico che nel privato (ospedali, sedi centrali di
banche, aree e centri commerciali, in Italia, Algeria,
Arabia Saudita, Turchia e Croazia), Sice crea una
divisione specializzata nella progettazione e installazione di impianti meccanici (termoidraulici, antincendio
e di condizionamento), presentandosi così sul mercato
come una delle prime realtà capaci di offrire al Cliente
una competenza ed un servizio completi.
L’ultimo decennio l’ha vista sempre più protagonista
anche in tale ambito ed oggi essa risulta leader sul
panorama nazionale nella realizzazione di impianti
elettrici e meccanici, con un fatturato annuo di circa 10
milioni di euro, suddiviso in percentuali quasi uguali tra
i due settori.
L’impresa ha ottenuto inoltre la certificazione di qualità
UNI EN ISO 9001:2008 (n° 510 del 13/02/2012) e l’attestazione SOA La Soatech srl (n.15569/17/00 del 05/04/2013)
per le categorie OG1, OG10, OG11, OS3, OS30, OS28 e
OG9, fino al VI livello (vedi certificati), per complessivi
circa 30 milioni di euro.
Founded in 1969, Sice was born by the dream of a group
of local managers, to start up a new company that, in
the “nord-east” way of making business, wiel improve
new realization of electrical equipments, by the time in
the regional market and then in all the country side.
In the last 20 years, Sice became a leader in the market
of electrical plants, developing business activities
abroad, building all plants in hospital areas, bank’s
headquarters, trading areas in Italy, Algeria, Saudi
Arabia, Turkey and Croatia. In the same time, completing
the offer, Sice build a new business unit of mechanical
plants and the project unit, giving to the holders a full
solution for all technological systems.
Presidente
President
Dott. Ing. Vito Villari
In the last ten years Sice increases business up to 10 mln
€ shared in the two division of electrical and mechanical
systems.
Sice is UNI EN ISO 9001:2008 certified and SOA certified
for categories OG1, OG10, OG11, OS3, OS30, OS28 e
OG9, to the VI° level. (30 mln).
INDICE - INDEX
DIVISIONI
DIVISIONS
pag. 3
PROGETTI
PROJECTS
pag. 9
ELENCO REFERENZE LAVORI
LIST OF WORK REFERENCES
pag. 29
CERTIFICAZIONI
CERTIFICATIONS
pag. 40
Sice s.r.l. ha al suo organico oltre 40 addetti, una divisione
specializzata nella progettazione e realizzazione degli impianti
elettrici e affini, una divisione specializzata in quelli meccanici
(termoidraulici, idricosanitari, antincendio,di condizionamento, etc),
una addetta alla realizzazione di tutti gli impianti speciali e
di sicurezza quali antintrusione, TVCC, controllo accessi, cablaggio
strutturato, diffusione sonora, supervisione e termoregolazione,
una divisione esperta nella realizzazione degli impianti a fonti
rinnovabili quali fotovoltaico, eolico, biomasse, biogas, etc.
Sice has a staff of more than 40 employees, a division specialized in
design and realization of electrical installations, a division specialized
in mechanical installations (thermohydraulic, hydrosanitary,
fire protection, air conditioning, etc.), another one is assigned at the
realization of all the special and security systems such as intrusion
detection, CCTV, access control, structured wiring, sound system,
supervision and thermoregulation and a division expert in the
production of renewable energy systems such as solar,
wind, biomass, biogas, etc.
DIVISIONI
DIVISIONS
Sice ha assunto una posizione di rilievo nella progettazione,
installazione e manutenzione di impianti elettrici,
meccanici e speciali.
La divisione di progettazione e sviluppo è costituita da
un pool di ingegneri, periti, architetti (iscritti all’Albo
professionale di riferimento) e con esperienze professionalità ad oggi ultra quarantennali.
È in grado di accompagnare il Cliente dallo studio di
fattibilità fino alla progettazione esecutiva e costruttiva,
oltre che nell’analisi dettagliata e nella traduzione in
“cantierabili” di progetti realizzati per Committenti
terzi.
DIVISIONE PROGETTAZIONE
DESIGN DIVISION
Sice ha un ufficio tecnico interno composto da
professionisti di lunga esperienza dedicato solo alla
progettazione preliminare, definitiva, esecutiva e
costruttiva relativa a tutta l’intera gamma di
impianti che realizza (impianti elettrici,
termotecnici, condizionamento, antincendio,
idrotermosanitari, trattamento aria e speciali).
Settori Principali
• impianti di spegnimento antincendio sprinkler e a gas inerte
• impianti idricosanitari e scarichi
• impianti elettrici civili, industriali, terziari, direzionali,
commerciali, di produzione e dispaccio di energia elettrica
• reti di distribuzione in AT, MT e BT
• impianti di trasformazione di potenza
• impianti di diffusione sonora, impianti TVCC
• impianti antintrusione, controllo accessi, varchi e presenze
• impianti multimediali e audiovisivi
• reti e sistemi di cablaggio strutturato e telefonici
• impianti di rilevazione fumi e spegnimento incendi
• impianti TV e satellitari
• impianti fotovoltaici, solari termici, eolici, centrali a
biodigestione e a biomasse, geotermici
• impianti di building automation, termoregolazione,
supervisione e domotica
Sice has a technical department,
consists of experienced professionals,
dedicated to preliminary, definitive and executive
design and construction on the entire range of
plant which Sice realizes (electrical,
heat engineering, air conditioning,
fire protection, plumbing, HVAC and special).
Sice has reached a successful position in design,
setting-up and maintenance of electrical and mechanical
plants.
Project division is a pool of engineers, technician and
architects (booked on the respective professional
register), with over forty years of experience.
This team suggests the customer by the featuring of a
new project to the realization of a solution “all inclusive”.
Main Applications
• Fire prevention systems
• Hydraulic plants
• Electrical plants including industrial, offices, trading centers,
• Power production and distribution
• HV, MV and LV networks
• Audio diffusion systems, TVCC
• Access control, security and checking systems
• Multimedia control
• LAN e WAN solutions
• TV set and satellite broadcast
• Solar systems, wind-based systems, ecological systems
• Building automation, clima settings and control
1
4
Sice è stata una delle prime realtà a livello nazionale a
specializzarsi nella progettazione, installazione e
manutenzione di impianti elettrici, maturando
un’ esperienza e una professionalità ad oggi
ultraquarantennali.
DIVISIONE IMPIANTI ELETTRICI
ELECTRICAL PLANTS DIVISION
Lo staff di Sice è in grado di gestire e risolvere ogni
problematica in quest’ambito, intervenendo su immobili
con ogni destinazione d’uso e potendo soddisfare le
specifiche esigenze del Cliente in piena armonia con le
normative vigenti.
Progettazione, installazione, supervisione e
controllo quadri elettrici di media e bassa tensione,
cabine, impianti di trasformazione e di potenza,
centrali elettriche e cogenerative.
Settori principali
•
•
•
•
•
•
•
•
Ospedali
Banche e istituti assicurativi
Terziario e direzionale
Centri e parchi commerciali
Scuole e istituti universitari
Industriale
Illuminazione pubblica
Aree sportive e culturali
Design, installation, supervision and
control switchboards of medium and low voltage,
cabins, processing plants and power plants, power
plants and cogeneration.
Sice was one of the first companies specialized in
engineering, installation and maintenance of electrical
system, having experience from 1969.
Staff is full-skilled to solve every problem, for every type
of plant, according to the customer’s requirements.
Main Applications
• Hospital areas
• Banks and insurances
• Offices and retail areas
• Trading areas
• Schools and universities
• Industrial areas
• Public lighting
• Social and sport areas
2
5
Sice copre tutti i settori nella progettazione,
realizzazione e manutenzione di impianti meccanici.
DIVISIONE IMPIANTI MECCANICI
MECHANICAL PLANTS DIVISION
In particolare opera su:
• Impianti termoidraulici (idrico-sanitario, scarichi, etc)
• Condizionamento e trattamento dell’aria
• Antincendio (Sprinkler, idranti, gas inerte, etc)
• Termoregolazione, gestione e supervisione
Installazione e supervisione impianti di
climatizzazione, riscaldamento e condizionamento,
termoregolazione, impianti areaulici, antincendio,
idrico-sanitari, a gas inerte
L’esperienza maturata in questo settore consente a Sice
di affrontare ogni problematica fornendo al Cliente la
migliore soluzione possibile, in piena armonia con le
normative vigenti.
Settori Principali
•
•
•
•
•
•
•
Ospedali
Banche e istituti assicurativi
Terziario e direzionale
Centri e parchi commerciali
Scuole e istituti universitari
Industriale
Aree sportive e culturali
Installation and supervision of air conditioning
systems heating and air conditioning,
temperature control systems, air treatment,
fire protection, waterworks, plumbing, hvac
Sice is leader in the engineering, installation and
maintenance of mechanical systems in particular:
• Water plants
• Air-conditioning and air-treatment
• Fire prevention and protection
• Clima management and supervision
• Waterworks and plumbing
The remarkable experience gives to Sice all the
knowledge to solve every customer’s problem by the
best possible solution, according to the law.
3
Main Applications
• Hospital areas
• Banks and insurances
• Offices and retail areas
• Trading areas
• Schools and universities
• Industrial areas
• Social and sport areas
6
Per fornire al Cliente un servizio e una competenza
globali sull’opera o sull’intervento, Sice può contare su
uno specifico settore che progetta, realizza e manutiene
tutti gli impianti “speciali” per la gestione intelligente
del “building” secondo le specifiche esigenze del Cliente.
DIVISIONE SISTEMI E
TECNOLOGIE INNOVATIVE
INNOVATIVE SYSTEMS DIVISION
Sice interviene su:
• sistemi di supervisione, domotica, building automation
e regolazione
• impianti di cablaggio strutturato (parte passiva e
attiva) chiavi in mano
• impianti di antintrusione e di sicurezza
• impianti tvcc e videocitofonici
• impianti di sonorizzazione e diffusione sonora
• impianti di rilevazione fumi e incendio
• sistemi e impianti audiovisivi, TV, satellitari e di
videoconferenza
• impianti controllo accessi, varchi e presenze
Sistemi e tecnologie innovative:
cablaggio strutturato, telefonia,
TVCC, antintrusione, controllo accessi e
presenze, diffusione sonora, rilevazione fumi,
TV-SAT, building automation, fotovoltaico,
solare termico, biomasse
L’attenzione di Sice è da sempre inoltre rivolta verso le
nuove tecnologie e le fonti energetiche alternative e
rinnovabili. Per questo è stata costituita una divisione
all’avanguardia nella realizzazione e gestione di:
• impianti fotovoltaici
• impianti a collettori solari termici
• impianti eolici
• impianti e sistemi geotermici
• sistemi e gruppi di assorbimento, impianti a biomasse
e biodigestione
In tutti questi settori Sice è partner certificato dei
principali costruttori mondiali e, in virtù di questo, è in
grado di fornire al Cliente ogni forma di garanzia sull’opera.
Innovative systems and technologies:
structured cabling, telephony,
CCTV, antitheft, access control and
attendance, sound systems, smoke detection,
TV-SAT, building automation, photovoltaics,
solar thermal, biomass
To full-care every project directly, overviewing the
develop of the construction, Sice is able to manage every
step, including all the advanced plants like:
• building automation
• LAN systems
• antitheft and control systems
• TVCC and video systems
• audio and conference rooms
• fire prevention systems
• access control and authorizations
Main Applications
4
Sice is every time up-to-date to the last
technology and alternative power source.
So a specific unit is able to project:
• photovoltaics systems
• solar thermal systems
• wind systems
• geothermical systems
• thermovalorization
Sice is partner of the major manufacturers in the world.
7
INDICE PROGETTI - PROJECTS INDEX
HYPO ALPE ADRIA BANK s.p.a.
VENETO BANCA s.c.ar.l.
PAM-PANORAMA s.p.a.
GRUPPO POLICENTRO s.p.a.
AZIENDA SANITARIA EMILIA ROMAGNA
AGENZIA DELLE ENTRATE E DEL TERRITORIO
FINBENI HOLDING s.r.l.
F.LLI LANDO s.p.a.
IMPIANTI FOTOVOLTAICI NOVA COOP s.c.ar.l. PIEMONTE
SHOPPING TEN
UNIVERSITA’ DEGLI STUDI DI PADOVA
FRIULAIR s.r.l.
DUSSMANN SERVICE s.r.l.
MARINA VERDE s.r.l.
BROSS - REDAIS s.r.l.
INTERPORTO DI PADOVA s.p.a.
TENUTA DI CASTEFALFI s.p.a.
SERENISSIMA RISTORAZIONE s.p.a.
pag. 10
pag. 11
pag. 12
pag. 13
pag. 14
pag. 15
pag. 16
pag. 17
pag. 18
pag. 19
pag. 20
pag. 21
pag. 22
pag. 23
pag. 24
pag. 25
pag. 26
pag. 27
L’intero staff di Sice opera con la consapevolezza
che un solo fatto conta più di mille parole.
Nelle pagine che seguono si possono scorrere una
lista delle referenze dedicate ad alcuni tra gli ultimi
cantieri più significativi da noi realizzati.
The entire staff of Sice works with the
knowledge that one only fact counts more than a
thousand words.
In the following pages you can scroll through a list
of references dedicated to some of the most
significant recent construction realized by us.
PROGETTI
PROJECTS
La nuova sede della Hypo Alpe Adria Bank a Tavagnacco
(UD) è un progetto ambizioso, che stupisce già per
l’originale struttura pensata dall’architetto californiano
Thom Mayne. Il progetto è articolato in un edificio
direzionale di 8 piani (oltre 12.000 mq) che troneggia
inclinato di ca 14° sulla verticale, un avveneristico
auditorium con copertura a vela (ca 1.000 mq),
una filiale operativa, un complesso adibito ad archivi (di
ca 1.500 mq) con uno sviluppo lineare di oltre 100 metri
e l’asilo, per un investimento globale di 36 milioni di
euro.
Gli impianti sono stati progettati dallo Studio IN.AR.CO.
di Udine (per un appalto di oltre 5 milioni di euro) e la
realizzazione ha impegnato SICE per 14 mesi,
con l’impiego di oltre 40 maestranze.
A conclusione dei lavori, gli impianti risultano raffinati
almeno quanto le strutture e i numeri restituiscono una
fotografia chiara del valore del lavoro.
HYPO ALPE ADRIA BANK s.p.a.
