conservation of old buildings in melaka izat hilmi bin mohamed
Transcription
conservation of old buildings in melaka izat hilmi bin mohamed
CONSERVATION OF OLD BUILDINGS IN MELAKA IZAT HILMI BIN MOHAMED SALLEH UNIVERSITI TEKNOLOGI MALAYSIA UNIVERSITI TEKNOLOGI MALAYSIA DECLARATION OF THESIS / UNDERGRADUATE PROJECT PAPER AND COPYRIGHT Author’s full name Date of birth : Author’s full name : Date of birth : : IZAT HILMI BIN MOHAMED SALLEH 6 APRIL 1987 IZAT HILMI BIN MOHAMED SALLEH 6 APRIL 1987 Title : CONSERVATION OF OLD BUILDINGS IN MELAKA : CONSERVATION OF OLD BUILDINGS IN MELAKA Title Academic Session : 2011/2012 Academic Session : 2011/2012 I declare that this thesis is classified as : I declare that this thesis is classified as : √ CONFIDENTIAL (Contains confidential information under the Official Secret Act 1972)* RESTRICTED (Contains restricted information as specified by the OPEN ACCESS organization where research was done)* I agree that my thesis to be published as online open access (full text) I acknowledged that Universiti Teknologi Malaysia reserves the right as follows: 1. IThe thesis is the property of Universiti Teknologi Malaysia. acknowledged that Universiti Teknologi Malaysia reserves the right as follows: 2. The Library of Universiti Teknologi Malaysia has the right to make copies for the purpose of research only. 1. The thesis is the property of Universiti Teknologi Malaysia. 3. The Library has the right to make copies of the thesis for academic exchange. 2. The Library of Universiti Teknologi Malaysia has the right to make copies for the purpose of research only. 3. The Library has the right to make copies of the thesis for academic Certified by : exchange. (Signature) 870406-30-5285 (Signature) Date : * by : MR. BACHAN SINGH A/L BESAWA JAGAR SINGH (Signature) Date : 870406-30-5285 SINGH A/L BESAWA JAGAR SINGH NOTES : (Signature) Certified MR. BACHAN If the thesis is CONFIDENTAL or RESTRICTED, please attach with the letter from the organization with period and reasons for confidentiality or restriction. “I hereby declare that I have read this thesis and in my opinion this thesis is sufficient in terms of scope and quality for the award of Bachelor of Civil Engineering” Signature : Name of Supervisor : Mr. Bachan Singh a/l Besawa Jagar Singh Date : 25 June 2012 CONSERVATION OF OLD BUILDINGS IN MELAKA IZAT HILMI BIN MOHAMED SALLEH A thesis submitted in partial fulfilment of the requirements for the award of the degree of Bachelor of Civil Engineering Faculty of Civil Engineering Universiti Teknologi Malaysia June 2012 ii I declare that this thesis entitled “Conservation of Old Building in Melaka” is the result of my own research except as cited in references. The thesis has not been accepted for any degree for and is not concurrently submitted in candidature of any other degree. Signature : Name : Izat Hilmi bin Mohamed Salleh Date : 25 June 2012 iii Specially dedicated to my mother, my father, my lovely family, my supervisor, friends and lecturers “Thanks for all support, time, love and understanding” iv ACKNOWLEDGEMENTS Alhamdulillah and praise to Allah for His Grace and Mercy, for giving me the strength and guidance to complete the report of “Conservation of Old Buildings in Melaka”. My hardship will be meaningless if I don’t express my gratitude to all the parties that lend me their hands throughout my time here. First of all, I would like to say thanks to Mr. Bachan Singh a/l Besawar Jagar Singh for his encouragement, guidance, critics, advices and motivation. His continuous guidance was the main reason for this project to be done successfully. I would also like to extend my gratitude to examiners, lecturers, and interviewees for their assistance and support throughout the project. In addition, this project will not be completed without the supports I received from my beloved family, Nadiah, and all my friends here. Without them, I’ll probably end up stranded somewhere not knowing what to do. Their supports and guidance will forever be remembered. Thank you very much. v ABSTRACT Melaka, being a historical city, need to conserve the old buildings so that the history of the city can be preserved and narrated to the public. The history of the city depends on the evidence of the existence of buildings constructed in the 15th and 16th century. The conservation of these buildings is not an easy task as the problems of materials used in their construction is no longer available. Furthermore, the structural aspect of the building need to be strengthened and it needs expertise. The objectives of this study are; to identify the procurement methods for the conservation of old building, to identify the building elements that are upgraded or repaired in the conservation process, the problems faced by the municipal council, contractors and building owners in the conservation of old buildings and the treatment methods are being used for building conservation. This study is carried out in the city of Melaka. The study is conducted through interviews and questionnaires. The respondents are the local council, contractors and the building owners. The data is analysed by Average Index. From the study, the types of procurement methods for the conservation of the old buildings are requisition, quotation, open tendering and term contract. The main building elements that are upgraded are windows, doors, ceramic tiles, flooring, roof tiles, granite Edges and timbers. The problems faced by the council are: poor allocation of funds from the state government for conservation projects and materials needed to replace the damaged ones in the buildings are no more in production. The treatment methods being used to conserve the old buildings are damp proofing system using silicone cream to form a barrier against rising damp and grouting for reinforced concrete beam using microcrete to fill up the cavity. vi ABSTRAK Melaka, sebagai sebuah bandar sejarah, perlu memulihara bangunan-bangunan lama supaya sejarah bandar ini dapat dikekalkan dan menceritakan kepada orang ramai. Sejarah bandar ini bergantung kepada bukti-bukti kewujudan bangunan yang dibina pada abad ke-15 dan ke-16. Pemuliharaan bangunan ini merupakan satu tugas yang sukar kerana masalah bahan-bahan yang digunakan dalam pembinaan mereka sudah tiada lagi. Tambahan pula, aspek struktur bangunan itu perlu diperkukuhkan dan ia memerlukan kepakaran. Objektif kajian ini adalah untuk mengenal pasti kaedah perolehan bagi pemuliharaan bangunan lama, untuk mengenal pasti elemen-elemen bangunan yang dinaik taraf atau dibaiki dalam proses pemuliharaan, masalah yang dihadapi oleh majlis perbandaran, kontraktor dan pemilik bangunan dalam pemuliharaan bangunan-bangunan lama dan kaedah rawatan yang digunakan untuk membina pemuliharaan. Kajian ini dijalankan di bandar Melaka. Kajian ini dijalankan melalui temubual dan soal selidik. Responden adalah majlis perbandaran tempatan, kontraktor dan pemilik bangunan. Data yang diperolehi dianalisis oleh Indeks rata. Daripada kajian ini, jenis kaedah perolehan bagi pemuliharaan bangunan-bangunan lama adalah permintaan, sebutharga, tender terbuka dan kontrak jangka. Elemen-elemen bangunan utama yang dinaik taraf tingkap, pintu, jubin seramik, lantai, jubin bumbung, tepi granit dan kayu. Masalah yang dihadapi oleh majlis itu adalah: pengagihan dana dari kerajaan negeri untuk projek-projek pemuliharaan dan bahan-bahan yang diperlukan untuk menggantikan yang rosak dalam bangunan yang miskin tiada lagi dalam pengeluaran. Kaedah rawatan yang digunakan untuk memulihara bangunan-bangunan lama adalah sistem kalis lembap menggunakan krim silikon untuk membentuk halangan terhadap peningkatan lembap dan Grouting bagi rasuk konkrit bertetulang yang menggunakan microcrete untuk mengisi rongga. vii TABLE OF CONTENTS CHAPTER TITLES PAGES DECLARATION OF THESIS 1 2 AUTHOR DECLARATION ii DEDICATION iii ACKNOWLEDGEMENTS iv ABSTRACT v ABSTRAK vi TABLE OF CONTENTS vii LIST OF TABLES ix LIST OF FIGURES x LIST OF ABBREVIATIONS xii LIST OF APPENDICES xiii INTRODUCTION 1 1.1 Background of Research 2 1.2 Research Problems 4 1.3 Objectives 4 1.4 Significance of Research 5 LITERATURE REVIEW 6 2.1 Introduction 6 2.2 To create awareness to the public 6 2.3 The ways of rehabilitating and preserving the buildings 2.4 7 The procurement of nominating the right contractor for the project 9 viii 2.5 2.6 3 repaired in the rehabilitation process 10 The cost of rehabilitating an old building 12 RESEARCH METHODOLOGY 14 3.1 Introduction 14 3.2 Data Collection 14 3.2.1 Literature Review 15 3.2.2 Questionnaire 15 3.2.3 Interviews 16 3.2.4 Preparation Questionnaire 16 3.2.5 Submission of Questionnaire 17 Analysis of Data 17 3.3.1 Average Index Method 17 3.3.2 Percentage Method 18 Conclusion 19 3.3 3.4 4 The building elements that are upgraded or RESULTS AND DISCUSSIONS 20 4.1 Introduction 20 4.2 Questionnaires Response 21 4.3 Interview Questions 27 4.3.1 Interview Answers 28 Restoration Methods 30 4.3.1 Rising Dampness Treatment 30 4.4 4.3.1.1 Saline Diffusion System 30 4.3.1.2 Siliconate Transfusion System 30 4.3.1.3 Siliconate Injection System 31 4.3.1.4 Preparation of Dryzone Damp-proof Course Installation 4.3.2 Grouting of Cavity to R.C. Beam at 31 ix balcony area by using Sika Microcrete 2000 38 4.3.2.1 Method of statement 38 4.3.3 Rebar Embedding 4.3.3.1 Method of statement 39 39 4.3.4 Waterproofing for Flat Roof by Using CL Kote UV Resistant Waterproofing Coating 40 4.3.4.1 Method of statement 40 4.3.5 Waterproofing System for Wet Floor Area 4.3.5.1 Method of statement 4.5 Building Elements Breakdown 5 41 41 45 CONCLUSION AND FUTURE RECOMMENDATION 77 5.1 Conclusion 77 5.2 Future Recommendations 79 REFERENCES 80 x LIST OF TABLES TABLE NO. TITLES PAGES 4.1 Procurement Method 21 4.2 Problems faced by contractors 22 4.3 Problems faced by authorities 23 4.4 Problems faced by building owners 25 4.5 Drill Hole Depths 33 4.6 Material Requirements 36 4.7 Building Elements of Each Lot 45 4.8 Summary of Each Element 48 xi LIST OF FIGURES FIGURE NO. PAGES TITLES 4.1 Drilling Patterns 32 4.2 Drilling Pattern for Cavity Walls 33 4.3 Drilling for Solid Brick Walls 34 4.4 Injection Positions 35 4.5 Grouting of Cavity 38 4.6 Rebar Embedding 39 4.7 Waterproofing for Flat Roof 40 4.8 Waterproofing for Wet Area Floors 41 4.9 Measuring Concrete Moisture Content 42 4.10 System for detecting rebar in concrete structures 43 4.11 Dryzone Damp proofing 43 4.12 StoCrete #4222 Waterproofing 44 4.13 General Elements A 67 4.14 General Element B 68 4.15 General Elements C 69 4.16 Elements in Lot No.10 70 4.17 Elements in Lot No.12 A 71 4.18 Elements in Lot No.12 B 72 4.19 Elements in Lot No.12 C 73 xii 4.20 Elements in Lot No.12 D 74 4.21 Elements in Lot No.12 E 75 4.22 Elements in Lot No.14 76 xiii LIST OF SYMBOLS/ABBREVIATIONS UNESCO - United Nations Educational, Scientific and Cultural Organization SPSS - Statistical Package for Social Science AI - Average Index M.S. - Mild Steel 3D - Three Dimensional M&E - Mechanical and Electrical TBC - To Be Confirmed