gDownload the PDF
Transcription
gDownload the PDF
Iturregui Arranz, Carlos Ingeniero de C. C. y P. Colegiado nº 21.723 Liaño Corona, Carlos Ingeniero de C. C. y P. Colegiado nº 20.862 PRESENTACIÓN DE LA EMPRESA o o o o o o o o o o o o INSTALACIONES DEPORTIVAS. CÁLCULOS Y DISEÑO DE ESTRUCTURAS. CARRETERAS, VIALES. URBANIZACIÓN. OBRAS HIDRAÚLICAS. ESTUDIO HIDROLÓGICO. INFORMES. EDIFICACIÓN Y REHABILITACIÓN. URBANÍSMO Y ORDENACIÓN DEL TERRITORIO. PARQUES EÓLICOS DIRECCIONES DE OBRA, COORDINACIONES DE SEGURIDAD Y SALUD, Y ASISTENCIAS TÉCNICAS. SURVEYING SERVICES ENTERPRISE PRESENTATION Ingenia was incorporated in 2004 under the name OCEMA INGENIEROS S.L., changing its name in 2006 to its current denomination INGENIA OFICINA DE INGENIERIA Y ARQUITECTURA S.L. with Tax ID Nº (B-39566450). Since its inception, the object is to develop architectural and engineering projects for both public and private entities and national level (Spain) and international (Romania, Iraq and Libya), in these eight years he has conducted the development of approximately 650 projects and e-books covering a wide range of content, reports and General Plans, Urban hydraulic Works (sanitation, ...), flood studies, design and control of wind farms, civil works (deposits regulatory, roads, bridges, culverts, roads and highways, etc ...) public buildings, structures, unique designs, evolutionary processes, hoisted, floats, diseases, industrial, residential, representative seats, etc ... The organization is managed by business managers from its headquarters near Plaza Mayor de Torrelavega (Cantabria, Spain) in addition it has a new headquarters in Málaga (southern Spain Delegation) and in its expansion policy maintained an office in Satu Mare, Romania, as well as official delegation in Tripoli, Libya. Proof of our experience and technical and financial solvency in recent years works and projects attached greater importance in which we have been involved directly and indirectly in the processing and execution: Projects of sports facilities, tennis coverage, refurbishing football fields, bike paths lane ... Civil engineering projects, structures for storage vessels, rearrangement of traffic, calculation reports for Global Steel Wire S.A. Calculation of the ship structure for Ford in Craiova, Romania. Registration dossier for the construction of sewage treatment of industrial wastewater, civil works projects (roads, road markings) to Sniace S.A. Construction of foundations of buildings, earthquake resistant structures, bridges in Constanta and Bucharest, Romania. And technical assistance projects of bridges, viaducts and bridges in Cantabria, Spain (Escudo and Suspino). Recalculation and control of various wind farms in Cernavoda, Mirceavoda and Tulcea - Romania. SPORTS FACILITIES COVERAGE OF TENNIS COURTS-TORRELAVEGA MILK, FASE II Value: 1.665.534,82 € Date: 2009 Beneficiary: The City Council of Torrelavega. PETANQUE CONSTRUCTION CUCHI, MIENGO. Value: 59.394,06 € Date: 2008 Beneficiary: The City Council of Miengo. EXTERIOR WALLS IN SPORTS HALL OF MUNICIPAL CUCHIA-MIENGO Value: 48.273,49 € Date: 2008 Beneficiary: The school Miengo City Council workshop. PROPOSED RENOVATION OF SPORTS FACILITIES IN VILLASEVIL DE TORANZO Value: 59.963,06 € Date: 2008 Beneficiary: Neighborhood Board Villasevil de Toranzo. MAPPING OF BICYCLE LANE ON FORMER RAILWAY IN THE MUNICIPALITY OF VILLAESCUSA. FASE II. Value: 299.998,97€ Date: 2007 Beneficiary: Ministry of Environment. REMODELING THE SOCCER FIELD RUBARCENA IN COMILLAS. Value: 1.319.956,07€ Date: 2007 Beneficiary: The City Council of Comillas. TRACK CONSTRUCTION OF SPORTS AND BOWLING IN SIERRAPANDO Value: 117.805,69€ Date: 2007 Beneficiary: The City Council of Torrelavega. MUNICIPAL FOOTBALL PITCH EN BERANGA, HAZAS DE CESTO Value: 981.532,60 € Date: 2006 Beneficiary: The City Council of Hazas de Cesto. RENOVATION OF THE ROOF OF FLAG TRUEBA VICENTE Value: 120.135,45 € Date: 2006 Beneficiary: The City Council of Torrelavega. TRACING STUDIES ON THE BIKE LANE BARROS - SUANCES Value: Fase de estudio Date: 2005 Beneficiary: Ministry of Environment - Regional Government. SOCCER FIELD PROJECT CITY IN MATAMOROSA. Value: 1.586.971,12 € Date: 2005 Beneficiary: The City Council of Campoo de En medio. COVER BOWLING LOS TILARES, COMILLAS. Value: 836.118,56€ Date: 2007 Beneficiary: The City Council of Comillas PROJECT EXECUTION OF UNDERGROUND PARKING AND SPORTS CENTER "CALVARY MULTISPORTS" ALGECIRAS Value: 7.785.034,78 € Date: 2010 Beneficiary: BODY FACTORY GESTION S.L. SOCCER FIELD RENOVATION OF CITY "SAN FRANCISCO" IN REINOSA Value: 1.375.873,17 € Date: 2007 Beneficiary: The City Council of Reinosa. PRICED REPORT. SPORTS COURT COVER IN STREET OF SOLANA, NERJA Value: 803.511,65 € Date: 2011 Beneficiary: The City Council of Nerja SPORT TRACK CONSTRUCTION AND BOWLING IN SIERRAPANDO. Value: 117.805,69€ Date: 2007 Beneficiary: SIEC S.A. PRICED REPORT. WOOD COVER FOOTBALL PITCH IN MARO, NERJA Value: 496.742,07 € Date: 2011 Beneficiary: The City Council of Nerja THIRD PRIZE COMPETITION REFORM MALECON SPORTS FIELD, TORRELAVEGA. CANTABRIA. Value: 5.999.999,98 € Date: 2008 Beneficiary: The City Council of Torrelavega. CALCULATIONS AND STRUCTURES PEDESTRIAN PATH FROM BERANGA TO HAZAS DE CESTO. CA-269, FROM JUNCTION WITH THE N-534 TO HAZAS DE CESTO. KM 0 TO KM +01+770. SECTION: BERANGA-HAZAS DE CESTO Value: 739.996,19 € Date: 2008 Beneficiary: Department of Public Works and Housing. Government of Cantabria. CALCULATION FOR TOWN HALL BUILDING IN CAMPOO DE ENMEDIO Value: 299.635,64 € Date: 2008 Beneficiary: The City Council of Campoo de Enmedio. DESIGN OF LIVESTOCK PATHS ON THE ROUTE FROM RÁBAGO TO LA FLORIDA Value: 675.779,24 € Date: 2008 Beneficiary: El Soplao S.L. CALCULATIONS AND DESIGN FOR CUT-OFF WALLS FOR BUILDING IN LAREDO Date: 2008 Beneficiary: PROMOCIONES EGULIOR S.L. STRUCTURAL CALCULATION FOR HOMES IN RODEZNO Value: 9.089.442,65 € Date: 2008 IMPLEMENTATION DESIGN FOR SUPERMARKET AND RETAIL UNIT Value: 694.461,62 € Date: 2008 Beneficiary: SUPER-CAH DE ALIMENTACIÓN, S.L. DESIGN OF INDUSTRIAL WAREHOUSE IN QUIROGA BUSINESS PARK Value: 667.616,66 € Date: 2008 Beneficiary: PILALVA INVES S.L IMPLEMENTATION PROJECT FOR REHABILITATION OF TWO URBAN THE RIVER EBRO Value: 230.694,28 € Date: 2008 Beneficiary: Department of the Environment. FOOTBRIDGES IN THE PARK OF STUDY OF ALTERNATIVES FOR THE CONSTRUCTION OF A BRIDGE ACROSS THE RIVER IN MORALZARZAL (MADRID). Date: 2008 Beneficiary: ASCAN S.A. UNDERGROUND CAR PARK FOR THE PALACE AND MANZANEDO PARKS (SANTOÑA) Value: 13.745.797,58 € Date: 2008 Beneficiary: The City Council of Santoña. EMBANKMENT STABILISATION IN VILLALBILLA, MADRID Date: 2007 Beneficiary: URVAMA S.A. STORAGE WAREHOUSE FOR G.S.W. Value: 776.975,84 € Date: 2008 Beneficiary: INELECMA CALCULATION FOR INDUSTRIAL WAREHOUSE IN BADAJOZ Value: 198.480,95 € Date: 2007 Beneficiary: Servicios y Construcciones ODEMAN S.L. REPLACEMENT OF ENCLOSURE