Visualizza la nostra brochure aziendale
Transcription
Visualizza la nostra brochure aziendale
45 thh 1969 - 2014 4 gruppo g gr NEL CUORE DI OGNI GRANDE OPERA IN THE HEART OF EVERY GREAT WORK CONTATTI - CONTACTS Generale SICE - Info SICE [email protected] Presidente - President Dott. Ing. Vito Villari [email protected] Amministratore Delegato - C.E.O. Dott. Ing. Alberto Villari [email protected] Direttore amministrativo qualità ISO e SOA C.F.O. Director Quality ISO e SOA Dott. Arch. Emanuela Villari [email protected] [email protected] Direttore Tecnico - Technical Director Per. Ind. Andrea Noventa [email protected] Ufficio Commerciale - Commercial Director Per. Ind. Igor Pallado [email protected] [email protected] Ufficio Lavori, Sicurezza e RSPP - Work’s Office, H&S Manager Dott. Ing. Pauline Consoli [email protected] Divisione Impianti Elettrici - Electrical Planning Coordinator Per. Ind. Marco Varotto [email protected] [email protected] Divisione Impianti Meccanici - Mechanical Planning Coordinator Dott. Ing. Roberto Maggiolo [email protected] [email protected] Ufficio Gare e Preventivi - Quotes/Estimates Office [email protected] Ufficio Acquisti - Purchase Office [email protected] Ufficio CAD - CAD Office [email protected] COMPANY PROFILE Sice srl gruppo leader nella progettazione, installazione e manutenzione di impianti elettrici, meccanici e speciali in Italia e nel mondo. Fondata nel 1969, Sice nasce dal desiderio di un gruppo di imprenditori veneti di dare vita ad una realtà nuova, che, sulla scorta del modello produttivo del nordest, riuscisse ad imporsi prima a livello regionale, e poi nazionale nell’ambito della progettazione e della realizzazione di impianti elettrici. Sice srl is leader-group in engineering, building and service of electrical, mechanical and networking systems. Founded in 1969, Sice was born from the desire of a group of Venetian entrepreneurs to realize a new reality, which, on the basis of the production model of the Northeast, was able to impose as leader of design and installation of electrical equipment, first at the regional level and then nationally. Fondata nel 1969, Sice nasce dal desiderio di un gruppo di imprenditori veneti di dare vita ad una realtà nuova che, sulla scorta del modello produttivo del nordest, riuscisse ad imporsi prima a livello regionale, e poi nazionale nell’ambito della progettazione e della realizzazione di impianti elettrici. Riuscita nel giro di un ventennio a guadagnare una posizione di rispetto in tale settore con realizzazioni significative a livello nazionale e internazionale, sia nel pubblico che nel privato (ospedali, sedi centrali di banche, aree e centri commerciali, in Italia, Algeria, Arabia Saudita, Turchia e Croazia), Sice crea una divisione specializzata nella progettazione e installazione di impianti meccanici (termoidraulici, antincendio e di condizionamento), presentandosi così sul mercato come una delle prime realtà capaci di offrire al Cliente una competenza ed un servizio completi. L’ultimo decennio l’ha vista sempre più protagonista anche in tale ambito ed oggi essa risulta leader sul panorama nazionale nella realizzazione di impianti elettrici e meccanici, con un fatturato annuo di circa 10 milioni di euro, suddiviso in percentuali quasi uguali tra i due settori. L’impresa ha ottenuto inoltre la certificazione di qualità UNI EN ISO 9001:2008 (n° 510 del 13/02/2012) e l’attestazione SOA La Soatech srl (n.15569/17/00 del 05/04/2013) per le categorie OG1, OG10, OG11, OS3, OS30, OS28 e OG9, fino al VI livello (vedi certificati), per complessivi circa 30 milioni di euro. Founded in 1969, Sice was born by the dream of a group of local managers, to start up a new company that, in the “nord-east” way of making business, wiel improve new realization of electrical equipments, by the time in the regional market and then in all the country side. In the last 20 years, Sice became a leader in the market of electrical plants, developing business activities abroad, building all plants in hospital areas, bank’s headquarters, trading areas in Italy, Algeria, Saudi Arabia, Turkey and Croatia. In the same time, completing the offer, Sice build a new business unit of mechanical plants and the project unit, giving to the holders a full solution for all technological systems. Presidente President Dott. Ing. Vito Villari In the last ten years Sice increases business up to 10 mln € shared in the two division of electrical and mechanical systems. Sice is UNI EN ISO 9001:2008 certified and SOA certified for categories OG1, OG10, OG11, OS3, OS30, OS28 e OG9, to the VI° level. (30 mln). INDICE - INDEX DIVISIONI DIVISIONS pag. 3 PROGETTI PROJECTS pag. 9 ELENCO REFERENZE LAVORI LIST OF WORK REFERENCES pag. 29 CERTIFICAZIONI CERTIFICATIONS pag. 40 Sice s.r.l. ha al suo organico oltre 40 addetti, una divisione specializzata nella progettazione e realizzazione degli impianti elettrici e affini, una divisione specializzata in quelli meccanici (termoidraulici, idricosanitari, antincendio,di condizionamento, etc), una addetta alla realizzazione di tutti gli impianti speciali e di sicurezza quali antintrusione, TVCC, controllo accessi, cablaggio strutturato, diffusione sonora, supervisione e termoregolazione, una divisione esperta nella realizzazione degli impianti a fonti rinnovabili quali fotovoltaico, eolico, biomasse, biogas, etc. Sice has a staff of more than 40 employees, a division specialized in design and realization of electrical installations, a division specialized in mechanical installations (thermohydraulic, hydrosanitary, fire protection, air conditioning, etc.), another one is assigned at the realization of all the special and security systems such as intrusion detection, CCTV, access control, structured wiring, sound system, supervision and thermoregulation and a division expert in the production of renewable energy systems such as solar, wind, biomass, biogas, etc. DIVISIONI DIVISIONS Sice ha assunto una posizione di rilievo nella progettazione, installazione e manutenzione di impianti elettrici, meccanici e speciali. La divisione di progettazione e sviluppo è costituita da un pool di ingegneri, periti, architetti (iscritti all’Albo professionale di riferimento) e con esperienze professionalità ad oggi ultra quarantennali. È in grado di accompagnare il Cliente dallo studio di fattibilità fino alla progettazione esecutiva e costruttiva, oltre che nell’analisi dettagliata e nella traduzione in “cantierabili” di progetti realizzati per Committenti terzi. DIVISIONE PROGETTAZIONE DESIGN DIVISION Sice ha un ufficio tecnico interno composto da professionisti di lunga esperienza dedicato solo alla progettazione preliminare, definitiva, esecutiva e costruttiva relativa a tutta l’intera gamma di impianti che realizza (impianti elettrici, termotecnici, condizionamento, antincendio, idrotermosanitari, trattamento aria e speciali). Settori Principali • impianti di spegnimento antincendio sprinkler e a gas inerte • impianti idricosanitari e scarichi • impianti elettrici civili, industriali, terziari, direzionali, commerciali, di produzione e dispaccio di energia elettrica • reti di distribuzione in AT, MT e BT • impianti di trasformazione di potenza • impianti di diffusione sonora, impianti TVCC • impianti antintrusione, controllo accessi, varchi e presenze • impianti multimediali e audiovisivi • reti e sistemi di cablaggio strutturato e telefonici • impianti di rilevazione fumi e spegnimento incendi • impianti TV e satellitari • impianti fotovoltaici, solari termici, eolici, centrali a biodigestione e a biomasse, geotermici • impianti di building automation, termoregolazione, supervisione e domotica Sice has a technical department, consists of experienced professionals, dedicated to preliminary, definitive and executive design and construction on the entire range of plant which Sice realizes (electrical, heat engineering, air conditioning, fire protection, plumbing, HVAC and special). Sice has reached a successful position in design, setting-up and maintenance of electrical and mechanical plants. Project division is a pool of engineers, technician and architects (booked on the respective professional register), with over forty years of experience. This team suggests the customer by the featuring of a new project to the realization of a solution “all inclusive”. Main Applications • Fire prevention systems • Hydraulic plants • Electrical plants including industrial, offices, trading centers, • Power production and distribution • HV, MV and LV networks • Audio diffusion systems, TVCC • Access control, security and checking systems • Multimedia control • LAN e WAN solutions • TV set and satellite broadcast • Solar systems, wind-based systems, ecological systems • Building automation, clima settings and control 1 4 Sice è stata una delle prime realtà a livello nazionale a specializzarsi nella progettazione, installazione e manutenzione di impianti elettrici, maturando un’ esperienza e una professionalità ad oggi ultraquarantennali. DIVISIONE IMPIANTI ELETTRICI ELECTRICAL PLANTS DIVISION Lo staff di Sice è in grado di gestire e risolvere ogni problematica in quest’ambito, intervenendo su immobili con ogni destinazione d’uso e potendo soddisfare le specifiche esigenze del Cliente in piena armonia con le normative vigenti. Progettazione, installazione, supervisione e controllo quadri elettrici di media e bassa tensione, cabine, impianti di trasformazione e di potenza, centrali elettriche e cogenerative. Settori principali • • • • • • • • Ospedali Banche e istituti assicurativi Terziario e direzionale Centri e parchi commerciali Scuole e istituti universitari Industriale Illuminazione pubblica Aree sportive e culturali Design, installation, supervision and control switchboards of medium and low voltage, cabins, processing plants and power plants, power plants and cogeneration. Sice was one of the first companies specialized in engineering, installation and maintenance of electrical system, having experience from 1969. Staff is full-skilled to solve every problem, for every type of plant, according to the customer’s requirements. Main Applications • Hospital areas • Banks and insurances • Offices and retail areas • Trading areas • Schools and universities • Industrial areas • Public lighting • Social and sport areas 2 5 Sice copre tutti i settori nella progettazione, realizzazione e manutenzione di impianti meccanici. DIVISIONE IMPIANTI MECCANICI MECHANICAL PLANTS DIVISION In particolare opera su: • Impianti termoidraulici (idrico-sanitario, scarichi, etc) • Condizionamento e trattamento dell’aria • Antincendio (Sprinkler, idranti, gas inerte, etc) • Termoregolazione, gestione e supervisione Installazione e supervisione impianti di climatizzazione, riscaldamento e condizionamento, termoregolazione, impianti areaulici, antincendio, idrico-sanitari, a gas inerte L’esperienza maturata in questo settore consente a Sice di affrontare ogni problematica fornendo al Cliente la migliore soluzione possibile, in piena armonia con le normative vigenti. Settori Principali • • • • • • • Ospedali Banche e istituti assicurativi Terziario e direzionale Centri e parchi commerciali Scuole e istituti universitari Industriale Aree sportive e culturali Installation and supervision of air conditioning systems heating and air conditioning, temperature control systems, air treatment, fire protection, waterworks, plumbing, hvac Sice is leader in the engineering, installation and maintenance of mechanical systems in particular: • Water plants • Air-conditioning and air-treatment • Fire prevention and protection • Clima management and supervision • Waterworks and plumbing The remarkable experience gives to Sice all the knowledge to solve every customer’s problem by the best possible solution, according to the law. 3 Main Applications • Hospital areas • Banks and insurances • Offices and retail areas • Trading areas • Schools and universities • Industrial areas • Social and sport areas 6 Per fornire al Cliente un servizio e una competenza globali sull’opera o sull’intervento, Sice può contare su uno specifico settore che progetta, realizza e manutiene tutti gli impianti “speciali” per la gestione intelligente del “building” secondo le specifiche esigenze del Cliente. DIVISIONE SISTEMI E TECNOLOGIE INNOVATIVE INNOVATIVE SYSTEMS DIVISION Sice interviene su: • sistemi di supervisione, domotica, building automation e regolazione • impianti di cablaggio strutturato (parte passiva e attiva) chiavi in mano • impianti di antintrusione e di sicurezza • impianti tvcc e videocitofonici • impianti di sonorizzazione e diffusione sonora • impianti di rilevazione fumi e incendio • sistemi e impianti audiovisivi, TV, satellitari e di videoconferenza • impianti controllo accessi, varchi e presenze Sistemi e tecnologie innovative: cablaggio strutturato, telefonia, TVCC, antintrusione, controllo accessi e presenze, diffusione sonora, rilevazione fumi, TV-SAT, building automation, fotovoltaico, solare termico, biomasse L’attenzione di Sice è da sempre inoltre rivolta verso le nuove tecnologie e le fonti energetiche alternative e rinnovabili. Per questo è stata costituita una divisione all’avanguardia nella realizzazione e gestione di: • impianti fotovoltaici • impianti a collettori solari termici • impianti eolici • impianti e sistemi geotermici • sistemi e gruppi di assorbimento, impianti a biomasse e biodigestione In tutti questi settori Sice è partner certificato dei principali costruttori mondiali e, in virtù di questo, è in grado di fornire al Cliente ogni forma di garanzia sull’opera. Innovative systems and technologies: structured cabling, telephony, CCTV, antitheft, access control and attendance, sound systems, smoke detection, TV-SAT, building automation, photovoltaics, solar thermal, biomass To full-care every project directly, overviewing the develop of the construction, Sice is able to manage every step, including all the advanced plants like: • building automation • LAN systems • antitheft and control systems • TVCC and video systems • audio and conference rooms • fire prevention systems • access control and authorizations Main Applications 4 Sice is every time up-to-date to the last technology and alternative power source. So a specific unit is able to project: • photovoltaics systems • solar thermal systems • wind systems • geothermical systems • thermovalorization Sice is partner of the major manufacturers in the world. 