DPC - Damp-Proof Coating DPM - Damp-Proof Membrane Mm - Millimeter m - Meter UV - Ultraviolet % - Percentage 1 CHAPTER 1 INTRODUCTION In the age of globalization buildings that have been around for the past century is slowly being forgotten. Those buildings that’s been ignored by the modern community have great historical and aesthetical value. Bad weather and the types of materials used in the buildings may be the factors that lead to their destruction. In the future, most of the world’s inhabitants will live in big cities because the numbers of inhabitants in cities are increasing rapidly. The industrialisation, the concentrated activities of the population in the cities and the rapid increase of traffic are the main factors contributing to the increased energy consumption and air pollution in the cities, as well as to the deteriorated environmental and climatic quality. From what have been observed, the planners and architects are more focused on making more buildings and paid very little attention on preserving the old ones. The main point that needs attention is the lack of awareness on the significances of the old buildings of is the main contributors to our urban heritage. Some of the buildings have been subjected to changes or being neglected and left to be swallowed by time. The old buildings found in the city are unique to this area. The main issue to be highlighted is the lack of awareness regarding the significance of the old shop houses as one of the main contribution to our urban heritage, among 2 both the higher authorities and the users. Some of the old shop houses have been subjected to either changes or neglect that damage the essence of the old shophouses. Even though part of the built form can be traced back to Southern China and European countries, the corridor added after 1880s, gives its unique character. Realising its heritage value, some emphasis have been given to the conservation of the old shop houses. The threats, apart from the natural causes include the lack of legislation to protect heritage buildings, economic interest to replace heritage buildings with new ones, lack of funds, conflict of interests and lack of understanding with regards to the values of heritage buildings between the different categories of public. In Malaysia, there are two historic cities in the straits of Melaka, Georgetown and Melaka that have been awarded with “UNESCO’s World Heritage Site. 1.1 Background of Study The biggest single threat to our heritage at present is our modern culture of disposability where our throw-away society is marginalising the past (Heritage of Malaysia Trust 2004). Despite increasing governmental and public concern, in the absence of effective legal protection, Malaysian cultural heritage continues to disappear at an alarming rate. In Malaysia, consciousness with regards to urban conservation is still a new phenomenon. In Kuala Lumpur, for instance, a growing concern among people arose due to the destruction of the urban environment and the threat to some of the city’s familiar and historical landmarks with the consequent alteration of the city’s character. The first public outcry was raised in 1983 (Chen Voon Fee 1989). Despite some efforts by conservation enthusiasts, demolition and unsympathetic changes to the original buildings still continue. In 2003, the President of the Heritage of Malaysian Trust had remarked that the oldest buildings in Malacca and Penang are under threat. Although these historic cities are seeking listing from UNESCO as a World Heritage Site, this destruction is fast spreading to other towns throughout the country (Heritage of Malaysia Trust 2003). The old shop-houses are under threats of extinction. Problems that relate to the destruction of the old shop-houses include the lack in legislation, lack of control within the local governments, modernisation i.e. economic interest to replace the old 3 shop-houses with new buildings, lack of funds, conflict of interests and lack of awareness in regards to the values of heritage buildings between the different categories of public. Apart from those aspects mentioned, the fact that the old shophouses are privately owned also plays a major role to their destruction. According to Jokilehto (1999), conservation in the specialised sense has two aspects: first the control of the environment to minimise the decay of artefacts and material and second, their treatment to arrest decay and to stabilise them where possible against further deterioration. Restoration is the process undertaken when conservation treatment is thought to be insufficient, to the extent of restoring an object without changing it to a condition in which it can be exhibited. Realising the heritage value of the old shop-houses, some emphasis have been given to the conservation of this building type. However, from the exploratory survey, it was found that the efforts in conserving the old shop-houses are still not effective. Some works can simply be called upgrading projects and do not qualified to be called conservation simply because the projects did not undergo the processes as mentioned earlier. Insensitive development both by private sectors and by the local governments can be damaging to the old shophouses. There are several problems encountered in conserving the old buildings. The problems include the lack of craftsmanship and shortage of original materials. For the conservation of Cheng Hoon Teng Temple and Puri Hotel in Malacca for instance, the artists and artisans had to be brought from China simply because the lack of skill locally. This involves costs that presumably not affordable by most owners of the old shop-houses. Secondly, the building materials used in the old shophouses are very rare and not in the production line today (Yongtanit 1997). Such materials are, for instance, baked clay roof tiles, French window with panelled louvered shutters and timber roof structure of the consequence of the development of mass production that causes homogenous building types. 4 1.2 Research Problems The old shop-houses are under threats of extinction. Problems that relate to the destruction of the old shop-houses include the lack in legislation, lack of control within the local governments, modernisation i.e. economic interest to replace the old shop-houses with new buildings, lack of funds, conflict of interests and lack of awareness in regards to the values of heritage buildings between the different categories of public. Apart from those aspects mentioned, the fact that the old shophouses are privately owned also plays a major role to their destruction. Next issue is that Melaka is a tourist hotspot, from locals to tourists abroad. Government and privately owned historical buildings located inside the city is apart of the reason tourist come to visit Melaka. Both parties need to take action to keep the good name of the city but the lack of materials to restore the buildings is becoming a big issue in conserving the buildings. Other issue that comes to mind is that, there are no engineers who are experts in this field. Usually, the restoration architect will be in charge in the decisions made without any reference to the engineering side of the project. No offense to the other professionals, but the engineering side of the project is very important, there is more to this than making the building look good and that is safety. 1.3 Objectives of Research 1- To identify the procurement method for the restoration of old building 2- To identify the building elements that are upgraded or repaired in the rehabilitation process 3- To identify the problems faced by the municipal council, contractors and building owners in the rehabilitation of old buildings 4- To identify some of the methods being used to repair the buildings 5 1.4 Significance of Research The significance of the study is to find ways to make old buildings more appealing to the masses. They say “you don’t know where you are, till you know where you come from”. History is an important aspect in this modern and fast growing society; people should know how to value their heritage. Preserving old buildings are one of them. But in the process of rehabilitating these buildings, they need the right set of professionals that can handle these projects, because the restoration and beautification works are very delicate and intricate. Hiring the right professionals is vital in this kind of work. The next step is how these professionals evaluate the buildings. Whether it is in good inhabiting condition or it is to be left untouched or torn down for safety reason. We need to know the situation before we could do anything to rectify it. After the valuating process is done, the cost of restoration comes into mind, because Melaka strive in the tourism industry and they need these building to look good to the tourist that comes in to tour the city. My hope for this research is to get a better perspective of what are the processes that undergoes in this kind of projects. This is a fairly new industry in Malaysia and to have more professionals in the field would create a healthy competition for restoration projects for old buildings. On the other hand, I also hope that there will be an area of expertise for engineers who are experts in this field of rehabilitation or restoration works for old buildings. 6 CHAPTER 2 LITERATURE REVIEW 2.1 Introduction Literature review was preliminary and main study used to view the related overall study. Literature review is made to obtain background and understanding of research topics beginning of the study title. Understanding of the overall study is important to get information about the study and avoid some of the information obtained will not be in the range of research done. It is also important to integrate all data and information has been obtained. The information required in the preparation of literature review for this study was through journals, articles, websites and former student’s thesis. 2.2 To create awareness to the public about the importance of rehabilitating and preserving the old building According to Wan Hashimah Wan Ismail and Assoc. Prof. Dr. Suhana Shamsuddin, authority leaders, community and developers sees the preservation of historical buildings and sites as an obstacle for modernisation. Citizens of developing nations usually associate rehabilitating with steps backwards; with the usual outcome is the absence of ambition to conserve. Safeguarding is perceived as stagnation or the opposite of progress. As a result, commoners are more proud with advancement, not safeguarding, because advancement is often measured in industrial terms. 