WALL AT ESTATE IN MATALEÑAS. Value: 60.000,00€ Date: 2007 Beneficiary: Department of the Environment. STRUCTURAL REHABILITATION OF ROOF AT THE SCHOOLS IN CUDÓN (MIENGO). Value: 127.612,60€ Date: 2007 Beneficiary: The City Council of Miengo. STRUCTURAL CALCULATION FOR ROOF FOR FRONTÓN COURT IN RODEZNO. Date: 2007 Beneficiary: The City Council of Rodezno. ROOF STRUCTURE FOR INDOOR BOWLS GROUND IN RIBAMONTÁN AL MAR. Value: 254.725,21€ Date: 2006 Beneficiary: The City Council of Ribamontán al Mar. REMOVAL OF LEVEL CROSSING AT PEDROSA ON THE SANTANDER-LLANES LINE (KM. 512.580) Value: 1.044.740,02 € Date: 2006 Beneficiary: Department of Transport and Communications – Regional Government of Cantabria STRUCTURAL DESIGN FOR WORKSHOP IN VALDECILLA (MEDIO CUDEYO). Value: 28.290,88 € Date: 2006 Beneficiary: The City Council of Medio Cudeyo. STRUCTURE OVER CONNECTING CHANNEL OVER THE CALLE PANDO AND AVDA FERNANDO ARCE Value: 119.755,99 € Date: 2006 Beneficiary: The City Council of Torrelavega. MACARENA COMBINED BRIDGE IN POLACIONES. Value: 97.197,83 € Date: 2005 Beneficiary: Regional Government of Cantabria. Servicio de Estructuras Agrarias. COMPLETE REHABILITATION OF THE “LA BARQUERA” FOOTBRIDGE IN TORRELAVEGA. Value: 107.703,67 €. Date: 2005 Beneficiary: The City Council of Torrelavega. DUBAI TOWER CONTEST DATE: 2010 BENEFICIARY: TDB ARQUITECTURA ACCESS BRIDGE TO LA MIES DE CURDEO IN ORUÑA (The City Council of Piélagos). Value: 55.943,60 € Date: 2004 Beneficiary: Department of Farming, Agriculture and Fisheries at the Regional Government of Cantabria CONSTRUCTION OF A BRIDGE IN THE NEIGHBORHOOD OF PONTONES EN HAZAS DE CESTO Value: 213.929,57 €. Date: 2004 Beneficiary: Department of Public Works and Housing - Government of Cantabria STRUCTURAL CALCULATIONS FOR CUT-OFF WALLS FOR BUILDING IN SIERRAPANDO (TORRELAVEGA). Value: 209.687,89€ Date: 2007 Beneficiary: PASEO DEL NORTE TORRELAVEGA S.L. UNDERGROUND CAR PARK IN PLAZA DE LA CONCORDIA. MUNICIPALITY OF SANTOÑA. Value: 525.291,53€ Date: 2007 Beneficiary: URCASOL S.L. WORKING DRIVE SHAFT FOR M-45 MOTORWAY MUNICIPALITY SAN FERNANDO DE HENARES (MADRID). Date: 2007 Beneficiary: ATP INGENIEROS S.L. STRUCTURAL CALCULATION FOR ANCHORAGE BLOCK FOR HIGH VOLTAGE NETWORK IN TORRELAVEGA. Date: 2007 Beneficiary: Electra de Viesgo Distribución S.L. CIVIL WORKS ON GARRET FOUNDATIONS IN NUEVA MONTAÑA. Value: 237.198,40 € Date: 2006 Beneficiary: G.S.W. STRUCTURAL CALCULATION FOR ROCK FACING FOR EMBANKMENT STABILISATION. LEGALISATION REPORT. Value: 27.875,03 € Date: 2006 Beneficiary: Jamalisa & Nueva Sevilla S.A. 0 REPORT ON FOUNDATION AND STRUCTURE FOR INTEGRATED CENTRE IN CALLE SILVINA - MADRID. Value: 531.926,07 € Date: 2006 Beneficiary: Intersa S.A. PROJECT DESIGN FOR FOUNDATIONS AND EXTENSION OF STRUCTURE IN CALLE SIERRA DE ALBARRACÍN – MADRID. Value: 173.023,22 € Date: 2006 Beneficiary: Joaquín López Fernández Arquitecto UNDERGROUND CAR PARK IN CALLE LOS LIRIOS (ALCORCÓN). Date: 2007 Beneficiary: URVAMA S.A. EMPRESA CONSTRUCTORA. CONSTRUCTION OF OFFICE AND STORAGE WAREHOUSE IN THE ANDALUSIA ACTIVITIES PARK IN AZNALCÓLLAR. Date: 2006 Beneficiary: Pilalva Inves S.L. ENVIRONMENTAL STRUCTURE FOR A HOUSE IN CILLORIGO DE LIÉBANA. Date: 2006 Beneficiary: Isidoro y Ernesto González Llorente. FOUNDATIONS FOR 3 HOMES AND GROUND FLOOR RETAIL UNIT IN PLAZA MAYOR 4. TORRELAVEGA. Date: 2006 Beneficiary: Punta Valterra S.L. MICRO PILES FOR FOUNDATIONS IN C/MAYOR 77, AZKOITIA (GUIPÚZCOA). Date: 2006 Beneficiary: Arrola Berri S.L. FOOTBRIDGE IN LAYOS (TOLEDO). Date: 2006 Beneficiary: Oriol Arquitectura. STRUCTURAL DESIGN FOR 6 HOMES IN TORRES. Date: 2006 Beneficiary: C&D. CALCULATION FOR SCREENING IN SANTOÑA. Date: 2006 Beneficiary: Urcasol S.L. EXCAVATIONS AND RETAINING WALL IN VIVEDA. Date: 2004 Beneficiary: Narciso Zunzunegui del Río. FOUNDATIONS, STRUCTURE AND ROOF IN CALLE ARGUMOSA. Date: 2004 Beneficiary: Ferrosa. PROJECT DESIGN FOR PILE FOUNDATIONS AND NEW DOCK IN THE PORT EXTENSION AT HONDARRIBIA (GUIPÚZCOA) Value: 615.480 € Date: 2004 Beneficiary: Construcciones Amenábar, S.A. JETTY PROJECT DESIGN WITH REINFORCED CONCRETE SLATTED DECKING ON GLASS ENCLOSED FLOATING DOCK WITH CURTAIN WALL. AWARDED FIRST PRIZE IN CALL FOR IDEAS. Date: 2004 Beneficiary: Industrias SIKA. CALCULATION OF STRUCTURE FOR TRANSFER STATION LAS ROZAS, MADRID DATE: 2009 ANCHORS FOR STUDY SCREENS ACOUSTIC DATE: 2009 BENEFICIARY: COMPOSAN ALTERNATIVES STUDY UNDERPASS. HIGHWAY CONSTRUCTION PROJECT A - 40 OF CASTILLA LA MANCHA. SECTION: OCAÑA - TARANCÓN. SUBSECTION: SANTA CRUZ DE LA BUSH – TARANCÓN DATE: 2009 BENEFICIARY: UTE INTERSA – ABALDO – UNO CALCULATION NOTE FOR PARKING IN BASAURI DATE: 2009 BENEFICIARY: CONSTRUCCIONES OLABARRI S.L. STRUCTURE IN THE PK 1 + 900 (A-8 MOTORWAY, SECTION: THE OAK - TORRELAVEGA) NOTE OF CALCULATION DATE: 2009 BENEFICIARY: BOUNDARY OF STATE ROAD CANTABRIA STRUCTURE IN THE PK 2 + 150 (A-8 MOTORWAY, SECTION: THE OAK - TORRELAVEGA) NOTE OF CALCULATION DATE: 2009 BENEFICIARY: BOUNDARY OF STATE ROAD CANTABRIA BRIDGE ON THE RIVERYERA (ESTACAS DE TRUEBA) DATE: 2009 BENEFICIARY: L. MIGUEL ALEJO BOCANEGRA PILE LOAD TESTS OF ACCESS INFRASTRUCTURE RUTIERA DE ACCES LA POD PESTE DUNARE LA CALAFAT-VIDIN (ROMANIA) DATE: 2010 BENEFICIARY: AZVI-VIMAC CALCULATION OF BASEMENT WALL FOR SPORTS CENTRE WITH UNDERGROUND PARKING "MONTEMAR". PHASE 1 DATE: 2010 BENEFICIARY: U.T.E. MONTEMAR ALTERNATIVE ACCESS "EL MANTO" VALUE: 293.000,00 € DATE: 2010 FOUNDATION AND STRUCTURE CALCULATION FOR FIVE TOWERS IN CONSTANTA, ROMANIA VALUE: 90.000.000 € DATE: 2009 BENEFICIARY: GVU BUILDING UNDERGROUND PARKING ALONG A NEW COURT IN GRAND CANARY DATE: 2010 BENEFICIARY: FITONOVO S.L. PREVIOUS STUDY. UNDERGROUND PARKING IN THE PLAZA "LOS LLANOS", IN OJEN DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF OJÉN CALCULATION NOTE. STRUCTURE OF STEP IN THE NEIGHBORHOOD LATEORRO LAUDI – LLODIO DATE: 2010 BENEFICIARY: ARRIKO DEFLECTION STUDY OF BARRIER ON GC-605 UBM (CABILDO DE GRAN CANARIA) DATE: 2010 BENEFICIARY: FITONOVO S.L. CALCULATION NOTE. RAFT HOMOGENIZATION. E.T.A.P. TORRELAGUNA DATE: 2010 BENEFICIARY: INTERSA PRE-DIMENSIONING OF "DOCK EXTENSION OF SPRING AXPE IN ERANDIO (VIZCAYA)" DATE: 2010 BENEFICIARY: GAIZKA LOZANO CALCULATION NOTE: ANALYSIS OF SPORTS IN BERANGO PLANE FRAMES, VIZCAYA DATE: 2010 BENEFICIARY: ARRIKO S.A. CALCULATION NOTE OF "STRUCTURE FOR FITNESS AND SPORTS COMPLEX EXPANSION PALMA DEL CONDADO - HUELVA" DATE: 2011 BENEFICIARY: FITONOVO S.L. CALCULATION NOTE OF "STRUCTURE FOR SPORTS COMPLEX GRANDSTAND PALMA DEL CONDADO – HUELVA” DATE: 2011 BENEFICIARY: FITONOVO S.L. REPORT OF TESTING OF PILES OF DESALINATION STATION AIR STEP CHÉLIFF (ARGELIA) DATE: 2011 BENEFICIARY: GRUPO ISOLUX CORSÁN STRUCTURE FOR SUPERMARKET IN CARABANCHEL, MADRID VALUE: 2.085.545,00 € DATE: 2011 BENEFICIARY: BOD2 CALCULATION OF STRUCTURE FOR SUPERMARKET IN VALLECAS, MADRID VALUE: 697.934,71 € DATE: 2011 BENEFICIARY: SUPER-CAH DE