7 INDICE PROGETTI - PROJECTS INDEX HYPO ALPE ADRIA BANK s.p.a. VENETO BANCA s.c.ar.l. PAM-PANORAMA s.p.a. GRUPPO POLICENTRO s.p.a. AZIENDA SANITARIA EMILIA ROMAGNA AGENZIA DELLE ENTRATE E DEL TERRITORIO FINBENI HOLDING s.r.l. F.LLI LANDO s.p.a. IMPIANTI FOTOVOLTAICI NOVA COOP s.c.ar.l. PIEMONTE SHOPPING TEN UNIVERSITA’ DEGLI STUDI DI PADOVA FRIULAIR s.r.l. DUSSMANN SERVICE s.r.l. MARINA VERDE s.r.l. BROSS - REDAIS s.r.l. INTERPORTO DI PADOVA s.p.a. TENUTA DI CASTEFALFI s.p.a. SERENISSIMA RISTORAZIONE s.p.a. pag. 10 pag. 11 pag. 12 pag. 13 pag. 14 pag. 15 pag. 16 pag. 17 pag. 18 pag. 19 pag. 20 pag. 21 pag. 22 pag. 23 pag. 24 pag. 25 pag. 26 pag. 27 L’intero staff di Sice opera con la consapevolezza che un solo fatto conta più di mille parole. Nelle pagine che seguono si possono scorrere una lista delle referenze dedicate ad alcuni tra gli ultimi cantieri più significativi da noi realizzati. The entire staff of Sice works with the knowledge that one only fact counts more than a thousand words. In the following pages you can scroll through a list of references dedicated to some of the most significant recent construction realized by us. PROGETTI PROJECTS La nuova sede della Hypo Alpe Adria Bank a Tavagnacco (UD) è un progetto ambizioso, che stupisce già per l’originale struttura pensata dall’architetto californiano Thom Mayne. Il progetto è articolato in un edificio direzionale di 8 piani (oltre 12.000 mq) che troneggia inclinato di ca 14° sulla verticale, un avveneristico auditorium con copertura a vela (ca 1.000 mq), una filiale operativa, un complesso adibito ad archivi (di ca 1.500 mq) con uno sviluppo lineare di oltre 100 metri e l’asilo, per un investimento globale di 36 milioni di euro. Gli impianti sono stati progettati dallo Studio IN.AR.CO. di Udine (per un appalto di oltre 5 milioni di euro) e la realizzazione ha impegnato SICE per 14 mesi, con l’impiego di oltre 40 maestranze. A conclusione dei lavori, gli impianti risultano raffinati almeno quanto le strutture e i numeri restituiscono una fotografia chiara del valore del lavoro. HYPO ALPE ADRIA BANK s.p.a. Sede centrale Italia - Tavagnacco (Udine) Servizi: impianti elettrici, speciali e meccanici Anno: 2005 - 2006 Importo Lavori: € 5.027.128,00 Headquarter Italy – Tavagnacco (Udine) Services: electrical, mechanical and special plants Years: 2005-2006 Amount of work: € 5.027.128,00 I Numeri del progetto • oltre 7.000 mq di soffitti radianti alimentati da 16 distinte linee di tubazioni dorsali per un totale di ca 44.000 kg • 1.300 infissi e tende motorizzati gestiti da un complesso impianto di building automation con trasduttori atmosferici • 1,6 MVA di potenza elettrica complessiva installata • oltre 50 quadri elettrici di bassa tensione • oltre 8.000 mt di canalizzazioni portacavi • 720 kVA di gruppo di autoproduzione elettrodiesel • oltre 1.600 mq complessivi (tra due CED e archivi) protetti da impianti di spegnimento a gas inerte • 8 linee ridondanti di blindosbarre da 250A a servizio delle utenze ai piani • 800 torrette portaprese da incasso su pavimento flottante per postazioni di lavoro • 500 kVA complessivi sotto continuità assoluta • oltre 4.500 mq di canalizzazioni di mandata e quasi 30.000 Kg di ripresa per un sofisticato impianto aeraulico che gestisce 16 aree indipendenti A very particular project for the new headquarter of Hypo Alpe Adria Bank in Tavagnacco (UD), the original architecture, planned by the famous Californian architect Thom Mayne consisting of a directional building (more than12.000sqm) of 8 floors tilted of 14°, a new auditorium with sail cover (of ca 1.000sqm), a bank office, and a nursery school. Numbers Of The Project • More than 7.000 sqm of radiant celling panels powered by 16 lines for a total of 44.000 kg • 1.300 motorized windows and curtains placed under a building automation control • 1,6MVA of total electrical power • Over 50 power panels under low voltage • 720kVA of power backup systems • More than 1600sqm of CED and archives protected by fire guard systems • 800 work-places • 500 kVA under UPS • An up-to-date system of climatization with 16 independent areas. • More than 4.500sqm of supply ducts and more than 30.000 kg of return air ducts. A project and a work where Sice was a SINGLE PARTNER by his total quality in building and maintenance of systems 10 La sede centrale di Veneto Banca a Montebelluna (TV) si sviluppa su una superficie complessiva di circa 17.000 mq. E’ composta da un edificio direzionale principale di 4 piani (2.100 mq ciascuno) con annesso auditorium semicircolare da 350 posti, da un edificio mensa di ca 1.000 mq, da un ulteriore edificio adibito ad archivi e locali tecnologici per ca 3.500 mq. Gli impianti, progettati dallo Studio TiFS di Padova, sono molto sofisticati sotto il profilo del building automation, che prevede la supervisione computerizzata in tempo reale di tutti gli apparati (impianti elettrici, illuminazione con reattori digitali dimmerabili DALI, rilevazione fumi, TVCC, controllo accessi, antintrusione, termoregolazione etc); l’opera risulta complessa anche in termini meccanici, prevedendo l’attivazione di 3 gruppi termofrigoriferi che scambiano calore con acqua di falda prelevata mediante 2 pozzi a 110 mt di profondita con pompe da 100 mc/h. L’intervento di SICE si è sviluppato complessivamente in 26 mesi di lavoro, con l’impiego di 40 maestranze di cantiere. L’importo della commessa per gli impianti supera i 6 milioni di euro. VENETO BANCA s.c.ar.l. Sede centrale Italia - Montebelluna (Treviso) Servizi: impianti elettrici, speciali e meccanici Anno: 2002-2005 Importo lavori: € 6.133.482,44 Headquarter – Montebelluna (Treviso) Services: electrical, mechanical and special plants Years: 2002-2005 Amount of work: € 6.133.482,44 I numeri del progetto • 16 Centrali di Trattamento Aria • 3 gruppi frigoriferi condensati ad acqua con compressori a vite ciascuno da 358 kWf • 300 ventilconvettori a quattro tubi, oltre 60.000 kg di tubazioni idrauliche in acciaio nero, ca 10.000 Kg di tubazioni idrauliche in acciaio zincato, oltre 50 quadri elettrici di bassa tensione • oltre 6.000 mt di canalizzazioni portacavi, ca 7.000 mt di cavidotti esterni • impianto di cablaggio strutturato con 16 rack per un tot di ca 3.000 prese in campo RJ45, oltre 180 km di cavo AWG24 cat.7 SFTP e 400 fibre ottiche multimodali per un tot di 4.000 mt di cavo a 12 fibre ottiche • oltre 300 rilevatori antintrusione • ca 50 telecamere fisse con 9 monitor e 4 registratori digitali connessi via rete ethernet • oltre 80 diffusori acustici, ca 1.000 punti di gestione dell’impianto di supervisione • ca 30 centrali di rilevazione fumi ad aspirazione, oltre 600 punti rilevazione di fumo The new headquarter of Veneto Banca is about 17.000 sqm with a main building of 4 floors of 2.100sqm each one, a semi-circular auditorium of 350 seats and a service area of 1.000 sqm and CED build of 3.500sqm The plants, projected by TIFS – Padova, are very particular, including building automation, lighting, full control checking and many others. Air conditioning and air treatment include 3 power settings coolers with geothermal system of 110m of depth. This project needed over 26 months and over 40 full-time workers. Numbers Of The Project • 16 air handling units • 3 coolers of 358 KWf • 300 fan coils, 60.000kg of each one steel 10.000 kg of galvanized steel pipelines • Over 6.000 mt of cable trays and 7.000 mt outdoor lines • LAN system with over 3.000 RJ45 outlet, over 300 km of AWG 24 cat. 7 SFTP, cables and 400 fiber optics network • Over 300 anti-theft sensors • 50 cam with 9 monitors and 4 recorders • Over 80 speakers • 1.000 control monitoring system points • 30 fire-alarm systems with 600 points of reveal 11 La realizzazione del centro commerciale di Ariccia rappresenta un progetto importante e al tempo stesso una sfida significativa, per l’impegno tecnico e operativo richiesto. SICE è stata scelta come partner unico in nome della fiducia della garanzia di qualità legata ad un marchio consolidato. L’intervento di SICE – che ha messo a disposizione le proprie competenze per affinare le soluzioni tecniche proposte nel progetto – si è dimostrato competitivo ed è stato ancora una volta importante per la visione integrata del lavoro. PAM-PANORAMA s.p.a. Centro Commerciale Ariccia (Roma) Servizi: impianti elettrici, speciali e meccanici Anno: 2006 Importo lavori: € 2.940.000,00 I numeri del progetto • ca 25 milioni di euro di investimento globale • ca 3 milioni di euro di appalto per le opere impiantistiche elettriche e meccaniche • 40 persone in cantiere per 6 mesi • 13.000 mq di aree coperte di cui 6.000 mq di sala vendita, 1.000 mq di sala lavorazioni, 1.500 mq di negozi di terzi, 1.000 mq di uffici, 2.000 mq di locali tecnici, 1.500 mq di magazzino di stoccaggio merci, 30.000 mq complessivi di parcheggi • 2,5 MVA di potenza elettrica complessiva installata • 800 kVA da gruppo di autoproduzione elettrica diesel • 15 quadri elettrici di bassa tensione • 15.000 mt di canalizzazioni e portacavi • impianto di cablaggio strutturato con 8 rack per 500 prese cat. 5e e 100 attestazioni di fibra ottica • 300 punti ottici, termici e lineari per impianto di rivelazione fumo • 200 punti in campo, costituiti da sensori a infrarossi e doppia tecnologia, per impianto antintrusione • impianto di gestione (building managment system) con 600 punti controllati • ca 40.000 kg di canalizzazioni aerauliche • ca 15.000 kg di tubazioni idrauliche a servizio degli impianti di condizionamento • ca 20.000 kg di tubazione a servizio dell’impianto Sprinkler per 1.200 testine in campo totali Trading Center Ariccia (Rome) Services: electrical, mechanical and special plants Year: 2006 Amount of work: € 2.940.000,00 Building of this trade center represents a very important project and a real challenge for the effort submitted. SICE has been chosen by PAM as the sole partner trusting in his quality and capabilities. The internal planning division help, was only one of the branch who support the engineers pool to find the best solution for the best plans inside this center: a very important field to an integrated overview on all the process. Numbers Of The Project • • • • • • • • • • • • • • • 12 Approximately 25.000.000 euro of global investment Approximately 3.000.000 euro of plants investment 40 workers engaged 13.000sqm of covered areas, 6.000sqm of sales room, 1.000sqm processing room, 1.500sqm of shops, 1.000sqm for offices, 2.000 of technical rooms, 1.500 for docks and 30.000sqm for parking 2,5 MVA of total power 800 kVa of backup power 15 power panels 15.000 m of cable trays LAN system with 8 rack, 500 outlet cat.5e and 100 fiber optic lines 300 optical, thermal and linear fire alarm points 200 points for anti-theft system 600 points for building management About 40.000kg of ducting About 15.000kg of hydraulic circuit (air-treatment) About 20.000kg of sprinkler system pipes (1.200 points) L’esperienza ultraquarantennale