Sede centrale Italia - Tavagnacco (Udine)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2005 - 2006
Importo Lavori: € 5.027.128,00
Headquarter Italy – Tavagnacco (Udine)
Services: electrical, mechanical and special plants
Years: 2005-2006
Amount of work: € 5.027.128,00
I Numeri del progetto
• oltre 7.000 mq di soffitti radianti alimentati da
16 distinte linee di tubazioni dorsali per un totale di
ca 44.000 kg
• 1.300 infissi e tende motorizzati gestiti da un
complesso impianto di building automation con
trasduttori atmosferici
• 1,6 MVA di potenza elettrica complessiva installata
• oltre 50 quadri elettrici di bassa tensione
• oltre 8.000 mt di canalizzazioni portacavi
• 720 kVA di gruppo di autoproduzione elettrodiesel
• oltre 1.600 mq complessivi (tra due CED e archivi)
protetti da impianti di spegnimento a gas inerte
• 8 linee ridondanti di blindosbarre da 250A a servizio
delle utenze ai piani
• 800 torrette portaprese da incasso su pavimento
flottante per postazioni di lavoro
• 500 kVA complessivi sotto continuità assoluta
• oltre 4.500 mq di canalizzazioni di mandata e quasi
30.000 Kg di ripresa per un sofisticato impianto
aeraulico che gestisce 16 aree indipendenti
A very particular project for the new headquarter of
Hypo Alpe Adria Bank in Tavagnacco (UD), the original
architecture, planned by the famous Californian
architect Thom Mayne consisting of a directional
building (more than12.000sqm) of 8 floors tilted of 14°,
a new auditorium with sail cover (of ca 1.000sqm),
a bank office, and a nursery school.
Numbers Of The Project
• More than 7.000 sqm of radiant celling panels
powered by 16 lines for a total of 44.000 kg
• 1.300 motorized windows and curtains placed under
a building automation control
• 1,6MVA of total electrical power
• Over 50 power panels under low voltage
• 720kVA of power backup systems
• More than 1600sqm of CED and archives protected by
fire guard systems
• 800 work-places
• 500 kVA under UPS
• An up-to-date system of climatization with 16
independent areas.
• More than 4.500sqm of supply ducts and more than
30.000 kg of return air ducts.
A project and a work where Sice was a SINGLE PARTNER
by his total quality in building and maintenance of
systems
10
La sede centrale di Veneto Banca a Montebelluna (TV) si
sviluppa su una superficie complessiva di circa 17.000 mq.
E’ composta da un edificio direzionale principale di 4
piani (2.100 mq ciascuno) con annesso auditorium semicircolare da 350 posti, da un edificio mensa di ca 1.000
mq, da un ulteriore edificio adibito ad archivi e locali
tecnologici per ca 3.500 mq.
Gli impianti, progettati dallo Studio TiFS di Padova, sono
molto sofisticati sotto il profilo del building automation,
che prevede la supervisione computerizzata in tempo
reale di tutti gli apparati (impianti elettrici, illuminazione
con reattori digitali dimmerabili DALI, rilevazione fumi,
TVCC, controllo accessi, antintrusione, termoregolazione
etc); l’opera risulta complessa anche in termini meccanici,
prevedendo l’attivazione di 3 gruppi termofrigoriferi
che scambiano calore con acqua di falda prelevata
mediante 2 pozzi a 110 mt di profondita con pompe da
100 mc/h. L’intervento di SICE si è sviluppato complessivamente in 26 mesi di lavoro, con l’impiego di 40
maestranze di cantiere. L’importo della commessa per gli
impianti supera i 6 milioni di euro.
VENETO BANCA s.c.ar.l.
Sede centrale Italia - Montebelluna (Treviso)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2002-2005
Importo lavori: € 6.133.482,44
Headquarter – Montebelluna (Treviso)
Services: electrical, mechanical and special plants
Years: 2002-2005
Amount of work: € 6.133.482,44
I numeri del progetto
• 16 Centrali di Trattamento Aria
• 3 gruppi frigoriferi condensati ad acqua con compressori
a vite ciascuno da 358 kWf
• 300 ventilconvettori a quattro tubi, oltre 60.000 kg di
tubazioni idrauliche in acciaio nero, ca 10.000 Kg di
tubazioni idrauliche in acciaio zincato, oltre 50 quadri
elettrici di bassa tensione
• oltre 6.000 mt di canalizzazioni portacavi,
ca 7.000 mt di cavidotti esterni
• impianto di cablaggio strutturato con 16 rack per un
tot di ca 3.000 prese in campo RJ45, oltre 180 km di
cavo AWG24 cat.7 SFTP e 400 fibre ottiche multimodali
per un tot di 4.000 mt di cavo a 12 fibre ottiche
• oltre 300 rilevatori antintrusione
• ca 50 telecamere fisse con 9 monitor e 4 registratori
digitali connessi via rete ethernet
• oltre 80 diffusori acustici, ca 1.000 punti di gestione
dell’impianto di supervisione
• ca 30 centrali di rilevazione fumi ad aspirazione,
oltre 600 punti rilevazione di fumo
The new headquarter of Veneto Banca is about 17.000
sqm with a main building of 4 floors of 2.100sqm each
one, a semi-circular auditorium of 350 seats and a service
area of 1.000 sqm and CED build of 3.500sqm
The plants, projected by TIFS – Padova, are very
particular, including building automation, lighting, full
control checking and many others. Air conditioning and
air treatment include 3 power settings coolers with
geothermal system of 110m of depth.
This project needed over 26 months and over 40
full-time workers.
Numbers Of The Project
• 16 air handling units
• 3 coolers of 358 KWf
• 300 fan coils, 60.000kg of each one steel
10.000 kg of galvanized steel pipelines
• Over 6.000 mt of cable trays and 7.000 mt outdoor
lines
• LAN system with over 3.000 RJ45 outlet, over 300 km
of AWG 24 cat. 7 SFTP, cables and 400 fiber optics network
• Over 300 anti-theft sensors
• 50 cam with 9 monitors and 4 recorders
• Over 80 speakers
• 1.000 control monitoring system points
• 30 fire-alarm systems with 600 points of reveal
11
La realizzazione del centro commerciale di Ariccia
rappresenta un progetto importante e al tempo stesso
una sfida significativa, per l’impegno tecnico e operativo
richiesto.
SICE è stata scelta come partner unico in nome della
fiducia della garanzia di qualità legata ad un marchio
consolidato.
L’intervento di SICE – che ha messo a disposizione le
proprie competenze per affinare le soluzioni tecniche
proposte nel progetto – si è dimostrato competitivo ed
è stato ancora una volta importante per la visione
integrata del lavoro.
PAM-PANORAMA s.p.a.
Centro Commerciale Ariccia (Roma)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2006
Importo lavori: € 2.940.000,00
I numeri del progetto
• ca 25 milioni di euro di investimento globale
• ca 3 milioni di euro di appalto per le opere
impiantistiche elettriche e meccaniche
• 40 persone in cantiere per 6 mesi
• 13.000 mq di aree coperte di cui 6.000 mq di sala
vendita, 1.000 mq di sala lavorazioni, 1.500 mq di
negozi di terzi, 1.000 mq di uffici, 2.000 mq di locali
tecnici, 1.500 mq di magazzino di stoccaggio merci,
30.000 mq complessivi di parcheggi
• 2,5 MVA di potenza elettrica complessiva installata
• 800 kVA da gruppo di autoproduzione elettrica diesel
• 15 quadri elettrici di bassa tensione
• 15.000 mt di canalizzazioni e portacavi
• impianto di cablaggio strutturato con 8 rack per 500
prese cat. 5e e 100 attestazioni di fibra ottica
• 300 punti ottici, termici e lineari per impianto di
rivelazione fumo
• 200 punti in campo, costituiti da sensori a infrarossi e
doppia tecnologia, per impianto antintrusione
• impianto di gestione (building managment system)
con 600 punti controllati
• ca 40.000 kg di canalizzazioni aerauliche
• ca 15.000 kg di tubazioni idrauliche a servizio degli
impianti di condizionamento
• ca 20.000 kg di tubazione a servizio dell’impianto
Sprinkler per 1.200 testine in campo totali
Trading Center Ariccia (Rome)
Services: electrical, mechanical and special plants
Year: 2006
Amount of work: € 2.940.000,00
Building of this trade center represents a very important
project and a real challenge for the effort submitted.
SICE has been chosen by PAM as the sole partner trusting
in his quality and capabilities.
The internal planning division help, was only one of the
branch who support the engineers pool to find the best
solution for the best plans inside this center: a very
important field to an integrated overview on all the
process.
Numbers Of The Project
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
12
Approximately 25.000.000 euro of global investment
Approximately 3.000.000 euro of plants investment
40 workers engaged
13.000sqm of covered areas, 6.000sqm of sales room,
1.000sqm processing room, 1.500sqm of shops,
1.000sqm for offices, 2.000 of technical rooms,
1.500 for docks and 30.000sqm for parking
2,5 MVA of total power
800 kVa of backup power
15 power panels
15.000 m of cable trays
LAN system with 8 rack, 500 outlet cat.5e and 100
fiber optic lines
300 optical, thermal and linear fire alarm points
200 points for anti-theft system
600 points for building management
About 40.000kg of ducting
About 15.000kg of hydraulic circuit (air-treatment)
About 20.000kg of sprinkler system pipes
(1.200 points)
L’esperienza ultraquarantennale nella costruzione di
impianti per la Grande Distribuzione Organizzata
(centri commerciali, ipermercati), con oltre 70 realizzazioni
in tutta Italia, ha indotto il Gruppo Policentro SpA a
scegliere SICE come appaltatore unico di quello ad oggi
è il suo progetto più importante: il centro commerciale
Tower Center di Rijeka (HR), che si affaccia sulle isole di
Krk e Cres.
SICE è partner di Policentro dal 1994 e questo proficuo
legame ha portato a collaborazioni in tutta Italia, tra le
quali vale la pena di citare i centri commerciali La Grande
Mela a Sona (VR), Torri d’Europa a Trieste, Piazzagrande
a Piove di Sacco (PD) e Piazza Umbra a Trevi (PG).
Le cifre del Tower Center sono notevoli, anche per
questo è forse il progetto che testimonia al meglio la
capacità di SICE nell’operare in Italia e all’estero,
garantendo al cliente totale affidabilità e un servizio di
alta specializzazione.
GRUPPO POLICENTRO s.p.a.
Tower center – Rijeka (Croazia)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2005-2006
Importo lavori: € 14.130.000,00
Tower center – Rijeka (Croatia)
Services: electrical, mechanical and special plants
Year: 2005-2006
Amount of work: € 14.130.000,00
I numeri del progetto
• ca 100 milioni di € di investimento globale
• 70 maestranze di cantiere
• ca 150.000 mq di aree coperte, comprendenti anche
un multisala cinematografica da 1700 posti,
una sala giochi, una palestra, un ipermercato di
ca 10.000 mq
• 1.877 posti auto
• oltre 180 negozi
• oltre 11 MVA di potenza elettrica complessiva
installata suddivisa in 5 cabine distinte e
12 trasformatori di potenza
• ca 1,7 MVA totali da gruppi di autoproduzione
elettrodiesel
• oltre 350.000 Kg di canalizzazioni aerauliche
• oltre 50.000 Kg di tubazioni idrauliche a servizio
degli impianti di condizionamento
• oltre 250.000 Kg di tubazioni a servizio dell’impianto
sprinkler per ca 9.000 testine totali in campo
• impianti speciali: TVCC, antintrusione,
diffusione sonora, rivelazione fumi
Policentro S.P.A. required Sice as sole contractor of his
best plan: “Tower Center“ the new trade center of
Rijeka (HR), a building area over the town and his islands
of Krk and Cres
Since 1994 SICE is a friendly partner of Policentro,
and this relationship has led to a lot of realizations:
• La Grande Mela of Sona (VR);
• Torri d’Europa of Trieste (TS);
• Piazzagrande of Piove di Sacco (PD);
• Piazza Umbra of Trevi (PG).
Numbers Of The Project
• Approximately 100 millions of euros of total
investment
• More than 140.000sqm of covered areas,
a 1700 seats multiplex cinema, games area,
fitness center and a 10.000sqm superstore
• 1877 parking spaces
• More than 180 shops
• 70 workers
• Over 11MVA of total electrical power
• Approximately 1,7MVA of electro diesel power’s backup
• More than 350,000 kg of ducting
• More than 50,000 kg of hydraulic piping for
air conditioning systems
• More than 250,000 kg of piping for fire
protection system
• CCTV, anti-theft, audio, fire alarm
13
Il nuovo blocco dell’Ospedale di Budrio (BO), di proprietà
della ASL Emilia Romagna, consta di quattro piani (di cui
tre totalmente fuori terra) per una superficie coperta
complessiva di ca 5.000 mq e di una nuova camera
mortuaria (Morgue) da ca 300 mq. Ogni piano è costituito
da due ali diametralmente opposte e da un corpo
centrale che accoglie lo sbarco per ascensori e
montalettighe e i vani scale.
Il complesso comprende un reparto radiologico al piano
seminterrato con 5 sale RX, 8 studi medici e 4 ambulatori
ecografia e mammografia; 38 stanze di degenza ai piani
primo e secondo; 4 ambulatori medici per terapia
intensiva, il pronto soccorso nell’ala Est del piano terra
(ca 600 mq) e nell’ala Ovest l’ingresso principale (ca 380
mq) con reception e bar interno; i locali tecnici sono
distribuiti tra il seminterrato (centrale tecnologica e di
pompaggio in copertura) e l’interrato (centrale gruppi
antincendio, con vasca da ca 130 mc).
AZIENDA SANITARIA
EMILIA ROMAGNA
Ospedale – Budrio (Bologna)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2006-2007
Importo lavori: € 2.550.000,00
Budrio Hospital (Bologna)
Services: electrical, mechanical and special plants
Years: 2006-2008
Amount of work: € 2.550.000,00
I numeri del progetto
•
•
•
•
•
•
•
•
•
•
66 quadri elettrici e centralini di bassa tensione
Oltre 2.500 mt di canalina portacavi in acciaio zincato
Oltre 25.000 mt di linee energia in cavo FG7OM1 0,6/1 kV
Oltre 3.000 mt di cavo coassiale TV-SAT con 50 prese
TV-SAT miscelate in campo
Un sofisticato impianto di termoregolazione e
building automation Siemens che gestisce e comanda
oltre 1.000 punti logici in campo
Ca 1.000 corpi illuminanti per illuminazione normale
e oltre 300 plafoniere per illuminazione di emergenza
gestite da impianto di diagnosi e telecontrocco
centralizzato
Gruppo statico di continuità assoluta UPS da 60 kVA
Un sofisticato impianto di rilevazione e segnalazione
incendi digitale interattivo Siemens Sinteso con oltre
600 punti in campo
Impianto di videochiamata infermiera ABB Clinos Phon
per 38 degenze, 19 WC assistiti, 3 capo sala 17
ambulatori e studi medici
Impianto di diffusione sonora conforme a norma
EN60849 con 60 diffusori acustici in campo da incasso
con fondello in acciaio e morse o in ceramica conforme
alle British Standard BS5839 part 8
The new branch of Budrio Hospital is a 4 floors
(3 above) building for a total of about 5.000sqm and a
Morgue of 300sqm
Each floor is set with two areas and a common area
which houses the landing for elevators, stretcher lifts
and stairwells. The building contains 5 RX room, 8 main
rooms and 4 ambulatories, 38 hospital rooms,
4 emergency rooms and the first aid area and the
entrance to the hospital with reception and bar.
Technical rooms are in the basement with the
fire-fighting units, with a water sypply of approx 130
cubic meter..