ALIMENTACIÓN, S.L. URBAN REHABILITATION OF TWO BRIDGES IN THE PARK RIVER EBRO. VALUE: 138.020,80€ Date: 2006 Beneficiary: Ministry of Environment. STRUCTURES IN THE M609, MADRID. ACCESS AND CORRECTIONAL FACILITY IN UNDERPASS PK2+825 (INTERSA) DATE: 2011 BENEFICIARY: INTERSA S.A. COMPARATIVE SOLUTION PROJECT - SOLUTION BUTTRESSED RETAINING WALL AT BENAMOCARRA (MALAGA) DATE: 2011 BENEFICIARY: FITONOVO S.L. STRUCTURAL ANALYSIS CARGADERO IN MIOÑO (CASTRO URDIALES) DATE: 2011 BENEFICIARY: TRAGSA CALCULATION OF METAL FASHION IN THE SPRING OF MALIAÑO, SANTANDER DATE: 2011 BENEFICIARY: MONTAJES CAMARGO S.L. MEMORY OF CALCULATION FORD TO SHIP CRAIOVA SOLERA ROMANIA MEMORY CAMPUS SOLERA PALLETS AND TRAILER PARKING CRAIOVA ROMANIA MEMORY OF CALCULATION COVERED WAY CRAIOVA - ROMANIA DATE: 2011 BENEFICIARY: CONSTRUCCIONES LUJÁN S.A. CALCULATION NOTE FOUNDATION NEW COURTHOUSE PLASENCIA (CÁCERES) DATE: 2011 BENEFICIARY: ISOLUX CORSÁN FEASIBILITY STUDY UNDERPASS PK 42 +900, OF THE M-40 IN POZUELO DE ALARCÓN, MADRID DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF POZUELO DE ALARCÓN CALCULATION OF STRUCTURE IN ALBERICIA 45 VPO DATE: 2011 BENEFICIARY: INBISA CONSTRUCCIÓN. MODIFIED Nº1 CANTABRIA MOTORWAY A-8. SECTION: LA ENCINA - TORRELAVEGA TOP STEP PK 0 + 670 VALUE: 171.261,83 € DATE: 2011 BENEFICIARY: ACCIONA S.A. TRY OUT CIRCUIT FOR FORD - ROMANIA CRAIOVA VALUE: 1.400.000,00 € DATE: 2011 BENEFICIARY: FORD COMPANY -CRAIOVA PREVIOUS PROJECT. COVERED WAY CRAIOVA – ROMANIA VALUE: 500.000, 00 € DATE: 2011 BENEFICIARY: CONSTRUCCIONES LUJÁN S.A. DESIGN OF BRIDGE OVER THE RIVER SOMES SATU - MARE. ROMANIA. DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF SATU-MARE THE GATEWAY REHABILITATION BARQUERA VALUE: 107.703,67 € DATE: 2005 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA BRIDGE OVER THE STREAM SHIELD IN LA COCINA. VALUE: 97.747,02 € DATE: 2010 BENEFICIARY: GESVICAN BRIDGE JOINT IN BARACALDO. VALUE: 472.630,38€ DATE: 2006 BENEFICIARY: URVAMA S.L. CALCULATION OF UNIONS IN PASRELA ON M-30 IN THE KNOTLA PALOMA VALUE: 4.079.338,81€ DATE: 2009 BENEFICIARY: INTERSA S.A. COMMUNICATION STRUCTURE OF PEDESTRIAN GANZO-TORRES. VALUE: 2.138.485,57 € DATE: 2010 BENEFICIARY: M.A.R.E. CONSTRUCTION OF A BRIDGE IN THE NEIGHBORHOOD OF PONTONES, HAZAS DE CESTO. VALUE: 213.929,57 € DATE: 2004 BENEFICIARY: Government of Cantabria, Department of Public. BRIDGE OVER THE ARROYO SUSPINO PK 4 +800 IN ROAD CA-855 VALUE: 529.761,17 € DATE: 2010 BENEFICIARY: GESVICAN BRIDGE OVER THE CREEK ESCUDO AND FEVE PK-100 IN THE CA-850. VALUE: 1.042.294,19 € DATE: 2010 BENEFICIARY: GESVICAN JOINT BRIDGE ON THE A-40 IN TARANCÓN. VALUE: 4.767.281,03 € DATE: 2009 BENEFICIARY: INTERSA S.A. ROADS AND HIGHWAYS CONDITIONING OF ROUTE FROM GORNAZO TO MOGRO VALUE: 230.082,82 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF MIENGO EXTENSION OF ROAD PARALLEL TO THE AVENIDA DE CANTABRIA NEXT TO Nº18 (BULEVAR RADIAL OESTE) VALUE: 85.547,59 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA VALUED TECHNICAL SPECIFICATIONS FOR ROAD CONDITIONING IN BARRIO LOS CARABINEROS IN BARCENA DE CUDÓN DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF MIENGO ROAD SURFACING IN LA MIES DEL MAYOR, MOGRO. MUNICIPALITY OF MIENGO VALUE: 83.982,38 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF MIENGO SEMI-PEDESTRIANISATION OF CALLE LASAGA LARRETA Value: 636.647,99 € Date: 2009 Beneficiary: The City Council of Torrelavega. ROAD CONDITIONING AND PEDESTRIAN ZONE IN THE AREA OF Bº CAGIGAS (HERAS) AND CONDITIONING OF URBAN WASTE COLLECTION POINTS (CECEÑAS AND SOBREMAZAS) Value: 50.366,50 € Date: 2009 Beneficiary: The City Council of Medio Cudeyo. ROAD SURFACING IN THE MUNICIPALITY OF TORRELAVEGA 2008. Value: 191.264,36 € Date: 2008 Beneficiary: The City Council of Torrelavega. CONDITIONING ROADS IN THE AREA OF ABRA DEL PAS, MOGRO - MIENGO. Value: 54.455,62 € Date: 2008 Beneficiary: The City Council of Miengo. RENOVATION OF ACCESS ROUTES AND SEA FRONT, AND CONSTRUCTION OF UNDERGROUND CAR PARK AT THE BEACH AT MOGRO Value: 9.742.574,59 € Date: 2008 Beneficiary: The City Council of Miengo. PAVING IN RURAL COMMUNITIES: GORNAZO, MIENGO, BÁRCENA DE CUDÓN, MOGRO, CUCHÍA AND CUDÓN. MUNICIPALITY OF MIENGO. Date: 2008 Beneficiary: The City Council of Miengo. IMPROVEMENTS TO CALLE FELIX APELLANIZ Value: 379.993,02 € Date: 2007 Beneficiary: The City Council of Torrelavega. IMPROVEMENTS TO CALLE RAIMUNDO CICERO ARTECHE Value: 188.818,79 € Date: 2007 Beneficiary: The City Council of Torrelavega. CONDITIONING OF PERIMETER ROAD IN INDUSTRIAL ESTATE IN VIERNOLES, TORRELAVEGA. Value: 249.027,14 € Date: 2007 Beneficiary: The City Council of Torrelavega. ROAD CONDITIONING IN ANAZ, MEDIO CUDEYO. Value: 293.754,42€ Date: 2007 Beneficiary: The City Council of Medio Cudeyo. CABLE BURIAL UNDER CA-307, FROM ACCESS TO CAMARGO QUARRY Value: 466.620,23 € Date: 2008 Beneficiary: CANDESA S.A. PEDESTRIAN WALK AMONG BERANGA Y HAZAS DE CESTO. CA-269, OF INTERSECTION WITH THE N-634 A HAZAS DE CESTO. PK-0 +000 +770 AL PK-01. SECTION: BERANGA Y HAZAS DE CESTO. Value: 739.996,19 € Date: 2008 Beneficiary: Department of Public Works and Housing. Government of Cantabria. REMOVAL OF LEVEL CROSSING IN BOO DE PIÉLAGOS. Value: 220.860,68€ Date: 2006 Beneficiary: Directorate General for Transport and Communications. IMPROVEMENTS OF ACCESS ROUTES TO GORNAZO AND BARCENA DE CUDÓN FROM THE A-67 TO THE CA-322. Value: 330.319,87€ Date: 2006 Beneficiary: The City Council of Miengo. PROJECT DESIGN FROM BARRIO LA COTERA TO BARRIO DE CARRIAZO. Value: 158.273,90 € Date: 2006 Beneficiary: The City Council of Miengo. ROAD CONDITIONING IN FERNANDEZ VALLEJO AND ACCESS TO RIO RIBA IN VIÉRNOLES Value: 114.706,40 € Date: 2006 Beneficiary: The City Council of Torrelavega. ROUTE IN LAS ILCES IN CAMALEÑO Value: 82.504,62 € Date: 2006 Beneficiary: Directorate General for Agricultural Structures – Livestock Department. MAPPING FOR REMODELLING OF FOOTPATHS BETWEEN VILLAESCUSA AND MEDIO CUDEYO. Value: 60.184,44 € Date: 2006 Beneficiary: The City Council of Medio Cudeyo. CONDITIONING OF THE ACCESS ROAD TO THE BEACH AT USGO Value: 480.690,10 €. Date: 2005 Beneficiary: The City Council of Miengo. ROAD CONDITIONING IN BARRIO DE CARRIAZO Value: 452.997,33 €. Date: 2005 Beneficiary: The City Council of Miengo. SURFACING AND RENOVATION OF ROUTES IN HAZAS DE CESTO. Value: 197.465,12 € Date: 2004 Beneficiary: Department of Public Works and Housing – Regional Government of Cantabria. REMOVAL OF LEVELCROSSING IN AMBROSERO. Date: 2006 Beneficiary: Comsa S.A. FEASIBILITY STUDIES FOR URBAN TRAM LINE IN TORRELAVEGA Value: Preliminary Studies Date: 2006 Beneficiary: Department of Transport and Communications – Regional Government of Cantabria CONDITIONING THE MUNICIPAL ROAD MOGRO TO ABRA DEL PAS. VALUE: 1.235.039,90 € DATE: 2007 BENEFICIARY: THE CITY COUNCIL OF MIENGO GENERAL ESTATE ROAD SYSTEM, RADIAL CENTER BOULEVARD. VALUE: 3.390.927,26 