nella costruzione di impianti per la Grande Distribuzione Organizzata (centri commerciali, ipermercati), con oltre 70 realizzazioni in tutta Italia, ha indotto il Gruppo Policentro SpA a scegliere SICE come appaltatore unico di quello ad oggi è il suo progetto più importante: il centro commerciale Tower Center di Rijeka (HR), che si affaccia sulle isole di Krk e Cres. SICE è partner di Policentro dal 1994 e questo proficuo legame ha portato a collaborazioni in tutta Italia, tra le quali vale la pena di citare i centri commerciali La Grande Mela a Sona (VR), Torri d’Europa a Trieste, Piazzagrande a Piove di Sacco (PD) e Piazza Umbra a Trevi (PG). Le cifre del Tower Center sono notevoli, anche per questo è forse il progetto che testimonia al meglio la capacità di SICE nell’operare in Italia e all’estero, garantendo al cliente totale affidabilità e un servizio di alta specializzazione. GRUPPO POLICENTRO s.p.a. Tower center – Rijeka (Croazia) Servizi: impianti elettrici, speciali e meccanici Anno: 2005-2006 Importo lavori: € 14.130.000,00 Tower center – Rijeka (Croatia) Services: electrical, mechanical and special plants Year: 2005-2006 Amount of work: € 14.130.000,00 I numeri del progetto • ca 100 milioni di € di investimento globale • 70 maestranze di cantiere • ca 150.000 mq di aree coperte, comprendenti anche un multisala cinematografica da 1700 posti, una sala giochi, una palestra, un ipermercato di ca 10.000 mq • 1.877 posti auto • oltre 180 negozi • oltre 11 MVA di potenza elettrica complessiva installata suddivisa in 5 cabine distinte e 12 trasformatori di potenza • ca 1,7 MVA totali da gruppi di autoproduzione elettrodiesel • oltre 350.000 Kg di canalizzazioni aerauliche • oltre 50.000 Kg di tubazioni idrauliche a servizio degli impianti di condizionamento • oltre 250.000 Kg di tubazioni a servizio dell’impianto sprinkler per ca 9.000 testine totali in campo • impianti speciali: TVCC, antintrusione, diffusione sonora, rivelazione fumi Policentro S.P.A. required Sice as sole contractor of his best plan: “Tower Center“ the new trade center of Rijeka (HR), a building area over the town and his islands of Krk and Cres Since 1994 SICE is a friendly partner of Policentro, and this relationship has led to a lot of realizations: • La Grande Mela of Sona (VR); • Torri d’Europa of Trieste (TS); • Piazzagrande of Piove di Sacco (PD); • Piazza Umbra of Trevi (PG). Numbers Of The Project • Approximately 100 millions of euros of total investment • More than 140.000sqm of covered areas, a 1700 seats multiplex cinema, games area, fitness center and a 10.000sqm superstore • 1877 parking spaces • More than 180 shops • 70 workers • Over 11MVA of total electrical power • Approximately 1,7MVA of electro diesel power’s backup • More than 350,000 kg of ducting • More than 50,000 kg of hydraulic piping for air conditioning systems • More than 250,000 kg of piping for fire protection system • CCTV, anti-theft, audio, fire alarm 13 Il nuovo blocco dell’Ospedale di Budrio (BO), di proprietà della ASL Emilia Romagna, consta di quattro piani (di cui tre totalmente fuori terra) per una superficie coperta complessiva di ca 5.000 mq e di una nuova camera mortuaria (Morgue) da ca 300 mq. Ogni piano è costituito da due ali diametralmente opposte e da un corpo centrale che accoglie lo sbarco per ascensori e montalettighe e i vani scale. Il complesso comprende un reparto radiologico al piano seminterrato con 5 sale RX, 8 studi medici e 4 ambulatori ecografia e mammografia; 38 stanze di degenza ai piani primo e secondo; 4 ambulatori medici per terapia intensiva, il pronto soccorso nell’ala Est del piano terra (ca 600 mq) e nell’ala Ovest l’ingresso principale (ca 380 mq) con reception e bar interno; i locali tecnici sono distribuiti tra il seminterrato (centrale tecnologica e di pompaggio in copertura) e l’interrato (centrale gruppi antincendio, con vasca da ca 130 mc). AZIENDA SANITARIA EMILIA ROMAGNA Ospedale – Budrio (Bologna) Servizi: impianti elettrici, speciali e meccanici Anno: 2006-2007 Importo lavori: € 2.550.000,00 Budrio Hospital (Bologna) Services: electrical, mechanical and special plants Years: 2006-2008 Amount of work: € 2.550.000,00 I numeri del progetto • • • • • • • • • • 66 quadri elettrici e centralini di bassa tensione Oltre 2.500 mt di canalina portacavi in acciaio zincato Oltre 25.000 mt di linee energia in cavo FG7OM1 0,6/1 kV Oltre 3.000 mt di cavo coassiale TV-SAT con 50 prese TV-SAT miscelate in campo Un sofisticato impianto di termoregolazione e building automation Siemens che gestisce e comanda oltre 1.000 punti logici in campo Ca 1.000 corpi illuminanti per illuminazione normale e oltre 300 plafoniere per illuminazione di emergenza gestite da impianto di diagnosi e telecontrocco centralizzato Gruppo statico di continuità assoluta UPS da 60 kVA Un sofisticato impianto di rilevazione e segnalazione incendi digitale interattivo Siemens Sinteso con oltre 600 punti in campo Impianto di videochiamata infermiera ABB Clinos Phon per 38 degenze, 19 WC assistiti, 3 capo sala 17 ambulatori e studi medici Impianto di diffusione sonora conforme a norma EN60849 con 60 diffusori acustici in campo da incasso con fondello in acciaio e morse o in ceramica conforme alle British Standard BS5839 part 8 The new branch of Budrio Hospital is a 4 floors (3 above) building for a total of about 5.000sqm and a Morgue of 300sqm Each floor is set with two areas and a common area which houses the landing for elevators, stretcher lifts and stairwells. The building contains 5 RX room, 8 main rooms and 4 ambulatories, 38 hospital rooms, 4 emergency rooms and the first aid area and the entrance to the hospital with reception and bar. Technical rooms are in the basement with the fire-fighting units, with a water sypply of approx 130 cubic meter.. Numbers Of The Project • • • • • • • • • • 14 66 electrical panel More than 2.500m of cable-trays More than 25.000m of power lines More than 3.000m of TV SAT system Siemens systems for building automation (over 1.000 points) Over 1.000 lighting systems and 300 full logic emergency light system UPS for 60kVA Siemens SINTESO fire detection system with more than 600 points Videocall system ABB CLinos for 38 bedrooms, 19 WC, 3 nurse and 17 other rooms Audio system according to EN60849 and BS5839 part B law. Nella realizzazione di edifici adibiti ad uso terziario direzionale, SICE ha maturato una vasta esperienza. Negli ultimi anni, solo a Padova, per l’impresa SVEC SpA ha realizzato la nuova sede provinciale dell’INAIL e la nuova sede della facoltà di Economia dell’Università degli Studi di Padova. Il proficuo legame di collaborazione ha portato a questo nuovo progetto che, per dimensioni e complessità, rappresenta una sfida impegnativa per SICE. La qualità del lavoro e l’attenzione ad ogni particolare ha consentito di realizzare compiutamente e correttamente il progetto. AGENZIA DELLE ENTRATE E DEL TERRITORIO Sede centrale (Padova) Servizi: impianti elettrici e speciali Anno: 2006 Importo lavori: € 768.604,54 I numeri del progetto • Tre blocchi di edifici attigui per oltre 8.000 mq complessivi adibiti ad uffici e ca 2.000 mq di autorimesse interrate • N° 3 cabine per un totale di 1 MVA ca di potenza elettrica complessiva installata. • oltre 1.500 apparecchi di illuminazione • oltre 240 apparecchi di illuminazione di sicurezza • Quasi 400 posti di lavoro previsti • N° 3 impianti di rilevazione fumi per un totale di ca 700 punti in campo • Impianti di richiesta udienza • N° 3 impianti autonomi TV e Satellitari • Ca 30 quadri elettrici di bassa tensione complessivamente installati • Oltre 4.000 mt di canalizzazioni portacavi • N° 2 impianti di spegnimento ad aerosol autonomi a servizio degli archivi Headquarter (Padova) Services: electrical and special plants Years: 2006 Amount of work: € 768.604,54 SICE has gained particular experience in the construction of buildings for commercial and directional use. In recent years, only in Padua, for SVEC SpA enterprise, SICE has implemented new INAIL provincial headquarters and the new headquarters of the Faculty of Economics of Padua University. The fruitful relationship of cooperation has led to this new project, which represents a challenge for SICE for its size and complexity The quality of work and the attention to every detail has allowed us to fully and properly implement the project. Numbers Of The Project • 3 blocks of adjacent buildings over 8,000 square meters used for offices and about 2,000 square meters of underground garages • 3 electrical sub-station of 1MVA • More than 1500 lighting fixtures • More than 240 safety lighting fixtures • Nearly 400 workplaces • 3 smoke detection systems for a total of 700 points • 3 independent TV and satellite systems • More than 4000 m of cable support • 2 aerosol fire control systems 15 Il Centro Commerciale Iperlando di Conselve, che sorge in corrispondenza della statale Monselice mare, rappresenta il primo vero grande Centro Commerciale del gruppo IPERLANDO S.p.A.Consta di ca. 33.000 mq. coperti totali su unico piano con un Ipermercato LANDO S.p.A. da ca. 7.900 mq., gallerie per tot. 3.000 mq. e tot. 20.000 mq. di negozi di cui N. 8 grandi o medie superfici. FINBENI HOLDING s.r.l. Centro Commerciale IPERLANDO di Conselve (PD) Servizi: impianti elettrici, speciali e meccanici Anno: 2008-2009 Importo Lavori: € 6.000.000,00 SICE s.r.l. è stata scelta come partner impiantistico unico sia elettrico che meccanico, e ha messo ancora una volta le sue competenze e la sua struttura a servizio del Cliente. I numeri del progetto Mall IPERLANDO of Conselve (PD) Services: electrical, mechanical and special plants Years: 2008-2009 Amount of work: € 6,000,000.00 • • • • • • • • • • Ca. 40 milioni di Euro di investimento globale Oltre 40 maestranze di cantiere medie 33.000 mq. di totale superficie coperta 7.900 mq. di Ipermercato di cui 4.900 mq. di area vendita 3.000 mq. di gallerie coperte e spazi comuni 20.000 mq. per negozi e N. 1.300 posti auto scoperti Oltre N. 3.385 testine impianto sprinklers 4,3 MVA di potenza elettrica complessiva installata 850 kVA autoprodotti da gruppi elettrogeni diesel Oltre 91.000 Kg. di canalizzazioni aerauliche Iperlando Conselve Shopping Center, located along the highway Monselice-Mare, is the first real big shopping center realized by IPERLANDO SpA group. It consists of approx. 33,000 sqm of covered area totally on one level with a Hypermarket LANDO SpA of approx. 7,900 sqm, arcade for tot. 3,000 sqm and tot. 20,000 sqm of shops including 8 large or medium-sized areas. SICE s.r.l was chosen as the sole partner for the installation of electrical and mechanical systems, and has once again brought its expertise and its structure to service the customer. Numbers Of The Project • • • • • • • • • • 16 Approximately € 40 million global investment More than 40 construction site workers 33,000 sqm of covered area 7,900 sqm Hypermarket including 4,900 sqm of sales area 3,000 sqm of covered arcades and public areas 20,000 sqm of shops and 1,300 parking places More than 3,385 nozzles of sprinklers system 4.3 MVA of total electric power installed 850 kVA self-produced by diesel generators More than 91,000 kg of ducting Il Centro Commerciale Iperlando di Cittadella (PD) rappresenta il secondo grande complesso commerciale realizzato dal Gruppo Iperlando S.p.A. Il progetto è nato nel lontano 1999 ma per oltre 10 anni è rimasto sospeso a causa di ritardi e problematiche amministrative e burocratiche. Il complesso consta di un piano interrato adibito ad autorimessa da tot. 29.000 mq., di un Ipermercato da 8.000 mq., di cui 5.100 mq. di area vendita, da un multisala cinematografico con N. 2 sale per tot. N. 400 posti a sedere. SICE s.r.l. è stata scelta come partner impiantistico unico e ha realizzato l’opera inaugurandola il 06/11/2013. F.LLI LANDO s.p.a. Centro Commerciale IPERLANDO di Cittadella (PD) Servizi: impianti elettrici, speciali e meccanici Anno: 2012-2013 Importo Lavori: € 6.000.000,00 I Numeri del progetto Mall IPERLANDO of Cittadella (PD) Services: electrical, mechanical and special plants Year: 2012-2013 Amount of work: € 6,000,000.00 • Ca. 50 milioni di Euro di investimento globale • Ca. 50.000 mq. di totale aree coperte di cui 29.000 mq. di autorimesse interrate • N. 1 multisala cinematografico da N. 2 sale per tot. N. 400 posti a sedere • N. 897 posti auto complessivi interrati • Oltre 3.000 testine sprinklers complessive • 2,5 MVA di potenza elettrica complessiva installata • 850 kVA autoprodotti da gruppi elettrogeni diesel The Shopping Center Iperlando of Cittadella (PD) is the second largest shopping complex built by Iperlando SpA Group. The project was started back in 1999 