7 The study done by Wan Hashimah Wan Ismail and Assoc. Prof. Dr. Suhana Shamsuddin also states that there is also variedness in the public view in different categories of the world (Timothy & Boyd 2003). Most of the Third World countries, the impression of heritage conservation are relatively new. Comparatively, few people appreciate the need for it. The case of conservation will be meaningful when there is a promise of financial benefits. Therefore, it is hard to increase their interests for preserving the heritage, comparable to their basic necessities. According to Lowenthal (1996), in most of the developed world, people have an urge to grow keener in their own heritage as they get older. In thriving regions, however, the elders are not so keen in keeping the past. Instead it is the younger generations who are fascinated in keeping their heritage. According to Burton (1993) in South-East Asia, safeguarding is fundamentally the eagerness of the affluent young; compared to the elders who have little affection to buildings that remind them of their humble beginnings. These arguments, however, need to be proven whether they relate to the old shop-houses as well. The argument of how economical it is to keep the old buildings or to demolish them and build a new one, because the price of the land in town is very valuable. The funds for the rehabilitation project are severely lacking. An on-going investigation is being conducted to clarify this matter. 2.3 The ways of rehabilitating and preserving the buildings that will not harm the building in the process According to Wan Hashimah Wan Ismail and Assoc. Prof. Dr. Suhana Shamsuddin the sequence of stages for heritage conservation involves procedure. Like policy setting, restoration identification of heritage location, management and interpretation research and inventory are all included in the procedures. To suit each circumstance, all of the procedures must can be taken as templates and be adapted individually. 8 According to Jokilehto (1999), preservation in the specialised sense has two components: first is ensuring the environment is under control to minimize the deterioration of the building’s aesthetic and material and second the decay needs to be stabilized and treated whichever possible to protect it from further deterioration. Restoration is the process used when conservation treatment is is not enough, to the extent of restoring an object without modifying or altering it, to a condition in which it can be displayed. Sudden realizations that the old shophouses have heritage value, there have been some importance in conserving this type of building. However, from the some survey conducted, it was found that the efforts in conserving the old shop-houses are still ineffective. Some works seen as upgrading projects and does qualify to be called conservation simply because the projects did not undergo the processes as mentioned earlier. Careless development both by private sectors and by the local governments can severely damaging to the old shop houses. There are a few problem faced in conserving of old building. Some of the problems are the lack of skilled craftsman and the shortage of original materials. For the conservation of Cheng Hoon Teng Temple Trust and Puri Hotel in Malacca for example, the artists and artisans had to be brought in from China because the lack of local craftsmen. The costs involved are presumptively can’t be afforded by the residents of the old shop-houses. Secondly, construction materials used in the old shop houses are very rare and have ceased production today (Yongtanit 1997). Such materials are, for example, baked clay roof tiles, French window with panelled louvered shutters and timber roof structure are the consequence of the development of mass production that causes homogenous building types. As emphasized earlier, the beauty of the shop houses lies in their creation as a group and their scene. The other aspect is regarding the authenticity. According to Mattinen, 1997 in Jokilehto 2002, authenticity can best be experienced as the ambiance of originally incorporated into the building, that is, a certain kind of unchanging characteristic of the building. An attempt to attain authenticity is the evident in the upgrading project of the old shop-houses along Laksamana Street, Malacca. In terms of colour, the choice is to go back to the grey colour as during the 9 Dutch period. Some may indicate that the area is already famous as the Red Square and the choice of colour may make the row of buildings to be out of place. The addition of landscaping and painting of the old shop houses have definitely enhanced the area. These old premises some of them have changed its functions. Some shop houses have been converted to shop and store, restaurants, etc. An example is the corner building in Jonker Street, Malacca which has undergone adaptive re-use to function as a restaurant. The final result is rather admirable. There are reports that some of the old buildings, including the old shop houses are converted as the breeding ground of birds. This is damaging since birds droppings destroy the interior fabric components of the old buildings (Interview with the Executive Director, Heritage of Malaysia Trust, 2003). It should be clear that conservation is the action taken to prevent deterioration, embracing all acts that sustain the life of the cultural and natural heritage. Approaches in conservation include three major aspects, that is, preservation, restoration and renovation. However, the current practice is concentrated more on building conservation and preservation rather than the setting. Affecting the predicament of the old shop houses whose main property is in its group value and setting. It is common to find only a few shop houses in the row to be preserved while the rest were subjected to the repulsive renovation works that totally destroy the aesthetic value of the row of old shop houses. 2.4 The procurement of nominating the right contractor for the project The nominations of contractors for this kind of projects are difficult. The contractors must have the knowledge of constructing or restoring these building back to its original condition without changing or modifying its look. The method that must be used is a specialized ways. The repairing works must follow how the building was built in the old days. The lack of skill locally is a big factor to do this process. Some of the materials used or manufactured materials are currently not available nowadays because it has been discontinued. For instance the window 10 panels that’s been used in the old buildings are not made locally, they must be imported from China. This will not be cost effective because there is no budget allocated for this kind of projects from the local government. According to Highfield (1987), the cost of rehabilitating an existing building will be only 50-80% of the cost of a new construction, resulting in considerable financial savings. Contractors should look into this matter and maybe take an extra initiative to be a pioneer in rehabilitation projects. The advantages are numerous; they will be called for any rehabilitation projects. Melaka and Penang were given the UNESCO’s World Heritage name because of these old buildings. The state government should take this opportunity to gain tourists from all over the world to come and visit their respective states and see the beauty of the old shop-houses. To make this possible is by nominating the right contractors for the job and ensure a satisfying outcome. 2.5 To identify the building elements that are upgraded or repaired in the rehabilitation process According to Young (2008), the goals of the building investigation are to identify character-defining features (elements that enhance the historic qualities) of a building, document existing conditions, and identify sources of decay and deterioration. Through a combination of on-site and archival research, missing features and changes that have occurred through time can also be determined. Based on the findings from these investigations, the desired rehabilitation, preservation, or restoration treatment can be selected. Essentially, the building is the accumulation of its previous usages and reflects the needs of the occupants through time. Character-defining features are identified by how a feature affects the presence of the building on the site and in its neighbourhood context, how one’s awareness of the surface, detail, and form changes as one approaches the building, and how the interior space is perceived due to both surface ornamentation and spatial relationship. 11 Exterior character-defining features may include overall building height, shape, and massing, roof and roof features such as chimneys, roof monitors, projection, such as porches, oriel windows, or bay windows, recesses, such as galleries, arcades, or recessed porches and balconies, openings, such as windows and doorways, and various exterior materials that contribute to the building's uniqueness. The building's condition directly affects the scope and cost of work. Obtaining a valid condition assessment before starting design or construction is critical. Two indicators that contribute to the immediate perception of potential cost are structural integrity and moisture damage. Initially, preliminary assessments are made of the overall building envelope, structural construction, and other architectural features to determine if they are in sustainable condition to proceed with the proceed with the proposed work or if they need major a alterations. A common approach used to initiate a project is a simple walk through of the building and site. In this approach, a preliminary assessments of the conditions and the extent of deterioration from the initial decision to either pursue or to stop further plans. Depending on the complexity of the building and the expertise of the parties involved, this phase may be completed in as little as a few hours. With current digital technology, it is possible to take notes and photographs as needed to summarize both overall and specific problems and opportunities. The walk through enable the team to form initial opinions about proceeding with the project and often allows the identification of systems and building elements in need of stabilization or temporary protection before a more formal and detailed inspection can safely occur. If the findings from the preliminary walk through are positive then the next step is the reconnaissance survey, in which the conditions are studied more closely. Note-taking and photography becomes more systematic and formal at this point since they will be used to prepare more detailed reports that will be used in the overall condition assessment. This phase includes both a thorough exterior envelope and structural assessment and an interior room-by-room analysis. Any number of consultants maybe used for work as need for specific expertise is identified. The complexity of the work Proposed and the historic significance of the building will 12 dictate the length of time and number of disciplines involved. This phase may take as little a few days or as much as several months or more. This survey can be a combination of visual and hands on inspection methods that include surface mapping, non destructive testing, and material sampling for laboratory analysis. The goal is to asses’ physical condition and sources of decay. Treatments addressing only the symptoms of the problem ultimately fail in the cause of decay is not corrected. 