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA TRAFFICS REARRANGING. MANAGEMENT ALTERNATIVES STUDY OF ACCESS TO THE FACTORY GSW DATE: 2009 BENEFICIARY: GLOBAL STEEL WIRE ROAD DISTRICT COTORNAL-ANAZ (PHASE II). MEDIO CUDEYO VALUE: 90.000,00 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF MEDIO CUDEYO ANALYSIS FIRM PLATFORM FOR CIRCULATION (G.S.W.) VALUE: 78.64 €/M2 DATE: 2010 BENEFICIARY: GLOBAL STEEL WIRE S.A. IMPROVEMENTS TO CALLE RAIMUNDO CICERO ARTECHE VALUE: 192.074,29 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA ROAD MARKING PROJECT IN DISTRICT ALONG RIAÑO EDARI SNIACE VALUE: 418.196,06 € DATE: 2011 BENEFICIARY: SNIACE S.L. ACTION ON THE MOUNTAIN FOREST ROADS, TORRELAVEGA VALUE: 197.898,64 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA DRAWING PROJECT ROAD CONNECTIONCELIS - EL SOPLAO VALUE: 9.437.953,69 € DATE: 2011 BENEFICIARY: DEPARTMENT OF HIGHWAYS, ROADS AND WORKS GOVERNMENT OF CANTABRIA PROJECT CONDITIONING ROAD FOR ACCESS TO HOUSING INFINCA LA GANCHOSA VALUE: 292.820,17 € DATE: 2011 BENEFICIARY: ANGORO MP, S.L. DESIGN AND DEVELOPMENT OF THE CALLE JOSÉ LUCIO MEDIAVILLA VALUE: 171.261,83 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA GENERAL ESTATE ROAD SYSTEM, RADIAL CENTER BOULEVARD. COSTE DE LAS OBRAS: 1.991.445,17 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA PROJECT FOR THE PROCUREMENT OF ENERGY EFFICIENCY, BETTER WATER RESOURCES, ACCESSIBILITY AND URBAN MOBILITY IN THE CONTEXT OF THEC/ VALLE DE CABUERNIGA. VALUE: 801.720,85 € DATE: 2010 BENEFICIARY: FONDOS FEDER URBAN ROAD IN THE CITIES OF TORRELAVEGA and MATAMOROSA DATE: 2008-2009 BENEFICIARY: LOCAL ADMINISTRATIONS VOYAGES OF ENTRY TO THE CITY OF TORRELAVEGA ON NATIONAL ROADS N-611 AND N-634. VALUE: 2.694.996,21 € DATE: 2007-2010 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA ACCESS ROAD SOPLAO. SECTION RABAGO LA FLORIDA. VALUE: 2.243.191,83 € DATE: 2006 BENEFICIARY: AGRICULTURAL SERVICES GOVERNMENT STRUCTURES CANTABRIA HIGH MOUNTAIN ROAD URBAN ROAD IN MATAMOROSA AND LA CAÑADA VALUE: 256,130.05 € DATE: 2007 BENEFICIARY: THE CITY COUNCIL OF CAMPO DE ENMEDIO CONNECTION AND ACCESS ROAD BEACH DISTRICT CUCHIA. VALUE: 914.392,38€ DATE: 2007 BENEFICIARY: THE CITY COUNCIL OF MIENGO. URBANIZATION CONDITIONING OF NEW REST AREA IN VILLASEVIL DE TORANZO Value: 128.232,51 € Date: 2009 Beneficiary: LOCAL ASSEMBLY, VILLASEVIL DE TORANZO. . CONDITIONING AND ENVIRONMENTAL REHABILITATION OF PARK IN VILLASEVIL DE TORANZO. Value: 91.396,30 € Date: 2009 Beneficiary: LOCAL ASSEMBLY, VILLASEVIL DE TORANZO. CONDITIONING AND PAVING OF DIFFERENT AREAS OF THE RÍO LAYA RESIDENTIAL ESTATE. Value: 189.885,32 € Date: 2009 Beneficiary: The City Council of Medio Cudeyo. CONDITIONING AND URBANIZATION OF Bº CABEZÓN, MOGRO – MUNICIPALITY OF MIENGO Value: 615.369,45 € Date: 2009 Beneficiary: The City Council of Miengo. CONDITIONING OF PLAZA DEL SOL IN BARREDA, TORRELAVEGA. Value: 237.014,23 € Date: 2009 Beneficiary: The City Council of Torrelavega. URBAN REHABILITATION OF THE AREA AROUND THE CHURCH IN CUDÓN, MUNICIPALITY OF MIENGO Value: 349.329,51 € Date: 2009 Beneficiary: The City Council of Miengo. PAVING AND URBANIZATION OF CROSSING OVER THE ARROYO EL CRISTO IN THE PASEO DEL NIÑO AREA. Value: 133.865,44 € Date: 2009 Beneficiary: The City Council of Torrelavega. PAVING AND CONDITIONING OF THE AREA AROUND THE SALA ROBAYERA IN CUDÓN - MUNICIPALITY OF MIENGO. Value: 117.028,95 € Date: 2009 Beneficiary: The City Council of Miengo. RENOVATION OF PLAZA DANIEL SZ Y BLANCO IN DUALEZ. Value: 54.440,63 € Date: 2008 Beneficiary: The City Council of Torrelavega. SPACE CONDITIONING CHILDREN AND BOWLING GAME ON THE UNITY OF ACTION PD1, THE MASTER PLAN OF INMOBILIARIA VALUE: 328.754,87 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA URBANIZATION PROJECT FOR THE PLAZA DE LA CONCORDIA IN SANTOÑA Value: 666.707,85 € Date: 2008 Beneficiary: URCASOL S.L. URBANIZATION FOR 16 SEMIDETACHED HOMES AND 1 DETACHED HOME IN BERANGA Value: 82.000,01 € Date: 2008 Beneficiary: ZEGARVA S.L. ENVIRONMENTAL RECUPERATION FOR CONSTRUCTION OF A PARK NEXT TO THE SAN MIGUEL ARCÁNGEL CHURCH Value: 29.998,32 € Date: 2007 Beneficiary: The City Council of Torrelavega. ENVIRONMENTAL RECUPERATION AND IMPROVEMENTS TO PLAYGROUND IN THE PARK IN Bº EMILIO REVUELTA . Value: 29.946,94 € Date: 2007 Beneficiary: The City Council of Torrelavega. STUDY FOR MIRADOR AT THE ENTRY TO THE ”EL SOPLAO” CAVE. Value: 1.392.113,77 € Date: 2007 Beneficiary: EL SOPLAO S.L. SQUARE AND CHILDREN’S PLAYGROUND NEXT TO AVDA. PEÑA CABARGA, SOLARES. MUNICIPALITY OF MEDIO CUDEYO. Value: 207.264,68 € Date: 2007 Beneficiary: The City Council of Medio Cudeyo. URBANIZATION AND REINFORCEMENT OVER CANAL IN TRECEÑO. Value: 262.023,40€ Date: 2006 Beneficiary: The City Council of Valdáliga. URBAN REHABILITATION OF BARRIO EL POMAR EN SOCOBIO. Value: 112.538,94 € Date: 2006 Beneficiary: The City Council of Castañeda. URBAN CONDITIONING OF C/AGUSTIN RIANCHO, PARALLEL TO PABLO GARNICA OPPOSITE ASPLA COMPANY OFFICES. Value: 111.716,65 € Date: 2006 Beneficiary: The City Council of Torrelavega. DESIGN AND URBANIZATION ALONGSIDE AVDA. FERNÁNDEZ VALLEJO FROM Nº 32 TO Nº 48, AND CONDITIONING OF URBAN AREA. Value: 595.854,57 € Date: 2006 Beneficiary: The City Council of Torrelavega. ENVIRONMENTAL REHABILITATION AND IMPROVEMENTS TO THE PLAYGROUND IN THE NUEVA CIUDAD II PARK. VALUE: 235.333,98 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA. DRAFT PROJECT FOR URBAN REHABILITATION OF BARRIO DE SAN MIGUEL (Puebla Vieja) Value: 927.932,77 €. Date: 2005 Beneficiary: The City Council of Campoo de Enmedio. URBAN REHABILITATION OF BARRIO DE LA MOLINA in Treceño Value: 262.023,40 € Date: 2004 Beneficiary: The City Council of Valdáliga. URBANIZATION OF THE UA-1 UNIT IN PEÑAMELLERA BAJA. Value: 420,564.64€ Date: 2007 Beneficiary: NARANCO 2000. URBANIZATION IN CICERO. Value: 728.691,40€ Date: 2007 Beneficiary: JUNTA COMPENSACION SUD C-7. URBANIZATION FOR 76 HOMES AND GARAGES IN BARRIO DE LA ESTACIÓN IN BERANGA Date: 2007 Beneficiary: IGNACIO GARCÍA UTRILLA BEREISEN S.L. URBANIZATION OF UNIT NOVAL-1 IN ESCALANTE. Value: 470.179,25 € Date: 2006 Beneficiary: INMOBILIARIA TRES Y ANA S.L. URBANIZATION FOR 30 SEMIDETACHED HOMES IN MUNICIPALITY OF GURIEZO. Value: 486.827,36 € Date: 2006 Beneficiary: Cantabra Castro Sociedad de Inversiones S.L. URBANIZATION FOR 41 HOMES IN CICERO. Value: 728.691,42 € Date: 2006 Beneficiary: Junta Compensación S.U.D. C-7. URBANIZATION OF UNIT Nº27 IN HOYA, COLINDRES.. Date: 2006 Beneficiary: Taller Inmobiliario Hoya S.L. IMPROVEMENTS TO NATURAL SURROUNDINGS OF THE SANTA JUSTA BEACH. Date: 2006 Beneficiary: Maria José Lopez-Collado Cornago - Raul Carral Sampedro. URBANIZATION FOR “LAS ROCAS” RESIDENTIAL COMPLEX, RUILOBA. Date: 2006 Beneficiary: Arrola Berri S.L. CONDITIONING OF CALLE CARRERA Value: 180.165,84 € Date: 2005 Beneficiary: The City Council of Torrelavega. RECOVERY AND PURIFICATION ZONE DEVELOPMENT ALONG THE