but for over 10 years has been suspended due to administrative and bureaucratic delays and problems. The complex consists of 29,000 square meters garage in the basement, an Hypermarket of 8,000 sqm, including 5,100 sqm of sales area, a multiplex cinema with 2 rooms for a total of 400 seats. SICE s.r.l was chosen as the sole partner for the construction of facilities and completed the work inaugurating the 06/11/2013. Numbers Of The Project • Approximately 50 million Euro global investment • Approximately 50,000 sqm of total covered areas including 29,000 sqm of underground garages • 1 multiplex cinema with 2 rooms for a total of 400 seats • A total of 897 parking spaces underground • More than 3,000 nozzles of sprinklers system • 2.5 MVA of total electric power installed • 850 kVA self-produced by diesel generatorsA project and a work where Sice was a SINGLE PARTNER by his total quality in building and maintenance of systems 17 SICE s.r.l. ha realizzato per la NOVA COOP s.c.ar.l. del Piemonte nel 2013 N. 5 impianti fotovoltaici su altrettanti ipermercati (Borgosesia, Santhià, Tradate, Novara, Pinasca) per tot. 635 kWp, con un importo lavori complessivo di Euro 863.000. Tutti questi impianti sono stati realizzati con pannelli policristallini o monocristallini da 250 Wp di produzione EU e con certificato in Classe di Reazione al Fuoco 1 con inverters trifasi del tipo “distribuito” stagno (tipo Power One Aurora Trio) e con strutture autoportanti in alluminio non perforanti zavorrate. Tutti gli impianti sono ricaduti negli incentivi del V° Conto Energia. IMPIANTI FOTOVOLTAICI NOVA COOP s.c.ar.l. PIEMONTE Servizi: N. 5 impianti fotovoltaici ed elettrici Anno: 2013 Importo Lavori: € 863.000,00 I Numeri del progetto • 635.000 Wp complessivi installati • N. 2.540 pannelli poli/mono-cristallini 250 Wp EU con Classe di Reazione al Fuoco 1 per VVF • N. 22 inverters Power One Aurora Trio 27,6 kW con Datalogger RS485 e Supervisione • Strutture autoportanti non perforanti zavorrate in profili di alluminio • Oltre N. 5.000 zavorre da 60 Kg. cad. in c.a. vibrato • Oltre 730.000 kWh complessivi attesi annui di energia autoprodotta • Oltre 130.000 Euro complessivi attesi di risparmio in bolletta annuo • Oltre 510 tonnellate di CO2 evitate annue Photovoltaic plants - Coop Piemonte s.c.ar.l. Services: n. 5 photovoltaic and electrical plants Year: 2013 Amount of work: € 863,000.00 In 2013 SICE s.r.l has realized for the NOVA COOP s.c.ar.l. 5 photovoltaic systems on many hypermarkets (Borgosesia, Santhià, Tradate, Novara, Pinasca) for a total of 635 kWp, with a total contract amount of Euro 863,000. All of these plants have been realized with polycrystalline or monocrystalline 250 Wp of EU production and certified in Class 1 Fire Resistance with three-phase watertight “distributed” inverters (type Power One Aurora Trio) and with self-supporting in non penetrating ballasted aluminum structures. Numbers Of The Project • 635,000 Wp total installed • 2,540 poly / mono-crystalline 250 Wp panels EU with Class 1 Fire Reaction • 22 Power One Aurora Trio 27.6 kW Inverters Datalogger with RS485 and Supervision • Self-supporting structures in non-penetrating ballasted aluminum profiles • More than 5,000 vibrated concrete weights of 60 kg each • More than 730,000 kWh total expected annual energy self-produced • More than 130,000 Euro of the total expected annual savings • More than 510 tons of CO2 avoided per year 18 Il Centro Commerciale Shopping Ten sorge a Tencarola nei pressi di Selvazzano (PD) ed è costituito da una superficie coperta di tot. 10.470 mq. di cui 4.700 mq. di autorimessa interrata, 2.700 mq. di Ipermercato ASPIAG- DESPAR., 1.400 mq. di negozi, zone comuni e gallerie del Centro Commerciale e da un piano 1° adibito a palestra Happy Fit da 1.670 mq. SICE è stata scelta come partner impiantistico unico ed ha realizzato i lavori in meno di 8 mesi con una media di 20 maestranze. SHOPPING TEN Centro Commerciale Shopping Ten di Tencarola (PD) Servizi: impianti elettrici, speciali e meccanici Anno: 2010-2011 Importo Lavori: € 1.750.000,00 I Numeri del progetto • Ca. 10 milioni di Euro di investimento globale • Tot. 10.470 mq. di superficie totale coperta • Tot. 4.700 mq. di autorimessa interrata con N. 144 posti auto • Tot. 2.700 mq. di Ipermercato Aspiag-Despar • Tot. 1.670 mq. di palestra Happy Fit al piano 1° • 1.727 testine sprinklers totali Shopping Ten Mall – Tencarola (PD) Services: electrical, mechanical and special plants Years: 2010-2011 Amount of work: € 1,750,000.00 The Shopping Ten Mall is located near Tencarola Selvazzano (PD) and consists of a 10,470 sqm area including a 4,700 sqm underground garage, a 2,700 sqm ASPIAG-DESPAR Hypermarket , 1,400 square meters of shops, arcades and public areas of the shopping center and a 1,670 sqm 1st floor used as a Happy Fit gym. SICE has been chosen as the sole partner plant and has carried out the work in less than 8 months with an average of 20 workers. Numbers Of The Project • Approximately 10 million global investment • Total 10,470 sqm of the total area covered • Total 4,700 sqm. of underground garage with N. 144 parking spaces • Total 2,700 sqm Hypermarket of Aspiag-Despar • Total 1,670 sqm Happy Fit gym on the 1st floor • 1,727 nozzles for sprinklers system 19 L’edificio della facoltà di Biologia e Biomedicina dell’Università degli Studi di Padova, ideato dal famoso architetto Mario Botta di Lugano, stupisce sia per la bellezza delle forme ispirate dallo sbocciare di un fiore, sia per le monumentali dimensioni e sviluppo esterni e interni. Consta infatti di tot. 15.000 mq. complessivi su N. 5 piani adibiti ad aule per un tot. di oltre N. 1.500 posti, laboratori, uffici, autorimessa, spazi comuni, etc. UNIVERSITÀ DEGLI STUDI DI PADOVA Nuova Facoltà di Biologia e Biomedicina Servizi: impianti elettrici e speciali Anno: 2011-2013 Importo Lavori: € 1.698.750,00 SICE è stata scelta come impiantista elettrico specializzato ed ha eseguito anche tutti i molteplici e complessi impianti speciali a servizio dell’intero fabbricato (rilevazione fumi e gas, diffusione sonora, trasmissione dati / cablaggio strutturato, etc.). New Biology and Biomedicine Faculty - Padova Services: electrical and special systems plants Year: 2011-2013 Amount of work: € 1,698,750.00 I Numeri del progetto • • • • • • • Oltre 30 milioni di investimento globale 15.000 mq. di superficie coperta globale N. 17 aule con oltre N. 1.500 posti a sedere N. 21 laboratori didattici e di ricerca 2,5 MVA di potenza elettrica complessiva installata Oltre N. 2.500 apparecchi illuminanti N. 1 gruppo elettrogeno da 650 kVA The building of Biology and Biomedicine Faculty of Padua University , designed by the famous Lugano architect Mario Botta, surprising both for the beauty of forms inspired by the blossoming of a flower, and for the monumental size and external and internal development. In fact consists of 15,000 square meters divided into 5 floors used as classrooms with more than 1,500 seats, laboratories, offices, garage, common areas, and so on. SICE has been chosen as specialized electrical plant engineer and also performed all the multiple and complex special equipment to service the entire building (smoke and gas detection, sound, data / structured cabling, and so on). Numbers Of The Project • • • • • • • 20 More than € 30 million global investment 15,000 sqm of global covered area 17 classrooms with more than 1,500 seats 21 teaching and research laboratories 2.5 MVA of total electric power installed More than 2,500 luminaires 1 generator of 650 kVA L’ampliamento della sede centrale produttiva della FriulAir s.r.l., ditta presente in tutto il mondo specializzata nella costruzione di essiccatori e gruppi frigoriferi, consta di ca. 10.000 mq. di nuovo capannone alto ca. 12 mt. interni con zona magazzino, area produzione e mensa e di un nuovo corpo uffici sul fronte da tot. ca. 1.000 mq. su 3 piani. SICE s.r.l. è stata scelta come partner impiantista unico sia elettrico che meccanico per la sua serietà e competenza. FRIULAIR s.r.l. Sede Centrale Cervignano del Friuli (UD) Servizi: impianti elettrici, speciali e meccanici Anno: 2013-2014 Importo Lavori: € 1.300.000,00 I Numeri del progetto • 10.000 mq. di ampliamento magazzini / produzione / mensa • 1.000 mq. nuova palazzina uffici su 3 piani fuori terra • 7,5 milioni di Euro di investimento globale • 1 MVA di potenza elettrica totale installata • Tot. N. 462 apparecchi illuminanti full led installati • Tot. N. 40 torrette portaprese da incasso nel pavimento flottante degli uffici • Tot. 1.738 mt. di blindo luce e FM installate Headquarter Friulair s.r.l. Cervignano del Friuli (UD) Services: electrical, mechanical and special plants Year: 2013-2014 Amount of work: € 1.300.000,00 The expansion of the production headquarters of FRIULAIR Ltd, worldwide company specialized in the construction of dryers and refrigeration units, consists of approximately 10,000 square meters of new factory high approximately 12 mt. with internal storage area, production area and refectory and a new 3 floors office block on the front of approximately 1,000 square meters. SICE s.r.l has been chosen as a partner both electrical and mechanical plant engineer only for his reliability and expertise. Numbers Of The Project • 10,000 sqm expansion of warehouse / production / refectory • 1,000 sqm new office building on 3 floors • 7.5 million global investment • 1 MVA of total electric power installed • 462 full led lighting fixtures installed • 40 turret socket built in the raised floor of the offices • 1,738 mt. light and power busway installed 21 Il nuovo Centro Cottura del Comune di Padova sorge all’interno dell’Interporto in zona Z.I.P. in Corso Stati Uniti 18. Detto consta di tot. 1.850 mq. adibiti a cucina industriale, zona preparazione, cucina diete speciali (celiachi, etc.), area lavaggio, area stoccaggio e zone e locali tecnici. Realizzato da SICE s.r.l. in meno di 14 settimane impiegando in media 18 maestranze con punte di 24 operai, è il fiore all’occhiello della DUSSMANN SERVICE S.r.l. non solo in Italia ma nel Mondo e rappresenta il suo più grande e tecnologicamente avanzato Centro di Cottura. DUSSMANN SERVICE s.r.l. Nuovo Centro Cottura Comune di Padova Servizi: impianti elettrici, speciali e meccanici Anno: 2013 Importo Lavori: € 850.000,00 I Numeri del progetto City of Padua – New Cooking Centre Services: electrical, mechanical and special plants Year: 2013 Amount of work: € 850.000,00 • • • • • • 1.850 mq. totali coperti Oltre 4 milioni di investimento globale Oltre 18.000 mq. di canalizzazioni aerauliche N. 4 UTA per tot. 69.910 mc/h N. 1 gruppo frigorifero da 352 kWf N. 3 caldaie a condensazione per tot. 348 kWt The new Cooking Center is located within the Interport of Padua in the industrial area. It consists of 1,850 sqm used for industrial kitchen, preparation area, cooking special diets (gluten free meals, and so on), washing area, storage area and technical rooms. Realized by SICE s.r.l. in less than 14 weeks using an average of 18 workers with a peak of 24 workers, it is the flagship of the DUSSMANN SERVICE s.r.l. not only in Italy but in the world and represents its largest and most technologically advanced center of cooking. Numbers Of The Project • • • • • • 22 1,850 sqm total covered More than 4 million global investment More than 18,000 sqm of ducting 4 air handling units for tot. 69,910 m³ / h 1 352 kWf chiller 3 condensing boilers for tot. 348 kWth Il Marina Verde Wellness Resort è un avveniristico complesso immobiliare che sorge fronte mare a Caorle (VE) costituito da N. 2 torri gemelle da 6 piani fuori terra per tot. N. 75 appartamenti di lusso, N. 1 bar / ristorante, N. 1 autorimessa interrata da 8.200 mq. per ca. tot. N. 100 posti auto e un wellness center da 1.500 mq. L’edificio, progettato dal famoso Arch. Simone Micheli, è realizzato interamente con struttura e solai in legno Holzbau-Rubner, certificato in Classe Energetica A+ CasaClima, dotato di sofisticati impianti con pompe di calore geotermiche ad acqua di pozzo, fotovoltaico, domotica, solare termico, trattamento aria automatizzato Aldes e pavimenti radianti per oltre 4.500 mq. Il complesso ha vinto due prestigiosi premi: il TrE Number ONE Award 2011 Expo Venice e il Contemporary S.p.A. Award 2011 – Best Future S.p.A., Arch. Simone Micheli. MARINA VERDE s.r.l. Marina Verde Wellness Resort, Caorle (VE) Servizi: impianti meccanici ed affini Anno: 2011-2012 Importo Lavori: € 3.000.000,00 Marina Verde Wellness Resort, Caorle (VE) Services: mechanical plants Years: 2011-2012 Amount of work: € 3.000.000,00 I Numeri del progetto • 35 milioni di investimento globale • Oltre 4.500 mq. di pavimento radiante • N. 6 pompe di calore geotermiche condensate ad altissima efficienza ad acqua di falda per tot. 297 kWf • N. 75 unità motoventilanti a recupero di calore Aldes • Circa N. 100 posti auto interrati per 8.200 mq. tot. The Marina Verde Wellness Resort is a futuristic building complex that is situated beachfront in Caorle (VE) consisting of 2 twin towers of 6 floors above ground for 75 luxury apartments in total, 1 bar / restaurant, 1 underground garage of 8,200 sqm for approximately 100 parking spaces and a wellness center of 1,500 sqm The structure and the floors of this building, designed by the famous architect Simone Micheli, are made entirely of Holzbau-Rubner wood. It is certified Climate House Energy class A+, equipped with sophisticated systems with well water geothermal heat pumps, solar, home automation, solar thermal, Aldes automated air handling and over 4,500 square meters of radiant floors. The complex has won two prestigious awards: the Expo Venice TrE Number ONE Award 2011 and the Contemporary SpA Award 2011 – Best Future SpA, Architect Simone Micheli. Numbers Of The Project • 35 million global investment • More than 4,500 sqm radiant floor • 6 high efficiency ground water geothermal heat pumps for tot. 297 kWf • 75 Aldes air handling units with heat recovery • Approximately 100 underground parking spaces distributed in 8,200 sqm. 23 Il complesso Redais di Via Casal Bertone a Roma consta di oltre N. 90 appartamenti di lusso suddivisi in 7 piani fuori terra e di un’ampia autorimessa interrata da tot. 9.600 mq. con N. 180 posti auto. Gli appartamenti, tutti in Classe A CasaClima, sono dotati di pannelli radianti a pavimento, domotica Bticino My Home SCS e di ampissime terrazze esterne dotate di tutti i confort ivi compresi degli ombrelli riscaldanti a soffitto da esterno per godere delle terrazze anche nelle stagioni più rigide. BROSS - REDAIS s.r.l. Complesso Redais, Via Casal Bertone – Roma Servizi: impianti elettrici, speciali e meccanici Anno: 2009-2011 Importo Lavori: € 5.700.000,00 I Numeri del progetto • Ca. 40 milioni di investimento globale • N. 90 appartamenti di lusso per tot. 7.000 mq. • Una autorimessa interrata da N. 180 posti auto per ca. 9.600 mq. • Una centrale termica centralizzata a gas metano da 1.050 kWt • Impianto solare termico da tot. 103 kWt Complex Redais, Via Casal Bertone – Rome Services: electrical, mechanical and special plants Years: 2009-2011 Amount of work: € 5.700.000,00 The Redais complex in Rome consists of over 90 luxury apartments divided into 7 floors above ground and a large 9,600 sqm underground garage with 180 parking spaces. All the Class A KlimaHouse apartments are equipped with radiant floor, Bticino My Home SCS home automation and very large outdoor terraces equipped with all the comforts including ceiling patio heater to enjoy the terraces even in the colder climate.. Numbers Of The Project • Approximately 40 million of global investment • 90 luxury apartments for total 7,000 sqm • A 9,600 sqm underground garage with 180 parking spaces • A 1,050 kWth natural gas centralized thermal power plant • A 103 kWth solar thermal plant 24 La piattaforma logistica lotto H dell’Interporto sorge in zona industriale di Padova (Z.I.P.) in Via Inghilterra. L’opera consta di un fabbricato adibito per 4.570 mq. a magazzino di stoccaggio merci con altezza interna di ca. 12 mt. e di altri 622 mq. di blocco uffici su 2 piani fuori terra. SICE ha realizzato l’impiantistica sia elettrica, sia meccanica, sia antincendio per un valore di ca. Euro 800.000, ultimando le opere in un tempo record inferiore ai 4 mesi. INTERPORTO DI PADOVA s.p.a. Piattaforma Logistica Lotto H, Via Inghilterra Z.I.P. (PD) Servizi: impianti elettrici, speciali e meccanici Anno: 2011-2012 Importo Lavori: € 800.000,00 I Numeri del progetto • • • • Investimento globale di ca. 4 milioni di Euro Tot. 4.570 mq. di magazzino di stoccaggio h = 12 mt. Tot. 622 mq. di blocco uffici su 2 piani N. 651 totali testine antincendio sprinklers ad umido tipo ESFR a norme NFPA13:2010 • 50.000 Kg. complessivi di tubazione acciaio zincato per sprinklers Site H Logistic Platform, Via Inghilterra (PD) Services: electrical, mechanical and special plants Years: 2011-2012 Amount of work: € 800.000,00 The Interporto site H logistics platform is situated in the industrial area of Padova (ZIP) in Via Inghilterra. The work consists of a building used for 4,570 sqm as a storage warehouse with an internal height of approximately 12 mt. and other 622 sqm as offices on 2 floors above ground. SICE has realized electrical, mechanical and fire installations,for a value of approx. € 800,000,00 completing the works in a record time of less than 4 months. Numbers Of The Project • • • • Global investment of approx. 4 million Euro Total 4,570 sqm storage warehouse h = 12 m. Total 622 sqm block offices on 2 floors N. 651 nozzles of wet type sprinklers system ESFR standards NFPA 13: 2010 • A total of 50,000 kg of galvanized steel piping for sprinklers 25 TENUTA DI CASTELFALFI s.p.a. Il restauro del Castello medievale di Castelfalfi a Montaione (FI) rientra nel monumentale intervento di recupero e conversione dell’intera tenuta di Castelfalfi ad opera del colosso tedesco del turismo TUI. Restauro Castello di Castelfalfi - Montaione (FI) Servizi impianti elettrici, speciali e meccanici Anno 2012 - 2014 Importo Lavori € 800.000,00 SICE è stata scelta come Appaltatore unico sia per gli impianti elettrici che termotecnici. L’opera ha impegnato per oltre due anni le maestranze ed i tecnici di SICE che si sono trovati ad affrontare il non semplice compito di trasformare il famoso castello, sede anche delle riprese del set cinematografico del film “Pinocchio” di Roberto Benigni, in resort con suite di lusso, un prestigioso ristorante con scuola di alta cucina e cantina vini. I numeri del progetto Restoration of Castelfalfi Castle - Montaione (FI) Services: electrical, mechanical and special plants Years: 2012 - 2014 Amount of work: € 800.000,00 • C.A. 1.600 mq suddivisi tra piano terra, primo, mezzanino e secondo • Oltre 550 mq di pannelli radianti a pavimento • Oltre 5500 kg di canalizzazioni aerauliche servite da 6 UTA, distinte per zona • Impianti elettrici e domotici KNX di altissimo livello e grado di automazione The restoration of the medieval castle of Castelfalfi Montaione (FI) is part of the monumental restoration and conversion of the entire estate of Castelfalfi by the big German tourism group TUI. SICE has been chosen as the sole contractor for both electrical systems and heat engineering. The work has involved more than two years, workers and technicians of SICE who have not had to deal with the simple task of transforming the famous castle, also home of the filming set of the movie "Pinocchio" by Roberto Benigni, in luxury suites resort with a prestigious restaurant with high school kitchen and wine cellar. Numbers Of The Project • About 1,600 square meters divided between ground floor, first, entresol and second • Over 550 square meters of radiant floor • More than 5500 kg of ducts served by 6 air handling units • KNX electrical systems and home automation at the highest level and degree of automation 26 L’intervento di ristrutturazione delle cucine interne all’Ospedale San Bortolo dell’ULSS 6 di Vicenza e di realizzazione della nuova mensa da circa 320 posti soprastante a dette ha impegnato SICE per oltre 3 anni. Dette opere hanno portato al quasi rifacimento dei totali 1.500mq di cucine industriali del nosocomio e alla costruzione di una nuova mensa aperta al pubblico per altri circa 1.300mq, realizzata in carpenteria metallica e completamente vetrata. SICE è stata scelta da Serenissima Ristorazione S.P.A. come impiantista unico sia elettrico sia termotecnico grazie alle sue riconosciute doti di solidità, competenza e affidabilità. SERENISSIMA RISTORAZIONE s.p.a. Cucine e Mensa Ospedale S. Bortolo ULSS 6 - Vicenza Servizi impianti elettrici, speciali e meccanici Anno 2009 - 2012 Importo Lavori € 1.422.550,00 I Numeri del progetto Kitchens and refectory of San Bortolo Hospital ULSS6 - Vicenza Services: electrical, mechanical and special plants Years: 2009 - 2012 Amount of work: € 1.422.550,00 • Nuova mensa da circa 1.300mq per 320 posti a sedere • Ristrutturazione cucine ULSS6 Ospedale San Bortolo per circa 1500mq • Oltre 15.000kg di canalizzazioni aerauliche • N° 4 UTA e n° 2 estrattori cappe • Impianti speciali di diffusione sonora EVAC, rivelazione fumi e supervisione • Impianto distribuzione vapore con rete tubazioni in acciaio inox The renovation of the internal kitchens of ULSS 6 San Bortolo Hospital in Vicenza and construction of a new refectory with about 320 seating above those, committed SICE for over 3 years . These works led to the almost total renovation of 1.500mq of industrial kitchens of the hospital and the construction of a new refectory opened to the public for other 1.300mq , made entirely of glass and metalwork . SICE has been chosen by Serenissima Ristorazione SPA as sole contractor for both electrical systems and heat engineering due to its recognized qualities of strength, competence and reliability. Numbers Of The Project • New refectory of about 1.300mq with 320 seating • ULSS6 San Bortolo Hospital kitchens renovation for ap proximately 1500sqm • More than 15.000kg of ducts • 4 air handling units and 2 extractor hoods • EVAC sound system, smoke detection and monitoring • Steam distribution system with stainless steel pipes 27 INDICE ELENCO REFERENZE INDEX LIST OF REFERENCES OPERE PUBBLICHE PUBLIC WORKS pag. 30 CENTRI COMMERCIALI E GRANDE DISTIBUZIONE SHOPPING CENTERS AND MALLS pag. 33 BANCHE E ASSICURAZIONI BANKS AND INSURANCES pag. 36 IMPIANTI FOTOVOLTAICI PHOTOVOLTAIC PLANTS pag. 37 TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE OFFICE AND RETAIL pag. 38 A seguire riportiamo un breve elenco delle opere più significative realizzate da Sice nell’ultimo trentennio , suddivise per tipologia di intervento (opere pubbliche, centri commerciali e grande distribuzione, banche e assicurazioni, impianti fotovoltaici, terziario, residenziale, industriale, e direzionale). Si tratta solo di un breve estratto della nostra lunga storia, un rapido sguardo nel nostro curriculum aziendale per capire cosa abbiamo fatto finora e come siamo arrivati fino a qui. In the next pages we quote a short list of the most significant works realized by Sice in the last thirty years, divided by type of intervention (public works, shopping centers and malls, banks and insurances, commercial, photovoltaics plants, office and retail). This is just a short example of our long history, a quick look in our business curriculum to understand what we have done so far and how we got here. ELENCO REFERENZE LAVORI LIST OF WORK REFERENCES OPERE PUBBLICHE PUBLIC WORKS U.L.S.S. n. 16 ALTO VICENTINO 1985-1991 Lire 366.071.516 MINISTERO AFFARI ESTERI 1988-1991 Lire 2.275.110.105 CAVAGNIS COSTRUZIONI S.R.L. 1988-1991 Lire 244.576.730 SIEMENS S.P.A. 1986-1993 Lire 2.522.289.763 COMUNE DI ESTE (PD) 1987-1993 Lire 509.594.102 BOTTACIN LUIGI S.R.L. 1992-1993 Lire 1.240.531.593 U.L.S.S. N. 8 1992-1994 Lire 228.352.840 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO L'OSPEDALE DI PEDEROBBA (TV). REALIZATION OF ELECTRICAL SYSTEMS AT PEDEROBBA HOSPITAL (TV). SIGLA SOC. COOP. A R.L. FORLI’ 1992-1994 Lire 690.237.250 RINNOVO ILLUMINAZIONE AEROSTAZIONE E PISTE DELL’AEROPORTO DI FIRENZE - PERETOLA. RENEWAL OF LIGHT OF THE AIRPORT TERMINAL AND TRACKS OF FLORENCE AIRPORT - PERETOLA. U.L.S.S. N. 36 1983-1994 Lire 401.857.232 RISTRUTTURAZIONE ED AMPLIAMENTO OSPEDALE / POLIAMBULATORI GRUPPI OPERATORI MESSA A NORMA IMPIANTI ELETTRICI PRESSO L'OSPEDALE DI MESTRE (VE). RENOVATION AND EXPANSION OF HOSPITAL, AMBULATORY AND OPERATING GROUP OF MESTRE HOSPITAL (VE) REGIONE VENETO 1991-1995 Lire 2.958.473.752 UNIVERSITA’ DEGLI STUDI PADOVA 1991-1995 Lire 603.171.998 ADEGUAMENTO STRUTTURE ED IMPIANTI ALLE CONDIZIONI DI AGIBILITA’ E SICUREZZA NELL' ISTITUTO SEMEIOTICA DI PADOVA. STRUCTURE AND SYSTEMS ADJUSTMENT OF THE SEMEIOTICS INSTITUTE OF PADUA. COMUNE DI PADOVA 1992-1996 Lire 864.003.270 NUOVO IMPIANTO DI ILLUMINAZIONE PUBBLICA NELLA ZONA GUIZZA – PADOVA I° E II° STRALCIO. NEW LIGHTING SYSTEM IN THE PUBLIC AREA OF GUIZZA PADOVA. U.L.S.S. N. 7 1995-1996 Lire 626.293.502 ESECUZIONE OPERE ELETTRICHE PRESSO L'OSPEDALE DI CONEGLIANO (TV). REALIZATION OF ELECTRICAL SYSTEMS AT CONEGLIANO HOSPITAL (TV). AZIENDA OSPEDALIERA DI PADOVA 1996-1999 Lire 751.277.736 OPERE ELETTRICHE ESEGUITE PRESSO IL CENTRO DI CARDIOLOGIA E CARDIOCHIRURGIA DI PADOVA (2^ FASE). REALIZATION OF ELECTRICAL SYSTEMS AT THE CENTER OF CARDIOLOGY AND CARDIAC SURGERY OF PADUA 30 