2.6 The cost of rehabilitating an old building According to Norman Tyler (2000), the cost/benefit financial analysis for rehabilitation of a historic property is typically more complicated than for new construction, and a number of factors must be considered. Someone once described historic preservation as a very expensive art form. Historic buildings "are vehicles of culture and in their evolved states, whole works of art, in whose intangible elements the true value lies, because it is there we find the signs of life". (Adele ChatfieldTaylor, "From Rouskin To Rouse,"29). Rehabilitation can seem as an expensive option for a commercial developer, for there are drawbacks to rehabbing older structures; space not easily adapted to current needs, problems of deterioration not apparent at the beginning of work, difficulty in finding appropriate construction materials. Yet rehab can also pay. Studies show that rehab can save money compared to new construction. According to one study, rehabilitation cost per square foot is often significantly less than the cost of new construction. At a conference, a study shows that the cost for rehabilitation of structures generally runs 25-33 percent less than a new construction project. In addition, rehabilitation oftentimes bypasses lengthy development review processes, local neighborhood opposition, and zoning delays. (Reprinted From Thomas D Bever, "Economic Benefits of Historic Preservation," in Norman Williams, Edmund H Kellogg, and Frank B Gilbert (eds.), Reading in 13 Historic Preservation: Why? What? How? (New Brunswick, N.J.: Center for Urban Policy Research, 1983) The costs of rehabilitation can be seen in other ways as well. As government study found that rehabilitation construction uses 23 percent less energy than new construction, the primary reason being that the work is more labour intensive than material intensive, depleting fewer natural resources. (Thomas D Bever, “Economic Benefits of Historic Preservation," 81) The cost of rehabilitation can be calculated in a number of ways. Initially, a project architect gives preliminary estimates based on prices from similar projects, also incorporating figures from costs-estimating books. Typically, a preliminary cost based on an overall per-square-foot value. This quick and easy approach generalizes many of the project details. The square-foot amount can also be obtained by talking to builders or realtors in the area, who can estimate it based on their experience with similar project. 14 CHAPTER 3 RESEARCH METHODOLOGY 3.1 Introduction Prior to execution of the work of a study, one must be careful in planning to ensure smooth implementation of the study and organized. Without careful planning, many problems will arise, particularly in terms of time management. Therefore, a survey methodology should be designed to show the work flow that occurs from the start of the study until the study found. The methodology of the study is a matter that describes the method used to obtain information related to the study or to meet all the requirements for carrying out the research study. For this study, problems that range are to obtain information relating to how the selection of contractors, ways to rehabilitate a building, the evaluation of old building whether it is still in good or bad condition, to find the cost of rehabilitating a building and other problems faced during the rehabilitation work. So a good methodology should be designed so that the goals and objectives of the study set to be executed. 3.2 Data Collection There are is several methods that can be used to collect all data and information obtained to complete this study. In this study, data collection is divided into several parts. The first part is the interview process and the second is through a questionnaire survey form. But in both this section will be broken into several stages of implementation so that the study can be implemented systematically and smoothly. Interviews will be conducted on clients such as the Municipal Council, contractors 15 and building owners. Whereas for surveys, it involves the preparation of questionnaires, the identification of respondents, sending and receiving questionnaires. Research for each stage is very important that the data obtained can be used to make conclusions on each of the objectives of the study. 3.2.1 Literature Review Literature review was preliminary and main study used to view the related overall study. Literature review is made to obtain background and understanding of research topics beginning of the study title. Understanding of the overall study is important to get information about the study and avoid some of the information obtained will not be in the range of research done. It is also important to integrate all data and information has been obtained. The information required in the preparation of literature review for this study was through journals, articles, websites and former student thesis. 3.2.2 Questionnaire The questionnaire is one of the important methods to obtain data and information related to the research conducted. Provision of questionnaires to a specific respondent is one way to collect information related to the rehabilitation of old buildings. Questionnaires are provided must be detailed and easy to understand by the respondents. Content of questionnaire focuses on the objectives of the study is made. Number of questionnaire survey forms was distributed to respondents who were identified as clients, contractors, and building owners. This form will be distributed to respondents in several ways, through the postal service, email and also send it to the respondents and will be collected again as soon as possible. 16 3.2.3 Interviews Interviews conducted for this study involves two parties, between the developer of the old buildings as a client and contractor. The client selected because they are the party that will conduct the research of the building and evaluate on how to do the project until it is completed. The main purpose of this interview method is to obtain relevant information and support in addition to the information that was obtained from questionnaires that have been made. 3.2.4 Preparation Questionnaire This stage is a continuation of interviews that have been implemented. Information obtained at this stage is more structured and accurate, if compared to the information at the interview. This is due to collect data that was formed involving more respondents and the information obtained is comprehensive. Preparation of the questionnaire forms the main strength of this study. Choice questions included in the questionnaires should be able to achieve goals and meet all the objectives that were made. Preparation of the questionnaire forms refer to the interviews and discussions with supervisors. Each set of questionnaires provided is broken into two parts, Part A and Part B. The following stated goals for each division: i. Part A is the process to obtain information concerning the respondent's background in contract procurement by means of how to rehabilitate a building and respondents identified the contractors, authorities and building owners. ii. Part B is to get information about the views and problems faced of contractors, authorities and building owners on the rehabilitation process. 17 3.2.5 Submission of Questionnaire The process of research can be done after the respondent has been set. There are two methods used in performing this study is; i. Delivery of questionnaires through their own means of delivery. ii. Delivery of questionnaire through mail. For part (A), a total of 10 selected respondents to answer the research being done. While for part (B), the total of 10 respondents consisting of a contractor, authorities and building owners who will answer the research is being done. Both these methods are used for the next process of data analysis. For part (B) four questionnaires will be handed out to the authority, four to contractors and two to building owners. 3.3 Analysis of Data At present, data analysis can be done using a computer based on a variety of software has been developed. Among the software most often used for the analysis were as software Statistical Package for Social Science (SPSS). In addition, there is also a method of analysis using the appropriate average Index conducted for this study because it is easier to use, easy to understand compared to SPSS. 3.3.1 Average Index Method In this study, the average index is used to determine the order obtained based on the opinion of the average respondent. Each factor has 5 hierarchical level of interest it was decided that the most important hierarchy factors and decreased 5 represents the lower level of significance. However, in the form of questionnaires, these factor based on the proposed form of questions. However, the concept of hierarchy remains the same degree of importance. Therefore, the calculation of the average index is based on the following formula: 18 Average Index, (AI) = ( 𝑎𝑖 𝑋𝑖/ 𝑋𝑖) Percentage of Average Index, (AI %) = ( 𝑎𝑖 𝑋𝑖/ 𝑋𝑖) (100%) In which, 𝑎 = constant, which indicates the weight given to each response. (𝑎 = 5, 4, 3, 2, 1) depending on the questions raised. 𝑋 = frequency of respondents for each constant. 