BEACH MOGRO Value: 380.405,85 € Date: 2006 Beneficiary: The City Council of Miengo. PROPOSED PLAZA PARKING AREA AND MEDIUM AND AQUILINO PEPE. SAN JUAN DEL AZNALFARACHE. SEVILLA. DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF SAN JUAN DEL AZNALFARACHE URBAN REHABILITATION OF STREETS OF ACCESS TO THIS RING ROAD FROM THE TOWN OF TORRELAVEGA VALUE: 735.811,05 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA RENEWAL OF STREET LIGHTING FACILITIES IN THE CORES OF CUDON BÁRCENA, CUDÓN, GORNAZO AND MOGRO TO REDUCE ENERGY CONSUMPTION (LIGHTING MIENGO) DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF MIENGO SPECIAL PLAN CUDON CAVE: PHASE III: EXTERNAL SIGNAL CONDITIONING VALUE: 244.174,63 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF MIENGO PROJECT EXECUTION OF UNDERGROUND PARKING AND SPORTS CENTER "CALVARY SPORTS" – ALGECIRAS VALUE: 7.785.034,78 € DATE: 2010 BENEFICIARY: BODY FACTORY GESTION S.L. SPORT BASIC INSTALLATION PROJECT - MUNICIPAL POOL FIVE PADDLE COURTS - TERM MUNICIPAL MARINALEDA – SEVILLA VALUE: 900.000,00 € DATE: 2010 BENEFICIARY: FITONOVO S.L. EXECUTION AND PARK PLAYGROUND WITH MAJOR AREAS OF STAY IN THE FERRETERA AND EL ZAPATÓN (TORRELAVEGA) VALUE: 50.270,20 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA DEVELOPMENT OF PASEO DEL NIÑO IN TORRELAVEGA VALUE: 1.361.502,02 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA DEVELOPMENT OF THE SQUARE GARCÍA DEL OLMO IN MATAMOROSA. Value: 91.382,81 €. Date: 2005. Beneficiary: The City Council of Campoo de Enmedio. URBANIZATION OF THE STREET LASAGA LARRETA Value: 636.647,99 €. Date: 2010 Beneficiary: The City Council of Torrelavega. DEVELOPMENT OF SQUARE LA LLANA AND STREET JULIO VELARDE IN TORRELAVEGA Value: 377.837,08 € Date: 2004 Beneficiary: The City Council of Torrelavega DESIGN OF SPACE IN THE FOREIGN NATIONAL CATTLE MARKET VALUE: 149.536,36 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA Space conditioning WITHIN THE DOMESTIC MARKET OF WON, TORRELAVEGA VALUE: 260.610,79 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA REHABILITATION Trade Fair CANTABRIA: “LA LECHERA” DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA ADEQUACY OF PUBLIC SCHOOL CHILDREN'S PATIO Manuel Andújar, MUNICIPALITY OF CAROLINA VALUE: 237.312,16 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF LA CAROLINA IMPLEMENTATION OF BUS STOPS FOR TUT TORRELAVEGA VALUE: 865.971,84 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA DRAFT HOUSING AND PARKING UNDERGROUND IN THE RIDE OF THE BURRIANA.NERJA-MÁLAGA VALUE: 8.032.784,62 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF NERJA REMODELING THE SOCCER FIELD BENAMOCARRA, MÁLAGA VALUE: 638.385,18 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF BENAMOCARRA HIDRAULIC PROJECT SEPARATED SEWAGE SYSTEM IN BARRIO DEL PILAR IN SOLARES, AND CONSTRUCTION OF RESERVOIR IN HERAS VALUE: 280.000,00 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF MEDIO CUDEYO RENOVATION OF SUPPLY PIPES IN CUDÓN AND MOGRO VALUE: 300.000,00€ DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF MIENGO SUPPLY LINE AND GENERAL SEWAGE NETWORK IN BARRIO MONTE AND MOGRO STATION. MUNICIPALITY OF MIENGO. VALUE: 336.351,35 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF MIENGO REPLACEMENT OF FIBRE CEMENT PIPES FOR WATER SUPPLY TO GANZO AND DUÁLEZ. VALUE: 159.666,48 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA. DRAINAGE NETWORK AND SEWERS IN BARRIO DE LA LASTRA, SOLORZANO. VALUE: 188.846,00 € DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF SOLÓRZANO. SUPPLY LINE AND GENERAL SEWAGE NETWORK IN Bº DE LA IGLESIA VIEJA IN CUDÓN. MUNICIPALITY OF MIENGO. VALUE: 274.253,56 € DATE: 2008 BENEFICIARY: THE CITY COUNCIL OF MIENGO. PROJECT DESIGN FOR GENERAL SUPPLY FOR SR-MACORES, REST OF MACORES, SR-13, SR-14, SR-15, SI-15, SOUTH AREA, MUNICIPALITY OF UMBRETE (SEVILLE). VALUE: 824.385,38 € DATE: 2008 BENEFICIARY: EUSMA UMBRETE I, S.L. Y OTRAS. PROJECT FOR CONDITIONING OF SUPPLY LINES FOR DRAINAGE IN Bº DE CARRIAZO, MIENGO. PHASE II. VALUE: 390.948,08 € DATE: 2008 BENEFICIARY: THE CITY COUNCIL OF MIENGO. CONDITIONING OF DRAINAGE AND SUPPLY NETWORKS IN THE MUNICIPALITY OF MEDIO CUDEYO. VALUE: 927.485,73 € DATE: 2008 BENEFICIARY: THE CITY COUNCIL OF MEDIO CUDEYO. INSTALLATION VALUE: DATE: BENEFICIARY: OF WATER PURIFICATION PLANT IN RIAÑO MUNICIPALITY OF SOLÓRZANO 208.011,54 € 2008 THE CITY COUNCIL OF SOLÓRZANO. WATER SUPPLY AND DRAINAGE IN MORTERA AND ANNEXED AREAS VALUE: 334.750,51 € DATE: 2007 BENEFICIARY: THE CITY COUNCIL OF PIÉLAGOS. CONSTRUCTION OF SUPPLY FOR WATERING SYSTEM USING RECYCLABLE WATER IN THE MUNICIPALITY OF PARLA. VALUE: 3.430.790,98€ DATE: 2007 BENEFICIARY: CANAL DE ISABEL II. DRAINAGE IN PRAVES-BERANGA. FASE I. VALUE: 200.000,00 € DATE: 2007 BENEFICIARY: THE CITY COUNCIL OF HAZAS DE CESTO. COMPLEMENTARY PROJECT FOR DRAINAGE AND WATER PURIFICATION IN THE MID-LOW BASINOF THE MIERA RIVER.PHASE IB. VALUE: 734.352,39€ DATE: 2006 BENEFICIARY: DEPARTMENT OF THE ENVIRONMENT. HYDRAULICS AND INTEGRAL WATER CYCLES DRAINAGE IN ZURITA DE PIÉLAGOS (TWO PHASES). VALUE: 304.730,05 € + 120.437,16 € DATE: 2006 BENEFICIARY: THE CITY COUNCIL OF ZURITA DE PIÉLAGOS. DRAFT PROJECT FOR DRAINAGE ON THE BANKS OF THE RIVER PÁMANES IN MEDIO CUDEYO. VALUE: 2.109.882,14 € DATE: 2004 BENEFICIARY: THE CITY COUNCIL OF MEDIO CUDEYO STATION DRINKING WATER TREATMENT AND COLLECTION ON THE RIVER PAS VALUE: 1.303.836,73 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF MIENGO DOMESTIC WASTE DISPOSAL AND OTHER ITEMS BARREDA TORRELAVEGA scattered SAJA-BESAYA SANITATION VALUE: 367.000,00 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA SEWER CONNECTIONS CONNECTING TO SANITATION IN DUÁLEZ SAJA-BESAYA VALUE: 30.000,00 € DATE: 2010 PIPE REPLACEMENT OF WATER SUPPLY AND SANITATION IN CONSTRUCTION LA HILERA VALUE: 1951.611,29€ DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA NEW IMPLEMENTATION PROJECT RUSH IN SAN VITORES AND HERMOSA. MEDIO CUDEYO VALUE: 230.000,00 € DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF MEDIO CUDEYO AUTHORIZATION TO FILE FOR CONSTRUCTION OF PHASE II OF SEWAGE TREATMENT PLANT INDUSTRIAL AREA POLICE CHANNELS OF THE LEFT BANK OF THE RIVER SAJA, in the neighborhood of RIAÑO, T.M. DE SANTILLANA DEL MAR DATE: 2011 BENEFICIARY: SNIACE S.L. PAS PLAN TO CONNECT WATER SUPPLY MIENGO VALUE: 261.176,52€ DATE: 2011 BENEFICIARY: GOVERNMENT OF CANTABRIA. MINISTRY OF ENVIRONMENT. DEPARTMENT OF WATER WORKS AND INTEGRATED WATER CYCLE CONTEST. ADDITIONAL DRIVE SAPO raft in El Ejido, Almería DATE: 2011 BENEFICIARY: ENVIRONMENT AGENCY AND WATER. MINISTRY OF ENVIRONMENT BOARD OF ANDALUCIA PLAN channel a stream segment as it passes through TRONQUERIAS TORRELAVEGA DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA HIDROLOGICAL STUDIES HYDROLOGICAL STUDY FOR AUTHORISATION OF CONSTRUCTION OF A ROADWORTHINESS TEST STATION (I.T.V.) IN RESTRICTED LAND USE AREA ON RIGHT BANK OF AN UNNAMED