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL DAY HOSPITAL DISTRETTO SANITARIO DI BASE E PIASTRA SERVIZI DELL’OSPEDALE DI SCHIO (VI). REALIZATION OF ELECTRICAL AND SIMILAR SYSTEMS OF THE DAY HOSPITAL, OF SCHIO (VI). COSTRUZIONE DEGLI IMPIANTI ELETTRICI NELL’AMBITO DELL’AMPLIAMENTO DELL’OSPEDALE DI CANKIRI (TURCHIA). REALIZATION OF ELECTRICAL SYSTEMS OF THE ENLARGEMTN OF CANKIRI HOSPITAL (TURKEY). REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO L’OSPEDALE DI FOLIGNO. REALIZATION OF ELECTRICAL AND SIMILAR SYSTEMS OF THE HOSPITAL OF FOLIGNO. REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI, DI SICUREZZA E SPECIALI COMPRESA LA FORNITURA E POSA DEL GRUPPO ELETTROGENO AUTOMATICO IN PARALLELO DA 500 KV PRESSO IL NUOVO MONOBLOCCO DELL’OSPEDALE DI PIOVE DI SACCO PD U.L.S.S. N. 23 CONSELVANA. REALIZATION OF ELECTRICAL, SECURITY AND SPECIAL SYSTEMS INCLUDING THE SUPPLY AND INSTALLATION OF AUTOMATIC GENERATOR OF 500 KVA AT THE HOSPITAL OF PIOVE DI SACCO - PD - Health Units N. HOSPITAL RAINS OF THE BAG - PD - Health Units N. 23 Conselvana. OPERE DI STRAORDINARIA MANUTENZIONE DEGLI IMPIANTI DI PUBBLICA ILLUMINAZIONE DEL CENTRO STORICO DI ESTE E DI ALTRE VIE COMUNALI. EXTRAORDINARY MAINTENANCE OF PUBLIC LIGHTING OF THE CITY OF ESTE AND OTHER MUNICIPAL WAY. IMPIANTI ELETTRICI PER CENTRALI TECNOLOGICHE C/O LA CASA DI CURA MORGAGNI - PADOVA. REALIZATION OF ELECTRICAL SYSTEMS FOR POWER TECHNOLOGY C/O THE NURSING HOME MORGAGNI - PADOVA. REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI, RELATIVI AI LAVORI DI COSTRUZIONE DELLA PIASTRA SERVIZI NUOVA PORTINERIA E PIASTRA OPERATORIA. REALIZZAZIONE IMPIANTO INTERFONICO, IMPIANTO RILEVAZIONE FUMI E MANUTENZIONE DEGLI IMPIANTI ELETTRICI PRESSO L'OSPEDALE DI MONTEBELLUNA (TV). REALIZATION OF ELECTRICAL SYSTEMS RELATING TO THE WORK OF SERVICES ZONE CONSTRUCTION - NEW RECEPTION AND OPERATING ZONE, NEW INTERCOM SYSTEM AND SMOKE DETECTION SYSTEM CONSTRUCTION AND MAINTENANCE OF ELECTRICAL INSTALLATIONS AT MONTEBELLUNA HOSPITAL (TV). OPERE PUBBLICHE PUBLIC WORKS SIRAM S.P.A. 1999-2001 € 2.053.192,20 REALIZZAZIONE IMPIANTI ELETTRICI, DI SICUREZZA ED AFFINI C/O IL COMPLESSO BASILICALE DI S. ANTONIO - PADOVA REALIZATON OF ELECTRICAL AND SECURITY SYSTEMS C/O S. ANTONIO CHURCH OF PADOVA. AZIENDA U.L.S.S. N. 16 2002-2003 € 3.602.107,90 MANUTENZIONE DEGLI IMMOBILI AZIENDALI, OPERE IDROTERMOSANITARIE, DI CONDIZIONAMENTO ED ELETTRICHE PRESSO L’OSPEDALE “AI COLLI”, “S. ANTONIO”, DISTRETTI E GERIATRICO DI PADOVA. PROPERTY, WATER, HEATING, AIR CONDITIONING AND ELECTRICAL MAINTENANCE AT THE HOSPITAL " AI COLLI" "S.ANTONIO" GERIATRIC AND DISTRICTS OF PADUA. CNR DI PADOVA 2004 € 272.601,11 RIFACIMENTO CENTRALE DI CONDIZIONAMENTO PRESSO IL CNR CORSO STATI UNITI - PADOVA. NEW CONTITIONIG PLANT AT THE CNR - STATI UNITI STREET- PADOVA. ISTITUTO AGRARIO DI SAN MICHELE ALL’ADIGE (TN) 2002-2005 € 3.428.357,87 AUTOSTRADA BS VR VI PD S.P.A. 2003-2007 € 722.000,00 AUTOSTRADA BS/VR/VI/PD - MANUTENZIONE E CONSERVAZIONE IMPIANTI ELETTRICI. LOTTO II. BS / VR / VI / PD HIGHWAY - MAINTENANCE OF ELECTRICAL SYSTEMS COMUNE DI VENEZIA 2004-2006 € 659.905,00 MANUTENZIONE IMPIANTI ELETTRICI E TERMOTECNICI PRESSO GLI IMPIANTI SPORTIVI TERRAFERMA - VENEZIA. MAINTENANCE OF ELECTRICAL AND THERMOTECHNICAL SYSTEMS OF SPORTS FACILITIES - VENICE. COMUNE DI MODENA 2005-2007 € 377.493,00 REALIZZAZIONE OPERE IMPIANTISTICHE ELETTRICHE E MECCANICHE PRESSO IL CENTRO POLIFUNZIONALE DELLA PROTEZIONE CIVILE MARZAGLIA NUOVA (MO). REALIZATION OF ELECTRICAL AND MECHANICAL SYSTEMS AT THE MULTIPURPOSE CENTER OF CIVIL PROTECTION - Marzaglia (MO). AUSL DI BOLOGNA 2006-2007 € 2.550.000,00 REALIZZAZIONE OPERE IMPIANTISTICHE ELETTRICHE E MECCANICHE PRESSO IL NUOVO OSPEDALE DI BUDRIO (BO). REALIZATION OF ELECTRICAL SYSTEMS AT BUDRIO HOSPITAL (B0). U.L.S.S. N. 7 CONEGLIANO VENETO (TV) 2006-2007 € 730.000,00 REALIZZAZIONE OPERE MANUTENZIONE IMPIANTISTICHE PRESIDI OSPEDALIERI U.L.S.S. N. 7 MAINTENANCE OF ELECTRICAL SYSTEMS AT HOSPITAL DISTRICT U.L.S.S. N. 7 U.L.S.S. N. 9 - TREVISO PADOVA 2006-2007 € 565.000,00 REALIZZAZIONE OPERE MANUTENZIONE IMPIANTISTICHE PRESIDI OSPEDALIERI U.L.S.S. N. 9 MAINTENANCE OF ELECTRICAL SYSTEMS AT HOSPITAL DISTRICT U.L.S.S. N. 9 AUSL DI BOLOGNA 2007-2008 € 1.320.000,00 REALIZZAZIONE OPERE EDILI E IMPIANTISTICHE ELETTRICHE E MECCANICHE PRESSO IL NUOVO REPARTO DI DIALISI PADIGLIONE TINOZZI OSPEDALE BELLARIA (BO). REALIZATION OF ELECTRICAL AND MECHANICAL SYSTEMS AT THE DEPARTMENT OF DIALYSIS, BELLARIA HOSPITAL (BO) U.L.S.S. N. 6 - VICENZA 2009-2012 € 1.422.550,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA MENSA E CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE SAN BORTOLO (VI). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF NEW REFECTORY AND KITCHEN OF SERENISSIMA CATERING C / O SAN BORTOLO HOSPITAL (VI) COOP 80 S.c.a.r.l. 2010-2011 € 366.550,00 RISTRUTTURAZIONE IMPIANTI ELETTRICI E MECCANICI PALASPORT ABANO TERME (PD). RENOVATION OF ELECTRICAL AND MECHANICAL SYSTEMS OF INDOOR STADIUM OF ABANO TERME (PD) AGENZIA DEL TERRITORIO 2011 € 150.000,00 IMPIANTO SPEGNIMENTO A GAS E RILEVAZIONE FUMI PER NUOVO ARCHIVIO CARTACEO AGENZIA DEL TERRITORIO (PD). GAS FIRE EXTINTION AND SMOKE DETECTION SYSTEM FOR NEW ARCHIVE OF LAND AGENCY (PD) U.L.S.S. N. 2 - FELTRE 2011 € 50.430,00 REALIZZAZIONE IMPIANTI ELETTRICI RISTRUTTURAZIONE CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE FELTRE (BL). REALIZATION OF ELECTRICAL SYSTEM FOR THE RENOVATION OF KITCHEN OF SERENISSIMA CATERING C / O FELTRE HOSPITAL (BL) 31 SISTEMAZIONE IMPIANTI TECNOLOGICI DEI LABORATORI DI ANALISI E RICERCA DELL’ISTITUTO AGRARIO SAN MICHELE ALL’ADIGE (TN). SET-UP OF TECHNOLOGICAL SYSTEMS OF ANALYSIS AND AGRICULTURAL RESEARCH WORKSHOPS OF SAN MICHELE ALL'ADIGE INSTITUTE (TN). OPERE PUBBLICHE PUBLIC WORKS U.L.S.S. N. 4 2011-2012 € 910.240,00 FIORE S.c.a.r.l. 2011-2013 € 1.698.750,00 U.L.S.S. N. 6 - VICENZA 2012-2013 € 389.725,00 IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVE DEGENZE IPAB 3° PIANO ULSS 6 OSPEDALE DI SANDRIGO (VI). ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM FOR NEW IPAB WARDS ON THE 3RD FLOOR OF ULSS6 SANDRIGO HOSPITAL (VI) INTERPORTO DI PADOVA S.p.A. 2011-2012 € 800.000,00 IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVO POLO LOGISTICO INTERPORTO DI PADOVA PIATTAFORMA H VIA INGHILTERRRA. ELECTRICAL, MECHANICAL AND SPECIAL SYATEM OF NEW LOGISTICS PLATFORM H INTERPORT - ENGLAND STREET -PADOVA INTERPORTO DI PADOVA S.p.A. 2012 € 180.000,00 IMPIANTI ANTINCENDIO SPRINKLER ED ELETTRICI MAGAZZINI N. 23-24-28 INTERPORTO DI PADOVA PIATTAFORMA H VIA INGHILTERRA FIRE SPRINKLER AND ELECTRICAL SYSTEMS OF WAREHOUSES N. 23 24-28 PADUA INTERPORT - CORSO STATI UNITI 18 U.L.S.S. N. 2 - FELTRE 2013 in corso € 420.000,00 REALIZZAZIONE IMPIANTI MECCANICI ED AFFINI NUOVE CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE FELTRE (BL). REALIZATION OF MECHANICAL SYSTEM FOR THE NEW KITCHEN OF SERENISSIMA CATERING C / O FELTRE HOSPITAL (BL) U.L.S.S. N. 6 - VICENZA 2014 in corso € 350.000,00 MANUTENZIONE IMPIANTI ELETTRICI E AFFINI ULSS 6 OSPEDALE SAN BORTOLO - (VI) MAINTENANCE OF ELECTRICAL SYSTEMS OF SAN BORTOLO HOSPITAL ULSS6 (VI) U.L.S.S. N. 1 - TRENTO 2014 in corso € 225.000,00 IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA MENSA E CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE DI TRENTO (TN). ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF NEW REFECTORY AND KITCHEN OF SERENISSIMA CATERING C/O TRENTO HOSPITAL 32 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVA MENSA E CUCINE SERENISSIMA RISTORAZIONE C/O OSPEDALE UDINE. REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF NEW REFECTORY AND KITCHEN OF SERENISSIMA CATERING C/O UDINE HOSPITAL REALIZZAZIONE IMPIANTI ELETTRICI E SPECIALI NUOVA SEDE BIOLOGIA E BIOMEDICINA DELL’UNIVERSITA’ DEGLI STUDI DI PADOVA VIA PESCAROTTO. REALIZATION OF ELECTRICAL AND SPECIAL SYSTEM OF NEW BIOLOGY AND BIOMEDICINE HEADQUARTERS OF PADOVA UNIVERSITY PESCAROTTO STREET CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE SHOPPING CENTER AND MALLS I.R.C.E.S. 55 S.P.A. 1988-1989 Lire 1.431.509.698 SILOS CENTRI COMMERCIALI S.P.A. 1990-1991 Lire 2.209.741.184 REALIZZAZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO COMMERCIALE SILOS DI PARMA – VIA SILVIO PELLICO. ELECTRICAL PLANTS BY SILOS - PARMA – VIA SILVIO PELLICO. SILOS CENTRI COMMERCIALI S.P.A. 1991-1993 Lire 3.538.141.504 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI NEL NUOVO CENTRO COMMERCIALE DI VIA TIBURTINA IN ROMA. ELECTRICAL PLANTS BY SILOS - ROMA RIZZANI DE ECCHER S.P.A. 1992-1993 Lire 1.115.999.981 OPERE ELETTRICHE NEL PARCHEGGIO INTERRATO E ILLUMINAZIONE ESTERNA NEL COMPLESSO AD USO DIREZIONALE DENOMINATO VALECENTER IN MARCON (VE). ELECTRICAL PLANTS IN UNDERGROUND FLOOR AND OUTDOOR LIGHTING BY VALECENTER - MARCON (VE) COVER S.R.L. 1993-1995 Lire 1.482.972.908 REALIZZAZIONE DEGLI IMPIANTI ELETTRICI PRESSO IL CENTRO COMMERCIALE PIAZZA GRANDE SITO IN PIOVE DI SACCO (PD) ELECTRICAL PLANTS INSIDE PIAZZAGRANDE TRADING CENTER PIOVE DI SACCO (PD).. BERNARDI S.R.L. 1993-1995 Lire 1.081.232.007 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI AL SERVIZIO DEL NUOVO IPERMERCATO NEL CENTRO COMMERCIALE PIAZZAGRANDE SITO IN PIOVE DI SACCO ELECTRICAL PLANTS INSIDE THE SUPERMARKET PIAZZAGRANDE TRADING CENTER - PIOVE DI SACCO (PD). BERNARDI S.R.L. 1993-1995 Lire 727.799.939 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO L’IPERMERCATO VIVO DI MONTEBELLUNA (TV). ELECTRICAL PLANTS INSIDE FOR VIVO SUPERMARKET IN MONTEBELLUNA PANORAMA S.P.A. 1993-1995 Lire 566.063.229 RISTRUTTURAZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO PANORAMA IN S. MAURO TORINESE (TO). NEW PLANTS BY PANORAMA IN S. MAURO TORINESE (TO). IMMOBILIARE VALLI S.R.L. 1993-1995 Lire 1.169.855.827 ESECUZIONE IMPIANTI ELETTRICI PRESSO IL FABBRICATO AD USO COMMERCIALE DIREZIONALE SITO A PADOVA IN VIA T. ASPETTI ANGOLO VIA ZANCHI. ELECTRICAL PLANTS INSIDE NEW BUILDING IN PADOVA - VIA T. ASPETTI PANORAMA S.P.A. 1994-1996 Lire 1.857.277.464 COSTRUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO IL CENTRO COMMERCIALE PANORAMA LOCALITA’ S. CROCE – FORMIA (LT). ELECTRICAL PLANTS BY THE NEW FORMIA TRADING CENTER BERNARDI S.R.L. 1994-1996 Lire 835.221.198 RIFACIMENTO DEGLI IMPIANTI ELETTRICI ED AFFINI DELL’IPERMERCATO BERTIN SITO A CASSOLA (VI). ELECTRICAL PLANTS BY THE BERTIN SUPERMARKET IN CASSOLA (VI) IMMOBILIARE R.C. S.R.L. 1995-1996 Lire 857.354.003 REALIZZAZIONE DEGLI IMPIANTI ELETTRICI E TERMOIDRAULICI PRESSO IL SUPERMERCATO PAM DI CASAL MORENA - ROMA ELECTRICAL AND MECHANICAL PLANTS INSIDE SUPERMARKET PAM CASALMORENA - ROME SUPERMERCATI OR.VE.A. S.P.A. 1995-1996 Lire 946.555.270 ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO L’IPERMERCATO OR.VE.A. IN LOCALITA’ AFFI (VR). ELECTRICAL PLANTS INSIDE OR.VE.A. SUPERMARKET - AFFI (VR) SILOS CENTRI COMMERCIALI S.P.A. 1995-1996 Lire 759.399.982 RISTRUTTURAZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO SILOS SITO IN VIA AURELIA A ROMA. ELECTRICAL PLANTS INSIDE SILOS SUPERMARKET - VIA AURELIA - ROMA SILOS CENTRI COMMERCIALI S.P.A. 1995-1997 Lire 2.466.125.057 IMPIANTI ELETTRICI RELATIVI ALLA RISTRUTTURAZIONE DELL’EDIFICIO DA ADIBIRE A IPERMERCATO SITO IN VIALE VENEZIA A UDINE. ELECTRICAL PLANTS FOR NEW SUPERMARKET - VIALE VENEZIA - UDINE SUPERMERCATI PAM S.P.A. 1996-1997 Lire 566.411.777 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI NEL SUPERMERCATO PAM DI MESTRE (VE) P.ZZA XXVII OTTOBRE. ELECTRICAL PLANTS INSIDE PAM SUPERMARKET - LE BARCHE TRADING CENTER - MESTRE - VE. PANORAMA S.P.A. 1999-2001 Lire 2.117.534.264 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI PRESSO L’IPERMERCATO PANORAMA LATINA-FIORI A LATINA.. ELECTRICAL PLANTS BY THE NEW PANORAMA CENTER - LATINAFIORI (LT) BERNARDI S.R.L. 1996-1997 Lire 733.495.787 ESECUZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO COLMARK NEL CENTRO COMMERCIALE AIRONE DI MONSELICE (PD). ELECTRICAL PLANTS INSIDE AIRONE TRADING CENTER - MONSELICE (PD META' SUPERNEGOZI S.P.A. 1996-1997 Lire 751.020.793 ESECUZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL SUPERMERCATO META' DI GENOVA. ELECTRICAL PLANTS INSIDE META’ SUPERMARKET - GENOVA 33 ESECUZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO COMMERCIALE GIOTTO DI PADOVA. ELECTRICAL AND MECHANICAL PLANT BY GIOTTO TRADING CENTER - PADOVA. CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE SHOPPING CENTER AND MALLS CAVAGNIS - POLICENTROSONA 1995-1998 Lit. 5.631.461.899 PANORAMA 1995-1998 Lire 3.102.427.739 ESECUZIONE DEGLI IMPIANTI ELETTRICI E SPECIALI NEL CENTRO COMMERCIALE DI SASSUOLO (MO) AREA EX CAMPANELLA VIA RADICI IN PIANO. ELECTRICAL PLANTS INSIDE SASSUOLO SHOPPING CENTER - EX CAMPANELLA AREA SILEA SUD