𝑖 = number of proposed factors. After all factors considered, then the next step is to arrange these factors in declining order. Index will be placed in the order of the largest average on top and the lower average index at bottom of the order. From this order, please note that the factors that are located at the top is the most important factor for each section to be studied and then the factors involved will be classified according to their level. Here is an example of a constant (a) used to form a questionnaire. However, this constant depends on the requirements questionnaire. User: 5 = strongly agree 4 = agree 3 = moderate 2 = disagree 1 = strongly disagree 3.3.2 Percentage Method After the data is taken; this data will be analyzed using the percentage method of analysis which is illustrated by the pie chart or bar chart. The data collected made comparison with the literature review in Chapter 2. The results obtained are discussed and the information thus concluded the results obtained. Percentage = Number of Respondents Who Answered The Questionaire Total Respondents × 100% 19 3.4 Conclusion The process of data collection is done by using survey questionnaires are based on literature review, objectives of the study, and discussions with supervisors and the results of an interview with the contractor, consultant, and also the city council. Complete analysis can be acquired in Chapter 4 is devoted to the analysis of data only. 20 CHAPTER 4 RESULTS AND DISCUSSION 4.1 Introduction This chapter is the part of the study where the data will be presented and analysed. From the study been done there will be a set of questionnaires, interview, and suitable materials to support the findings. A total of ten questionnaires have been handed out to four member of the conservation committee from the state government, four have been handed out to contractors and two to the owners of a building that is being conserved. All of the participating respondents cooperated well and shared their experiences during the conservation process. Also the relevant materials to support what is being done also will be presented in this chapter. There will be some methods that being used in the conservation process for example, waterproofing systems, grouting and more. 21 4.2 Questionnaires Response The questionnaire is divided in to three parts; A, B, and interview questions. Part A will be answered by all respondents. Part B is different because it is been broken down to three types. The types are for authorities, building owners and contractors. There is ten questions being asked as part for the interview. Here is the result of the survey and interview session. Table 4.1: Procurement Method 1 - Strongly Disagree 5 - Strongly Agree Section A - To identify the procurement method for the maintenance of old building 1 2 3 4 5 AI 0 0 0 0 0 0 0 0 10 10 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0 0 10 5 0 0 5 Q1. Procurement Method frequently used to rehabilitate the buildings a) Requisition b) Quotation c) Tender i) Open ii) Restricted iii) Selected d) Term Contracts This part was answered by all ten respondents. Table 4.1 shows that the method of procurement used is through requisition, quotation, open tender and term of contracts. Requisition is a request by a party for a project, in this case the party is usually the government and they will pay for the owners for the requisition, usually not a big project, maybe for repair works. Next is quotation, contractors need to submit a quotation if they want to gain projects. Other than that, the method of open tender, where a number of contractors will try to bid for a project through tendering for the project, the most suitable contractor will be awarded with the project. Next method is term of contracts, where contractors will be paid after the project is completed in a lump sum. To sum up, restricted and selected tendering is not used to award a project. 22 Table 4.2: Problems faced by contractors 1 - Strongly Disagree Section B (Contractors) - Problems faced by contractors in the rehabilitation of old buildings Q1. Unable to obtain materials Q2. Few suppliers Q3. Lack of capital Q4. Poor cooperation from building owners Q5. Short duration to complete work 5- Strongly Agree 1 2 3 4 5 AI 0 0 0 4 4 0 0 2 0 0 0 0 0 0 0 4 4 2 0 0 0 0 0 0 0 4 4 3 1 1 This part was answered by four contractors. Through table 4.2 it shows that contractor faces a problem with obtaining materials and suppliers. Next is the lack of capital is a problem for half of the respondents and the other half doesn’t seem to be bothered by the issue that much. Moving on, there is no issue between contractors and building owners. Finally the contractors don’t agree with a short duration to complete their tasks. The problem with the materials it is hard to obtain because some of them are no longer being manufactured and back then maybe it was imported into Melaka. This is incoherent with the lack of suppliers for these materials. For example the floor tiles used in the building is no longer manufactured. Next issue is the lack of capital. This comes down on how the project was awarded to the contractors. If the owners used the term contracts as the method of procurement, then the contactors must use their own money to complete the project but if the method of payment id progressive payment, the contractor won’t face too much problems because they can claim their payment whenever a target is achieved. Next, the contractor doesn’t seem to have problems with the building’s owner maybe because the owners understand what needs to be done for the project to be completed. Finally about the short duration for work to be completed, the contractor does not agree because the time needed to complete a project is a long time because it takes time to get the works done right. Each conservation project is unique in its own way because some just needs a little touch-up and some needs a lot of refurbishment work done. 23 Table 4.3: Problems faced by authorities 5 – Strongly 1 - Strongly Disagree Agree Section B (Authorities) - Problems faced by authorities in the rehabilitation of old buildings Q1. Difficulty to identify buildings to be rehabilitated Q2. Rehabilitation of old buildings is a waste of money Q3. Poor cooperation from building owners Q4. Poor allocations of funds from the government Q5. Main components that needs repairing: a) Roof b) Roof beams c) Columns d) Gutters e) Ceramic f) Windows g) Doors h) Flooring i) Stairs j) Timber k) Granite l) Beams 1 2 3 4 5 AI 4 0 0 0 0 1 4 0 0 0 0 1 0 4 0 0 0 2 0 0 0 4 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 This part is being answered by four respondents of the authorities. Table 4.3 shows that there is no problem in identifying buildings to be rehabilitated. Next question shows that the rehabilitation is a waste of money is not true. Moving on, it shows that the authorities don’t have that much of a problem with building owners. Next, it shows that there is a poor allocation of funding from the government for rehabilitation projects. Finally it shows that all building components need repairs. Firstly, the authorities do not face problems regarding how to identify buildings that needs conserving. This is because there is a conservation zone, and in this conservation zone, the building needs to be conserved because it is under the conservation law of UNESCO. They will have a procedure on how to asses a building that needs conserving. They will need the architect to come up with a 24 dilapidation report for the building to be conserved and the conservation work starts form there. Second issue is that some party seems that conserving the building is a waste of money and a step back in a world of modernization. The authorities seem to think otherwise because they need to conserve these buildings because it attracts tourists from in and around the world. Melaka is a state that runs on tourism and with these conservation projects, it will boost the tourism industry, with that they don’t see it as a waste of money, more like an investment for the tourism industry. Next is the matter with the building owners. The authority does not have any problems with the building owners. This is because the authority will help the owners throughout the course of the project. Moving on is the issue of funding from the state government. Seem that they agree with the statement that there are insufficient financial allocations for these conservation projects. Some of the projects need a large amount of investment for it to be completed and with the current allocation it doesn’t give the authority the freedom to manage many projects. Finally regarding the building elements that need repair is mostly all of them, from top to bottom. Generally all of the components listed needs repairs. The breakdown for this will be presented latter in this chapter with the example of a breakdown table that shows components that needs repairs and replacements. 25 Table 4.4: Problems faced by building owners 5 – Strongly Agree 1 - Strongly Disagree Section B ( Private Building Owners ) - Problems faced by private building owners in the rehabilitation of old buildings 1 2 3 4 5 AI 0 2 0 0 0 2 0 0 2 0 0 3 2 0 0 0 0 1 2 0 0 0 0 1 0 0 0 0 2 5 b) Roof beams 0 0 0 0 2 5 c) Columns 0 0 0 0 2 5 d) Gutters 0 0 0 0 2 5 e) Ceramic 0 0 0 0 2 5 f) Windows 0 0 0 0 2 5 g) Doors 0 0 0 0 2 5 h) Flooring 0 0 0 0 2 5 i) Stairs 0 0 0 0 2 5 j) Timber 0 0 0 0 2 5 k) Granite 0 0 0 0 2 5 l) Beams 0 0 0 0 2 5 Q1. Difficulty in looking for funding. Q2. Difficult to find qualified contractors to undertake projects Q3. Poor cooperation from authorities. Q4. The condition of the building is beyond repair Q5. Main components of building that needs repairing/replacement: a) Roof This part was answered by two building owners. The first question shows that respondents don’t have an issue with funding. Second question shows that there is a problem looking for qualified contractors to undertake the projects. The next question shows that there is no problem working with authorities. The fourth question shows that the building is not beyond repair. Finally, all building components need repairs. 26 Firstly, the owners do not have problems in funding for the conservation project because it is privately funded and some help from the authority. Major investment comes from the owners and if needed some from the authority. The next issue are regards to find the right contractors to undertake the project. This is not a conventional construction project it is a conservation project, the original building can’t be demolished to make way for a new building. It is very tedious and intricate works that need experts to give consultation to what needs to be done. In the interview this question will be answered. Moving on, there is no issue with the authority because the authority helps them every step of the way in the conservation process and giving good input on how to finish the project successfully. Next issue on hand is the building is not beyond repair. The owners agree that the building can salvaged from its current condition back to the glory days. The owners understand that work needed to be done and they are fine with it and they have resources to make that dream into reality. Finally the all components listed needs to be repaired or replaced. There will be a table to describe what needs to be done with the mentioned building components. 27 4.3 Interview Questions 1. What are the main problems faced? 2. What is the financial range to rehabilitate the building? 3. How do you assess the building if it needs restoration? 4. Is there any kind of targets that you must achieve annually in this kind of projects? 5. Are there many contractors that do these kinds of projects? How was the performance of the contractors? 6. Is there any special funding from the government for these kinds of projects? 7. What is the average time needed to complete the projects? 8. Who carry out the design work? 9. Difficult component of the building to be rehabilitated? 10. How do you deal with the building components that have been changed to a more advanced technology of its time? 28 4.3.1 Answers 1. From what the interview has produced the main problem faced is the safety of the structure. The structure must be analyzed thoroughly and in detail to ensure that the building is safe to be rehabilitated. The next problem faced is finding the exact replacement for some part for the building for example the crafted wooden windows, the crafted partitions, just to name a few. Other than that, the growth of plants in the building and some living animals such as birds and strays. The main problems that are being highlighted by all parties are searching for the replacement for parts of the buildings. 