Numbers Of The Project
•
•
•
•
•
•
•
•
•
•
14
66 electrical panel
More than 2.500m of cable-trays
More than 25.000m of power lines
More than 3.000m of TV SAT system
Siemens systems for building automation
(over 1.000 points)
Over 1.000 lighting systems and 300 full logic
emergency light system
UPS for 60kVA
Siemens SINTESO fire detection system with more
than 600 points
Videocall system ABB CLinos for 38 bedrooms,
19 WC, 3 nurse and 17 other rooms
Audio system according to EN60849 and
BS5839 part B law.
Nella realizzazione di edifici adibiti ad uso terziario
direzionale, SICE ha maturato una vasta esperienza.
Negli ultimi anni, solo a Padova, per l’impresa SVEC SpA
ha realizzato la nuova sede provinciale dell’INAIL e la
nuova sede della facoltà di Economia dell’Università
degli Studi di Padova. Il proficuo legame di collaborazione
ha portato a questo nuovo progetto che, per dimensioni
e complessità, rappresenta una sfida impegnativa per
SICE.
La qualità del lavoro e l’attenzione ad ogni particolare
ha consentito di realizzare compiutamente e correttamente
il progetto.
AGENZIA DELLE ENTRATE
E DEL TERRITORIO
Sede centrale (Padova)
Servizi: impianti elettrici e speciali
Anno: 2006
Importo lavori: € 768.604,54
I numeri del progetto
• Tre blocchi di edifici attigui per oltre 8.000 mq
complessivi adibiti ad uffici e ca 2.000 mq di
autorimesse interrate
• N° 3 cabine per un totale di 1 MVA ca di potenza
elettrica complessiva installata.
• oltre 1.500 apparecchi di illuminazione
• oltre 240 apparecchi di illuminazione di sicurezza
• Quasi 400 posti di lavoro previsti
• N° 3 impianti di rilevazione fumi per un totale di ca
700 punti in campo
• Impianti di richiesta udienza
• N° 3 impianti autonomi TV e Satellitari
• Ca 30 quadri elettrici di bassa tensione
complessivamente installati
• Oltre 4.000 mt di canalizzazioni portacavi
• N° 2 impianti di spegnimento ad aerosol autonomi a
servizio degli archivi
Headquarter (Padova)
Services: electrical and special plants
Years: 2006
Amount of work: € 768.604,54
SICE has gained particular experience in the construction
of buildings for commercial and directional use.
In recent years, only in Padua, for SVEC SpA enterprise,
SICE has implemented new INAIL provincial headquarters
and the new headquarters of the Faculty of Economics
of Padua University. The fruitful relationship of cooperation
has led to this new project, which represents a challenge
for SICE for its size and complexity
The quality of work and the attention to every detail has
allowed us to fully and properly implement the project.
Numbers Of The Project
• 3 blocks of adjacent buildings over 8,000 square
meters used for offices and about 2,000 square meters
of underground garages
• 3 electrical sub-station of 1MVA
• More than 1500 lighting fixtures
• More than 240 safety lighting fixtures
• Nearly 400 workplaces
• 3 smoke detection systems for a total of 700 points
• 3 independent TV and satellite systems
• More than 4000 m of cable support
• 2 aerosol fire control systems
15
Il Centro Commerciale Iperlando di Conselve, che sorge
in corrispondenza della statale Monselice mare,
rappresenta il primo vero grande Centro Commerciale
del gruppo IPERLANDO S.p.A.Consta di ca. 33.000 mq.
coperti totali su unico piano con un Ipermercato LANDO
S.p.A. da ca. 7.900 mq., gallerie per tot. 3.000 mq. e tot.
20.000 mq. di negozi di cui N. 8 grandi o medie
superfici.
FINBENI HOLDING s.r.l.
Centro Commerciale IPERLANDO
di Conselve (PD)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2008-2009
Importo Lavori: € 6.000.000,00
SICE s.r.l. è stata scelta come partner impiantistico unico
sia elettrico che meccanico, e ha messo ancora una volta
le sue competenze e la sua struttura a servizio del
Cliente.
I numeri del progetto
Mall IPERLANDO of Conselve (PD)
Services: electrical, mechanical and special plants
Years: 2008-2009
Amount of work: € 6,000,000.00
•
•
•
•
•
•
•
•
•
•
Ca. 40 milioni di Euro di investimento globale
Oltre 40 maestranze di cantiere medie
33.000 mq. di totale superficie coperta
7.900 mq. di Ipermercato di cui 4.900 mq. di area vendita
3.000 mq. di gallerie coperte e spazi comuni
20.000 mq. per negozi e N. 1.300 posti auto scoperti
Oltre N. 3.385 testine impianto sprinklers
4,3 MVA di potenza elettrica complessiva installata
850 kVA autoprodotti da gruppi elettrogeni diesel
Oltre 91.000 Kg. di canalizzazioni aerauliche
Iperlando Conselve Shopping Center, located along the
highway Monselice-Mare, is the first real big shopping
center realized by IPERLANDO SpA group. It consists of
approx. 33,000 sqm of covered area totally on one level
with a Hypermarket LANDO SpA of approx. 7,900 sqm,
arcade for tot. 3,000 sqm and tot. 20,000 sqm of shops
including 8 large or medium-sized areas.
SICE s.r.l was chosen as the sole partner for the
installation of electrical and mechanical systems, and has
once again brought its expertise and its structure to
service the customer.
Numbers Of The Project
•
•
•
•
•
•
•
•
•
•
16
Approximately € 40 million global investment
More than 40 construction site workers
33,000 sqm of covered area
7,900 sqm Hypermarket including 4,900 sqm of sales area
3,000 sqm of covered arcades and public areas
20,000 sqm of shops and 1,300 parking places
More than 3,385 nozzles of sprinklers system
4.3 MVA of total electric power installed
850 kVA self-produced by diesel generators
More than 91,000 kg of ducting
Il Centro Commerciale Iperlando di Cittadella (PD)
rappresenta il secondo grande complesso commerciale
realizzato dal Gruppo Iperlando S.p.A.
Il progetto è nato nel lontano 1999 ma per oltre 10 anni
è rimasto sospeso a causa di ritardi e problematiche
amministrative e burocratiche.
Il complesso consta di un piano interrato adibito ad
autorimessa da tot. 29.000 mq., di un Ipermercato da
8.000 mq., di cui 5.100 mq. di area vendita, da un
multisala cinematografico con N. 2 sale per tot. N. 400
posti a sedere.
SICE s.r.l. è stata scelta come partner impiantistico unico
e ha realizzato l’opera inaugurandola il 06/11/2013.
F.LLI LANDO s.p.a.
Centro Commerciale IPERLANDO
di Cittadella (PD)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2012-2013
Importo Lavori: € 6.000.000,00
I Numeri del progetto
Mall IPERLANDO of Cittadella (PD)
Services: electrical, mechanical and special plants
Year: 2012-2013
Amount of work: € 6,000,000.00
• Ca. 50 milioni di Euro di investimento globale
• Ca. 50.000 mq. di totale aree coperte di cui 29.000 mq.
di autorimesse interrate
• N. 1 multisala cinematografico da N. 2 sale per tot. N.
400 posti a sedere
• N. 897 posti auto complessivi interrati
• Oltre 3.000 testine sprinklers complessive
• 2,5 MVA di potenza elettrica complessiva installata
• 850 kVA autoprodotti da gruppi elettrogeni diesel
The Shopping Center Iperlando of Cittadella (PD) is the
second largest shopping complex built by Iperlando SpA
Group.
The project was started back in 1999 but for over 10
years has been suspended due to administrative and
bureaucratic delays and problems.
The complex consists of 29,000 square meters garage in
the basement, an Hypermarket of 8,000 sqm, including
5,100 sqm of sales area, a multiplex cinema with 2 rooms
for a total of 400 seats.
SICE s.r.l was chosen as the sole partner for the construction
of facilities and completed the work inaugurating the
06/11/2013.
Numbers Of The Project
• Approximately 50 million Euro global investment
• Approximately 50,000 sqm of total covered areas
including 29,000 sqm of underground garages
• 1 multiplex cinema with 2 rooms for a total of
400 seats
• A total of 897 parking spaces underground
• More than 3,000 nozzles of sprinklers system
• 2.5 MVA of total electric power installed
• 850 kVA self-produced by diesel generatorsA project
and a work where Sice was a SINGLE PARTNER by his
total quality in building and maintenance of systems
17
SICE s.r.l. ha realizzato per la NOVA COOP s.c.ar.l. del
Piemonte nel 2013 N. 5 impianti fotovoltaici su
altrettanti ipermercati (Borgosesia, Santhià, Tradate,
Novara, Pinasca) per tot. 635 kWp, con un importo lavori
complessivo di Euro 863.000. Tutti questi impianti sono
stati realizzati con pannelli policristallini o monocristallini
da 250 Wp di produzione EU e con certificato in Classe
di Reazione al Fuoco 1 con inverters trifasi del tipo
“distribuito” stagno (tipo Power One Aurora Trio) e con
strutture autoportanti in alluminio non perforanti
zavorrate. Tutti gli impianti sono ricaduti negli incentivi
del V° Conto Energia.
IMPIANTI FOTOVOLTAICI
NOVA COOP s.c.ar.l. PIEMONTE
Servizi: N. 5 impianti fotovoltaici ed elettrici
Anno: 2013
Importo Lavori: € 863.000,00
I Numeri del progetto
• 635.000 Wp complessivi installati
• N. 2.540 pannelli poli/mono-cristallini 250 Wp EU con
Classe di Reazione al Fuoco 1 per VVF
• N. 22 inverters Power One Aurora Trio 27,6 kW con
Datalogger RS485 e Supervisione
• Strutture autoportanti non perforanti zavorrate in
profili di alluminio
• Oltre N. 5.000 zavorre da 60 Kg. cad. in c.a. vibrato
• Oltre 730.000 kWh complessivi attesi annui di energia
autoprodotta
• Oltre 130.000 Euro complessivi attesi di risparmio in
bolletta annuo
• Oltre 510 tonnellate di CO2 evitate annue
Photovoltaic plants - Coop Piemonte s.c.ar.l.
Services: n. 5 photovoltaic and electrical plants
Year: 2013
Amount of work: € 863,000.00
In 2013 SICE s.r.l has realized for the NOVA COOP s.c.ar.l.
5 photovoltaic systems on many hypermarkets
(Borgosesia, Santhià, Tradate, Novara, Pinasca) for a total
of 635 kWp, with a total contract amount of Euro
863,000. All of these plants have been realized with
polycrystalline or monocrystalline 250 Wp of EU
production and certified in Class 1 Fire Resistance with
three-phase watertight “distributed” inverters (type
Power One Aurora Trio) and with self-supporting in non
penetrating ballasted aluminum structures.
Numbers Of The Project
• 635,000 Wp total installed
• 2,540 poly / mono-crystalline 250 Wp panels EU with
Class 1 Fire Reaction
• 22 Power One Aurora Trio 27.6 kW Inverters
Datalogger with RS485 and Supervision
• Self-supporting structures in non-penetrating
ballasted aluminum profiles
• More than 5,000 vibrated concrete weights of 60 kg
each
• More than 730,000 kWh total expected annual energy
self-produced
• More than 130,000 Euro of the total expected annual
savings
• More than 510 tons of CO2 avoided per year
18
Il Centro Commerciale Shopping Ten sorge a Tencarola
nei pressi di Selvazzano (PD) ed è costituito da una
superficie coperta di tot. 10.470 mq. di cui 4.700 mq. di
autorimessa interrata, 2.700 mq. di Ipermercato
ASPIAG- DESPAR., 1.400 mq. di negozi, zone comuni e
gallerie del Centro Commerciale e da un piano 1° adibito
a palestra Happy Fit da 1.670 mq.
SICE è stata scelta come partner impiantistico unico ed
ha realizzato i lavori in meno di 8 mesi con una media di
20 maestranze.
SHOPPING TEN
Centro Commerciale Shopping Ten
di Tencarola (PD)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2010-2011
Importo Lavori: € 1.750.000,00
I Numeri del progetto
• Ca. 10 milioni di Euro di investimento globale
• Tot. 10.470 mq. di superficie totale coperta
• Tot. 4.700 mq. di autorimessa interrata con
N. 144 posti auto
• Tot. 2.700 mq. di Ipermercato Aspiag-Despar
• Tot. 1.670 mq. di palestra Happy Fit al piano 1°
• 1.727 testine sprinklers totali
Shopping Ten Mall – Tencarola (PD)
Services: electrical, mechanical and special plants
Years: 2010-2011
Amount of work: € 1,750,000.00
The Shopping Ten Mall is located near Tencarola
Selvazzano (PD) and consists of a 10,470 sqm area
including a 4,700 sqm underground garage, a 2,700 sqm
ASPIAG-DESPAR Hypermarket , 1,400 square meters of
shops, arcades and public areas of the shopping center
and a 1,670 sqm 1st floor used as a Happy Fit gym.
SICE has been chosen as the sole partner plant and has
carried out the work in less than 8 months with an
average of 20 workers.
Numbers Of The Project
• Approximately 10 million global investment
• Total 10,470 sqm of the total area covered
• Total 4,700 sqm. of underground garage with
N. 144 parking spaces
• Total 2,700 sqm Hypermarket of Aspiag-Despar
• Total 1,670 sqm Happy Fit gym on the 1st floor
• 1,727 nozzles for sprinklers system
19
L’edificio della facoltà di Biologia e Biomedicina
dell’Università degli Studi di Padova, ideato dal famoso
architetto Mario Botta di Lugano, stupisce sia per la
bellezza delle forme ispirate dallo sbocciare di un fiore,
sia per le monumentali dimensioni e sviluppo esterni e
interni. Consta infatti di tot. 15.000 mq. complessivi su
N. 5 piani adibiti ad aule per un tot. di oltre N. 1.500
posti, laboratori, uffici, autorimessa, spazi comuni, etc.
UNIVERSITÀ DEGLI STUDI
DI PADOVA
Nuova Facoltà di Biologia e Biomedicina
Servizi: impianti elettrici e speciali
Anno: 2011-2013
Importo Lavori: € 1.698.750,00
SICE è stata scelta come impiantista elettrico specializzato
ed ha eseguito anche tutti i molteplici e complessi
impianti speciali a servizio dell’intero fabbricato
(rilevazione fumi e gas, diffusione sonora, trasmissione
dati / cablaggio strutturato, etc.).
New Biology and Biomedicine Faculty - Padova
Services: electrical and special systems plants
Year: 2011-2013
Amount of work: € 1,698,750.00
I Numeri del progetto
•
•
•
•
•
•
•
Oltre 30 milioni di investimento globale
15.000 mq. di superficie coperta globale
N. 17 aule con oltre N. 1.500 posti a sedere
N. 21 laboratori didattici e di ricerca
2,5 MVA di potenza elettrica complessiva installata
Oltre N. 2.500 apparecchi illuminanti
N. 1 gruppo elettrogeno da 650 kVA
The building of Biology and Biomedicine Faculty of
Padua University , designed by the famous Lugano
architect Mario Botta, surprising both for the beauty of
forms inspired by the blossoming of a flower, and for the
monumental size and external and internal development.
In fact consists of 15,000 square meters divided into 5
floors used as classrooms with more than 1,500 seats,
laboratories, offices, garage, common areas, and so on.
SICE has been chosen as specialized electrical plant
engineer and also performed all the multiple and
complex special equipment to service the entire building
(smoke and gas detection, sound, data / structured
cabling, and so on).