S.R.L. 1996-1998 Lire 3.330.277.014 ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO L'IPERMERCATO PANORAMA NEL CENTRO COMMERCIALE "I GIGLI" DI CAMPI BISENZIO (FI). ELECTRICAL PLANTS INSIDE “I GIGLI SHOPPING CENTER” - FIRENZE. IPERLANDO S.R.L. 1997-1998 Lire 724.314.169 ESECUZIONE DEGLI IMPIANTI ELETTRICI NEL FABBRICATO SITO IN Z.I. PADOVA CORSO STATI UNITI ELECTRICAL PLANTS INSIDE LANDO SUPERMARKET - PADOVA SUPERMERCATI ALI' S.P.A. 1997-1998 Lire 127.559.705 REALIZZAZIONE IMPIANTI ELETTRICI C/O SUPERMERCATO ALI’ A CAMPODARSEGO (PD) ELECTRICAL PLANTS INSIDE ALI’ SUPERMARKET - CAMPODARSEGO - PD PANORAMA S.P.A. 1996-1999 Lire 1.816.398.022 BERNARDI S.R.L. 1997-1999 Lire 1.639.334.495 COSTRUZIONE DEGLI IMPIANTI ELETTRICI PRESSO IL CENTRO COMMERCIALE "LA GRANDE MELA" SITO IN LOCALITA’ LUGAGNANO DI SONA (VR). ELECTRICAL PLANTS INSIDE “LA GRANDE MELA” SHOPPING CENTER IN VERONA ESECUZIONE DEGLI IMPIANTI ELETTRICI ED AFFINI PRESSO L’IPERMERCATO PANORAMA SITO AD OSTIA – ROMA IMPLEMENTATION OF ELECTRICAL AND RELATED AT THE SUPERMARKET PANORAMA SITE TO Ostia - Rome... ESECUZIONE DEGLI IMPIANTI ELETTRICI PRESSO L’IPERMERCATO COLMARK NEL CENTRO COMMERCIALE DIAMANTE DI FERRARA... ELECTRICAL PLANTS BY NEW COLMARK SUPERMARKET INSIDE DIAMANTE SHOPPING CENTER - FERRARA. F.LLI LANDO S.P.A. 1997-1999 Lire 2.676.475.989 BREK RISTORANTI S.P.A. 2000-2001 € 110.069,69 VIGNALE IMMOBILIARE 1999-2001 Lire 8.307.893.064 PANORAMA S.P.A. 1999-2001 € 3.704.137,84 PANORAMA S.P.A. 1999-2002 Lire 3.206.843.036 TREVINORD S.R.L. / PANORAMA S.P.A. 2001-2003 € 3.661.717,60 REALIZZAZIONE IMPIANTI ELETTRICI, DI COMUNICAZIONE, SPECIALI E MECCANICIPRESSO IL FABBRICATO 6 DEL PARCO COMMERCIALE DI VILLORBA (TV). ELECTRICAL AND MECHANICAL PLANTS BY THE NEW VILLORBA SHOPPING AREA VIVO PREGANZIOL S.R.L. 2002-2003 € 1.096.341,00 ESECUZIONE IMPIANTI MECCANICI, ELETTRICI E SPECIALI PRESSO L'IMMOBILE COMMERCIALE VIVO A PREGANZIOL (TV). ELECTRICAL AND MECHANICAL PLANTS INSIDE VIVO SUPERMARKET PREGANZIOL - TV COOP.OP. DI TS ISTRIA E FRIULI S.C.A.R.L. 2003-2004 € 986.295,67 POLICENTRO GESTIONI IMMOBILIARI S.R.L. 2002-2005 € 3.322.273,91 REALIZZAZIONE IMPIANTI ELETTRICI C/O CENTRO COMMERCIALE “LE TORRI D’EUROPA” - TRIESTE. ELECTRICAL CONSTRUCTION C / O COMMERCIAL CENTER "THE TOWERS OF EUROPE" - TRIESTE. F.LLI LANDO S.P.A. 2004-2005 € 1.389.558,39 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO IPERMERCATO LOCALITA’ DI MIRANO (VE). ELECTRICAL AND MECHANICAL PLANTS INSIDE LANDO SUPERMARKET MIRANO (VE) 34 ESECUZIONE IMPIANTI ELETTRICI, TERMOTECNICI E SPECIALI PRESSO IL NUOVO FABBRICATO SITO IN CAZZAGO DI PIANIGA (VE) ELECTRICAL AND MECHANICAL PLANTS FOR THE NEW HEADQUARTER OF CAZZAGO (VE) ESECUZIONE IMPIANTI ELETTRICI PRESSO IL RISTORANTE SITO A CANNAREGGIO N.124 – VENEZIA. ELECTRICAL PLANTS FOR RESTAURANT IN VENICE. REALIZZAZIONE IMPIANTI MECCANICI PRESSO IL CENTRO COMMERCIALE SITO IN VIA CASILINA A ROMA. MECHANICAL PLANTS INSIDE CASILINA SHOPPING CENTER. ESECUZIONE IMPIANTI MECCANICI, ELETTRICI ED AFFINI PRESSO IL CENTRO COMMERCIALE PANORAMA DI ALATRI (FR). ELECTRICAL AND MECHANICAL PLANTS INSIDE PANORAMA SHOPPING CENTER - ALATRI (FR) REALIZZAZIONE OPERE IMPIANTISTICHE PER AMPLIAMENTO DEL CENTRO COMMERCIALE DI VIA TIBURTINA IN ROMA. ELECTRICAL AND MECHANICAL PLANTS FOR TIBURTINA SHOPPING CENTER - ROME. REALIZZAZIONE IMPIANTI ELETTRICI C/O SUPERMERCATO COOP NEL CENTRO COMMERCIALE DI TRIESTE. ELECTRICAL PLANTS COOP SUPERMARKET - TRIESTE CENTRI COMMERCIALI E GRANDE DISTRIBUZIONE SHOPPING CENTER AND MALLS F.LLI LANDO S.P.A. 2004-2005 € 1.186.884,73 POLICENTRO RIJEKA (HR) 2005-2006 € 14.130.000,00 PANORAMA S.P.A. 2006 € 2.940.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI C/O CENTRO COMMERCIALE PANORAMA ARICCIA (ROMA). ELECTRICAL AND MECHANICAL PLANTS BY THE TRADING CENTER IN ARICCIA (RM) F.LLI LANDO S.P.A. 2005-2006 € 2.000.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO CENTRO COMMERCIALE LANDO DI VEGGIANO (PD) ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER IN VEGGIANO (PD) FINBENI HOLDING S.R.L. 2008-2009 € 6.000.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO CENTRO COMMERCIALE LANDO DI CONSELVE (PD) ELECTRICAL AND MECHANICAL PLANTS BY THE NEW TRADING CENTER IN CONSELVE (PD) PANORAMA S.P.A. 2008-2009 € 1.750.300,00 COMMERCIALE BRENDOLAN S.P.A. 2007-2009 € 1.100.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO IPERMERCATO LOCALITA’ DI TREVISO ELECTRICAL AND MECHANICAL PLANTS INSIDE LANDO SUPERMARKET TREVISO REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI C/O CENTRO COMMERCIALE “TOWER CENTER” - RIJEKA (FIUME) CROAZIA (HR). THE NEW RIJEKA TOWER CENTER REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO RISTRUTTURAZIONE IPERMERCATO PANORAMA DI STIORE (TV) ELECTRICAL AND MECHANICAL PLANTS BY RESIZING OF PANORAMA-STIORE (TV) REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO NUOVO IPERMERCATO FAMILA DI CREMONA VIA MAGAZZINI GENERALI ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER IN CREMONA (CR) PANORAMA S.P.A. 2008 € 65.000,00 GRUPPO PAM S.P.A. 2010 € 210.000,00 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO RISTRUTTURAZIONE IPERMERCATO PANORAMA I GRANAI (ROMA) MAINTENANCE AND SETTING OF THE ELECTRICAL PLANTS BY TRADING CENTER “I GRANAI” IN ROMA NUOVO IMPIANTO ILLUMINAZIONE IPERMERCATO PANORAMA VIA TIBURTINA (ROMA). NEW LIGHTING SYSTEM OF PANORAMA HYPERMARKET TIBURTINA STREET - ROME SANTA TERESA S.R.L. 2010-2011 € 1.750.000,00 NOVA COOP S.C. 2011-2012 € 300.000,00 F.LLI LANDO S.P.A. 2012-2013 € 6.000.000,00 GRUPPO PAM S.P.A. 2012-2013 € 950.000,00 OPERE DI RISTRUTTURAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CENTRO COMMERCIALE PAM DI PANORAMA DI ARICCIA (ROMA). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR THE RENOVATION OF PAM PANORAMA MALL - ARICCIA - ROME SONAE SIERRA ITALIA S.P.A. 2012-2013 € 575.000,00 IMPIANTI ELETTRICI SPECIALI RISTRUTTURAZIONE AUTORIMESSA INTERRATA CENTRO COMMERCIALE VALECENTER MARCON (VE). ELECTRICAL AND SPECIAL SYSTEMS OF RENOVATION OF UNDERGROUND GARAGE OF VALECENTER MALL - MARCON (VE) 2012 € 200.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI RISTRUTTU RAZIONE IPERMERCATO IPERLANDO C/O EX PELLICANO A STRAELLE DI CAMPOSAMPIERO (PD). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF IPERLANDO INSIDE IL PELLICANO MALL IN CAMPOSAMPIERO (PD) 2013 - 2014 € 700.000,00 IMPIANTI ELETTRICI E SPECIALI NUOVO CENTRO COMMERCIALE E IPERMERCATO ALI’ SPA DI DUEVILLE (VI) ELECTRICAL AND SPECIAL SYSTEMS OF ALÌ MALL AND HYPERMARKET DUEVILLE (VI) F.LLI LANDO S.P.A. ALI’ S.P.A. NOVA COOP S.C. 2014 in corso € 2.000.000,00 35 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CENTRO COMMERCIALE SHOPPING TEN TENCAROLA DI SELVAZZANO (PD).. REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF SHOPPING TEN MALL - TENCAROLA SELVAZZANO (PD) REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI RISTRUTTU RAZIONE IPERCOOP CENTRO COMMERCIALE NOVACOOP NOVARA.. REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR THE RENOVATION OF IPERCOOP MALL NOVACOOP NOVARA REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CENTRO COMMERCIALE IPERLANDO A CITTADELLA (PD). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF IPERLANDO MALL IN CITTADELLA (PD) IMPIANTI ELETTRICI, SPECIALI E MECCANICI NUOVO SUPERMERCATO COOP IN CORSO MOLISE A TORINO ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS FOR THE RENOVATION OF IPERCOOP OF CORSO MOLISE TORINO BANCHE E ASSICURAZIONI BANKS AND INSURANCES CIVIDIN CO. S.P.A. 1987-1991 Lire 1.379.979.261 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA SEDE CENTRALE DELLA CASSA DI RISPARMIO DI TRIESTE. v ELECTRICAL PLANTS INSIDE CRT BANK - TRIESTE CASSA DI RISPARMIO DI VENEZIA 1987-1991 Lire 3.867.150.000 CENTRO ELABORAZIONE DATI IN MESTRE (VE) – VIA TORINO. CED CA.RI.VE IN MESTRE - VIA TORINO FOCHI BUINI & GRANDI 1989-1991 Lire 173.224.251 RISTRUTTURAZIONI IN VARIE FILIALI E AGENZIE DEL BANCO DI ROMA DEL TRIVENETO. RESTRUCTURANTION OF SEVERAL AGENCIES OF BANCO DI ROMA VENETO - FRIULI VENEZIA GIULIA - TRENTINO ALTO ADIGE LLOYD ADRIATICO S.P.A. 1992-1993 Lire 143.871.231 RIFACIMENTO DEGLI IMPIANTI ELETTRICI NELLE SEGUENTI FILIALI DEL LLOYD ADRIATICO: PADOVA VIA AQUILEIA E VIA MARCO POLO - RIMINI MESTRE - BOLOGNA. RESTRUCTURATION OF ELECTRICAL PLANTS OF LLOYD ADRIATICO PADOVA - RIMINI - MESTRE - BOLOGNA. IMPRESA ELETTROBETON S.P.A. 1988-1994 Lire 1.438.469.001 SEDE CENTRALE BANCA POPOLARE VENETA IN PADOVA - VIA VERDI RISTRUTTURAZIONE GENERALE. NEW HEADQUARTER OF BANCA POPOLARE VENETA IN PADOVA SEA - SOCIETA’ EDILE ADRIATICA - TS 1995-1996 Lire 1.822.275.782 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA NUOVA SEDE DEL LLOYD ADRIATICO DI ASSICURAZIONI – PASSEGGIO S.ANDREA - TRIESTE. ELECTRICAL PLANTS FOR THE NEW HEADQUARTER OF LLOYD ADRIATICO TRIESTE RIUNIONE ADRIATICA DI SICURTA’ S.P.A. 1995-1997 Lire 149.446.759 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LE FILIALI RAS DI VERONA E TREVISO. ELECTRICAL PLANTS FOR RAS SUBSIDIARY IN VERONA AND TREVISO. CASSA DI RISPARMIO DI VENEZIA 1996-1997 Lire 1.606.978.145 SEDE CENTRALE IN VENEZIA – CAMPO MANIN RISTRUTTURAZIONE TOTALE. HEADQUARTER OF VENICE - TOTAL RENEW SERVIZI ELETTROCONTABILI BANCHE POP. 1995-2000 Lire 2.171.189.468 GESTIONE, CONDUZIONE E MANUTENZIONE PROGRAMMATA IMPIANTI TECNOLOGICI , ELETTRICI ED AFFINI PRESSO IL S.E.C. SITO IN VIA TRANSALGARDO A PADOVA.. MAINTENANCE OF S.E.C. HEADQUARTER - PADOVA HYPO ALPE ADRIA BANK S.P.A 2003-2004 € 307.833,85 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LE FILIALI DI PADOVA VIALE VENEZIA E ROVIGO VIALE DELLA PACE. ELECTRICAL AND MECHANICAL PLANTS FOR PADOVA AND ROVIGO SUBSIDIARY GUERRINO PIVATO S.P.A. 2002-2005 € 6.133.482,44 CESVE 2002 in corso € 677.006,17 IMPIANTI TECNOLOGICI ED ELETTRICI PRESSO IL CENTRO SERVIZI 2000 VENETO BANCA A MONTEBELLUNA (TV). ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER OF VENETO BANCA IN MONTEBELLUNA (TV). MANUTENZIONE IMPIANTI ELETTRICI PRESSO LA CESVE DI PADOVA. MAINTENANCE OF ELECTRICAL PLANTS IN PADOVA. € 5.027.128,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO SEDE CENTRALE ITALIA - TAVAGNACCO (UD). ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER IN TAVAGNACCO (UD) 2006 € 718.045,30 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LE FILIALI DI MODENA -VILLORBA (TV). ELECTRICAL AND MECHANICAL PLANTS BY THE SUBSIDIARY OF MODENA AND TREVISO 2010 € 161.878,50 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LA FILIALE DI PIOVE DI SACCO (PD). ELECTRICAL AND MECHANICAL PLANTS BY THE SUBSIDIARY OF PIOVE DI SACCO IN PADOVA HYPO ALPE ADRIA BANK S.P.A 2005-2006 HYPO ALPE ADRIA BANK S.P.A. HYPO ALPE ADRIA BANK S.P.A. 36 IMPIANTI FOTOVOLTAICI PHOTOVOLTAIC PLANTS COOP 80 S.C.A.R.L. 2011 € 300.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 71,91KWP PALASPORT DI ABANO TERME (PD). 71,91KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF OF ABANO TERME PALASPORT. BOSCHELLO MUSIC STORE S.R.L. 2011 € 200.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 58,00KWP BOSCHELLO MUSIC STORE VIA G. GALILEI MIRANO (VE). 58,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR BOSCHELLO MUSIC STORE - G. GALILEI STREET MIRANO (VE) 2011-2012 € 300.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 130,75KWP SEDE DIADORA SPORT VIA MONTELLO 80 CAERANO SAN MARCO (TV). 130,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR DIADORA SPORT HEADQUARTER - MONTELLO 80 STREET - CAERANO SAN MARCO (TV) 2012 € 160.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 48,96KWP SEDE SICE IMMOBILIARE SRL VIA LISBONA 3 PADOVA (PD). 30,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM FOR SICE REAL ESTATE SRL VIA LISBON 3 PADOVA (PD). 2012-2013 € 680.000,00 N.4 IMPIANTI FOTOVOLTAICI “GRID CONNECTED” PER TOTALI 503,00KWP SU COPERTURE IPERMERCATI NOVA COOP DI BORGOSESIA, NOVARA, SANTHIA’ E TRADATE. N.4 "GRID CONNECTED" PHOTOVOLTAIC SYSTEMS FOR A TOTAL OF 503,00KWP ON THE ROOF OF NOVA COOP SUPERMARKET OF BORGOSESIA, NOVARA, SANTHIÀ AND TRADATE SMA S.P.A. 2013 € 142.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 99,00KWP SU COPERTURA SUPERMERCATO SMA SIMPLY DI PONTEVICO (BS).. 99,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF OF SMA SIMPLY SUPERMARKET OF PONTEVICO (BS) NOVA COOP S.C. 2013 € 183.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 132 KWP SU COPERTURA IPERMERCATO NOVA COOP DI PINASCA (TO) 132,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF OF NOVA COOP SUPERMARKET OF PINASCA (TO) 2013 - 2014 € 100.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 68,75 KWP SU COPERTURA PUNTO VENDITA “IL TULIPANO” DI ODERZO (TV). DIADORA SPORT S.R.L. SICE IMMOBILIARE S.R.L. NOVA COOP S.C. GRUPPO VEGA S.C. 68,75KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF OF "IL TULIPANO" SUPERMARKET OF ODERZO (TV) NOVA COOP S.C. 2014 in corso € 257.