STREAM IN BARRIO EL CALLEJO IN LAREDO. DATE: 2008 BENEFICIARY: GRUPO ITEVELESA S.L. HYDROLOGICAL STUDY IN SNIACE. DATE: 2008 BENEFICIARY: COGECAN S.L.U. HYDROLOGICAL STUDY ON THE BANKS OF THE SAN SEBASTIAN STREAM IN SOLÓRZANO DATE: 2008 BENEFICIARY: KONYMA ESPACIOS S.L CÁLCULO HIDROLÓGICO EN SANTECILLA DE MENA DATE: 2008 BENEFICIARY: PROMOCIONES INMOBILIARIAS KARJUMASO S.L. HYDROLOGICAL STUDY FOR AUTHORISATION OF CONSTRUCTION OF FOUR DETACHED HOUSES ON THE LEFT BANK OF THE RIVER ASÓN AT AMPUERO DATE: 2007 BENEFICIARY: RESIDENCIAL COTACAN S.L. HYDROLOGICAL STUDY OF RIVER HÍJAR. DATE: 2005 BENEFICIARY: REGIONAL GOVERNMENT OF CANTABRIA. DEPARTMENT OF THE ENVIRONMENT. HYDROLOGICAL AND FLOOD RISK STUDY IN THE AREA AROUND THE INDIANA STREAM. DATE: 2007 BENEFICIARY: INMOBILIARIA URBIS S.A. HYDROLOGICAL STUDY ON THE RIVER CAMPIAZO AT BERANGA. DATE: 2007 BENEFICIARY: Mª DEL CARMEN RUIZ DE VILLA. ADDITIONAL TECHNICAL HYDRAULIC SPECIFICATIONS FOR 31 HOMES, UNITS AND GARAGES.. DATE: 2007 BENEFICIARY: EZCURDIA PUENTE CABRERO ARQUITECTOS. HYDROLOGICAL CALCULATIONS IN BERANGA. DATE: 2006 BENEFICIARY: RUA 3000 S.L. HYDROLOGIC STUDY ON THE RIVER SAJA-BESAYA TORRELAVEGA YOUR STEP, RIAÑO DISTRICT APPLICATION FOR PERMISSION TO WORKS EJECUACIÓN DATE: 2011 BENEFICIARY: COGECAN S.L.U. Hydrological studies to PERMIT CONSTRUCTION OF A CENTER FOR ADULT EDUCATION AND PARKING AREA UNDERGROUND IN POLICE CHANNELS OF THE LEFT BANK OF THE STEP BY ARROYO TRONQUERIAS TORRELAVEGA. DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA REPORTS EXPERT’S REPORT: IMPROVEMENTS IN DRAINAGE, REINFORCEMENT OF ROAD SURFACE AND STABILISATION OF EMBANKMENTS ON THE CA-185, FROM KM 0 TO KM 23.4 SECTION: POTES-FUENTE DE. Date: 2008 URBAN DEVELOPMENT REPORT FOR PLOT 4822003 IN Bº DE RIAÑO IN SANTILLANA DEL MAR. Date: 2008 Beneficiary: SNIACE S.A. REPORT FOR CONSTRUCTION OF A SPORTS HALL / GYM AT THE ZORRILLA SECONDARY SCHOOL. Date: 2008 Beneficiary: INTERSA S.A. COST ESTIMATE FOR WORKS ON A TWO-FAMILY HOME FOR E.P.I. PREDINER S.L. Value: 420,741€ Date: 2008 Beneficiary: E.P.I. PREDINER S.L. EXPERTS’ REPORT FOR IMPLEMENTATION CHECKS FOR THE PROJECT: WATER POWER UTILISATION ON THE RIVER FRÍO, SALTO DE CUCAYO. Date: 2008 Beneficiary: ODEMAN S.L. EXPERT’S REPORT ON THE URBANIZATION OF THE EXTENSION OF C/ SUÁREZ INCLÁN AND C/GARCÍA DE LA CONCHA IN CUDILLERO. Date: 2008 Beneficiary: ODEMAN S.L. DAMAGE EVALUATION REPORT IN QUEVEDA (ALEJANDRINA) Date: 2008 Beneficiary: Alejandrina. TECHNICAL REPORT. VERIFICATION OF COASTAL DEMARCATION DS 12/15 AROUND THE RESIDENTIAL ESTATE “PINARES DE NOJA”. MUNICIPALITY OF NOJA Date: 2008 Beneficiary: RESIDENCIAL PINARES DE NOJA. HYDRAULIC ANALYSIS IN MACORES I AND II, SEVILLE Date: 2007 Beneficiary: URVAMA S.A. ACTIVITY REPORT FOR ZEN BEAUTY PARLOUR, CARTES. Date: 2007 Beneficiary: Patricia Compostizo García. ACCEPTANCE CRITERIA FOR OCCUPANCY IN CABEZÓN DE LIEBANA. Date: 2007 Beneficiary: Uribe Family REPORT ON AMENDED PROJECT FOR NEW CONCHA ESPINA THEATRE. Date: 2005 Beneficiary: Town Hall of Torrelavega. REPORT ON TENSO-DEFORMATIONAL STATE OF HOMES IN HERAS. Date: 2005 Beneficiary: Town Hall of Medio Cudeyo. REPORT ON ENVIRONMENTAL IMPACT OF EXTENSION OF CEMETERY IN VIÉRNOLES. Date: 2004 Beneficiary: Town Hall of Torrelavega. TECHNICAL REPORT AND CALCULATIONS FOR URBAN WASTE WATER PURIFICATION PLANTS. Date: 2004 Beneficiary: Town Hall of Medio Cudeyo. EXPERT’S REPORT FOR ALMACENES LAVÍN. Date: 2007 Beneficiary: ALMACENES LAVÍN S.A. TRAFFIC STUDY FOR THE RESIDENTIAL ESTATE “EL ALIAGAR”. MUNICIPALITY OF ZUERA (ZARAGOZA). Date: 2006 Beneficiary: Campos de Zuera S.L. REPORT ON SEGREGATION OF ESTATE IN BARRIO LA IGLESIA (RUILOBA). Date: 2006 Beneficiary: Arrola Berri S.L. REPORT ON PROCESSING OF WASTE AND BUILDING WORK IN LAS ROCAS RESIDENTIAL ESTATE. Date: 2004 Beneficiary: Arrola Berri S.L. REPORT ON TOXIC, DANGEROUS AND UNSANITARY ACTIVITIES. Date: 2004 Beneficiary: Mario Di Lorenzo. REPORT ON NUISANCE ACTIVITIES IN THE LIENCRES HOTEL. Date: 2004 Beneficiary: Inverliencres S.L. DETACHED BUILDING DEMOLITION DUÁLEZ TM. DE TORRELAVEGA DATE: 2010 PROPERTY: ÁNGELA ELISA SAN MIGUEL CABO Expert report "SALVADOR STREET REDEVELOPMENT ESCANDON" DATE: 2010 CAMP PAPER WORK DATE: 2010 PLOT PAPER NEIGHBORHOOD BOARD FOR POSSIBLE CHANGE VILLASEVIL THE SAME FOR A WELL WELL COMMUNITY ASSET DATE: 2011 BENEFICIARY: JUNTA VECINAL DE VILLASEVIL EXPERT REPORTS. WORK: REGULATORY CAPACITY OF WATER TREATED BY RAFT OF EDARI, SNIACE MUNICIPALITY OF SANTILLANA DEL MAR AND TORRELAVEGA DATE: 2011 BENEFICIARY: SNIACE S.A. PUBLIC SCHOOLS IN KURDISTAN VALUE: 6.736.871,50 € DATE: 2010 BENEFICIARY: INTERNATIONAL DEVELOPMENT CONSTRUCTION IMPLEMENTATION PROJECT SCHOOL OF MUSIC (PART PROJECT FOUNDATION AND STRUCTURE) VALUE: 314.362,08 € DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF MOGUER URBAN DEVELOPMENT AND SPATIAL PLANNING MASTER PLAN URBAN 2008. MASTER PLAN IN Bº DE LA INMOBILIARIA. DATE: 2009 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA. GENERAL URBAN DEVELOPMENT PLAN FOR BEMBIBRE (LEÓN). PHASE: URBAN DEVELOPMENT REPORTING AND PROGRESS (IN COLLABORATION WITH URBYPLAN, S.L.) VALUE: 767,500.36€ DATE: 2001 BENEFICIARY: THE CITY COUNCIL OF BEMBIBRE (LEÓN) SPECIFIC AMENDMENT TO THE MUNICIPAL URBAN DEVELOPMENT STANDARD IN BEMBIBRE (LEÓN) PHASE: FINAL APPROVAL (IN COLLABORATION WITH URBYPLAN, S.L.) VALUE: 767,500.36€ DATE: 2001 BENEFICIARY: THE CITY COUNCIL OF BEMBIBRE (LEÓN) SUBSIDIARY STANDARDS FOR DISTRICT OF RIVER UBIERNA (BURGOS) PHASE: INITIAL APPROVAL (IN COLLABORATION WITH URBYPLAN, S.L.) VALUE: 60,000€ DATE: 2001 BENEFICIARY: DEPARTMENT OF PUBLIC DEVELOPMENT – COUNCIL OF CASTILE AND LEÓN SUBSIDIARY STANDARDS FOR MUNICIPALITIES LOCATED IN THE ARRIBES DEL DUERO NATURAL PARK SALAMANCA: SOBRADILLO, HINOJOSA DE DUERO, SAN FELICES DE LOS GALLEGOS. ZAMORA: VILLARDIEGUA, VILLADEPERA PHASE: URBAN DEVELOPMENT REPORTING AND PROGRESS (IN COLLABORATION WITH URBYPLAN, S.L.) VALUE: 60,000€ DATE: 2001 BENEFICIARY: DEPARTMENT OF PUBLIC DEVELOPMENT – COUNCIL OF CASTILE AND LEÓN GENERAL URBAN DEVELOPMENT PLAN FOR LAMAZÓN (CANTABRIA) PHASE: INITIAL COST ESTIMATE AND BASIC GUIDELINES DATE: 2005 BENEFICIARY: THE CITY COUNCIL OF LAMASÓN (CANTABRIA) GENERAL URBAN DEVELOPMENT PLAN FOR SOLÓRZANO (CANTABRIA) PHASE: INITIAL COST ESTIMATE AND BASIC GUIDELINES DATE: 2005 BENEFICIARY: THE CITY COUNCIL OF SOLÓRZANO (CANTABRIA) AMENDMENT TO SUBSIDIARY STANDARDS Nº 1 TO 4 FOR TOWN HALL OF HAZAS DE CESTO (CANTABRIA) DATE: 2005 - 2006 BENEFICIARY: THE CITY COUNCIL OF HAZAS DE CESTO. TECHNICAL SUPPORT AND ASSESSMENT IN URBAN DEVELOPMENT MATTERS AS MUNICIPAL TECHNICIANS FOR THE FOLLOWING TOWN HALLS: -CASTAÑEDA -HAZAS DE CESTO. GENERAL URBAN DEVELOPMENT PLAN FOR SOBA(CANTABRIA) PHASE: INITIAL APPROVAL DATE: 2006 BENEFICIARY: THE CITY COUNCIL OF SOBA (CANTABRIA). COMPENSATION PROJECT IMPLEMENTATION UNIT 5 IN BERANGO DATE: 2010 BENEFICIARY: COMPENSATION BOARD OF THE EU-5 NNSS THE PLANNING