2. From the interview conducted all parties’ mention the price of rehabilitating the buildings varies because all of the cases are unique in its own way. Some of the buildings are well kept because it is still taken care of by family members who inherited the building from their elders and some are left to be swollen by time. It depends on the nature of the project. The building size and approach that will be used. Is it pure conservation works, repair works, alteration of the existing building or an adaptive reuse. What is meant by adaptive reuse is that the building owner can change their lot into a business lot for example the owner changes his lot into a boutique hotel. 3. In the interview all parties mentioned that they must make a dilapidation report of the building and must be sent to the authority for approval. In this process, the party who wants to rehabilitate must sent together the dilapidation report with the scope of work that needs to be done, the conservation approach and method how the conservation process will be conducted. Without the authorities’ approval they can proceed with the next stage of the project because most of the buildings are located in the conservation area. 4. This question was directed to only the authority. Their reply is no. there is no target on how many conservation projects that needs to be done annually because this thing needs time and they can’t rush into making decisions that will benefit them only. 29 5. This question was directed to the local authority and the building owners. The authority mentioned that there are only nine contractors who are qualified to do conservation works and so far they have performed well and within regulations. The owner’s response was that the contractors was performing well and doing the job very carefully and patiently, they said they were happy with the works that have been done and they don’t mind the time the contractors needed because they fully understand the work that needs to be done. 6. There are funding from the state government for this kind of projects. Every year, the state government will allocate a certain amount of fund for conservation projects, but the projects are never fully funded by the government. It is a joint effort from the building owners and the government where the majority of the funding comes from the owner of the buildings. The government funds will aid some of the project cost not all of it. It’s like the funds are for emergency cases only. 7. There is no specific time that a conservation project needs to be completed. All of the projects are unique in its way. Some projects may take longer time because the work that needs to be done is a lot or maybe intricate and some may have a shorter period because the works that needed to be done is not that difficult. 8. The design works will be carried out by the conservation architect with the approval of the owners and the final approval from the conservation committee. 9. The difficult component that needs rehabilitating is usually the structure of the building. All of the respondents agree that the structural aspect is the most challenging. They gave examples of the settlement problems the buildings had. They need to rectify the structural issues before they can proceed further with the project. 10. The response was that they will change to a more subtle technology. For example the M.S. window louvers, back in the day there were no such thing as a M.S. louvers, back in the day there were only wooden louvers. 30 4.3 Restoration Methods This section will discuss about some of the methods being used in the rehabilitation process. Just to highlight that the parties involved can’t change the originality of the building because it is protected under the UNESCO Conservation act. 4.3.1 Rising Dampness Treatment 4.3.1.1 Saline Diffusion System This is the very latest in damp proofing utilising a concentrated, thixotropic silane / silicone cream to form a barrier against rising damp. As the cream slowly diffuses, it releases a silane vapour which reacts with the silica in the masonry to form a water repellent resin. No liquid is involved so the wall is dries quicker and it is not injected under pressure so there are no problems with party walls. It is particularly recommended for: i. Walls of any thickness ii. Brick or stone iii. 280mm cavity brick walls iv. For both external and internal use 4.3.1.2 Siliconate Transfusion System Developed more than 40 years ago, the transfusion system has proved the most universally applicable method of installing remedial dpc. The gravity fed transfusion units allow a slow, even distribution of the siliconate fluid into the wall and unlike pressure injection, there is no wastage via hidden fissures or voids. It is suitable for i. Walls of any thickness ii. Brick or stone 31 iii. Rubble filled walls iv. Cavity walls, from one side only of needed 4.3.1.3 Siliconate Injection System This method is recommended on occasions, primarily on 112mm single brick walls, injecting the fluid into the wall with a single lance under low pressure. 4.3.1.4 Preparation of Dryzone Damp-proof Course Installation 4.3.1.4.1 Pre-installation Procedure Important: before undertaking any work it is essential to check the following 1. Check all cavities, where present, for debris which may cause bridging of the damp-proof course 2. Ensure subfloor ventilation is adequate where timber suspended floors are installed. 3. Lower ground levels where necessary. 4. Remove perished/damaged external plinths and cut any external rendering back to above the height of the DPC line. 5. Remove all floor covering and furniture. 6. Remove floorboards if appropriate. 7. Remove timber skirting and architraves. If they are to be refixed put to one side; remove all fixing grounds. 8. Remove all plasterwork to a minimum height of 1 metre or to 500 mm above evidence of dampness/ contamination with hygroscopic salts. 9. Ensure that plants, paths and glass are protected from spillage. 32 10. Check level of any adjoining solid floor which may be present and ensure that proposed DPC line is not bridged. 4.3.1.4.2 The Drilling Programme 4.3.1.4.2.1 Line of the Damp-proof Course 1. All damp-proof courses should be installed not less than 150 mm above external ground level. 2. The intended line for the damp-proof course should be exposed and clearly defined, taking into consideration internal and external ground levels, party and abutting walls, and changes in ground levels. Internally, where a solid floor is present, the DPC should be inserted as close as possible to floor level. In all cases there should be continuity between the injected DPC and any damp-proof membrane of a solid floor, where suspended timber floors are encountered the DPC should, if possible, be inserted below the timbers. 4.3.1.4.3 Drill Hole Size, Depth and Location For treatment to be fully effective the correct volume must be introduced. The system requires 12mm diameter holes to be drilled at horizontal centres no greater than 120mm. The depth of hole required for various thickness of wall. For all other walls the depth of hole should be to within 40mm of the opposite face. In all cases the most effective target site is to drill horizontally directly into the mortar course, preferably at the base of all perpends of the selected course. Drilling pattern for Double Flemish Bond Drilling pattern for Stretching Bond Figure 4.1 Drilling Patterns 33 Table 4.5: Drill Hole Depths 4.3.1.4.4 Drill Preparation Measure the thickness of each wall to be treated. Set the depth gauge of the drill or apply tape to the drill bit in order to identify the correct drilling depth accordingly. 4.3.1.4.4.1 Drilling Cavity Walls Cavity walls may be drilled/treated from one side in a single operation or if preferred each leaf may be treated separately. When undertaking treatment from one side drill completely through the selected mortar coarse, allow drill bit to pass across the cavity and then drill the other leaf of brickwork to a depth of 90mm. the viscosity of silane is such that it is possible to treat each leaf from a single drilling operation. Always ensure that the cavity is clear before treatment. Single drill from one side for cavity walls Figure 4.2: Drilling Pattern for Cavity Walls 34 4.3.1.4.4.2 Drilling Solid Brick Walls In virtually all cases solid brick walls may be drilled/ treated from one side only in a single operation. Drill the selected mortar course at the prescribed centres to the appropriate depth in accordance with the table above. Figure 4.3: Drilling for Solid Brick Walls 35 4.3.1.4.5 Examples of Injection Positions Please note: Ideally inject below timber suspended floors. Where timber above and below injected damp-proof courses exist action must be taken to protect them from decay. Figure 4.4: Injection Positions 36 4.3.1.4.6 Material Requirements Table 4.6: Material Requirements 37 4.3.1.4.7 Making Good after Treatment IMPORTANT: The insertion of a chemical damp-proof course does not dry out already damp walls; it only controls the further vertical ingress of moisture from the ground. Therefore, if possible, delay the attendant works for as long as feasible to facilitate the maximum possible period for drying. 1. Provide good ventilation to allow drying of the wall. 2. Ensure that the damp-proof membrane (DPM) of any new solid floor overlaps with the inserted damp-proof course. If necessary join the DPM with the DPC by the use of a pitch epoxy material or similar. If no DPM is present run Safeguard SWS Slurry out across the solid floor for 50-100 mm and up the wall to overlapwith the DPC. 3. Replaster strictly in accordance with the “Replastering Specification”. 4. Refix timber skirtings after applying a liberal coat of bonding agent to their backs and base. Similarly,when dry apply two coats of bituminous paint to the backs and base. Fix using plastic grounds. If timber grounds are used these must be first worked to size then thoroughly treated with bonding agent prior to fixing. 38 4.3.2 Grouting of Cavity to R.C. Beam at balcony area by using Sika Microcrete 2000 4.3.2.1 Method of statement Figure 4.5: Grouting of Cavity 1. Identify unsound concrete, chip to remove the loosed particles until solid base is obtained by using chipper hammer. 2. Clean entire surface by steel brush followed by high pressure water blasting. 3. Erect formwork as per size of exposed substrate. 4. Mix Sika Microcrete as per manufacturer’s specifications and instructions :a. Add 4.4 litre of water into a container. b. Add it into the container slowly, and start to stir by using electrical tool. c. During mixing process, add water and Sika Microcrete 2000 into bigger container simultaneously. Mix until uniform mortar is obtained. 5. Damp the concrete surface whiles the mixing process in action. Prime bonding agent base material. 