Numbers Of The Project
•
•
•
•
•
•
•
20
More than € 30 million global investment
15,000 sqm of global covered area
17 classrooms with more than 1,500 seats
21 teaching and research laboratories
2.5 MVA of total electric power installed
More than 2,500 luminaires
1 generator of 650 kVA
L’ampliamento della sede centrale produttiva della
FriulAir s.r.l., ditta presente in tutto il mondo specializzata
nella costruzione di essiccatori e gruppi frigoriferi,
consta di ca. 10.000 mq. di nuovo capannone alto ca.
12 mt. interni con zona magazzino, area produzione e
mensa e di un nuovo corpo uffici sul fronte da tot.
ca. 1.000 mq. su 3 piani.
SICE s.r.l. è stata scelta come partner impiantista unico
sia elettrico che meccanico per la sua serietà e competenza.
FRIULAIR s.r.l.
Sede Centrale Cervignano del Friuli (UD)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2013-2014
Importo Lavori: € 1.300.000,00
I Numeri del progetto
• 10.000 mq. di ampliamento
magazzini / produzione / mensa
• 1.000 mq. nuova palazzina uffici su 3 piani fuori terra
• 7,5 milioni di Euro di investimento globale
• 1 MVA di potenza elettrica totale installata
• Tot. N. 462 apparecchi illuminanti full led installati
• Tot. N. 40 torrette portaprese da incasso nel pavimento
flottante degli uffici
• Tot. 1.738 mt. di blindo luce e FM installate
Headquarter Friulair s.r.l.
Cervignano del Friuli (UD)
Services: electrical, mechanical and special plants
Year: 2013-2014
Amount of work: € 1.300.000,00
The expansion of the production headquarters of
FRIULAIR Ltd, worldwide company specialized in the
construction of dryers and refrigeration units, consists of
approximately 10,000 square meters of new factory high
approximately 12 mt. with internal storage area,
production area and refectory and a new 3 floors office
block on the front of approximately 1,000 square meters.
SICE s.r.l has been chosen as a partner both electrical and
mechanical plant engineer only for his reliability and
expertise.
Numbers Of The Project
• 10,000 sqm expansion of
warehouse / production / refectory
• 1,000 sqm new office building on 3 floors
• 7.5 million global investment
• 1 MVA of total electric power installed
• 462 full led lighting fixtures installed
• 40 turret socket built in the raised floor of the offices
• 1,738 mt. light and power busway installed
21
Il nuovo Centro Cottura del Comune di Padova sorge
all’interno dell’Interporto in zona Z.I.P. in Corso Stati
Uniti 18. Detto consta di tot. 1.850 mq. adibiti a cucina
industriale, zona preparazione, cucina diete speciali
(celiachi, etc.), area lavaggio, area stoccaggio e zone e
locali tecnici.
Realizzato da SICE s.r.l. in meno di 14 settimane
impiegando in media 18 maestranze con punte di 24
operai, è il fiore all’occhiello della DUSSMANN SERVICE
S.r.l. non solo in Italia ma nel Mondo e rappresenta il suo
più grande e tecnologicamente avanzato Centro di
Cottura.
DUSSMANN SERVICE s.r.l.
Nuovo Centro Cottura Comune di Padova
Servizi: impianti elettrici, speciali e meccanici
Anno: 2013
Importo Lavori: € 850.000,00
I Numeri del progetto
City of Padua – New Cooking Centre
Services: electrical, mechanical and special plants
Year: 2013
Amount of work: € 850.000,00
•
•
•
•
•
•
1.850 mq. totali coperti
Oltre 4 milioni di investimento globale
Oltre 18.000 mq. di canalizzazioni aerauliche
N. 4 UTA per tot. 69.910 mc/h
N. 1 gruppo frigorifero da 352 kWf
N. 3 caldaie a condensazione per tot. 348 kWt
The new Cooking Center is located within the Interport
of Padua in the industrial area. It consists of 1,850 sqm
used for industrial kitchen, preparation area, cooking
special diets (gluten free meals, and so on), washing
area, storage area and technical rooms.
Realized by SICE s.r.l. in less than 14 weeks using an
average of 18 workers with a peak of 24 workers, it is
the flagship of the DUSSMANN SERVICE s.r.l. not only in
Italy but in the world and represents its largest and most
technologically advanced center of cooking.
Numbers Of The Project
•
•
•
•
•
•
22
1,850 sqm total covered
More than 4 million global investment
More than 18,000 sqm of ducting
4 air handling units for tot. 69,910 m³ / h
1 352 kWf chiller
3 condensing boilers for tot. 348 kWth
Il Marina Verde Wellness Resort è un avveniristico
complesso immobiliare che sorge fronte mare a Caorle (VE)
costituito da N. 2 torri gemelle da 6 piani fuori terra per
tot. N. 75 appartamenti di lusso, N. 1 bar / ristorante,
N. 1 autorimessa interrata da 8.200 mq. per ca. tot.
N. 100 posti auto e un wellness center da 1.500 mq.
L’edificio, progettato dal famoso Arch. Simone Micheli,
è realizzato interamente con struttura e solai in legno
Holzbau-Rubner, certificato in Classe Energetica A+
CasaClima, dotato di sofisticati impianti con pompe di
calore geotermiche ad acqua di pozzo, fotovoltaico,
domotica, solare termico, trattamento aria automatizzato
Aldes e pavimenti radianti per oltre 4.500 mq.
Il complesso ha vinto due prestigiosi premi: il TrE Number
ONE Award 2011 Expo Venice e il Contemporary S.p.A.
Award 2011 – Best Future S.p.A., Arch. Simone Micheli.
MARINA VERDE s.r.l.
Marina Verde Wellness Resort, Caorle (VE)
Servizi: impianti meccanici ed affini
Anno: 2011-2012
Importo Lavori: € 3.000.000,00
Marina Verde Wellness Resort, Caorle (VE)
Services: mechanical plants
Years: 2011-2012
Amount of work: € 3.000.000,00
I Numeri del progetto
• 35 milioni di investimento globale
• Oltre 4.500 mq. di pavimento radiante
• N. 6 pompe di calore geotermiche condensate ad
altissima efficienza ad acqua di falda per tot. 297 kWf
• N. 75 unità motoventilanti a recupero di calore Aldes
• Circa N. 100 posti auto interrati per 8.200 mq. tot.
The Marina Verde Wellness Resort is a futuristic building
complex that is situated beachfront in Caorle (VE)
consisting of 2 twin towers of 6 floors above ground for
75 luxury apartments in total, 1 bar / restaurant,
1 underground garage of 8,200 sqm for approximately
100 parking spaces and a wellness center of 1,500 sqm
The structure and the floors of this building, designed
by the famous architect Simone Micheli, are made
entirely of Holzbau-Rubner wood. It is certified Climate
House Energy class A+, equipped with sophisticated
systems with well water geothermal heat pumps, solar,
home automation, solar thermal, Aldes automated air
handling and over 4,500 square meters of radiant floors.
The complex has won two prestigious awards: the Expo
Venice TrE Number ONE Award 2011 and the
Contemporary SpA Award 2011 – Best Future SpA,
Architect Simone Micheli.
Numbers Of The Project
• 35 million global investment
• More than 4,500 sqm radiant floor
• 6 high efficiency ground water geothermal heat
pumps for tot. 297 kWf
• 75 Aldes air handling units with heat recovery
• Approximately 100 underground parking spaces
distributed in 8,200 sqm.
23
Il complesso Redais di Via Casal Bertone a Roma consta
di oltre N. 90 appartamenti di lusso suddivisi in 7 piani
fuori terra e di un’ampia autorimessa interrata da
tot. 9.600 mq. con N. 180 posti auto.
Gli appartamenti, tutti in Classe A CasaClima, sono dotati
di pannelli radianti a pavimento, domotica Bticino My
Home SCS e di ampissime terrazze esterne dotate di tutti
i confort ivi compresi degli ombrelli riscaldanti a soffitto
da esterno per godere delle terrazze anche nelle stagioni
più rigide.
BROSS - REDAIS s.r.l.
Complesso Redais, Via Casal Bertone – Roma
Servizi: impianti elettrici, speciali e meccanici
Anno: 2009-2011
Importo Lavori: € 5.700.000,00
I Numeri del progetto
• Ca. 40 milioni di investimento globale
• N. 90 appartamenti di lusso per tot. 7.000 mq.
• Una autorimessa interrata da N. 180 posti auto per
ca. 9.600 mq.
• Una centrale termica centralizzata a gas metano
da 1.050 kWt
• Impianto solare termico da tot. 103 kWt
Complex Redais, Via Casal Bertone – Rome
Services: electrical, mechanical and special plants
Years: 2009-2011
Amount of work: € 5.700.000,00
The Redais complex in Rome consists of over 90 luxury
apartments divided into 7 floors above ground and a
large 9,600 sqm underground garage with 180 parking
spaces.
All the Class A KlimaHouse apartments are equipped
with radiant floor, Bticino My Home SCS home automation
and very large outdoor terraces equipped with all the
comforts including ceiling patio heater to enjoy the
terraces even in the colder climate..
Numbers Of The Project
• Approximately 40 million of global investment
• 90 luxury apartments for total 7,000 sqm
• A 9,600 sqm underground garage with 180 parking
spaces
• A 1,050 kWth natural gas centralized thermal power
plant
• A 103 kWth solar thermal plant
24
La piattaforma logistica lotto H dell’Interporto sorge in
zona industriale di Padova (Z.I.P.) in Via Inghilterra.
L’opera consta di un fabbricato adibito per 4.570 mq. a
magazzino di stoccaggio merci con altezza interna di ca.
12 mt. e di altri 622 mq. di blocco uffici su 2 piani fuori
terra. SICE ha realizzato l’impiantistica sia elettrica, sia
meccanica, sia antincendio per un valore di ca. Euro
800.000, ultimando le opere in un tempo record
inferiore ai 4 mesi.
INTERPORTO DI PADOVA s.p.a.
Piattaforma Logistica Lotto H,
Via Inghilterra Z.I.P. (PD)
Servizi: impianti elettrici, speciali e meccanici
Anno: 2011-2012
Importo Lavori: € 800.000,00
I Numeri del progetto
•
•
•
•
Investimento globale di ca. 4 milioni di Euro
Tot. 4.570 mq. di magazzino di stoccaggio h = 12 mt.
Tot. 622 mq. di blocco uffici su 2 piani
N. 651 totali testine antincendio sprinklers ad umido
tipo ESFR a norme NFPA13:2010
• 50.000 Kg. complessivi di tubazione acciaio zincato per
sprinklers
Site H Logistic Platform, Via Inghilterra (PD)
Services: electrical, mechanical and special plants
Years: 2011-2012
Amount of work: € 800.000,00
The Interporto site H logistics platform is situated in the
industrial area of Padova (ZIP) in Via Inghilterra.
The work consists of a building used for 4,570 sqm as a
storage warehouse with an internal height of
approximately 12 mt. and other 622 sqm as offices on 2
floors above ground. SICE has realized electrical,
mechanical and fire installations,for a value of approx.
€ 800,000,00 completing the works in a record time of
less than 4 months.
Numbers Of The Project
•
•
•
•
Global investment of approx. 4 million Euro
Total 4,570 sqm storage warehouse h = 12 m.
Total 622 sqm block offices on 2 floors
N. 651 nozzles of wet type sprinklers system ESFR
standards NFPA 13: 2010
• A total of 50,000 kg of galvanized steel piping for
sprinklers
25
TENUTA DI CASTELFALFI s.p.a.
Il restauro del Castello medievale di Castelfalfi a
Montaione (FI) rientra nel monumentale intervento di
recupero e conversione dell’intera tenuta di Castelfalfi
ad opera del colosso tedesco del turismo TUI.
Restauro Castello di Castelfalfi - Montaione (FI)
Servizi impianti elettrici, speciali e meccanici
Anno 2012 - 2014
Importo Lavori € 800.000,00
SICE è stata scelta come Appaltatore unico sia per gli
impianti elettrici che termotecnici. L’opera ha impegnato
per oltre due anni le maestranze ed i tecnici di SICE che
si sono trovati ad affrontare il non semplice compito di
trasformare il famoso castello, sede anche delle riprese
del set cinematografico del film “Pinocchio” di Roberto
Benigni, in resort con suite di lusso, un prestigioso
ristorante con scuola di alta cucina e cantina vini.
I numeri del progetto
Restoration of Castelfalfi Castle - Montaione (FI)
Services: electrical, mechanical and special plants
Years: 2012 - 2014
Amount of work: € 800.000,00
• C.A. 1.600 mq suddivisi tra piano terra, primo,
mezzanino e secondo
• Oltre 550 mq di pannelli radianti a pavimento
• Oltre 5500 kg di canalizzazioni aerauliche servite da
6 UTA, distinte per zona
• Impianti elettrici e domotici KNX di altissimo livello e
grado di automazione
The restoration of the medieval castle of Castelfalfi
Montaione (FI) is part of the monumental restoration
and conversion of the entire estate of Castelfalfi by the
big German tourism group TUI.
SICE has been chosen as the sole contractor for both
electrical systems and heat engineering. The work has
involved more than two years, workers and technicians
of SICE who have not had to deal with the simple task
of transforming the famous castle, also home of the
filming set of the movie "Pinocchio" by Roberto Benigni,
in luxury suites resort with a prestigious restaurant with
high school kitchen and wine cellar.
Numbers Of The Project
• About 1,600 square meters divided between ground
floor, first, entresol and second
• Over 550 square meters of radiant floor
• More than 5500 kg of ducts served by 6 air handling
units
• KNX electrical systems and home automation at the
highest level and degree of automation
26
L’intervento di ristrutturazione delle cucine interne
all’Ospedale San Bortolo dell’ULSS 6 di Vicenza e di
realizzazione della nuova mensa da circa 320 posti
soprastante a dette ha impegnato SICE per oltre 3 anni.
Dette opere hanno portato al quasi rifacimento dei
totali 1.500mq di cucine industriali del nosocomio e alla
costruzione di una nuova mensa aperta al pubblico per
altri circa 1.300mq, realizzata in carpenteria metallica e
completamente vetrata.
SICE è stata scelta da Serenissima Ristorazione S.P.A.
come impiantista unico sia elettrico sia termotecnico
grazie alle sue riconosciute doti di solidità, competenza
e affidabilità.
SERENISSIMA RISTORAZIONE s.p.a.
Cucine e Mensa Ospedale S. Bortolo
ULSS 6 - Vicenza
Servizi impianti elettrici, speciali e meccanici
Anno 2009 - 2012
Importo Lavori € 1.422.550,00
I Numeri del progetto
Kitchens and refectory of San Bortolo Hospital
ULSS6 - Vicenza
Services: electrical, mechanical and special plants
Years: 2009 - 2012
Amount of work: € 1.422.550,00
• Nuova mensa da circa 1.300mq per 320 posti a sedere
• Ristrutturazione cucine ULSS6 Ospedale San Bortolo
per circa 1500mq
• Oltre 15.000kg di canalizzazioni aerauliche
• N° 4 UTA e n° 2 estrattori cappe
• Impianti speciali di diffusione sonora EVAC, rivelazione
fumi e supervisione
• Impianto distribuzione vapore con rete tubazioni in
acciaio inox
The renovation of the internal kitchens of ULSS 6 San
Bortolo Hospital in Vicenza and construction of a new
refectory with about 320 seating above those, committed
SICE for over 3 years .