TERMINO MUNICIPAL DE HAZAS DE CESTO PREVIEW OF THE PARK PLAN IN TORRELAVEGA MANUEL BARQUIN DATE: 2010 BENEFICIARY: THE CITY COUNCIL OF TORRELAVEGA SET MAPPING OF THE LAW OF CANTABRIA 2 / 2004, THE COASTAL MANAGEMENT PLAN ON LAND SNIACE RIAÑO NEIGHBORHOOD. TÉRMINO MUNICIPAL DE SANTILLANA DEL MAR. DATE: 2011 BENEFICIARY: THE CITY COUNCIL OF SANTILLANA DEL MAR SPECIFIC AMENDMENT Nº 5 THE P.G. AND P.E. DE SANTILLANA DEL MAR IN THE GROUNDS OF SNIACE, BARRIO DE RIAÑO BENEFICIARY: THE CITY COUNCIL OF SANTILLANA DEL MAR WIND FARMS Pestera WIND / CONSTANTA VALUE: 90.000.000,00€ DATE: 2009-2010 BENEFICIARY: EDP EXECUTION OF ACCESS ROADS TO THE WIND TOWERS NUCARILOR VALEA WIND FARM / TULCEA Value: 34.000.000,00€ DATE: 2010 Beneficiary: ENEL WIND FARM PHASE 1/TULCEA SALBATICA Value: 30.000.000,00€ DATE: 2010 Beneficiary: ENEL EXECUTION OF FOUNDATION EXCAVATION FOUNDATION EXTENDED LEVELING PILES IN OF AND CONCRETE CONCRETE PLACEMENT OF ARMATURE IN FOUNDATION VIROLA PLACEMENT IN FOUNDATION WIND TOWER METALIC FORM WORK IN FOUNDATION AND EXTENDED CONCRETE WIND FARM PHASE 2/TULCEA SALBATICA Value: 110.000.000,00€ DATE: 2011 Beneficiary: ENEL WIND FARM SARICHIOI / TULCEA VALUE: 22.000.000,00€ DATE: 2011 BENEFICIARY: EDP TRANSPORT AND INSTALLATION TOWER HEALTH ANDS SAFETY COORDINATION AND TECHNICAL SUPPORTOADS AND HIGHWAYS MANAGEMENT AND HEALTH AND SAFETY Health and Safety Coordination: “Road surfacing in Juan XXIII, Hermilio Alcalde del Río, Rui Tagle, Conde Torreanaz”. Health and Safety Coordination: “Road repairs in Fernández Vallejo, between Granja Poch and Carretera de la Estación”. Health and Safety Coordination: “Rehabilitation La Barquera”. Health and Safety Coordination: “Ermita de Santa Ana”. Health and Safety Coordination: “Escultor Teodoro Calderón between Torres de Carabaza and Joaquín Cayón.”. Health and Safety Coordination: “Garcia del Olmo (Campoo de Enmedio)”. Health and Safety Plan and Coordination: STRUCTURE FOR GARRET WAREHOUSE IN NUEVA MONTAÑA. Health and Safety Plan and Coordination: REPLACEMENT OF ROOF ON VICENTE TRUEBA SPORTS HALL. Health and Safety Coordination: “PEDESTRIANISATION OF CALLE HERMILIO ALCALDE DEL RIO” Torrelavega-Cantabria. Health and Safety Coordination: “REFURBISHMENT OF MUNICIPAL SLAUGHTERHOUSE” Torrelavega-Cantabria. Health and Safety Coordination: “Painting of façades, Bº Nueva Ciudad – Torrelavega”. Health and Safety Coordination: “CONDITIONING OF RETAIL UNIT FOR COMMUNITY ASSISTANCE AND DISTRICT POLICE”. Health and Safety Coordination: “URBANIZATION OF BULEVAR RONDA INTERSECTION ON AVDA.PALENCIA”. Health and Safety Coordination: “NORTH ACCESS TO NATIONAL LIVESTOCK MARKET”. Health and Safety Coordination: “CYCLE LANE IN VILLAESCUSA” Health and Safety Coordination: “Paseo Garelly and CA-135, Comillas”. Health and Safety Coordination: “Torrelavega Bus Station”. Health and Safety Coordination: “Sierrallana Old People’s Home”. Health and Safety Coordination: Drainage And Water Purification in the Mid-Low Basin of the Miera River, Phase 1 B”. Health and Safety Coordination: “Drainage in Mataleñas”. Health and Safety Coordination: “Remodelling of the N-611 (Calle Jose María Pereda) and N-634 (Avenida de Oviedo) at Torrelavega”. Health and Safety Coordination: “Remodelling of San Francisco municipal football field in Reinosa". Health and Safety Coordination: “Plaza García del Olmo. Campoo de Enmedio”. Health and Safety Coordination: “G.S.W. Civil Works”. Health and Safety Coordination: “New Sewage Network in areas of Bº Pesquero and Castilla-Hermida”. Health and Safety Coordination: “REMODELLING OF THE N-611 (C/REAL) AT MATAMOROSA”. Health and Safety Coordination: “REMODELLING OF THE N-611 AT CAÑEDA. CAMPOO DE ENMEDIO Health and Safety Coordination: “MUNICIPAL LIBRARY IN TORRELAVEGA”. Health and Safety Coordination: “TENNIS COURTS IN TORRELAVEGA”. Health and Safety Coordination: “RESTORATION OF WATER STORE. MEDIO CUDEYO”. Health and Safety Coordination: “GLOBAL STEEL WIRE SLAG STORE”. Health and Safety Coordination: “CONNECTION OF NETWORK IN BAJO MIERA PHASE II”. Health and Safety Coordination: “RECUPERATION PURIFICATION PLANT AREA BY THE BEACH AT MOGRO". AND URBANIZATION OF WATER Health and Safety Coordination: “DRAINAGE AND SUPPLY NETWORK ON THE CA-232 CUDÓN – MIENGO”. AT Health and Safety Coordination: “DRAINAGE NETWORK IN ZURITA DE PIÉLAGOS”. Health and Safety Coordination: MIXED USE BRIDGE IN BARAKALDO-VIZCAYA. Health and Safety Coordination: CONSTRUCTION OF INDUSTRIAL SHIP IN THE POLYGON “EL NEVERO” Health and Safety Coordination: REHABILITATION OF TWO URBAN WALKWAYS IN THE PARK AT THE RIVER EBRO. Health and Safety Coordination: QUARRY CABLE BURIAL UNDER CA-307, FROM ACCESS TO CAMARGO Health and Safety Coordination: INSTALLATION OF WATER PURIFICATION PLANT IN RIAÑO AND WATER SUPPLY IN FRESNEDO Health and Safety Coordination: IMPROVEMENT OF THE REPARATION OF NESTARES's OLD HULL AND CONNECTION TO REINOSA Health and Safety Coordination: NEW DRAIN COLLECTOR AND SUPPLY LINE. MACORES. MUNICIPALITY OF UMBRETE (SEVILLE). Health and Safety Coordination: DRAINAGE NETWORK AND SEWERS IN BARRIO DE LA LASTRA, SOLORZANO. MANAGEMENT AND TECHNICAL SUPPORTOADS AND HIGHWAYS DIRECCIONES DE OBRA Y ASISTENCIAS TÉCNICAS REMODELLING OF THE FORMER N-611 CAÑEDA – CAMPOO DE ENMEDIO. COVERING OF TENNIS COURTS AT LA LECHERA – TORRELAVEGA. PHASE I. “REMODELLING OF THE N-611 (C/REAL) AT MATAMOROSA. DRAINAGE AND SUPPLY SYSTEM FROM BARRIO LA GÁNDARA TO BARRIO LA IGLESIA. DRAINAGE AND SUPPLY NETWORK ON THE CA-232 AT CUDÓN – MIENGO. RECUPERATION AND URBANIZATION OF WATER PURIFICATION PLANT AREA BY THE BEACH AT MOGRO. REMODELLING OF THE ROOF OF THE VICENTE TRUEBA SPORTS HALL. CONDITIONING OF THE ACCESS ROAD to the Beach at Usgo. URBANIZATION OF PLAZA GARCÍA DEL OLMO in Matamorosa. CYCLE LANE ALONG FORMER RAILWAY, VILLAESCUSA. INTEGRAL REHABILITATION OF THE “LA BARQUERA” FOOTBRIDGE IN TORRELAVEGA. REMODELLING OF N-611 (Calle José María Pereda) and N-634 (Avenida de Oviedo) in Torrelavega. 