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 198,00KWP SU COPERTURA IPERMERCATO NOVA COOP DI CORSO MOLISE (TO). 198,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF OF SUPERMARKET COOP OF CORSO MOLISE (TO). NOVA COOP S.C. 2014 in corso € 135.000,00 IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DA 104,00KWP SU COPERTURA IPERMERCATO NOVA COOP DI COLLEGNO (TO). 104,00KWP "GRID CONNECTED" PHOTOVOLTAIC SYSTEM ON THE ROOF OF NEW IPERMARKET COOP OF COLLEGNO (TO). 37 TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE OFFICE AND RETAIL COGEFAR IMPRESIT S.P.A. 1993 Lire 2.356.999.997 REALIZZAZIONE IMPIANTI ELETTRICI NEL FABBRICATO EX-PALAZZO BORLETTI A MILANO. ELECTRICAL PLANTS - EX BORLETTI PALACE - MILANO TELECOM ITALIA S.P.A 1994 Lire 1.174.473.728 ADEGUAMENTO ALLA L.46/90 DELLE OPERE TECNOLOGICHE PRESSO LA CENTRALE TLC DI BARI. SETUP TO 46/90 LAW OF CED - BARI TELECOM ITALIA S.P.A 1995-1997 Lire 1.640.356.284 REALIZZAZIONE OPERE EDILI, ELETTRICHE E TERMOTECNICHE PRESSO LA CENTRALE TELECOM DI FAVARO VENETO (VE). GENERAL CONTRACTOR - CED - FAVARO VENETO - VE. CAVAGNIS COSTRUZIONI S.R.L. 1997-1998 Lire 2.382.403.569 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI PRESSO LA CASA D RIPOSO “S.CHIARA” DI FERRARA. ELECTRICAL AND MECHANICAL PLANT FOR S.CHIARA HOSPITAL FERRARA. CAVAGNIS COSTRUZIONI S.R.L. 1997-1998 Lire 962.600.501 REALIZZAZIONE IMPIANTI ELETTRICI ADIBITI AL CINEMA AD 8 SALE PRESSO IL C.C. “LA GRANDE MELA” DI LUGAGNANO DI SONA (VR). ELECTRICAL PLANTS FOR CINEMA VILLAGE BY LA GRANDE MELA SHOPPING CENTER - VERONA TELECOM ITALIA S.P.A 1996-1998 Lire 785.515.559 REALIZZAZIONE OPERE EDILI, ELETTRICHE E TECNOLOGICHE PRESSO LA CENTRALE TELECOM DI S.DONA’ DI PIAVE (VE). GENERAL CONTRACTOR - CED - SAN DONA’ DI PIAVE - VE TELECOM ITALIA S.P.A 1998-1999 Lire 986.822.987 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA CENTRALE TELECOM DI TRIESTE. ELECTRICAL PLANTS FOR CED - TRIESTE CIR COSTRUZIONI S.R.L. 1999-2000 € 924.457,84 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO DI ACCOGLIENZA DI MESSIDORO (FE). ELECTRICAL PLANTS - MESSIDORO OFFICE - FERRARA. TELECOM ITALIA S.P.A 1998-2000 € 935.930,46 REALIZZAZIONE OPERE EDILI, ELETTRICHE E TERMOTECNICHE PRESSO LA CENTRALE TELECOM DI SCHIO (VI). CONSTRUCTION WORKS, ELECTRICAL AND AT THE CENTRAL TELECOM TERMOTECNICHE IN SCHIO (VI). PAVAN COSTRUZIONI S.P.A. 1998-2001 € 223.199,74 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA CENTRALE TELECOM ITALIA A PORDENONE. ELECTRICAL PLANTS - TELECOM ITALIA CED - PORDENONE COOPCOSTRUTTORI SOC. COOP. A R.L. 1999-2001 € 2.283.729,39 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO IL CENTRO DI ACCOGLIENZA O.I.C. - MANDRIA - PADOVA. ELECTRICAL PLANTS - OIC LA MANDRIA - PADOVA. SICEA S.P.A.. 2000-2001 € 2.104.124,22 REALIZZAZIONE IMPIANTI ELETTRICI ED AFFINI PRESSO LA TORRE 2 NEL CENTRO DIREZIONALE “LA CITTADELLA” DI PADOVA. ELECTRICAL PLANTS - TOWER 2 - CITTADELLA CENTER - PADOVA. SICEA S.P.A. 2001-2002 € 222.706,51 REALIZZAZIONE IMPIANTI ELETTRICI E SPECIALI PRESSO IL COMMISSARIATO POLIZIA DI STATO NEL CENTRO DIREZIONALE “LA CITTADELLA” DI PADOVA. ELECTRICAL PLANTS - POLICE CITY OFFICE - CITTADELLA CENTER PADOVA VODAFONE OMNITEL S.P.A. 2001-2002 € 122.815,49 REALIZZAZIONE IMPIANTI SPECIALI LOTTO IV E VII PRESSO LA TORRE OMNITEL NEL CENTRO DIREZIONALE “LA CITTADELLA” DI PADOVA ELECTRICAL PLANTS - NEW HEADQUARTER - PADOVA IMMOBILIARE TOMMASEO S.R.L. 2003-2004 € 625.833,97 REALIZZAZIONE IMPIANTI ELETTRICI PRESSO LA NUOVA SEDE PROVINCIALE DELL’INAIL DI PADOVA - VIA NANCY 2 ELECTRICAL PLANTS OF SUBSIDIARY - PADOVA S.V.E.C. S.P.A. 2003-2005 € 671.777,44 IMPIANTI ELETTRICI ED AFFINI PRESSO LA NUOVA SEDE DELLA FACOLTA’ DI ECONOMIA DELL’UNIVERSITA’ DI PADOVA VIA BASSI N. 1. ELECTRICAL PLANTS - NEW BUILDING - UNIVERITY OF PADOVA TIFS INGEGNERIA S.R.L. 2004-2005 € 314.500,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI A SERVIZIO DELL’EDIFICIO AD USO SERVIZI E UFFICI SITO A PADOVA IN C.SO STATI UNITI (NUOVA SEDE DELLO STUDIO). ELECTRICAL AND MECHANICAL PLANTS FOR NEW HEADQUARTER IN PADOVA SINTECO S.P.A. 2004-2005 € 2.371.199,26 38 ESECUZIONE IMPIANTI ELETTRICI E MECCANICI NELL’EDIFICIO AD USO ALLOGGI UNIVERSITARI IN VIA DARSENA A FERRARA ELECTRICAL AND MECHANICAL PLANTS FOR NEW UNIVERSITY SITE LA DARSENA - FERRARA TERZIARIO, RESIDENZIALE, INDUSTRIALE E DIREZIONALE OFFICE AND RETAIL CARMINE S.R.L. 2005-2006 € 768.604,54 ESECUZIONE IMPIANTI ELETTRICI E AFFINI PRESSO LA NUOVA SEDE DELLA AGENZIA DELLE ENTRATE E DEL TERRITORIO VIA TURAZZA (PD) ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER OF INCOMING-TAX AND LAND OFFICES IN PADOVA CARMINE S.R.L. 2007-2009 € 910.000,00 IMPIANTI ELETTRICI E MECCANICI PRESSO LA NUOVA SEDE DELLA CASERMA DELLA GUARDIA DI FINANZA DI VIA S. FIDENZIO (PD). ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER FINANCE CONTROL ARMY IN PADOVA INTERCANTIERI VITTADELLO S.P.A. 2006-2007 € 1.450.000,00 IMPIANTI ELETTRICI E MECCANICI PRESSO EDIFICIO DIREZIONALE RICETTIVO ELECTRICAL AND MECHANICAL PLANTS BY THE NEW CENTER OF VIA PO IN PADOVA IMMOBILIARE MILANESE 2006 S.R.L. 2008-2010 € 2.553.804,44 IMPIANTI MECCANICI PRESSO NUOVO COMPLESSO RICETTIVO POGGIO MECHANICAL PLANTS BY THE NEW TOURIST-CENTER POGGIO DELL’AGNELLO - POPULONIA - PIOMBINO (LI) CO.GE.VI. S.R.L. 2009-2010 € 1.500.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI EDIFICIO DIREZIONALE-COMMERCIALE CENTER ONE VIA BREDA LIMENA (PD). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEMS OF NEW TRADE AND DIRECTIONAL BUILDING - CENTER ONE - LIMENA (PD) BROSS S.R.L. 2009-2011 € 5.700.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI COMPLESSO RESIDENZIALE-COMMERCIALE REDAIS VIA CASAL BERTONE (ROMA). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF RESIDENTIAL AND COMMERCIAL BUILDING REDAIS VIA CASAL BERTONE (ROME) MARINA VERDE S.R.L. 2011-2012 € 3.000.000,00 IMPIANTI MECCANICI COMPLESSO RESIDENZIALE MARINA VERDE WELNESS RESORT, CAORLE (VE). REALIZATION OF MECHANICAL SYSTEM OF RESIDENTIAL BUILDING MARINA VERDE WELLNESS RESORT, CAORLE (VE) TENUTA DI CASTELFALFI S.P.A. 2012 - 2014 € 400.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI COMPLESSO RICETTIVO-RESIDENZIALE I BIANCHI - TENUTA DI CASTELFALFI A MOTAIONE (FI). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF RESIDENTIAL AND RICEPTIVE BUILDING I BIANCHI CASTELFALFI ESTATE - MONTAIONE (FI) TENUTA DI CASTELFALFI S.P.A 2012 - 2014 € 800.000,00 REALIZZAZIONE IMPIANTI ELETTRICI, SPECIALI E MECCANICI CASTELLO TENUTA DI CASTELFALFI A MOTAIONE (FI). REALIZATION OF ELECTRICAL, MECHANICAL AND SPECIAL SYSTEM OF THE CASTLE - CASTELFALFI ESTATE - MONTAIONE (FI) FRIULAIR S.R.L. DUSSMANN SERVICE S.P.A. 2012 - 2014 2013 € 1.300.000,00 € 850.000,00 IMPIANTI ELETTRICI, MECCANICI, ANTINCENDIO ED AFFINI AMPLIAMENTO SEDE E SITO PRODUTTIVO FRIULAIR VIA CISIS FRAZ. STRASSOLDO, CERVIGNANO DEL FRIULI (UD). ELECTRICAL, MECHANICAL, FIRE PROTECTION SYSTEMS OF NEW ENLARGEMENT OF OFFICES AND PRODUCTION SITE OF FRIULAIR VIA CISIS FRAZ. STRASSOLDO CERVIGNANO DEL FRIULI (UD) IMPIANTI ELETTRICI, MECCANICI, ANTINCENDIO ED AFFINI NUOVO CENTRO COTTURA COMUNE DI PADOVA C/O INTERPORTO CORSO STATI UNITI N. 187 - PADOVA. ELECTRICAL, MECHANICAL, FIRE PROTECTION SYSTEM OF NEW COOKING CENTRE OF PADUA INTERPORT - CORSO STATI UNITI 18 NOVA COOP S.C. CARREFOUR ITALIA S.P.A. 2012 - 2014 € 400.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI CENTRALE TERMOFRIGORIFERIA NUOVA SEDE NOVACOOP A VERCELLI FRAZIONE LARIZZATE REALIZATION OF ELECTRICAL AND MECHANICAL HEATING-COOLING OF NEW HEADQUARTER NOVACOOP IN LARIZZATE - VERCELLI 2014 in corso € 115.000,00 RIFACIMENTO IMPIANTO DI RILEVAZIONE FUMI E ALLARME INCENDI IPERMERCATO CARREFOUR C/O CENTRO COMMERCIALE VALLECENTER A MARCON (VE) REALIZATION OF SMOKE DETECTION AND FIRE ALARM SYSTEM OF CARREFOUR HYPERMARKET INSIDE VALECENTER MALL LMARCON (VE) PROVINCIA DEI FRATI MINORI CONVENTUALI DI PADOVA 2014 in corso € 900.000,00 IMPIANTI MECCANICI E AFFINI - RISTRUTTURAZIONE COMPLESSO “VILLAGGIO S. ANTONIO” A NOVENTA PADOVANA (PD) MECHANICAL SYSTEMS - RESTRUCTURING OF COMPLEX “S. ANTONIO VILLAGE” IN NOVENTA PADOVANA (PD) HOFFMANN ITALIA S.R.L. 2014 in corso € 650.000,00 REALIZZAZIONE IMPIANTI ELETTRICI E MECCANICI NUOVA SEDE CENTRALE ITALIA A VIGONZA (PD). ELECTRICAL AND MECHANICAL PLANTS BY THE NEW HEADQUARTER OF VIGONZA (PD). 39 LE NOSTRE CERTIFICAZIONI OUR CERTIFICATIONS Certificazioni ISO Sice, nell’ottica della piena soddisfazione del cliente, ha sottoposto la propria struttura alla certificazione di qualità secondo lo standard UNI EN ISO 9001. Questo traguardo diventa ogni giorno un inizio, in quanto, nell’ottica di un costante sviluppo delle proprie potenzialità, l’azienda tiene costantemente corsi di formazione dedicati al proprio personale, in risposta alla continua evoluzione che la tecnologia impone. L’azienda è inoltre costantemente impegnata a perseguire i più elevati standard di qualità e di attenzione al cliente nel proporre i propri prodotti e servizi. Il rispetto puntuale degli impegni assunti con i propri clienti e il superamento delle loro aspettative costituiscono un obbligo permanente di tutto il team aziendale. Oggi l’azienda possiede sia la Certificazione a norma UNI EN ISO 9001:2008 settore EA 28b relativa alla Progettazione, Installazione e Manutenzione di Impianti Elettrici, Termoidraulici, di Condizionamento e Fotovoltaici sia la Certificazione di Conformità al D.P.R. n. 43/2012 attuazione del Regolamento (CE) n. 842/2006, al Regolamento (CE) n. 303/2008 e al regolamento Tecnico Accredia RT-29 rev. 02 inerente l’installazione di Apparecchiature Fisse di Refrigerazione, di Condizionamento e di pompe di Calore contenenti taluni Gas Fluorurati ad Effetto Serra (F-GAS sec. G.U. n. 93 del 20 aprile 2012). ISO Certifications SICE, caring his customers, obtains the ISO 9001 certification. But this target is only a beginning of a quality process, because all the manpower is costantly updated to the recent technology to apply with special courses and tests. Satisfy and overcoming customer’s target is need by our staff. Today, the company owns both the certification UNI EN ISO 9001:2008 EA 28b on the design, Installation and Maintenance of Electrical Installations, HVAC, Conditioning and Photovoltaic both the Certification of Compliance with the Presidential Decree n. 43/2012 implementation of Regulation (EC) no. 842/2006, to Regulation (EC) no. 303/2008 Technical Regulation and Accreditation RT-29 rev. 02 regarding installation of refrigeration, equipment Air Conditioning and Heat pumps containing certain Greenhouse Effect F-Gas (F-GAS sec. G.U. n. 93 of 20 April 2012). 40 Attestazione SOA SOA Certification L’ottenimento della certificazione SOA e’ una ulteriore conferma della volontà di continuare a crescere anche nell’ambito tradizionalmente proprio delle opere pubbliche. E’ nel DNA di Sice essere un partner affidabile rispetto al committente pubblico, ormai sempre piu’ esigente in quanto al rispetto di qualita’ e tempistiche di progetto. Le categorie generali delle quali l’azienda si può avvalere vanno dalla OG1 (costruzioni edili), OG9 (impianti produzione energia elettrica) OG10 e OG11 (complessi di impianti) fino alla VI classifica (10 mln di euro). Da non sottovalutare la presenza delle classifiche specialistiche OS3 (impianti idrico-sanitari), OS28 (impianti termomeccanici) e OS30 (impianti elettrici e di telecomunicazioni), che certificano la corretta esecuzione di singoli lavori per importi fino alla V classifica (5,165 mln di euro). Obtaining this certification is a confirm to join and develop public works, DNA of Sice is to effort the customers like and to realize in the right time every order. Sice is certified for general construction (OG1), systems of power generation (OG9), public lighting (OG10) and plants (OG11) up to the 6 class (over 10.000.000 €) and specialized in hydraulic plants (OS3), air treatment (OS28) and electrical plants (OS30) up to the 5° class (5.165.000 €). gruppo NEL CUORE DI OGNI GRANDE OPERA IN THE HEART OF EVERY GREAT WORK SICE srl Via Lisbona, 3 - 35127 Padova - Italy tel. +39 049 8286911 - Fax +39 049 8286940 [email protected] - www.siceimpianti.com 45 thh 1969 - 2014 4 PRESIDENTE / PRESIDENT Dott. Ing. Vito Villari AMMINISTRATORE DELEGATO / C.E.O. Dott. Ing. Alberto Villari DIRETTORE TECNICO / TECHNICAL DIRECTOR Per. Ind. Andrea Noventa la soatech s.p.a. organismo di attestazione ORGANISMO DI CERTIFICAZIONE S G Q certificato secondo la Norma UNI EN ISO 9 0 0 1 : 2 00 8 DIRETTORE AMMINISTRATIVO / C.F.O. Dott. Arch. Emanuela Villari