These works led to the almost total renovation of
1.500mq of industrial kitchens of the hospital and the
construction of a new refectory opened to the public for
other 1.300mq , made entirely of glass and metalwork .
SICE has been chosen by Serenissima Ristorazione SPA as
sole contractor for both electrical systems and heat
engineering due to its recognized qualities of strength,
competence and reliability.
Numbers Of The Project
• New refectory of about 1.300mq with 320 seating
• ULSS6 San Bortolo Hospital kitchens renovation for ap
proximately 1500sqm
• More than 15.000kg of ducts
• 4 air handling units and 2 extractor hoods
• EVAC sound system, smoke detection and monitoring
• Steam distribution system with stainless steel pipes
27
INDICE ELENCO REFERENZE
INDEX LIST OF REFERENCES
OPERE PUBBLICHE
PUBLIC WORKS
pag. 30
CENTRI COMMERCIALI E GRANDE DISTIBUZIONE
SHOPPING CENTERS AND MALLS
pag. 33
BANCHE E ASSICURAZIONI
BANKS AND INSURANCES
pag. 36
IMPIANTI FOTOVOLTAICI
PHOTOVOLTAIC PLANTS
pag. 37
TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE
OFFICE AND RETAIL
pag. 38
A seguire riportiamo un breve elenco delle opere più significative
realizzate da Sice nell’ultimo trentennio , suddivise per tipologia di
intervento (opere pubbliche, centri commerciali e
grande distribuzione, banche e assicurazioni, impianti fotovoltaici,
terziario, residenziale, industriale, e direzionale).
Si tratta solo di un breve estratto della nostra lunga storia, un rapido
sguardo nel nostro curriculum aziendale per capire cosa abbiamo
fatto finora e come siamo arrivati fino a qui.
In the next pages we quote a short list of the most significant works
realized by Sice in the last thirty years, divided by type of intervention
(public works, shopping centers and malls, banks and insurances,
commercial, photovoltaics plants, office and retail).
This is just a short example of our long history, a quick look in our
business curriculum to understand what we have done
so far and how we got here.
ELENCO
REFERENZE
LAVORI
LIST OF
WORK
REFERENCES
OPERE PUBBLICHE
PUBLIC WORKS
U.L.S.S. n. 16
ALTO VICENTINO
1985-1991
Lire 366.071.516
MINISTERO AFFARI ESTERI
1988-1991
Lire 2.275.110.105
CAVAGNIS
COSTRUZIONI S.R.L.
1988-1991
Lire 244.576.730
SIEMENS S.P.A.
1986-1993
Lire 2.522.289.763
COMUNE DI ESTE (PD)
1987-1993
Lire 509.594.102
BOTTACIN LUIGI S.R.L.
1992-1993
Lire 1.240.531.593
U.L.S.S. N. 8
1992-1994
Lire 228.352.840
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO
L'OSPEDALE DI PEDEROBBA (TV).
REALIZATION OF ELECTRICAL SYSTEMS AT PEDEROBBA HOSPITAL (TV).
SIGLA SOC. COOP. A R.L.
FORLI’
1992-1994
Lire 690.237.250
RINNOVO ILLUMINAZIONE AEROSTAZIONE E PISTE
DELL’AEROPORTO DI FIRENZE - PERETOLA.
RENEWAL OF LIGHT OF THE AIRPORT TERMINAL AND TRACKS OF
FLORENCE AIRPORT - PERETOLA.
U.L.S.S. N. 36
1983-1994
Lire 401.857.232
RISTRUTTURAZIONE ED AMPLIAMENTO OSPEDALE / POLIAMBULATORI
GRUPPI OPERATORI MESSA A NORMA IMPIANTI ELETTRICI PRESSO
L'OSPEDALE DI MESTRE (VE).
RENOVATION AND EXPANSION OF HOSPITAL, AMBULATORY AND
OPERATING GROUP OF MESTRE HOSPITAL (VE)
REGIONE VENETO
1991-1995
Lire 2.958.473.752
UNIVERSITA’ DEGLI STUDI
PADOVA
1991-1995
Lire 603.171.998
ADEGUAMENTO STRUTTURE ED IMPIANTI ALLE CONDIZIONI DI
AGIBILITA’ E SICUREZZA NELL' ISTITUTO SEMEIOTICA DI PADOVA.
STRUCTURE AND SYSTEMS ADJUSTMENT OF THE SEMEIOTICS
INSTITUTE OF PADUA.
COMUNE DI PADOVA
1992-1996
Lire 864.003.270
NUOVO IMPIANTO DI ILLUMINAZIONE PUBBLICA NELLA ZONA
GUIZZA – PADOVA I° E II° STRALCIO.
NEW LIGHTING SYSTEM IN THE PUBLIC AREA OF GUIZZA PADOVA.
U.L.S.S. N. 7
1995-1996
Lire 626.293.502
ESECUZIONE OPERE ELETTRICHE PRESSO L'OSPEDALE DI CONEGLIANO (TV).
REALIZATION OF ELECTRICAL SYSTEMS AT CONEGLIANO HOSPITAL (TV).
AZIENDA OSPEDALIERA DI
PADOVA
1996-1999
Lire 751.277.736
OPERE ELETTRICHE ESEGUITE PRESSO IL CENTRO DI CARDIOLOGIA E
CARDIOCHIRURGIA DI PADOVA (2^ FASE).
REALIZATION OF ELECTRICAL SYSTEMS AT THE CENTER OF CARDIOLOGY
AND CARDIAC SURGERY OF PADUA
30
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL DAY HOSPITAL
DISTRETTO SANITARIO DI BASE E PIASTRA SERVIZI DELL’OSPEDALE DI
SCHIO (VI).
REALIZATION OF ELECTRICAL AND SIMILAR SYSTEMS OF THE DAY
HOSPITAL, OF SCHIO (VI).
COSTRUZIONE DEGLI IMPIANTI ELETTRICI NELL’AMBITO
DELL’AMPLIAMENTO DELL’OSPEDALE DI CANKIRI (TURCHIA).
REALIZATION OF ELECTRICAL SYSTEMS OF THE ENLARGEMTN OF
CANKIRI HOSPITAL (TURKEY).
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO L’OSPEDALE
DI FOLIGNO.
REALIZATION OF ELECTRICAL AND SIMILAR SYSTEMS OF THE
HOSPITAL OF FOLIGNO.
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI, DI SICUREZZA E SPECIALI
COMPRESA LA FORNITURA E POSA DEL GRUPPO ELETTROGENO
AUTOMATICO IN PARALLELO DA 500 KV PRESSO IL NUOVO
MONOBLOCCO DELL’OSPEDALE DI PIOVE DI SACCO PD
U.L.S.S. N. 23 CONSELVANA.
REALIZATION OF ELECTRICAL, SECURITY AND SPECIAL SYSTEMS
INCLUDING THE SUPPLY AND INSTALLATION OF AUTOMATIC GENERATOR
OF 500 KVA AT THE HOSPITAL OF PIOVE DI SACCO - PD - Health Units N.
HOSPITAL RAINS OF THE BAG - PD - Health Units N. 23 Conselvana.
OPERE DI STRAORDINARIA MANUTENZIONE DEGLI IMPIANTI DI
PUBBLICA ILLUMINAZIONE DEL CENTRO STORICO DI ESTE E DI ALTRE
VIE COMUNALI.
EXTRAORDINARY MAINTENANCE OF PUBLIC LIGHTING OF THE
CITY OF ESTE AND OTHER MUNICIPAL WAY.
IMPIANTI ELETTRICI PER CENTRALI TECNOLOGICHE
C/O LA CASA DI CURA MORGAGNI - PADOVA.
REALIZATION OF ELECTRICAL SYSTEMS FOR POWER TECHNOLOGY
C/O THE NURSING HOME MORGAGNI - PADOVA.
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI, RELATIVI AI LAVORI DI
COSTRUZIONE DELLA PIASTRA SERVIZI NUOVA PORTINERIA E PIASTRA
OPERATORIA. REALIZZAZIONE IMPIANTO INTERFONICO, IMPIANTO
RILEVAZIONE FUMI E MANUTENZIONE DEGLI IMPIANTI
ELETTRICI PRESSO L'OSPEDALE DI MONTEBELLUNA (TV).
REALIZATION OF ELECTRICAL SYSTEMS RELATING TO THE WORK OF
SERVICES ZONE CONSTRUCTION - NEW RECEPTION AND OPERATING
ZONE, NEW INTERCOM SYSTEM AND SMOKE DETECTION SYSTEM
CONSTRUCTION AND MAINTENANCE OF ELECTRICAL INSTALLATIONS AT
MONTEBELLUNA HOSPITAL (TV).
OPERE PUBBLICHE
PUBLIC WORKS
SIRAM S.P.A.
1999-2001
€ 2.053.192,20
REALIZZAZIONE IMPIANTI ELETTRICI, DI SICUREZZA ED AFFINI C/O
IL COMPLESSO BASILICALE DI S. ANTONIO - PADOVA
REALIZATON OF ELECTRICAL AND SECURITY SYSTEMS C/O S. ANTONIO
CHURCH OF PADOVA.
AZIENDA U.L.S.S. N. 16
2002-2003
€ 3.602.107,90
MANUTENZIONE DEGLI IMMOBILI AZIENDALI, OPERE IDROTERMOSANITARIE,
DI CONDIZIONAMENTO ED ELETTRICHE PRESSO L’OSPEDALE “AI COLLI”,
“S. ANTONIO”, DISTRETTI E GERIATRICO DI PADOVA.
PROPERTY, WATER, HEATING, AIR CONDITIONING AND ELECTRICAL
MAINTENANCE AT THE HOSPITAL " AI COLLI"
"S.ANTONIO" GERIATRIC AND DISTRICTS OF PADUA.
CNR DI PADOVA
2004
€ 272.601,11
RIFACIMENTO CENTRALE DI CONDIZIONAMENTO PRESSO IL CNR
CORSO STATI UNITI - PADOVA.
NEW CONTITIONIG PLANT AT THE CNR - STATI UNITI STREET- PADOVA.
ISTITUTO AGRARIO DI SAN
MICHELE ALL’ADIGE (TN)
2002-2005
€ 3.428.357,87
AUTOSTRADA BS VR VI PD
S.P.A.
2003-2007
€ 722.000,00
AUTOSTRADA BS/VR/VI/PD - MANUTENZIONE E CONSERVAZIONE
IMPIANTI ELETTRICI. LOTTO II.
BS / VR / VI / PD HIGHWAY - MAINTENANCE OF ELECTRICAL SYSTEMS
COMUNE DI VENEZIA
2004-2006
€ 659.905,00
MANUTENZIONE IMPIANTI ELETTRICI E TERMOTECNICI PRESSO GLI
IMPIANTI SPORTIVI TERRAFERMA - VENEZIA.
MAINTENANCE OF ELECTRICAL AND THERMOTECHNICAL
SYSTEMS OF SPORTS FACILITIES - VENICE.
COMUNE DI MODENA
2005-2007
€ 377.493,00
REALIZZAZIONE OPERE IMPIANTISTICHE ELETTRICHE E MECCANICHE
PRESSO IL CENTRO POLIFUNZIONALE DELLA PROTEZIONE CIVILE
MARZAGLIA NUOVA (MO).
REALIZATION OF ELECTRICAL AND MECHANICAL SYSTEMS AT THE
MULTIPURPOSE CENTER OF CIVIL PROTECTION - Marzaglia (MO).
AUSL DI BOLOGNA
2006-2007
€ 2.550.000,00
REALIZZAZIONE OPERE IMPIANTISTICHE ELETTRICHE E MECCANICHE
PRESSO IL NUOVO OSPEDALE DI BUDRIO (BO).
REALIZATION OF ELECTRICAL SYSTEMS AT BUDRIO HOSPITAL (B0).
U.L.S.S. N. 7
CONEGLIANO VENETO (TV)
2006-2007
€ 730.000,00
REALIZZAZIONE OPERE MANUTENZIONE IMPIANTISTICHE PRESIDI
OSPEDALIERI U.L.S.S. N. 7
MAINTENANCE OF ELECTRICAL SYSTEMS AT HOSPITAL
DISTRICT U.L.S.S. N. 7
U.L.S.S. N. 9 - TREVISO
PADOVA
2006-2007
€ 565.000,00
REALIZZAZIONE OPERE MANUTENZIONE IMPIANTISTICHE PRESIDI
OSPEDALIERI U.L.S.S. N. 9
MAINTENANCE OF ELECTRICAL SYSTEMS AT HOSPITAL
DISTRICT U.L.S.S. N. 9
AUSL DI BOLOGNA
2007-2008
€ 1.320.000,00
REALIZZAZIONE OPERE EDILI E IMPIANTISTICHE ELETTRICHE E
MECCANICHE PRESSO IL NUOVO REPARTO DI DIALISI PADIGLIONE
TINOZZI OSPEDALE BELLARIA (BO).
REALIZATION OF ELECTRICAL AND MECHANICAL SYSTEMS AT THE
DEPARTMENT OF DIALYSIS, BELLARIA HOSPITAL (BO)
U.L.S.S. N. 6 - VICENZA
2009-2012
€ 1.422.550,00
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA
MENSA E CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE
SAN BORTOLO (VI).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS
OF NEW REFECTORY AND KITCHEN OF SERENISSIMA CATERING
C / O SAN BORTOLO HOSPITAL (VI)
COOP 80 S.c.a.r.l.
2010-2011
€ 366.550,00
RISTRUTTURAZIONE IMPIANTI ELETTRICI E MECCANICI PALASPORT
ABANO TERME (PD).
RENOVATION OF ELECTRICAL AND MECHANICAL SYSTEMS OF
INDOOR STADIUM OF ABANO TERME (PD)
AGENZIA DEL TERRITORIO
2011
€ 150.000,00
IMPIANTO SPEGNIMENTO A GAS E RILEVAZIONE FUMI PER NUOVO
ARCHIVIO CARTACEO AGENZIA DEL TERRITORIO (PD).
GAS FIRE EXTINTION AND SMOKE DETECTION SYSTEM FOR NEW
ARCHIVE OF LAND AGENCY (PD)
U.L.S.S. N. 2 - FELTRE
2011
€ 50.430,00
REALIZZAZIONE IMPIANTI ELETTRICI RISTRUTTURAZIONE CUCINE
SERENISSIMA RISTORAZIONE C/O OSPEDALE FELTRE (BL).
REALIZATION OF ELECTRICAL SYSTEM FOR THE RENOVATION OF KITCHEN
OF SERENISSIMA CATERING C / O FELTRE HOSPITAL (BL)
31
SISTEMAZIONE IMPIANTI TECNOLOGICI DEI LABORATORI DI ANALISI E
RICERCA DELL’ISTITUTO AGRARIO SAN MICHELE ALL’ADIGE (TN).
SET-UP OF TECHNOLOGICAL SYSTEMS OF ANALYSIS AND AGRICULTURAL
RESEARCH WORKSHOPS OF SAN MICHELE ALL'ADIGE INSTITUTE (TN).