2004 – Basic Price of Call to Tender. REMODELLING OF N-611 (Avenida de Palencia) at Torrelavega. REMODELLING OF “SAN FRANCISCO” MUNICIPAL FOOTBALL FIELD in Reinosa. STRUCTURE FOR GARRET WAREHOUSE IN NUEVA MONTAÑA (PHASE II). CONDITIONING OF MUNICIPAL ACCESS ROUTE TO THE BEACH AT CUCHÍA. CONDITIONING OF MUNICIPAL ROAD FROM MOGRO TO ABRA DEL PAS. CONDITIONING OF THE ACCESS ROAD TO USGO. RESERVOIRS IN MIENGO. RESTORATION OF WATER STORE. MEDIO CUDEYO. DRAINAGE IN SOBREMAZAS. PHASE I. GLOBAL STEEL WIRE SLAG STORE. CONNECTION OF NETWORKS IN BAJO MIERA PHASE II. CONDITIONING OF THE ROUTE FROM BARCENA DE CUDÓN TO MOGRO. DRAINAGE AND SUPPLY NETWORK ON THE CA-232 AT CUDÓN – MIENGO. MARZÁN SCHOOL -CUCHÍA. PARTIAL BURIAL OF INDIVIDUAL MID VOLTAGE LINE AT SOTILLA WATER POWER STATION. BURIAL OF SECTION OF OVERHEAD HIGH VOLTAGE CABLES BETWEEN PUENTE SAN MIGUELFRAGUAS. CONNECTION OF COMMUNITIES TO THE DRAINAGE NETWORK FOR BAJO MIERA/ANAZ AND SAN VÍTORES (PHASE I AND PHASE II). MIXED USE BRIDGE IN BARACALDO-VIZCAYA UNDERGROUND CAR PARK IN PLAZA DE LA CONCORDIA, SANTOÑA TRANSFORMATION CENTRE IN SUANCES. STRUCTURAL REHABILITATION OF ROOF FOR SCHOOLS IN CUDÓN (MIENGO). CONSTRUCTION OF WAREHOUSE ON EL NEVERO INDUSTRIAL ESTATE. WAREHOUSE A AND WAREHOUSE B GANZO-TORRES FOOTBRIDGE MARCO DE EZCARAY REHABILITATION OF TWO URBAN WALKWAYS IN THE PARK AT THE RIVER EBRO. STRUCTURAL REPAIR OF REAR FAÇADE C/ VARGAS 13, SANTANDER. SEWAGE SYSTEM IN SIERRAPANDO, ACCESS ROUTE TO TANOS RESERVOIR. EXTENSION OF SEWAGE SYSTEM ON ACCESS ROUTE TO RESERVOIR IN TANOS. IMPROVEMENTS IN STREET POETA JOSE LUIS HIDALGO BURIAL OF ROAD UNDER THE CA-307. ROAD CONDITIONING IN ANAZ. CONDITIONING OF SPORTS FACILITIES IN VILLASEVIL DE TORANZO. DRAINAGE IN BARREDA. PHASE II. EXTENSION OF DRAINAGE SYSTEM ON THE OLD N-634 AT LA MONTAÑA, TORRELAVEGA. CONNECTION OF NEW RESERVOIRS IN ALTO DEL MILLAJO IN MIENGO AND TO DISTRIBUTION NETWORKS DE CUDÓN-MIENGO-MOGRO-BARCENA DE CUDÓN AND GORNAZO. NEW DRAIN COLLECTOR AND SUPPLY LINE. MACORES. MUNICIPALITY OF UMBRETE (SEVILLE). AMENDMENT Nº2 TO PEDESTRIAN BRIDGE FROM BERANGA-HAZAS DEL CESTO URBANIZATION OF GENERAL ROAD SYSTEM “BULEVAR RADIAL CENTRO” URBANIZATION OF GENERAL ROAD SYSTEM “BULEVAR RADIAL OESTE” DRAINAGE NETWORK AND SEWERS IN BARRIO DE LA LASTRA, SOLORZANO. SQUARE AND URBANIZATION IN SOLARES, RIO LAYA RENOVATION OF THE SUPPLY TO BÁRCENA OF CUDÓN, CUDÓN AND GORNAZO I PROJECT OF EXECUTION OF SCHOOL OF MUSIC OF MOGUER'S MUNICIPALITY (HUELVA) RESTORATION AND URBANIZATION OF SQUARE IN SOLÓRZANO CLOSE TO THE CA-267 RENOVATION OF THE FACILITIES OF PUBLIC SYSTEM OF ILLUMINATION IN BARCENA'S CORES OF CUDON, CUDON, GORNAZO AND MOGRO. ROAD NEIGHBORHOOD COTORNAL - ANAZ (PHASE II), MEDIO CUDEYO. PROJECT FOR THE OBTAINING OF ENERGETIC EFFICIENCY, IMPROVEMENT OF WATER RESOURCES, ACCESSIBILITY AND URBAN MOBILITY IN THE ENVIRONMENT OF THE STREET VALLE CABUÉRNIGA ELIMINATION OF BARREDA'S DOMESTIC SPILLAGES AND OTHER TORRELAVEGA'S DISPERSED POINTS TO THE DRAINAGE SAJA-BESAYA EXTENSION OF THE E.T.A.P. IN SANTA CRUZ DE BEZANA (CANTABRIA). PHASE I COLLECTORS' RENOVATION OF DRAINAGE AND ASSAULTS IN C/JOSE PEDRAJA CONDITIONING SPACE OF INFANTILE GAME AND BOWLING ALLEY, ON THE UNIT OF ACTION PD1, OF THE PLAN DIRECTOR OF “LA INMOBILIARIA” REHABILITATION OF THE CHURCH OF MIENGO IMPROVEMENT OF STRUCTURES IN THE CA-850 TRECEÑO-BRIDGE THE ARRUDO. PLAN: BRIDGE ON THE CREEK ESCUDO AND ON FEVE IN THE P.K.1000 AND EXTENSION OF THE BRIDGE IN THE POPULATION OF LA COCINA. DEMOLITION OF SPORTS FACILITIES AND BUILDING SITUATED IN AVDA. RAMON PUYOL FOR POLYSPORT THE CALVARY ROAD OF CONNECTION PLAZA DEL MONTE-LA FLORIDA-EL SOPLAO. TRAMO: LA FLORIDA-EL SOPLAO UNDERGROUND PARKING AND SPORTS CENTER, BODY FACTORY MANAGEMENT S.L. NETWORK OF SEWER AND REPARATION IN MEDIO CUDEYO EXECUTION OF PLAYPARK IN THE FERRETERA AND PARK GIVES MAJOR IN THE ZAPATÓN ROUTINE MAINTENANCE HANGING NEIGHBORHOOD COVADONGA. GANGPLANK ON THE RIVER BESAYA IN THE CONDITIONING SPACE IN THE EXTERIOR OF THE DOMESTIC MARKET OF CATTLES, TORRELAVEGA CONDITIONING SPACE INSIDE THE DOMESTIC MARKET OF CATTLES, TORRELAVEGA CONSTRUCTION GIVES ROAD IN RIAÑO'S NEIGHBORHOOD TOGETHER WITH E.D.A.R.I. SNIACE SURVEYING SERVICES ICMA PROAKIS S.A.U *NEW STATION ARDANTZA – EIBAR (PAIS VASCO) GENERAL PLAN AND LEVELING OF DEVIATIONS, CONCRETE ROAD AND BALLAST ROAD FROM 01/07/2009 TOL 31/05/2010 * ADEQUACY OF GAUGES FOR THE ELECTRIFICATION OF THE RAILWAY OF FEVE INFIESTO ‐ ARRIONDAS. POSITION, MODIFICATION OF THE PROJECT AND COMPLET TOPOGRAPHY OF THE SITE, FOR THE NEXT KILOMETRICOS POINTS Pk‐374/450 MODIFICATION AND THE GENERAL PLAN OF THE ROUTE FLUSH AND RECONSTRUCTION OF PLATFORM DEFINITION AND GENERAL PLAN OF OVERPASS ON FEVE RAILWAY AT AROBES FROM 09/2009 TO 07/2010 * REMOVAL OF THE PASS FROM THE RENFE LEVELING LINE MADRID‐HENDAYA, PK ‐ 519/830 IN MEZQUIA (ÁLAVA). POSITION, MODIFICATION OF THE PROJECT AND COMPLET TOPOGRAPHY OF THE SITE SITE WICH INCLUDE A STRUCTURE OVERPASS ON ROADS, WITH A LENGTH BY 40 M AND ACCESS ROADS TO PROVINCIAL HIGHWAY WITH A LENGTH BY 2500 METERS. FROM 11/2009 TO 10/2010 SERESCO *OBSERVATION AND CALCULATION OF GEODESIC POINTS FOR THE PHOTOGRAMMETRIC FLIGHT OF THE BURGOS PROVINCIA (CASTILLA Y LEON). TAKING POINTS WITH GPS, AND THEIR CORRESPONDING CALCULATION OF THE RESTITUTION OF THE PHOTOGRAMMETRIC FLIGHT FROM 02/2010 TO 03/2010 * ONSERVATION AND CALCULATION OF GEODESIC POINTS FOR THE PHOTOGRAMMETRIC FLIGHT OF BELMONTE DE MIRANDA (PRINCIPADO DE ASTURIAS). TAKING POINTS WITH GPS, AND THEIR CORRESPONDING CALCULATION OF THE RESTITUTION OF THE PHOTOGRAMMETRIC FLIGHT FROM 05/2010 TO 07/2010 GOVERNMENT OF THE PRINCIPALITY OF ASTURIAS GENERAL DIRECTORATE FOR ORDERING THE LANDS CENTER OF CARTOGRAPHY * OBSERVATION OF SUPPORT PHOTOGRAMMETRIC POINTS USING SPACE GEODESIC TECHNIQUES FOR THE DIGITAL AEROTRIANGULATION IN BLOCK OF 1825 FOTOS WITH GSD 10 CM‐ FROM 08/2009 TO 09/2009 * OBSERVATION OF SUPPORT PHOTOGRAMMETRIC POINTS USING SPACE GEODESIC TECHNIQUES FOR THE AEROTRIANGULATION AND DIGITAL CONTROL IN BLOCK OF IMAGES PNOA 2009 WITH GSD 25 cm. FROM 09/2009 TO 10/2009 UTE COCHERON SAN * CONSTRUCTION OF THE CLEANING AND REPAIR STRUCTURE OF TRAINS AT THE STATION OF SAN FELIZ (LEÓN). GENERAL PLAN DEFINITION AND LEVELING OF ROAD WITH CONCRETED SLAB AND ACCESS ROADS FROM 05/2011 TO 07/2011 JAIME FERNANDEZ S.L. *CONSTRUCTION OF SEWAGE FOR RIOSA RIVER (PRINCIPALITY OF ASTURIAS). GENERAL PLAN DEFINITION AND LEVELING GENERAL COLLECTOR, ADDITIONS, MAIN MANHOLES AND AND THRESHOLDS, AS WELL AS THE SUPLLY OF THE NEW PLANS FROM 07/2010 TO 08/2011 S.A. DE OBRAS Y SERVICIOS COPASA * CONSTRUCTION OF CROSSING POINT OF ROADS IN THE FEVE RAILWAY PRAVIA – GIJON, IN THE STATION OF SANTIAGO DEL MONTE (PRINCIPALITY OF ASTURIAS). DEFINITION OF THE WORK BY MODIFICATIONS TO THE PROJECT, COMPLETE TOPOGRAPHY OF THE SITE, GENERAL PLANS, LEVELING, MEASUREMENTS, ETC., AS WELL AS THE SUPLLY OF THE NEW PLANS FROM 07/2011 TO 12/2011 * WORK OF TOPOGRAPHY IN THE SITE OF MAINTENANCE OF FEVE RAILWAY (Narrow railways) IN ASTURIAS. MESSURMENT, SIGNALS AND CALCULATION OF CURVES FOR BATEO DE IAS, BY MECHANICAL MEANS METRADO, FLECHADO Y CALCULO DE CURVAS PARA BATEO DE IAS, POR MEDIOS MECANICOS. FROM 06/2011 TOL 03/2012 S.A. DE OBRAS Y SERVICIOS COPASA * CONSTRUCTION OF CROSSING POINT OF ROADS IN THE FEVE RAILWAY GIJON – LAVIANA, IN THE STATION OF LA AGUDA (PRINCIPALITY OF ASTURIAS). DEFINITION OF THE WORK BY MODIFICATIONS TO THE PROJECT, COMPLETE TOPOGRAPHY OF THE SITE, GENERAL PLANS, LEVELING, MEASUREMENTS, ETC., AS WELL AS THE SUPLLY OF THE NEW PLANS FROM 08/2011 PRESENTLY UTE UNQUERA‐TUNEL PESUES * RENOVATION OF THE STATION UNQUERA, THE FEVE RAILWAY OVIEDO – SANTANDER (CANTABRIA). DEFINITION OF THE WORK BY MODIFICATIONS TO THE PROJECT, COMPLETE TOPOGRAPHY OF THE SITE, GENERAL PLANS, LEVELING, MEASUREMENTS, ETC., AS WELL AS THE SUPLLY OF THE NEW PLANS FROM 11/2011 PRESENTLY