6. Filling up cavity by form and pour method. Care should be taken to prevent air void trapped during grouting. 7. Allow 28 days full cure prior to dismantling of formwork. 39 4.3.3 Rebar Embedding 4.3.3.1 Method of Statement Figure 4.6: Rebar Embedding 1. Drill the rebar holes according to Hilti specifications 2. Clean the drilled holes thoroughly by using steel brush and blow out dust by using air blower. 3. Insert Hilti HY-150 Geo-Polymer cartridge into MD-2000 dispenser. 4. Pump the content of HY-150 into the drill hole 5. Shaft in cut to length bar into the hole. 6. Wait for chemical to dry in 1 hour time full cure prior to casting concrete. 40 4.3.4 Waterproofing for Flat Roof by Using CL Kote UV Resistant Waterproofing Coating Figure 4.7: Waterproofing for Flat Roof 4.3.4.1 Method of Statement 1. Remove bitumen, oils, dusts, rust loose particles, brittle parts, and laitance. 2. Repair damaged substrate and shrink holes first with with suitable repair material. All corners to be filled up using cement sand to form angle fillet 3. After hardening and curing period of 24 hours, apply CL Primer P1. First coat of weather resistant acrylic waterproofing coating CL Kote 22 to be applied one day later after primer coat. 4. The second comes with fabric to be applied wet on wet or within period of 24 hours after first coat. Use spike roller to release air trapped if notice air bubble during or after application. 5. Apply finishing coat within 24 hours after second coat. 41 4.3.4.2 Rectification Work 1. To add one more coat or layer on top of leaking are; and 2. To seal up water seepage at the soffit slab by PU injection method. 4.3.5 Waterproofing System for Wet Floor Area 4.3.5.1 Method of Statement Figure 4.8: Waterproofing for Wet Area Floors A) Pre-treatment of Substrate All substrate to be coated with Stocrete #4222 must be cleaned and structurally sound. Remove all dirt and contaminants, repair all crack and joint leakage with Ispo Concretin PLUG. Prepare angle fillet around all up-stands. B) Mixing of Stocrete #4222 1. Damp the surface before application of Stocrete #4222 2. Add Stocrete #4222 powder gradually to the liquid polymer and mix thoroughly to a consistency of heavy batter, 42 3. For the first coat, apply a minimum of 1kg/m2 . Application is best suited to a stiff brush. 4. Allow 8 hours or more between coats. 5. Apply a second coat, preferably at 90° to the first coat at a minimum uniform rate of 500gms/m2. Figure 4.9: Measuring Concrete Moisture Content 43 Figure 4.10: System for detecting rebar in concrete structures Figure 4.11: Dryzone Damp proofing 44 Figure 4.12: StoCrete #4222 Waterproofing System 4.5 Building Elements Breakdown Table 4.7: Building Elements of Each Lot Not Original Poor Condition M.S.*1 Gutter M.S. Gutter 2 Building Elements Original Fair Condition Good Condition Action Lot No. 10 External MS Door TBC*4 M.S. Collapsible Grille Plaster Arches & Central Keystone Louvers Window w/ Fanlights 3D*2 Plaster Wall w Intensive use of Chinese & European Decorations Roof "Di Shui" Timber Window Timber Window 2 To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To remove, make good area & install new item to match original To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To remove, make good area & install new item to match original To remove with care, repair area affected by item for new design installation 45 Building Elements Original Timber Panels Cement Screed Flooring Not Original Poor Condition Cement In-print TBC Cement In-print 2 TBC Granite Edge Interlocking French Tiles Interlocking French Tiles 2 Chimney Corrugated Metal Roof Corrugated Metal Roof 2 Fair Condition Good Condition Action To remove, make good area & install new item to match original To remove, make good area & install new item to match original To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To retain, repair, make good and refinish To retain, repair, clean, make good and refinish To retain, repair, make good and refinish To remove, make good area & install new item to match original To remove, make good area & install new item to match original To remove with care, repair area affected by item for new design installation 46 Building Elements Vent Pipe Original Not Original Poor Condition Fair Condition Good Condition Action To remove, make good area & install new item to match original To retain, repair, make good and refinish Ceramic Baluster TBC Ceramic Baluster 2 TBC To remove with care, repair area affected Ceramic Air Vent Ceramic Air Vent 2 To remove, make good area & install new item to match original To remove, make good area & install new item to match original Ceramic Roof Tile TBC Mural TBC Roof Ridge Wooden Door Wooden Plaque Wall To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected To retain, repair, make good and refinish To restore and make good to engineer's specification 47 Building Elements Original Not Original Poor Condition Fair Condition Good Condition Action Internal Ground Floor Timber Floor Joists Timber Floor Joists 2 M&E*3 Services Party Wall Party Wall 2 Paint Finish Wooden Plaque Timber Panels Cement Screed Flooring Cement Screed Flooring 2 To retain, repair, make good and refinish To retain, repair, make good and refinish To repair/ replace with new matching items To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To remove, make good area & install new item to match original To remove, make good area & install new item to match original To remove, make good area & install new item to match original 48 Building Elements Cornices Original Not Original Poor Condition Timber Staircase TBC Timber Staircase 2 TBC Timber Finish Opening TBC Fair Condition Good Condition Action To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation Courtyard Party Wall Wells Geometric Floor Tiles Geometric Floor Tiles 2 Geometric Floor Tiles 3 Granite Edge Timber Staircase TBC Timber Louvers TBC To retain, repair, make good and refinish To retain, repair, make good and refinish To remove, make good area & install new item to match original To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation 49 Building Elements Original Wall M.S. Door Built-in Cabinet & Stove Toilets M&E Services Not Original Poor Condition Fair Condition Good Condition Action To restore and make good to engineer's specification To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation. To Reroute Internal First Floor Timber Ceiling Timber Ceiling 2 Timber Ceiling 3 Timber Ceiling 4 Timber Floor Boards To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish 50 Building Elements Original Timber Floor Boards 2 Timber Floor Boards 3 Timber Partition TBC Timber Partition 2 Timber Window Louvers Timber Window Louvers 2 Timber Window Louvers 3 Timber Window Louvers 4 Timber Staircase Timber Staircase 2 M&E Services Not Original Poor Condition To retain, repair, make good and refinish Action To retain, repair, make good and refinish Good Condition Fair Condition To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation. To reroute 51 Building Elements Original Paint Finish Party Wall Wall & Doorway Hanging Lights Not Original Poor Condition Fair Condition Good Condition Action To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation. To reroute 52 Not Original Poor Condition M.S. Gutter M.S. Gutter 2 Building Elements Original Fair Condition Good Condition Action Lot No. 12 External M.S. Door TBC M.S. Grille M.S. Grille 2 Plaster Arches & Central Keystone Louvers Window w/ Fanlights 3D Plaster Wall w Intensive use of Chinese & European Decorations Roof "Di Shui" Timber Window Timber Window 2 To retain, repair, make good and refinish To remove, make good area & install new item to match original To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove, make good area & install new item to match original To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation 53 Building Elements Granite Flooring Original Not Original Poor Condition TBC Edged Granite Interlocking French Tiles Interlocking French Tiles 2 Corrugated Metal Roof Corrugated Metal Roof 2 Fair Condition Good Condition Action To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, clean, make good and refinish To retain, repair, make good and refinish To remove, make good area & install new item to match original To remove, make good area & install new item to match original Ceramic Baluster TBC To retain, repair, make good and refinish Ceramic Baluster 2 TBC To retain, repair, make good and refinish Ceramic Air Vent Ceramic Air Vent 2 To remove, make good area & install new item to match original To remove with care, repair area affected by item for new design installation Ceramic Roof Tile TBC To retain, repair, make good and refinish Ceramic Wall Tiles To retain, repair, make good and refinish TBC To retain, repair, make good and refinish Mural 54 Building Elements Original Roof Ridge Wooden Door Party Wall Cement In-print Not Original Poor Condition Fair Condition Action To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation TBC Good Condition Internal Ground Floor Timber Floor Joists Timber Floor Joists 2 M&E Services Wooden Plaque Cornices Cornices 2 Timber Windows Geometric Floor Tiles To retain, repair, make good and refinish To retain, repair, make good and refinish To repair/ replace with new matching items To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish 55 Building Elements Original Geometric Floor Tiles 2 Ceramic Wall Tiles Courtyard Not Original Poor Condition Fair Condition Good Condition Action To retain, repair, make good and refinish To retain, repair, make good and refinish Party Wall To retain, repair, make good and refinish Wells To retain, repair, make good and refinish TBC To retain, repair, make good and refinish Granite Edge To remove with care, repair area affected by item for new design installation Granite Floor Tiles To retain, repair, make good and refinish TBC To retain, repair, make good and refinish Geometric Floor Tiles Timber Staircase Wall To restore and make good to engineer's specification M.S Door To retain, repair, make good and refinish Toilets To remove with care, repair area affected by item for new design installation 56 Building Elements Original M&E Services Built-in Timber Cabinets Ceramic Wall Tiles Cement In-print Built-in Cabinet & Stove Not Original Fair Condition Good Condition Action To remove with care, repair area affected by item for new design installation. To reroute To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation TBC Poor Condition Internal First Floor Timber Ceiling To retain, repair, make good and refinish Timber Ceiling 2 To retain, repair, make good and refinish Timber Floor Boards To retain, repair, make good and refinish Timber Floor Boards 2 To retain, repair, make good and refinish Timber Floor Boards 3 To retain, repair, make good and refinish TBC To remove with care, repair area affected by item for new design installation Timber Partition 57 Building Elements Original