OPERE PUBBLICHE
PUBLIC WORKS
U.L.S.S. N. 4
2011-2012
€ 910.240,00
FIORE S.c.a.r.l.
2011-2013
€ 1.698.750,00
U.L.S.S. N. 6 - VICENZA
2012-2013
€ 389.725,00
IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVE DEGENZE IPAB 3°
PIANO ULSS 6 OSPEDALE DI SANDRIGO (VI).
ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM FOR NEW IPAB WARDS
ON THE 3RD FLOOR OF ULSS6 SANDRIGO HOSPITAL (VI)
INTERPORTO DI
PADOVA S.p.A.
2011-2012
€ 800.000,00
IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVO POLO LOGISTICO
INTERPORTO DI PADOVA PIATTAFORMA H VIA INGHILTERRRA.
ELECTRICAL, MECHANICAL AND SPECIAL SYATEM OF NEW LOGISTICS
PLATFORM H INTERPORT - ENGLAND STREET -PADOVA
INTERPORTO DI
PADOVA S.p.A.
2012
€ 180.000,00
IMPIANTI ANTINCENDIO SPRINKLER ED ELETTRICI MAGAZZINI
N. 23-24-28 INTERPORTO DI PADOVA PIATTAFORMA H VIA INGHILTERRA
FIRE SPRINKLER AND ELECTRICAL SYSTEMS OF WAREHOUSES
N. 23 24-28 PADUA INTERPORT - CORSO STATI UNITI 18
U.L.S.S. N. 2 - FELTRE
2013 in corso
€ 420.000,00
REALIZZAZIONE IMPIANTI MECCANICI ED AFFINI NUOVE CUCINE
SERENISSIMA RISTORAZIONE C/O OSPEDALE FELTRE (BL).
REALIZATION OF MECHANICAL SYSTEM FOR THE NEW KITCHEN OF
SERENISSIMA CATERING C / O FELTRE HOSPITAL (BL)
U.L.S.S. N. 6 - VICENZA
2014 in corso
€ 350.000,00
MANUTENZIONE IMPIANTI ELETTRICI E AFFINI ULSS 6 OSPEDALE
SAN BORTOLO - (VI)
MAINTENANCE OF ELECTRICAL SYSTEMS OF SAN BORTOLO HOSPITAL
ULSS6 (VI)
U.L.S.S. N. 1 - TRENTO
2014 in corso
€ 225.000,00
IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA MENSA E CUCINE
SERENISSIMA RISTORAZIONE C/O OSPEDALE DI TRENTO (TN).
ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF NEW REFECTORY
AND KITCHEN OF SERENISSIMA CATERING C/O TRENTO HOSPITAL
32
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA
MENSA E CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE UDINE.
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS
OF NEW REFECTORY AND KITCHEN OF SERENISSIMA CATERING C/O
UDINE HOSPITAL
REALIZZAZIONE IMPIANTI ELETTRICI E SPECIALI NUOVA SEDE BIOLOGIA
E BIOMEDICINA DELL’UNIVERSITA’ DEGLI STUDI DI PADOVA
VIA PESCAROTTO.
REALIZATION OF ELECTRICAL AND SPECIAL SYSTEM OF NEW BIOLOGY
AND BIOMEDICINE HEADQUARTERS OF PADOVA UNIVERSITY
PESCAROTTO STREET
CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE
SHOPPING CENTER AND MALLS
I.R.C.E.S. 55 S.P.A.
1988-1989
Lire 1.431.509.698
SILOS CENTRI COMMERCIALI
S.P.A.
1990-1991
Lire 2.209.741.184
REALIZZAZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO
COMMERCIALE SILOS DI PARMA – VIA SILVIO PELLICO.
ELECTRICAL PLANTS BY SILOS - PARMA – VIA SILVIO PELLICO.
SILOS CENTRI COMMERCIALI
S.P.A.
1991-1993
Lire 3.538.141.504
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI NEL NUOVO CENTRO
COMMERCIALE DI VIA TIBURTINA IN ROMA.
ELECTRICAL PLANTS BY SILOS - ROMA
RIZZANI DE ECCHER S.P.A.
1992-1993
Lire 1.115.999.981
OPERE ELETTRICHE NEL PARCHEGGIO INTERRATO E ILLUMINAZIONE
ESTERNA NEL COMPLESSO AD USO DIREZIONALE DENOMINATO
VALECENTER IN MARCON (VE).
ELECTRICAL PLANTS IN UNDERGROUND FLOOR AND OUTDOOR LIGHTING
BY VALECENTER - MARCON (VE)
COVER S.R.L.
1993-1995
Lire 1.482.972.908
REALIZZAZIONE DEGLI IMPIANTI ELETTRICI PRESSO IL CENTRO
COMMERCIALE PIAZZA GRANDE SITO IN PIOVE DI SACCO (PD)
ELECTRICAL PLANTS INSIDE PIAZZAGRANDE TRADING CENTER
PIOVE DI SACCO (PD)..
BERNARDI S.R.L.
1993-1995
Lire 1.081.232.007
ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI AL SERVIZIO DEL
NUOVO IPERMERCATO NEL CENTRO COMMERCIALE PIAZZAGRANDE SITO
IN PIOVE DI SACCO
ELECTRICAL PLANTS INSIDE THE SUPERMARKET PIAZZAGRANDE
TRADING CENTER - PIOVE DI SACCO (PD).
BERNARDI S.R.L.
1993-1995
Lire 727.799.939
ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO
L’IPERMERCATO VIVO DI MONTEBELLUNA (TV).
ELECTRICAL PLANTS INSIDE FOR VIVO SUPERMARKET IN MONTEBELLUNA
PANORAMA S.P.A.
1993-1995
Lire 566.063.229
RISTRUTTURAZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
PANORAMA IN S. MAURO TORINESE (TO).
NEW PLANTS BY PANORAMA IN S. MAURO TORINESE (TO).
IMMOBILIARE VALLI S.R.L.
1993-1995
Lire 1.169.855.827
ESECUZIONE IMPIANTI ELETTRICI PRESSO IL FABBRICATO AD USO
COMMERCIALE DIREZIONALE SITO A PADOVA IN VIA T. ASPETTI ANGOLO
VIA ZANCHI.
ELECTRICAL PLANTS INSIDE NEW BUILDING IN PADOVA - VIA T. ASPETTI
PANORAMA S.P.A.
1994-1996
Lire 1.857.277.464
COSTRUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO IL CENTRO
COMMERCIALE PANORAMA LOCALITA’ S. CROCE – FORMIA (LT).
ELECTRICAL PLANTS BY THE NEW FORMIA TRADING CENTER
BERNARDI S.R.L.
1994-1996
Lire 835.221.198
RIFACIMENTO DEGLI IMPIANTI ELETTRICI ED AFFINI DELL’IPERMERCATO
BERTIN SITO A CASSOLA (VI).
ELECTRICAL PLANTS BY THE BERTIN SUPERMARKET IN CASSOLA (VI)
IMMOBILIARE R.C. S.R.L.
1995-1996
Lire 857.354.003
REALIZZAZIONE DEGLI IMPIANTI ELETTRICI E TERMOIDRAULICI PRESSO IL
SUPERMERCATO PAM DI CASAL MORENA - ROMA
ELECTRICAL AND MECHANICAL PLANTS INSIDE SUPERMARKET PAM
CASALMORENA - ROME
SUPERMERCATI OR.VE.A.
S.P.A.
1995-1996
Lire 946.555.270
ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO
L’IPERMERCATO OR.VE.A. IN LOCALITA’ AFFI (VR).
ELECTRICAL PLANTS INSIDE OR.VE.A. SUPERMARKET - AFFI (VR)
SILOS CENTRI COMMERCIALI
S.P.A.
1995-1996
Lire 759.399.982
RISTRUTTURAZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
SILOS SITO IN VIA AURELIA A ROMA.
ELECTRICAL PLANTS INSIDE SILOS SUPERMARKET - VIA AURELIA - ROMA
SILOS CENTRI COMMERCIALI
S.P.A.
1995-1997
Lire 2.466.125.057
IMPIANTI ELETTRICI RELATIVI ALLA RISTRUTTURAZIONE DELL’EDIFICIO DA
ADIBIRE A IPERMERCATO SITO IN VIALE VENEZIA A UDINE.
ELECTRICAL PLANTS FOR NEW SUPERMARKET - VIALE VENEZIA - UDINE
SUPERMERCATI PAM S.P.A.
1996-1997
Lire 566.411.777
ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI NEL SUPERMERCATO
PAM DI MESTRE (VE) P.ZZA XXVII OTTOBRE.
ELECTRICAL PLANTS INSIDE PAM SUPERMARKET - LE BARCHE TRADING
CENTER - MESTRE - VE.
PANORAMA S.P.A.
1999-2001
Lire 2.117.534.264
ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO
L’IPERMERCATO PANORAMA LATINA-FIORI A LATINA..
ELECTRICAL PLANTS BY THE NEW PANORAMA CENTER - LATINAFIORI (LT)
BERNARDI S.R.L.
1996-1997
Lire 733.495.787
ESECUZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
COLMARK NEL CENTRO COMMERCIALE AIRONE DI MONSELICE (PD).
ELECTRICAL PLANTS INSIDE AIRONE TRADING CENTER - MONSELICE (PD
META' SUPERNEGOZI S.P.A.
1996-1997
Lire 751.020.793
ESECUZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL SUPERMERCATO
META' DI GENOVA.
ELECTRICAL PLANTS INSIDE META’ SUPERMARKET - GENOVA
33
ESECUZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO
COMMERCIALE GIOTTO DI PADOVA.
ELECTRICAL AND MECHANICAL PLANT BY GIOTTO TRADING
CENTER - PADOVA.
CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE
SHOPPING CENTER AND MALLS
CAVAGNIS - POLICENTROSONA
1995-1998
Lit. 5.631.461.899
PANORAMA
1995-1998
Lire 3.102.427.739
ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI NEL CENTRO
COMMERCIALE DI SASSUOLO (MO) AREA EX CAMPANELLA VIA RADICI
IN PIANO.
ELECTRICAL PLANTS INSIDE SASSUOLO SHOPPING CENTER - EX
CAMPANELLA AREA
SILEA SUD S.R.L.
1996-1998
Lire 3.330.277.014
ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO
L'IPERMERCATO PANORAMA NEL CENTRO COMMERCIALE
"I GIGLI" DI CAMPI BISENZIO (FI).
ELECTRICAL PLANTS INSIDE “I GIGLI SHOPPING CENTER” - FIRENZE.
IPERLANDO S.R.L.
1997-1998
Lire 724.314.169
ESECUZIONE DEGLI IMPIANTI ELETTRICI NEL FABBRICATO SITO IN Z.I.
PADOVA CORSO STATI UNITI
ELECTRICAL PLANTS INSIDE LANDO SUPERMARKET - PADOVA
SUPERMERCATI ALI' S.P.A.
1997-1998
Lire 127.559.705
REALIZZAZIONE IMPIANTI ELETTRICI C/O SUPERMERCATO ALI’ A
CAMPODARSEGO (PD)
ELECTRICAL PLANTS INSIDE ALI’ SUPERMARKET - CAMPODARSEGO - PD
PANORAMA S.P.A.
1996-1999
Lire 1.816.398.022
BERNARDI S.R.L.
1997-1999
Lire 1.639.334.495
COSTRUZIONE DEGLI IMPIANTI ELETTRICI PRESSO IL CENTRO
COMMERCIALE "LA GRANDE MELA" SITO IN LOCALITA’ LUGAGNANO DI
SONA (VR).
ELECTRICAL PLANTS INSIDE “LA GRANDE MELA” SHOPPING CENTER IN
VERONA
ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO
L’IPERMERCATO PANORAMA SITO AD OSTIA – ROMA
IMPLEMENTATION OF ELECTRICAL AND RELATED AT THE SUPERMARKET
PANORAMA SITE TO Ostia - Rome...
ESECUZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO
COLMARK NEL CENTRO COMMERCIALE DIAMANTE DI FERRARA...
ELECTRICAL PLANTS BY NEW COLMARK SUPERMARKET INSIDE
DIAMANTE SHOPPING CENTER - FERRARA.
F.LLI LANDO S.P.A.
1997-1999
Lire 2.676.475.989
BREK RISTORANTI S.P.A.
2000-2001
€ 110.069,69
VIGNALE IMMOBILIARE
1999-2001
Lire 8.307.893.064
PANORAMA S.P.A.
1999-2001
€ 3.704.137,84
PANORAMA S.P.A.
1999-2002
Lire 3.206.843.036
TREVINORD S.R.L. /
PANORAMA S.P.A.
2001-2003
€ 3.661.717,60
REALIZZAZIONE IMPIANTI ELETTRICI, DI COMUNICAZIONE, SPECIALI E
MECCANICIPRESSO IL FABBRICATO 6 DEL PARCO COMMERCIALE DI
VILLORBA (TV).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW VILLORBA
SHOPPING AREA
VIVO PREGANZIOL S.R.L.
2002-2003
€ 1.096.341,00
ESECUZIONE IMPIANTI MECCANICI, ELETTRICI E SPECIALI PRESSO
L'IMMOBILE COMMERCIALE VIVO A PREGANZIOL (TV).
ELECTRICAL AND MECHANICAL PLANTS INSIDE VIVO SUPERMARKET PREGANZIOL - TV
COOP.OP. DI TS ISTRIA E FRIULI
S.C.A.R.L.
2003-2004
€ 986.295,67
POLICENTRO GESTIONI
IMMOBILIARI S.R.L.
2002-2005
€ 3.322.273,91
REALIZZAZIONE IMPIANTI ELETTRICI C/O CENTRO COMMERCIALE
“LE TORRI D’EUROPA” - TRIESTE.
ELECTRICAL CONSTRUCTION C / O COMMERCIAL CENTER "THE TOWERS
OF EUROPE" - TRIESTE.
F.LLI LANDO S.P.A.
2004-2005
€ 1.389.558,39
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO IPERMERCATO
LOCALITA’ DI MIRANO (VE).
ELECTRICAL AND MECHANICAL PLANTS INSIDE LANDO SUPERMARKET
MIRANO (VE)
34
ESECUZIONE IMPIANTI ELETTRICI, TERMOTECNICI E SPECIALI PRESSO IL
NUOVO FABBRICATO SITO IN CAZZAGO DI PIANIGA (VE)
ELECTRICAL AND MECHANICAL PLANTS FOR THE NEW HEADQUARTER
OF CAZZAGO (VE)
ESECUZIONE IMPIANTI ELETTRICI PRESSO IL RISTORANTE SITO A
CANNAREGGIO N.124 – VENEZIA.
ELECTRICAL PLANTS FOR RESTAURANT IN VENICE.
REALIZZAZIONE IMPIANTI MECCANICI PRESSO IL CENTRO COMMERCIALE
SITO IN VIA CASILINA A ROMA.
MECHANICAL PLANTS INSIDE CASILINA SHOPPING CENTER.
ESECUZIONE IMPIANTI MECCANICI, ELETTRICI ED AFFINI PRESSO IL
CENTRO COMMERCIALE PANORAMA DI ALATRI (FR).
