Drawings - Centre Region Parks and Recreation

Transcription

Drawings - Centre Region Parks and Recreation
DRAWING LIST:
Cover - General Notes
SP-1 - Site Plan
CD-1 - Details
CD-2 - Details
GENERAL NOTES:
1.
Perform PA One-Call prior to any digging.
2.
Contractor shall obtain and pay for any necessary permits from the
Authorities Having Juristiction prior to any construction activities.
3.
Verify layout with Landscape Architect prior to any construction and adjust as
required.
4.
Repair and/or replace bituminous, concrete, lawn, and/or landscape beds
damaged or removed due to construction operations, including adjacent
roads, sites and parking lots.
5.
Determine that the location of underground utilities or features to remain do
not interfere with proposed improvements. Contact Landscape Architect for
alternate locations if required.
6.
Construction notes and typicals may appear only once on drawings, but
apply to all similar conditions where new construction occurs to fulfill the
intent of the drawings.
7.
All questions during the bidding phase should be directed to the Landscape
Architect.
8.
Site plans and other related plan information was not prepared from a
physical and/or topographic survey and should be used only as a reference
to fulfill the design intent include herein. Verification of all site conditions are
the responsibilty of the site contractor.
9.
Perform on-site review to verify existing site conditions. Confirm locations of
on-site utilities prior to start of work.
10. Remove existing features as required to accommodate new construction.
11. Repair and replace maintained site feature damaged during construction to
the pre-construction condition.
12. Adhere to the Pennsylvania Department of Environmental Protection Erosion
and Sedimentation Control Standards for all erosion control measures. All
erosion and sedimentation permits and controls are the responsibility of the
contractor.
13. Disposal of any surplus excavated materials are the responsibility of the
contractor to remove, haul, and dispose of properly.
14. All subsurface conditions are to be considered unclassified. Any necessary
rock removal and associated costs are the responsibility of the contractor.
Blasting is strickly prohibited.
OWNER:
Centre Region Parks and Recreation
Authority
c/o Todd Roth, Aquatics Supervisor
2643 Gateway Drive, #1
State College, PA 16827
ph; (814) 231-3071
fx: (814) 235-7832
PROJECT LOCATION:
Park Forest Community Swimming
Pool
2100 School Drive
State College, PA 16801
LANDSCAPE ARCHITECT:
J. Douglas Wenger, Landscape
Architect
1109 Karen Street
Boalsburg, PA 16827
ph: (814) 360-7272
e: [email protected]
COVER SHEET
Artificial Turf Installation
Park Forest Community Pool, 2100 School Drive, State College, PA 16801
Centre Region Parks and Recreation Authority
Date:
J. Douglas Wenger
Landscape Architect
ISSUED FOR BIDDING
Not for Construction
1109 Karen Street
Boalsburg, PA 16827
ph: (814) 360-7272
e: [email protected]
Revisions:
10 March 2014
Project No:
2014-02-001
Scale:
As Noted
Sheet No:
© 2014 (pending) J. Douglas Wenger, Landscape Architect
Existing
Parking
Area
Existing lawn to be removed
and replaced with synthetic turf
Existing
Lawn
Embankment
Approx.19'-6"
Existing access gate.
Existing
Concrete
Approx.24'-6"
Approx.11'
Existing
Segmented
Retaining
Wall
Meet all
existing
grades
Existing
Splash
Pad
1
CD-2
Meet all
existing
grades
Approx.13'
Existing
Bath House
1
CD-1
Approx.13'6"
Existing lawn
to be removed
and replaced
with
o synthetic turf
Existing
Kiddie
Pool
Approx.13'
Existing
Concrete
Existing natural lawn to be
replaced with syntetic turf
& Contract Limits
Existing
Concrete
SITE PLAN
North
0
10
20
40
Scale: 1" = 20'-0"
Artificial Turf Installation
Park Forest Community Pool, 2100 School Drive, State College, PA 16801
Centre Region Parks and Recreation Authority
Date:
J. Douglas Wenger
Landscape Architect
ISSUED FOR BIDDING
Not for Construction
1109 Karen Street
Boalsburg, PA 16827
ph: (814) 360-7272
e: [email protected]
Revisions:
10 March 2014
Project No:
2014-02-001
Scale:
As Noted
Sheet No:
SP-1
© 2014 (pending) J. Douglas Wenger, Landscape Architect
EXISTING CONCRETE POOL DECK AND BASE
NAIL SOD EDGE TO LEDGER 6" O.C.
WITH APPROVED FASTNER
2" x 6" COMPOSITE LEDGER BOARD SET 1/2"
BELOW SURFACE OF CONCRETE POOL DECK.
SAW KERF TO FORM RADIUS AS NEEDED.
1" SYNTHETIC TURF
1/2" LIMESTONE SCREENING & SAND SETTING BED
2" AASHTO #8
3" OGS
FILTER FABRIC
6" DRAINAGE SUBGRADE
COMPACTED SUBGRADE
3" TAP-CON LEDGER TO CONCRETE
1
CD-1
SYNTHETIC GRASS INSTALL DETAIL AT CONCRETE POOL DECK
NOT TO SCALE
DETAILS
Artificial Turf Installation
Park Forest Community Pool, 2100 School Drive, State College, PA 16801
Centre Region Parks and Recreation Authority
Date:
J. Douglas Wenger
Landscape Architect
ISSUED FOR BIDDING
Not for Construction
1109 Karen Street
Boalsburg, PA 16827
ph: (814) 360-7272
e: [email protected]
Revisions:
10 March 2014
Project No:
2014-02-001
Scale:
As Noted
Sheet No:
CD-1
© 2014 (pending) J. Douglas Wenger, Landscape Architect
EXISTING RETAINING WALL
NAIL SOD EDGE TO LEDGER 6" O.C.
WITH APPROVED FASTNER
2" x 6" COMPOSITE LEDGER BOARD SET 1/2"
BELOW SURFACE OF CONCRETE POOL DECK.
SAW KERF TO FORM RADIUS AS NEEDED.
1" SYNTHETIC TURF
1/2" LIMESTONE SCREENING & SAND SETTING BED
2" AASHTO #8
3" OGS
FILTER FABRIC
6" DRAINAGE SUBGRADE
COMPACTED SUBGRADE
3" TAP-CON LEDGER TO CMU
1
CD-2
SYNTHETIC GRASS INSTALL DETAIL AT RETAINING WALL
NOT TO SCALE
DETAILS
Artificial Turf Installation
Park Forest Community Pool, 2100 School Drive, State College, PA 16801
Centre Region Parks and Recreation Authority
Date:
J. Douglas Wenger
Landscape Architect
ISSUED FOR BIDDING
Not for Construction
1109 Karen Street
Boalsburg, PA 16827
ph: (814) 360-7272
e: [email protected]
Revisions:
10 March 2014
Project No:
2014-02-001
Scale:
As Noted
Sheet No:
CD-2
© 2014 (pending) J. Douglas Wenger, Landscape Architect