Timber Partition 2 TBC Not Original Timber Board Timber Window Louvers Timber Window Louvers 2 Timber Staircase Blustered Timber Staircase Blustered 2 Timber Staircase M&E Services Paint Finish Wall Corridor Doorway Poor Condition Fair Condition Good Condition Action To remove with care, repair area affected by item for new design installation To retain, repair, make good and refinish To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation. To reroute To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To retain, repair, make good and refinish 58 Building Elements Original Not Original Poor Condition Fair Condition Good Condition Action Lot No. 14 External M.S. Grille Louvers Window Timber Panels TBC TBC Cement Screed Flooring Corrugated Metal Roof Corrugated Metal Roof 2 Ceramic Roof Tile TBC Mural TBC M.S. Door TBC To remove, make good area & install new item to match original To retain, repair, make good and refinish To remove, make good area & install new item to match original To remove, make good area & install new item to match original To remove with care, repair area affected by item for new design installation To remove, make good area & install new item to match original To remove, make good area & relocate to proposed area To retain, repair, make good and refinish To remove, make good area & relocate to proposed area Internal Ground Floor Timber Floor Joists To retain, repair, make good and refinish 59 Building Elements Original M&E Services Party Wall Paint Finish Glass Louvers Cement Screed Flooring Not Original Poor Condition Fair Condition Good Condition Action To repair/ replace with new matching items To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To retain, repair, make good and refinish To remove, make good area & install new item to match original To remove, make good area & install new item to match original To remove with care, repair area affected by item for new design installation Timber Panels TBC Timber Staircase TBC Timber Partition Toilets To remove with care, repair area affected M.S. Staircase M.S. Door To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation 60 Building Elements Original Not Original Poor Condition Fair Condition Good Condition Action Internal First Floor Timber Ceiling Timber Ceiling 2 Timber Floor Boards Timber Floor Boards 2 Timber Floor Boards 3 Timber Partition Timber Partition 2 Timber Window Louvers Timber Staircase M&E Services Wall To remove, make good area & install new item to match original To remove, make good area & install new item to match original To remove, make good area & install new item to match original To retain, repair, make good and refinish To retain, repair, make good and refinish To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To repair/ replace with new matching items To remove with care the existing plantation, repair area affected by item 61 Building Elements Original Not Original Poor Condition Glass Louvers Corrugated Metal Roof Toilets Fair Condition Good Condition Action To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation To remove with care, repair area affected by item for new design installation Legend: Table Header *1 M.S.: Mild Steel Lot Number *2 3D : Three Dimensional External *3 M&E : Mechanical and Electrical Internal Ground Floor *4 TBC : To Be Confirmed Internal First Floor Courtyard 62 Table 4.8: Summary of Each Element Item Breakdown Nos. Original Not Original Poor Condotion Fair Condition Good Condition M.S. M.S. Collapsible Grille M.S. Door M.S. Grille M.S. Gutter M.S. Staircase 1 2 2 4 1 Plaster Arches & Central Keystone 2 2 3D Plaster Wall w Intensive use of Chinese & European Decorations 2 2 Timber Board Timber Ceiling Timber Finish Opening Timber Floor Boards Timber Floor Joists Timber Louvers Timber Panels Timber Partition Timber Staircase Timber Staircase Blustered 1 8 1 9 5 1 4 7 9 2 8 1 1 1 2 1 2 1 1 2 Plaster 2 2 Timber 1 6 1 7 1 9 5 4 2 4 4 2 4 5 1 2 2 4 1 2 3 4 2 63 Item Breakdown Nos. Original Not Original Poor Condotion Fair Condition Good Condition Timber Window Timber Window Louvers 5 7 5 7 4 4 1 3 Cement In-print Cement Screed Flooring 4 5 - 4 1 4 Ceramic Air Vent Ceramic Baluster Ceramic Wall Tiles Ceramic Roof Tile 4 4 3 3 4 3 - Granite Edge Granite Floor Tiles 3 1 3 1 Wooden Door Wooden Plaque 2 3 2 3 2 1 Built-in Cabinet & Stove Built-in Timber Cabinets 2 1 2 1 2 Cement 5 Ceramic 4 4 3 3 - Granite 3 1 Wooden 2 Others 1 64 Item Breakdown Chimney Cornices Corridor Doorway Corrugated Metal Roof Geometric Floor Tiles Glass Louvers Hanging Lights Interlocking French Tiles Louvers Window Louvers Window w/ Fanlights M&E Services Mural Paint Finish Party Wall Roof "Di Shui" Roof Ridge Toilets Vent Pipe Nos. 1 3 1 7 6 2 1 4 1 2 8 3 4 7 2 2 4 1 Original Not Original Poor Condotion Fair Condition Good Condition 1 3 1 7 6 1 3 2 1 4 1 2 6 7 2 2 2 1 7 6 2 1 3 1 1 2 2 3 4 2 1 8 1 5 2 2 1 3 3 2 2 2 65 Item Breakdown Wall Wall & Doorway Wells Sum Nos. Original 5 5 1 1 2 2 70 176 118 Sum of Originality Not Original Poor Condotion Fair Condition Good Condotion 4 1 1 2 38 = 156 98 76 Sum of Conditions 2 = 176 *The discrepancy between the sums of originality and conditions occur because of the unidentified elements of the building that are it is original or not the original. 66 Figure 4.13: General Element A 67 Figure 4.14: General Element B 68 Figure 4.15: General Element C 69 Figure 4.16: Elements in Lot No.10 70 Figure 4.17: Elements in Lot No.12 A 71 Figure 4.18: Elements in Lot No.12 B 72 Figure 4.19: Elements in Lot No.12 C 73 74 Figure 4.20: Elements in Lot No.12 D Figure 4.21: Elements in Lot No.12 E 75 Figure 4.22: Elements in Lot No.14 76 77 CHAPTER 5 CONCLUSION AND FUTURE RECOMMENDATIONS 5.1 Conclusion From the data analysis, the following conclusions are as follows: Objective 1: The procurement method for the conservation of old building From the study, the procurement methods used for the conservation of old buildings are: Open Tendering Quotation, Selected Tendering Objective 2: Building elements that are upgraded or repaired in the conservation process From the study, the buildings elements that are repaired or upgraded are: Timbers Doors Roof Gutters Stairs Granite Edges Windows Ceramic Tiles. Flooring 78 Objective 3: The problems faced by the municipal council, contractors and building owners in the conservation of old buildings From the study, the problems faced by the council are: Poor allocation of funds from the state government for conservation projects. Materials needed to replace the damaged ones in the buildings are no more in production. Lack of local qualified experts in conservation projects. Contractors do not have enough capital to carry out conservation work Objective 4: Treatment methods being used for building conservation. From the study, the treatment methods used for building conservation are Damp proofing system using silicone cream to form a barrier against rising damp. Grouting for reinforced concrete beam using microcrete to fill up the cavity. Rebar embedding using geo-polymer and new steel bar to re-bar the section. Waterproofing for flat roof using specialist’s waterproof coating. Waterproofing for wet floor area using specialist’s waterproof coating. 79 5.2 Recommendation The study been done have a lot of area that needs improving. The lack of materials and suppliers for them is a big issue. The study strongly recommends that there should be more suppliers for the materials needed to complete the project. Next the financial allocation from the government should be increased so that there will be more conservation projects could be undertake. Finally there should be a way to inject some engineering expertise in the field of conservation. Currently there are no local experts that could help with these kinds of projects. These experts should be molded from the higher educational system because in higher learning institutions there are no courses which can mould these engineering experts. Hope that the field of building will have a bright future to withstand the tide of modernization. 80 References Ahmad, A.G. Rangka Kerja PemuliharaanBangunan Warisan di Malaysia, Bengkel Konservasi Monumen dan Tapak Tanah Bersejarah, 27-29 November 2006, Hotel Mahkota, Melaka. pp.1-12. Bever TD. 1983. Economic Benefits of Historic Preservation in Williams N, Kellogg, E.H., and Gilbert, F.H., ed. Historic Preservation: Why? What? How? New Brunswick, N.J.: Center for Urban Policy Research. Burton S. 1993. History with a Bottom Line. Time 12: 36-37. Community Project Manager of Downtown Eastside Revitalization Program, General Manager of Community Services and Director of Current Planning, 2002, Chinatown Revitalization Program : Chinatown Vision, City of Vancouver. Elert K, Cultrone, G., Navarro, C.R., Pardo, E.S. 2003. Durability of Bricks Used in the Conservation of Historic Buildings - Influence of Composition and Microstructure. Journal of Cultural Heritage 4: 91-99. Highfield D. 1987. Rehabilitation and Reuse of Old Buildings: E. & F.N. Spon, London. Johar S, Ahmad, A.G.; Che-Ani, A.I.; Tahir, M.M.; Abdullah, N.A.G.; Tawil, N.M. . 2010. Conservation Activities of Old Traditional Mosque in Malaysia: An Overview. Pages 269-277. International Conference on Electric Power Systems, High voltages, Electric Machines, International Conference on Remote sensing. Jokilehto J. 1999. A History of Architectural Conservation. Oxford: ButterworthHeinemann. 81 John Worthington & Peter Eley, “The Management of Change: new working environments from obsolete industrial buildings”, Chapter 10 in Thomas A. Markus (ed.) Building Conversion and Rehabilitation: Designing for Change in Building Use, London: Butterworth & Co., 1979. Mutiari, M, 2003, Heritage Environment Conservation Management Related to Economic Orientation in Urban Design, Paper of International Symposium and Workshop, Managing Heritage Environment in Asia, January, 8-12,2003, Yogyakarta, Indonesia. Poriaa Y. RB, Aireya D. 2001. The Core of Heritage Tourism. Elsevier. Powell, R. Living Legacy, Singapore, Singapore Heritage Society. 1994. Tiesdell S., et.al., Revitalizing Historic Urban Quarters, Oxford: Architectural Press, 1996. Tjandradewi BI, Peter, J., Kidokoro, M.T. 2006. Evaluating City-to-City Cooperation: A Case Study of the Penang and Yokohama Experience. Habitat International 30: 357-376. Urban Redevelopment Authority, 1988, Toward a Better City, Historic Districts in The Central Area, A manual For Chinatown conservation Area, Singapore. Wan Ismail WH, Shamshudin, S.,. 2005. The Old Shophouses as Part of Malaysian Urban Heritage:The Current Dilemma. Paper presented at 8th International Conference of the Asian Planning Schools Association; 1114th September 2005, Penang, Malaysia. 82 Warke PA, Curran, J.M., Turkington, A.V., Smith, B.J. 2003. Condition Assessment for Building Stone Conservation: A Staging System Approach. Building and Environment 38: 1113 - 1123. Young, G. Authenticity in Cultural Conservation, Australia Planner, Vol 29, 1991, pp. 3-5