ELECTRICAL AND MECHANICAL PLANTS INSIDE PANORAMA SHOPPING
CENTER - ALATRI (FR)
REALIZZAZIONE OPERE IMPIANTISTICHE PER AMPLIAMENTO DEL CENTRO
COMMERCIALE DI VIA TIBURTINA IN ROMA.
ELECTRICAL AND MECHANICAL PLANTS FOR TIBURTINA SHOPPING
CENTER - ROME.
REALIZZAZIONE IMPIANTI ELETTRICI C/O SUPERMERCATO COOP NEL
CENTRO COMMERCIALE DI TRIESTE.
ELECTRICAL PLANTS COOP SUPERMARKET - TRIESTE
CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE
SHOPPING CENTER AND MALLS
F.LLI LANDO S.P.A.
2004-2005
€ 1.186.884,73
POLICENTRO RIJEKA (HR)
2005-2006
€ 14.130.000,00
PANORAMA S.P.A.
2006
€ 2.940.000,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI C/O CENTRO
COMMERCIALE PANORAMA ARICCIA (ROMA).
ELECTRICAL AND MECHANICAL PLANTS BY THE TRADING CENTER IN
ARICCIA (RM)
F.LLI LANDO S.P.A.
2005-2006
€ 2.000.000,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO CENTRO
COMMERCIALE LANDO DI VEGGIANO (PD)
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER IN
VEGGIANO (PD)
FINBENI HOLDING S.R.L.
2008-2009
€ 6.000.000,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO CENTRO
COMMERCIALE LANDO DI CONSELVE (PD)
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW TRADING
CENTER IN CONSELVE (PD)
PANORAMA S.P.A.
2008-2009
€ 1.750.300,00
COMMERCIALE BRENDOLAN
S.P.A.
2007-2009
€ 1.100.000,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO IPERMERCATO
LOCALITA’ DI TREVISO
ELECTRICAL AND MECHANICAL PLANTS INSIDE LANDO SUPERMARKET
TREVISO
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI C/O CENTRO
COMMERCIALE “TOWER CENTER” - RIJEKA (FIUME) CROAZIA (HR).
THE NEW RIJEKA TOWER CENTER
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO
RISTRUTTURAZIONE IPERMERCATO PANORAMA DI STIORE (TV)
ELECTRICAL AND MECHANICAL PLANTS BY RESIZING OF
PANORAMA-STIORE (TV)
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO NUOVO
IPERMERCATO FAMILA DI CREMONA VIA MAGAZZINI GENERALI
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER IN
CREMONA (CR)
PANORAMA S.P.A.
2008
€ 65.000,00
GRUPPO PAM S.P.A.
2010
€ 210.000,00
REALIZZAZIONE IMPIANTI ELETTRICI PRESSO RISTRUTTURAZIONE
IPERMERCATO PANORAMA I GRANAI (ROMA)
MAINTENANCE AND SETTING OF THE ELECTRICAL PLANTS BY TRADING
CENTER “I GRANAI” IN ROMA
NUOVO IMPIANTO ILLUMINAZIONE IPERMERCATO PANORAMA
VIA TIBURTINA (ROMA).
NEW LIGHTING SYSTEM OF PANORAMA HYPERMARKET
TIBURTINA STREET - ROME
SANTA TERESA S.R.L.
2010-2011
€ 1.750.000,00
NOVA COOP S.C.
2011-2012
€ 300.000,00
F.LLI LANDO S.P.A.
2012-2013
€ 6.000.000,00
GRUPPO PAM S.P.A.
2012-2013
€ 950.000,00
OPERE DI RISTRUTTURAZIONE IMPIANTI ELETTRICI, SPECIALI E
MECCANICI CENTRO COMMERCIALE PAM DI PANORAMA DI ARICCIA
(ROMA).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR
THE RENOVATION OF PAM PANORAMA MALL - ARICCIA - ROME
SONAE SIERRA ITALIA S.P.A.
2012-2013
€ 575.000,00
IMPIANTI ELETTRICI SPECIALI RISTRUTTURAZIONE AUTORIMESSA
INTERRATA CENTRO COMMERCIALE VALECENTER MARCON (VE).
ELECTRICAL AND SPECIAL SYSTEMS OF RENOVATION OF UNDERGROUND
GARAGE OF VALECENTER MALL - MARCON (VE)
2012
€ 200.000,00
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI RISTRUTTU
RAZIONE IPERMERCATO IPERLANDO C/O EX PELLICANO A STRAELLE DI
CAMPOSAMPIERO (PD).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
IPERLANDO INSIDE IL PELLICANO MALL IN CAMPOSAMPIERO (PD)
2013 - 2014
€ 700.000,00
IMPIANTI ELETTRICI E SPECIALI NUOVO CENTRO COMMERCIALE E
IPERMERCATO ALI’ SPA DI DUEVILLE (VI)
ELECTRICAL AND SPECIAL SYSTEMS OF ALÌ MALL AND HYPERMARKET
DUEVILLE (VI)
F.LLI LANDO S.P.A.
ALI’ S.P.A.
NOVA COOP S.C.
2014 in corso
€ 2.000.000,00
35
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CENTRO
COMMERCIALE SHOPPING TEN TENCAROLA DI SELVAZZANO (PD)..
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
SHOPPING TEN MALL - TENCAROLA SELVAZZANO (PD)
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI RISTRUTTU
RAZIONE IPERCOOP CENTRO COMMERCIALE NOVACOOP NOVARA..
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR
THE RENOVATION OF IPERCOOP MALL NOVACOOP NOVARA
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CENTRO
COMMERCIALE IPERLANDO A CITTADELLA (PD).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
IPERLANDO MALL IN CITTADELLA (PD)
IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVO SUPERMERCATO
COOP IN CORSO MOLISE A TORINO
ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR
THE RENOVATION OF IPERCOOP OF CORSO MOLISE TORINO
BANCHE E ASSICURAZIONI
BANKS AND INSURANCES
CIVIDIN CO. S.P.A.
1987-1991
Lire 1.379.979.261
REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA SEDE CENTRALE DELLA
CASSA DI RISPARMIO DI TRIESTE. v
ELECTRICAL PLANTS INSIDE CRT BANK - TRIESTE
CASSA DI RISPARMIO
DI VENEZIA
1987-1991
Lire 3.867.150.000
CENTRO ELABORAZIONE DATI IN MESTRE (VE) – VIA TORINO.
CED CA.RI.VE IN MESTRE - VIA TORINO
FOCHI BUINI & GRANDI
1989-1991
Lire 173.224.251
RISTRUTTURAZIONI IN VARIE FILIALI E AGENZIE DEL BANCO DI ROMA DEL
TRIVENETO.
RESTRUCTURANTION OF SEVERAL AGENCIES OF BANCO DI ROMA
VENETO - FRIULI VENEZIA GIULIA - TRENTINO ALTO ADIGE
LLOYD ADRIATICO S.P.A.
1992-1993
Lire 143.871.231
RIFACIMENTO DEGLI IMPIANTI ELETTRICI NELLE SEGUENTI FILIALI DEL
LLOYD ADRIATICO: PADOVA VIA AQUILEIA E VIA MARCO POLO - RIMINI
MESTRE - BOLOGNA.
RESTRUCTURATION OF ELECTRICAL PLANTS OF LLOYD ADRIATICO
PADOVA - RIMINI - MESTRE - BOLOGNA.
IMPRESA ELETTROBETON
S.P.A.
1988-1994
Lire 1.438.469.001
SEDE CENTRALE BANCA POPOLARE VENETA IN PADOVA - VIA VERDI
RISTRUTTURAZIONE GENERALE.
NEW HEADQUARTER OF BANCA POPOLARE VENETA IN PADOVA
SEA - SOCIETA’ EDILE
ADRIATICA - TS
1995-1996
Lire 1.822.275.782
REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA NUOVA SEDE DEL LLOYD
ADRIATICO DI ASSICURAZIONI – PASSEGGIO S.ANDREA - TRIESTE.
ELECTRICAL PLANTS FOR THE NEW HEADQUARTER OF LLOYD ADRIATICO
TRIESTE
RIUNIONE ADRIATICA DI
SICURTA’ S.P.A.
1995-1997
Lire 149.446.759
REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LE FILIALI RAS DI VERONA E
TREVISO.
ELECTRICAL PLANTS FOR RAS SUBSIDIARY IN VERONA AND TREVISO.
CASSA DI RISPARMIO
DI VENEZIA
1996-1997
Lire 1.606.978.145
SEDE CENTRALE IN VENEZIA – CAMPO MANIN
RISTRUTTURAZIONE TOTALE.
HEADQUARTER OF VENICE - TOTAL RENEW
SERVIZI ELETTROCONTABILI
BANCHE POP.
1995-2000
Lire 2.171.189.468
GESTIONE, CONDUZIONE E MANUTENZIONE PROGRAMMATA IMPIANTI
TECNOLOGICI , ELETTRICI ED AFFINI PRESSO IL S.E.C. SITO
IN VIA TRANSALGARDO A PADOVA..
MAINTENANCE OF S.E.C. HEADQUARTER - PADOVA
HYPO ALPE ADRIA BANK S.P.A
2003-2004
€ 307.833,85
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LE FILIALI DI
PADOVA VIALE VENEZIA E ROVIGO VIALE DELLA PACE.
ELECTRICAL AND MECHANICAL PLANTS FOR PADOVA AND ROVIGO
SUBSIDIARY
GUERRINO PIVATO S.P.A.
2002-2005
€ 6.133.482,44
CESVE
2002 in corso
€ 677.006,17
IMPIANTI TECNOLOGICI ED ELETTRICI PRESSO IL CENTRO SERVIZI 2000
VENETO BANCA A MONTEBELLUNA (TV).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER OF
VENETO BANCA IN MONTEBELLUNA (TV).
MANUTENZIONE IMPIANTI ELETTRICI PRESSO LA CESVE DI PADOVA.
MAINTENANCE OF ELECTRICAL PLANTS IN PADOVA.
€ 5.027.128,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO SEDE
CENTRALE ITALIA - TAVAGNACCO (UD).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER IN
TAVAGNACCO (UD)
2006
€ 718.045,30
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LE FILIALI DI
MODENA -VILLORBA (TV).
ELECTRICAL AND MECHANICAL PLANTS BY THE SUBSIDIARY OF MODENA
AND TREVISO
2010
€ 161.878,50
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LA FILIALE DI
PIOVE DI SACCO (PD).
ELECTRICAL AND MECHANICAL PLANTS BY THE SUBSIDIARY OF
PIOVE DI SACCO IN PADOVA
HYPO ALPE ADRIA BANK S.P.A
2005-2006
HYPO ALPE ADRIA BANK S.P.A.
HYPO ALPE ADRIA BANK S.P.A.
36
IMPIANTI FOTOVOLTAICI
PHOTOVOLTAIC PLANTS
COOP 80 S.C.A.R.L.
2011
€ 300.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 71,91KWP
PALASPORT DI ABANO TERME (PD).
71,91KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF ABANO TERME PALASPORT.
BOSCHELLO
MUSIC STORE S.R.L.
2011
€ 200.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 58,00KWP
BOSCHELLO MUSIC STORE VIA G. GALILEI MIRANO (VE).
58,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR
BOSCHELLO MUSIC STORE - G. GALILEI STREET MIRANO (VE)
2011-2012
€ 300.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 130,75KWP
SEDE DIADORA SPORT VIA MONTELLO 80 CAERANO SAN MARCO (TV).
130,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR DIADORA
SPORT HEADQUARTER - MONTELLO 80 STREET - CAERANO SAN MARCO (TV)
2012
€ 160.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 48,96KWP SEDE SICE
IMMOBILIARE SRL VIA LISBONA 3 PADOVA (PD).
30,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR SICE
REAL ESTATE SRL VIA LISBON 3 PADOVA (PD).
2012-2013
€ 680.000,00
N.4 IMPIANTI FOTOVOLTAICI “GRID CONNECTED” PER TOTALI 503,00KWP
SU COPERTURE IPERMERCATI NOVA COOP DI BORGOSESIA, NOVARA,
SANTHIA’ E TRADATE.
N.4 "GRID CONNECTED" PHOTOVOLTAIC SYSTEMS FOR A TOTAL OF
503,00KWP ON THE ROOF OF NOVA COOP SUPERMARKET OF
BORGOSESIA, NOVARA, SANTHIÀ AND TRADATE
SMA S.P.A.
2013
€ 142.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 99,00KWP SU
COPERTURA SUPERMERCATO SMA SIMPLY DI PONTEVICO (BS)..
99,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF SMA SIMPLY SUPERMARKET OF PONTEVICO (BS)
NOVA COOP S.C.
2013
€ 183.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 132 KWP SU
COPERTURA IPERMERCATO NOVA COOP DI PINASCA (TO)
132,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF NOVA COOP SUPERMARKET OF PINASCA (TO)
2013 - 2014
€ 100.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 68,75 KWP SU
COPERTURA PUNTO VENDITA “IL TULIPANO” DI ODERZO (TV).
DIADORA SPORT S.R.L.
SICE IMMOBILIARE S.R.L.
NOVA COOP S.C.
GRUPPO VEGA S.C.
68,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF "IL TULIPANO" SUPERMARKET OF ODERZO (TV)
NOVA COOP S.C.
2014 in corso
€ 257.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 198,00KWP SU
COPERTURA IPERMERCATO NOVA COOP DI CORSO MOLISE (TO).
198,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF
OF SUPERMARKET COOP OF CORSO MOLISE (TO).
NOVA COOP S.C.
2014 in corso
€ 135.000,00
IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 104,00KWP SU
COPERTURA IPERMERCATO NOVA COOP DI COLLEGNO (TO).
104,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE
ROOF OF NEW IPERMARKET COOP OF COLLEGNO (TO).
37
TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE
OFFICE AND RETAIL
COGEFAR IMPRESIT S.P.A.
1993
Lire 2.356.999.997
REALIZZAZIONE IMPIANTI ELETTRICI NEL FABBRICATO EX-PALAZZO
BORLETTI A MILANO.
ELECTRICAL PLANTS - EX BORLETTI PALACE - MILANO
TELECOM ITALIA S.P.A
1994
Lire 1.174.473.728
ADEGUAMENTO ALLA L.46/90 DELLE OPERE TECNOLOGICHE PRESSO LA
CENTRALE TLC DI BARI.
SETUP TO 46/90 LAW OF CED - BARI
TELECOM ITALIA S.P.A
1995-1997
Lire 1.640.356.284
REALIZZAZIONE OPERE EDILI, ELETTRICHE E TERMOTECNICHE PRESSO LA
CENTRALE TELECOM DI FAVARO VENETO (VE).
GENERAL CONTRACTOR - CED - FAVARO VENETO - VE.
CAVAGNIS COSTRUZIONI S.R.L.
1997-1998
Lire 2.382.403.569
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LA CASA D
RIPOSO “S.CHIARA” DI FERRARA.
ELECTRICAL AND MECHANICAL PLANT FOR S.CHIARA HOSPITAL
FERRARA.
CAVAGNIS COSTRUZIONI S.R.L.
1997-1998
Lire 962.600.501
REALIZZAZIONE IMPIANTI ELETTRICI ADIBITI AL CINEMA AD 8 SALE
PRESSO IL C.C. “LA GRANDE MELA” DI LUGAGNANO DI SONA (VR).
ELECTRICAL PLANTS FOR CINEMA VILLAGE BY LA GRANDE MELA
SHOPPING CENTER - VERONA
TELECOM ITALIA S.P.A
1996-1998
Lire 785.515.559
REALIZZAZIONE OPERE EDILI, ELETTRICHE E TECNOLOGICHE PRESSO LA
CENTRALE TELECOM DI S.DONA’ DI PIAVE (VE).
GENERAL CONTRACTOR - CED - SAN DONA’ DI PIAVE - VE
TELECOM ITALIA S.P.A
1998-1999
Lire 986.822.987
REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA CENTRALE TELECOM DI
TRIESTE.
ELECTRICAL PLANTS FOR CED - TRIESTE
CIR COSTRUZIONI S.R.L.
1999-2000
€ 924.457,84
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO DI
ACCOGLIENZA DI MESSIDORO (FE).
ELECTRICAL PLANTS - MESSIDORO OFFICE - FERRARA.
TELECOM ITALIA S.P.A
1998-2000
€ 935.930,46
REALIZZAZIONE OPERE EDILI, ELETTRICHE E TERMOTECNICHE PRESSO LA
CENTRALE TELECOM DI SCHIO (VI).
CONSTRUCTION WORKS, ELECTRICAL AND AT THE CENTRAL TELECOM
TERMOTECNICHE IN SCHIO (VI).
PAVAN COSTRUZIONI S.P.A.
1998-2001
€ 223.199,74
REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA CENTRALE TELECOM
ITALIA A PORDENONE.
ELECTRICAL PLANTS - TELECOM ITALIA CED - PORDENONE
COOPCOSTRUTTORI SOC.
COOP. A R.L.
1999-2001
€ 2.283.729,39
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO DI
ACCOGLIENZA O.I.C. - MANDRIA - PADOVA.
ELECTRICAL PLANTS - OIC LA MANDRIA - PADOVA.
SICEA S.P.A..
2000-2001
€ 2.104.124,22
REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO LA TORRE 2 NEL
CENTRO DIREZIONALE “LA CITTADELLA” DI PADOVA.
ELECTRICAL PLANTS - TOWER 2 - CITTADELLA CENTER - PADOVA.
SICEA S.P.A.
2001-2002
€ 222.706,51
REALIZZAZIONE IMPIANTI ELETTRICI E SPECIALI PRESSO IL
COMMISSARIATO POLIZIA DI STATO NEL CENTRO DIREZIONALE
“LA CITTADELLA” DI PADOVA.
ELECTRICAL PLANTS - POLICE CITY OFFICE - CITTADELLA CENTER
PADOVA
VODAFONE OMNITEL S.P.A.
2001-2002
€ 122.815,49
REALIZZAZIONE IMPIANTI SPECIALI LOTTO IV E VII PRESSO LA TORRE
OMNITEL NEL CENTRO DIREZIONALE “LA CITTADELLA” DI PADOVA
ELECTRICAL PLANTS - NEW HEADQUARTER - PADOVA
IMMOBILIARE TOMMASEO
S.R.L.
2003-2004
€ 625.833,97
REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA NUOVA SEDE
PROVINCIALE DELL’INAIL DI PADOVA - VIA NANCY 2
ELECTRICAL PLANTS OF SUBSIDIARY - PADOVA
S.V.E.C. S.P.A.
2003-2005
€ 671.777,44
IMPIANTI ELETTRICI ED AFFINI PRESSO LA NUOVA SEDE DELLA FACOLTA’
DI ECONOMIA DELL’UNIVERSITA’ DI PADOVA VIA BASSI N. 1.
ELECTRICAL PLANTS - NEW BUILDING - UNIVERITY OF PADOVA
TIFS INGEGNERIA S.R.L.
2004-2005
€ 314.500,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI A SERVIZIO
DELL’EDIFICIO AD USO SERVIZI E UFFICI SITO A PADOVA IN C.SO STATI
UNITI (NUOVA SEDE DELLO STUDIO).
ELECTRICAL AND MECHANICAL PLANTS FOR NEW HEADQUARTER IN
PADOVA
SINTECO S.P.A.
2004-2005
€ 2.371.199,26
38
ESECUZIONE IMPIANTI ELETTRICI E MECCANICI NELL’EDIFICIO AD USO
ALLOGGI UNIVERSITARI IN VIA DARSENA A FERRARA
ELECTRICAL AND MECHANICAL PLANTS FOR NEW UNIVERSITY SITE
LA DARSENA - FERRARA
TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE
OFFICE AND RETAIL
CARMINE S.R.L.
2005-2006
€ 768.604,54
ESECUZIONE IMPIANTI ELETTRICI E AFFINI PRESSO LA NUOVA SEDE DELLA
AGENZIA DELLE ENTRATE E DEL TERRITORIO VIA TURAZZA (PD)
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER OF
INCOMING-TAX AND LAND OFFICES IN PADOVA
CARMINE S.R.L.
2007-2009
€ 910.000,00
IMPIANTI ELETTRICI E MECCANICI PRESSO LA NUOVA SEDE DELLA
CASERMA DELLA GUARDIA DI FINANZA DI VIA S. FIDENZIO (PD).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER
FINANCE CONTROL ARMY IN PADOVA
INTERCANTIERI VITTADELLO
S.P.A.
2006-2007
€ 1.450.000,00
IMPIANTI ELETTRICI E MECCANICI PRESSO EDIFICIO DIREZIONALE
RICETTIVO
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER OF
VIA PO IN PADOVA
IMMOBILIARE MILANESE 2006
S.R.L.
2008-2010
€ 2.553.804,44
IMPIANTI MECCANICI PRESSO NUOVO COMPLESSO RICETTIVO POGGIO
MECHANICAL PLANTS BY THE NEW TOURIST-CENTER POGGIO
DELL’AGNELLO - POPULONIA - PIOMBINO (LI)
CO.GE.VI. S.R.L.
2009-2010
€ 1.500.000,00
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI EDIFICIO
DIREZIONALE-COMMERCIALE CENTER ONE VIA BREDA LIMENA (PD).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF
NEW TRADE AND DIRECTIONAL BUILDING - CENTER ONE - LIMENA (PD)
BROSS S.R.L.
2009-2011
€ 5.700.000,00
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI COMPLESSO
RESIDENZIALE-COMMERCIALE REDAIS VIA CASAL BERTONE (ROMA).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF
RESIDENTIAL AND COMMERCIAL BUILDING REDAIS
VIA CASAL BERTONE (ROME)
MARINA VERDE S.R.L.
2011-2012
€ 3.000.000,00
IMPIANTI MECCANICI COMPLESSO RESIDENZIALE MARINA VERDE
WELNESS RESORT, CAORLE (VE).
REALIZATION OF MECHANICAL SYSTEM OF RESIDENTIAL BUILDING
MARINA VERDE WELLNESS RESORT, CAORLE (VE)
TENUTA DI CASTELFALFI S.P.A.
2012 - 2014
€ 400.000,00
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI COMPLESSO
RICETTIVO-RESIDENZIALE I BIANCHI - TENUTA DI CASTELFALFI A
MOTAIONE (FI).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF
RESIDENTIAL AND RICEPTIVE BUILDING I BIANCHI
CASTELFALFI ESTATE - MONTAIONE (FI)
TENUTA DI CASTELFALFI S.P.A
2012 - 2014
€ 800.000,00
REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CASTELLO
TENUTA DI CASTELFALFI A MOTAIONE (FI).
REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF
THE CASTLE - CASTELFALFI ESTATE - MONTAIONE (FI)
FRIULAIR S.R.L.
DUSSMANN SERVICE S.P.A.
2012 - 2014
2013
€ 1.300.000,00
€ 850.000,00
IMPIANTI ELETTRICI, MECCANICI, ANTINCENDIO ED AFFINI
AMPLIAMENTO SEDE E SITO PRODUTTIVO FRIULAIR VIA CISIS
FRAZ. STRASSOLDO, CERVIGNANO DEL FRIULI (UD).
ELECTRICAL, MECHANICAL, FIRE PROTECTION SYSTEMS OF NEW
ENLARGEMENT OF OFFICES AND PRODUCTION SITE OF FRIULAIR VIA CISIS
FRAZ. STRASSOLDO CERVIGNANO DEL FRIULI (UD)
IMPIANTI ELETTRICI, MECCANICI, ANTINCENDIO ED AFFINI NUOVO
CENTRO COTTURA COMUNE DI PADOVA C/O INTERPORTO
CORSO STATI UNITI N. 187 - PADOVA.
ELECTRICAL, MECHANICAL, FIRE PROTECTION SYSTEM OF NEW COOKING
CENTRE OF PADUA INTERPORT - CORSO STATI UNITI 18
NOVA COOP S.C.
CARREFOUR ITALIA S.P.A.
2012 - 2014
€ 400.000,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI CENTRALE
TERMOFRIGORIFERIA NUOVA SEDE NOVACOOP A VERCELLI
FRAZIONE LARIZZATE
REALIZATION OF ELECTRICAL AND MECHANICAL HEATING-COOLING OF
NEW HEADQUARTER NOVACOOP IN LARIZZATE - VERCELLI
2014 in corso
€ 115.000,00
RIFACIMENTO IMPIANTO DI RILEVAZIONE FUMI E ALLARME INCENDI
IPERMERCATO CARREFOUR C/O CENTRO COMMERCIALE
VALLECENTER A MARCON (VE)
REALIZATION OF SMOKE DETECTION AND FIRE ALARM SYSTEM OF
CARREFOUR HYPERMARKET INSIDE VALECENTER MALL LMARCON (VE)
PROVINCIA DEI FRATI MINORI
CONVENTUALI DI PADOVA
2014 in corso
€ 900.000,00
IMPIANTI MECCANICI E AFFINI - RISTRUTTURAZIONE COMPLESSO
“VILLAGGIO S. ANTONIO” A NOVENTA PADOVANA (PD)
MECHANICAL SYSTEMS - RESTRUCTURING OF COMPLEX
“S. ANTONIO VILLAGE” IN NOVENTA PADOVANA (PD)
HOFFMANN ITALIA S.R.L.
2014 in corso
€ 650.000,00
REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI NUOVA SEDE
CENTRALE ITALIA A VIGONZA (PD).
ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER
OF VIGONZA (PD).
39
LE NOSTRE CERTIFICAZIONI
OUR CERTIFICATIONS
Certificazioni ISO
Sice, nell’ottica della piena soddisfazione del cliente,
ha sottoposto la propria struttura alla certificazione di
qualità secondo lo standard UNI EN ISO 9001.
Questo traguardo diventa ogni giorno un inizio, in quanto,
nell’ottica di un costante sviluppo delle proprie
potenzialità, l’azienda tiene costantemente corsi di
formazione dedicati al proprio personale,
in risposta alla continua evoluzione che la tecnologia impone.
L’azienda è inoltre costantemente impegnata a
perseguire i più elevati standard di qualità e di
attenzione al cliente nel proporre i propri prodotti e servizi.
Il rispetto puntuale degli impegni assunti con i propri clienti e il
superamento delle loro aspettative costituiscono un obbligo
permanente di tutto il team aziendale.
Oggi l’azienda possiede sia la Certificazione a norma UNI EN ISO
9001:2008 settore EA 28b relativa alla Progettazione,
Installazione e Manutenzione di Impianti Elettrici,
Termoidraulici, di Condizionamento e Fotovoltaici
sia la Certificazione di Conformità al D.P.R. n. 43/2012
attuazione del Regolamento (CE) n. 842/2006,
al Regolamento (CE) n. 303/2008
e al regolamento Tecnico Accredia RT-29 rev. 02
inerente l’installazione di Apparecchiature Fisse
di Refrigerazione, di Condizionamento e di
pompe di Calore contenenti taluni Gas Fluorurati
ad Effetto Serra (F-GAS sec. G.U. n. 93 del 20 aprile 2012).
ISO Certifications
SICE, caring his customers, obtains the ISO 9001 certification.
But this target is only a beginning of a quality process, because
all the manpower is costantly updated to the recent technology
to apply with special courses and tests.
Satisfy and overcoming customer’s target is need by our staff.
Today, the company owns both the certification UNI EN ISO
9001:2008 EA 28b on the design,
Installation and Maintenance of Electrical Installations,
HVAC, Conditioning and Photovoltaic
both the Certification of Compliance with
the Presidential Decree n. 43/2012
implementation of Regulation (EC) no. 842/2006,
to Regulation (EC) no. 303/2008
Technical Regulation and Accreditation RT-29 rev. 02
regarding installation of refrigeration,
equipment Air Conditioning and
Heat pumps containing certain Greenhouse Effect F-Gas
(F-GAS sec. G.U. n. 93 of 20 April 2012).
40
Attestazione SOA
SOA Certification
L’ottenimento della certificazione SOA e’ una ulteriore conferma della
volontà di continuare a crescere anche nell’ambito
tradizionalmente proprio delle opere pubbliche.
E’ nel DNA di Sice essere un partner affidabile rispetto al
committente pubblico, ormai sempre piu’ esigente
in quanto al rispetto di qualita’ e tempistiche di progetto.
Le categorie generali delle quali l’azienda si può avvalere vanno dalla
OG1 (costruzioni edili),
OG9 (impianti produzione energia elettrica)
OG10 e OG11 (complessi di impianti) fino alla VI classifica (10 mln di euro).
Da non sottovalutare la presenza delle classifiche specialistiche OS3 (impianti idrico-sanitari), OS28 (impianti termomeccanici) e OS30 (impianti
elettrici e di telecomunicazioni), che certificano la corretta esecuzione di
singoli lavori per importi fino alla V classifica (5,165 mln di euro).
Obtaining this certification is a confirm to join and develop
public works, DNA of Sice is to effort the customers like
and to realize in the right time every order.
Sice is certified for general construction (OG1),
systems of power generation (OG9),
public lighting (OG10) and plants (OG11)
up to the 6 class (over 10.000.000 €)
and specialized in hydraulic plants (OS3),
air treatment (OS28) and electrical plants (OS30)
up to the 5° class (5.165.000 €).
gruppo
NEL CUORE
DI OGNI GRANDE OPERA
IN THE HEART OF
EVERY GREAT WORK
SICE srl
Via Lisbona, 3 - 35127 Padova - Italy
tel. +39 049 8286911 - Fax +39 049 8286940
[email protected] - www.siceimpianti.com
45
thh
1969 - 2014
4
PRESIDENTE / PRESIDENT
Dott. Ing. Vito Villari
AMMINISTRATORE DELEGATO / C.E.O.
Dott. Ing. Alberto Villari
DIRETTORE TECNICO / TECHNICAL DIRECTOR
Per. Ind. Andrea Noventa
la soatech s.p.a.
organismo di attestazione
ORGANISMO
DI CERTIFICAZIONE
S G Q certificato secondo la Norma
UNI EN ISO 9 0 0 1 : 2 00 8
DIRETTORE AMMINISTRATIVO / C.F.O.
Dott. Arch. Emanuela Villari